Loading...
APPROVED BLD2021-0094+Transportation_Impact_Form+3.15.2021_1.33.17_PM+2092788APPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: _ ��/yJ0/(/,Os /OGy/✓ ,�->� /9%E,5 Owner/Applicant ;;oVe,- xie/1,eVlte 14 e;. Name ,, .,� _/i /4�_ dlic_ Street/Mailing Address k/� 9�Ppl� City State Zip Telephone: !�� //�?,/ Applicant Contact Person: Af, a �ktn ZAWI Name /37 / 21/Oz-h /�- � Street/Mailing Address City State Zip Telephone: 5,,�33— i/ ns—/ Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Telephone: Contact Name E-mail: PROJECT DESCRIPTION a. Location - Street address: �cam, ri.0 /1 ,ef f, W g& SLID (Attach a vicinity map and site plan.) b. Specify existing land use: c. Specify proposed type and size of development: e/ C- # of residential units and/or square footage of building) 6616,10 d. Date construction will begin and be completed: / A e. Define proposed access locations: �2�f:,r s � ?�3k�i Firefox about:blank APPENDIX A Page 2 of 2 f. Define proposed sight distance at site egress locations: .-e 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. CHANGE IN USE V Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. Units in ITE Land Use Category Per Unit square feet, Fee Fee Rate # of dwelling, //►► v , etc. �✓J I New Use �j/3D (.01'tdD _ $3c3% t�.1 X $�a� Prior Usei1 - �% --- $ V ��/•' X -----� - -- . _ $ New Use Fee: S131Z _ Prior Use Fee: S 8'4V 7 S 1 /7, y8/. ❑ NEW DEVELOPMENT ITE Land Use Category Per Unit Fee Rate New Use $ ❑ OTHER Units in square feet, Fee # of dwelling, of , etc. XII = $ .00 (+ TOTAL TRANSPORTATION IMPACT FEE I S City of Edmonds, Engineering Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. 4of11 3/12/2021, 3:30 PM