BLD2022-0694_Bond_Quantity_Worksheet_12-28-2023_APPROVED_ENG_RESUB4_BLD2022-0694+Bond_Quantity_Worksheet+11.13.2023_9.54.58_AM+3895794Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
RESUB
NCITY OF ov 13 2023
L-9 King Count DSBLD2022-0694 DEVELOPMENTERVCES
DEPARTMENT
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600.
206-296-6600 TTY Relay 711
Project Name:
Location:
Pine Park 614
614-616 5th Ave S Edmonds
Clearing greater than or equal to 5,000 board feet of timber?
yes X no
If yes,
Forest Practice Permit Number: N/A
(RCW 76.09)
Page 1 of 9
614 5th Ave S_KC BQ_REV 4
Fill/Grade Performance Bond required
prior to issuance of fill/grade permit.
Subdivision Performance Bond
required prior to recording of plat and
shall replace fill/grade permit bond.
Date: 11 /10/2023
Project No.
Activity No.
BLDG2022-0694 FILUGRADE PERMIT
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
ENGINEERING DIVISION
APPROVED AS NOTED
2/12/2023
FILL/GRADE PERMIT
PERFORMANCE BOND AMOUNT:
$227,249.00
SUBDIVISION
PERFORMANCE BOND AMOUNT:
$470,491.80
INSPECTION FEES:
$12,939.00
FUTURE MAINTENANCE BOND AMOUNT:
$70,574.00
Check out the DDES Web site at www.kinpcountypoy/permits/permits
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 11/10/2023
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
RESUB
Reference #
Unit
Price
Unit
Quantity
# of
Applications
Nov
Cost oEVEL,o
EROSION/SEDIMENT CONTROL
Number
Backfill & compaction -embankment
ESCA
$ 6.00
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 80.00
Each
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 95.00
CY
Ditching
ESC-4
$ 9.00
CY
Excavation -bulk
ESC-5
$ 2.00
CY
Fence, silt
ESC-6
SWDM 5.4.3.1
$ 1.50
LF
685
1
$ 1,027.50
Fence, Temporary (NGPE)
ESC-7
$ 1.50
LF
246
1
$ 369.00
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.80
SY
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 3.50
SY
Mulch, by hand, straw, 3" deep
ESC-10
SWDM 5.4.2.1
$ 2.50
SY
Mulch, by machine, straw, 2" deep
ESCA1
SWDM 5.4.2.1
$ 2.00
SY
Piping, temporary, CPP, 6"
ESC-12
$ 12.00
LF
Piping, temporary, CPP, 8"
ESC-13
$ 14.00
LF
Piping, temporary, CPP, 12"
ESC-14
$ 18.00
LF
Plastic covering, 6mm thick, sandbagged
ESC-15
SWDM 5.4.2.3
$ 4.00
SY
Rip Rap, machine placed; slopes
ESC-16
WSDOT 9-13.1(2)
$ 45.00
CY
Rock Construction Entrance, 50'x15'x1'
ESC-17
SWDM 5.4.4.1
$ 1,800.00
Each
1
1
1800
Rock Construction Entrance, 100'x15'x1'
ESC-18
SWDM 5.4.4.1
$ 3,200.00
Each
Sediment pond riser assembly
ESC-19
SWDM 5.4.5.2
$ 2,200.00
Each
1
1
2200
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 19.00
LF
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$ 70.00
LF
Seeding, by hand
Sodding, 1" deep, level ground
ESC-22
SWDM 5.4.2.4
$ 1.00
SY
ESC-23
SWDM 5.4.2.5
$ 8.00
SY
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 10.00
SY
TESC Supervisor
ESC-25
$ 110.00
HR
40
1
4400
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 140.00
HR
WRITE -IN -ITEMS **** (see gape 91
Inlet Protection
$ 74.00
Each
10
1
740
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
Page 2 of 9
$ 10,536.50
$ 3,160.95
$ 13,697.45
A
132023
FEOMONOS
ENT SERVICES
ARTMENT
Page 9 of 9 Unit prices updated: 03/02/2015
Check out the DDES Web site at www.kinpcounty._poy/permits Version: 03/02/2015
614 5th Ave S_KC BQ_REV 4 Report Date: 11/10/2023
Site Improvement Bond Quantitv Worksheet
Web date: 04/03/2015
o�c%„o
Existing
Right -of -Way
Future Public
Right of Way
& Drainage Facilities
Private Nov 13
Improvements CITY OFE
DEVELOPMEN
DEPART
2023
MONDS
SERVICES
IENT
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
GENERAL ITEMS
No.
Backfill & Compaction- embankment
GI - 1
$ 6.00
CY
Backfill & Compaction- trench
GI-2
$ 9.00
CY
100
$ 900.00
2493
$ 22,437.00
Clear/Remove Brush, by hand
GI - 3
$ 1.00
SY
Clearing/Grubbing/Tree Removal
GI - 4
$ 10,000.00
Acre
Excavation - bulk
GI-5
$ 2.00
CY
Excavation - Trench
GI - 6
$ 5.00
CY
100
$ 500.00
2565
$ 12,825.00
Fencing, cedar, 6' high
GI - 7
$ 20.00
LF
Fencing, chain link, vinyl coated, 6' high
GI - 8
$ 20.00
LF
Fencing, chain link, gate, vinyl coated, 20'
GI - 9
$ 1,400.00
Each
Fencing, split rail, 3' high
GI - 10
$ 15.00
LF
Fill & compact - common barrow
GI - 11
$ 25.00
CY
Fill & compact - gravel base
GI - 12
$ 27.00
CY
Fill & compact - screened topsoil
GI - 13
$ 39.00
CY
Gabion, 12" deep, stone filled mesh
GI - 14
$ 65.00
SY
Gabion, 18" deep, stone filled mesh
GI - 15
$ 90.00
SY
Gabion, 36" deep, stone filled mesh
GI - 16
$ 150.00
SY
Grading, fine, by hand
GI - 17
$ 2.50
SY
Grading, fine, with grader
GI - 18
$ 2.00
SY
487
$ 974.00
301
$ 602.00
Monuments, 3' long
GI - 19
$ 250.00
Each
Sensitive Areas Sign
GI - 20
$ 7.00
Each
Sodding, 1" deep, sloped ground
GI - 21
$ 8.00
SY
Surveying, line & grade
GI - 22
$ 850.00
Day
Surveying, lot location/lines
GI - 23
$ 1,800.00
Acre
Traffic control crew ( 2 flaggers)
GI - 24
$ 120.00
HR
40
$ 4,800.00
Trail, 4" chipped wood
GI - 25
$ 8.00
SY
Trail, 4" crushed cinder
GI - 26
$ 9.00
SY
Trail, 4" top course
GI - 27
$ 12.00
SY
Wall, retaining, concrete
GI - 28
$ 55.00
SF
5
$ 275.00
Wall, rockery
GI - 29
$ 15.00
SF
Page 3 of 9
SUBTOTAL
7,174.00
36,139.00
Page -9 of 9- Unit prices updated: 03/02/2015
Check out the DDES Web site at www.kinpcounty.pov/permits Version: 03/02/2015
614 5th Ave S_KC BQ_REV 4 Report Date: 11/10/2023
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
RESUB
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private Nov 13
Improvements DEVETODEE
DEPART'ENT
2023
MONDS VICES
SERVICES
Unit Price
Unit
Quant. Cost
Quant.T Cost
Quant. I Cost
ROADIMPROVEMENT
No.
AC Grinding, 4' wide machine < 1000sy
RI - 1
$ 30.00
SY
487
$ 14,610.00
AC Grinding, 4' wide machine 1000-2000sy
RI - 2
$ 16.00
SY
AC Grinding, 4' wide machine > 2000sy
RI - 3
$ 10.00
SY
AC Removal/Disposal
RI - 4
1 $ 35.00
SY
410
14,350.00
Barricade, type III ( Permanent)
RI - 6
$ 56.00
LF
Curb & Gutter, rolled
RI - 7
$ 17.00
LF
Curb & Gutter, vertical
RI - 8
$ 12.50
LF
162
$ 2,025.00
Curb and Gutter, demolition and disposal
RI - 9
$ 18.00
LF
162
$ 2,916.00
Curb, extruded asphalt
RI - 10
$ 5.50
LF
Curb, extruded concrete
RI - 11
$ 7.00
LF
Sawcut, asphalt, 3" depth
RI - 12
$ 1.85
LF
216
$ 399.60
Sawcut, concrete, per 1" depth
RI - 13
$ 3.00
LF
Sealant, asphalt
RI - 14
$ 2.00
LF
165
$ 330.00
Shoulder, AC, ( see AC road unit price)
RI - 15
$ -
SY
Shoulder, gravel, 4" thick
RI - 16
$ 15.00
SY
Sidewalk, 4" thick
RI - 17
$ 38.00
SY
129
$ 4,902.00
33
$ 1,254.00
Sidewalk, 4" thick, demolition and disposal
RI - 18
$ 32.00
SY
129
$ 4,128.00
Sidewalk, 5" thick
RI - 19
$ 41.00
SY
Sidewalk, 5" thick, demolition and disposal
RI - 20
$ 40.00
SY
Sign, handicap
RI - 21
$ 85.00
Each
Striping, per stall
RI - 22
$ 7.00
Each
4
$ 28.00
12
84.00
Striping, thermoplastic, ( for crosswalk)
RI - 23
$ 3.00
SF
Striping, 4" reflectorized line
RI - 24
$ 0.50
LF
Page 4 of 9
SUBTOTAL
43,688.60
1,338.00
Page -9 of 9— Unit prices updated: 03/02/2015
Check out the DDES Web site at www.kinpcounty.pov/permits Version: 03/02/2015
614 5th Ave S_KC BQ_REV 4 Report Date: 11/10/2023
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
RESUB
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private Nov 13
Improvements DEVE�OPMEN
DEPART
2023
SEERVCES
ENT
Unit Price
Unit
Quant.
Cost
Quant. Cost
Quant. Cost
ROAD SURFACING
No.
(4" Rock = 2.5 base & 1.5" top course) 9 1/2" Rock= 8" base & 1.5" top course)
Additional 2.5" Crushed Surfacing
RS - 1
$ 3.60
SY
HMA 1/2" Overlay, 1.5"
RS - 2
$ 14.00
SY
$ -
$ -
HMA 1/2" Overlay 2"
RS - 3
$ 18.00
SY
379
6,822.00
69
1,242.00
HMA Road, 2", 4" rock, First 2500 SY
RS - 4
$ 28.00
SY
939
$ 26,292.00
HMA Road, 2", 4" rock, Qty. over 2500 SY
RS - 5
$ 21.00
SY
HMA Road, 3", 9 1/2" Rock, First 2500 SY
RS - 6
$ 42.00
SY
$ -
232
$ 9,744.00
HMA Road, 3", 9 1/2" Rock, Qty Over 2500 S
RS - 7
$ 35.00
SY
Not Used
RS - 8
Not Used
RS - 9
HMA Road, 6" Depth, First 2500 SY
RS - 10
$ 33.10
SY
52
1,721.20
HMA Road, 6" Depth, Qty. Over 2500 SY
RS - 11
$ 30.00
SY
HMA 3/4" or 1", 4" Depth
RS - 12
$ 20.00
SY
Gravel Road, 4" rock, First 2500 SY
RS - 13
$ 15.00
SY
Gravel Road, 4" rock, Qty. over 2500 SY
RS - 14
$ 10.00
SY
PCC Road (Add Under Write -Ins w/Design)
RS - 15
Thickened Edge
RS - 17
$ 8.60
LF
Page 5 of 9
SUBTOTAL
8,543.20
37,278.00
Page -9 of 9— Unit prices updated: 03/02/2015
Check out the DDES Web site at www.kinpcounty.pov/permits Version: 03/02/2015
614 5th Ave S_KC BQ_REV 4 Report Date: 11/10/2023
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
RESUB
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private Nov 13
CITY OF El
Improvements DEVEp PART
2023
MONDS
SERVICES
ET
Unit Price
Unit
Quant. Cost
Quant. F Cost
Quant. Cost
DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as s
Access Road, R/D
D - 1
$ 21.001
SY
Bollards - fixed
D - 2
$ 240.74
Each
Bollards - removable
D - 3
$ 452.34
Each
* (CBs include frame and lid)
CB Type I
D - 4
$ 1,500.00
Each
6
$ 9,000.00
CB Type IL
D - 5
$ 1,750.00
Each
CB Type II, 48" diameter
D - 6
$ 2,300.00
Each
for additional depth over 4'
D - 7
$ 480.00
FT
CB Type II, 54" diameter
D - 8
$ 2,500.00
Each
for additional depth over 4'
D - 9
$ 495.00
FT
CB Type II, 60" diameter
D - 10
$ 2,800.00
Each
for additional depth over 4'
D - 11
$ 600.00
FT
CB Type II, 72" diameter
D - 12
$ 3,600.00
Each
for additional depth over 4'
D - 13
$ 850.00
FT
Through -curb Inlet Framework (Add)
D - 14
$ 400.00
Each
Cleanout, PVC, 4"
D - 15
$ 150.00
Each
8
$ 1,200.00
Cleanout, PVC, 6"
D - 16
$ 170.00
Each
8
$ 1,360.00
Cleanout, PVC, 8"
D - 17
$ 200.00
Each
Culvert, PVC, 4"
D - 18
$ 10.00
LF
864
$ 8,640.00
Culvert, PVC, 6"
D - 19
$ 13.00
LF
1098
$ 14,274.00
Culvert, PVC, 8"
D - 20
$ 15.00
LF
15
$ 225.00
Culvert, PVC, 12"
D - 21
$ 23.00
LF
Culvert, CMP, 8"
D - 22
$ 19.00
LF
Culvert, CMP, 12"
D - 23
$ 29.00
LF
Culvert, CMP, 15"
D - 24
$ 35.00
LF
Culvert, CMP, 18"
D - 25
$ 41.00
LF
Culvert, CMP, 24"
D - 26
$ 56.00
LF
Culvert, CMP, 30"
D - 27
$ 78.00
LF
Culvert, CMP, 36"
D - 28
$ 130.00
LF
Culvert, CMP, 48"
D - 29
$ 190.00
LF
Culvert, CMP, 60"
D - 30
$ 270.00
LF
Culvert, CMP, 72"
D - 31
1 $ 350.00
LF
Page 6 of 9
SUBTOTAL
34.699 UU
614 5th Ave S_KC BQ_REV 4
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
RESUB
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private Nov 13
CITY OF El
Improvements DEVEp PART
2023
MONDS
SERVICES
ET
No.
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
Culvert, Concrete, 8"
D - 32
$ 25.00
LF
Culvert, Concrete, 12"
D - 33
$ 36.00
LF
Culvert, Concrete, 15"
D - 34
$ 42.00
LF
Culvert, Concrete, 18"
D - 35
$ 48.00
LF
Culvert, Concrete, 24"
D - 36
$ 78.00
LF
Culvert, Concrete, 30"
D - 37
$ 125.00
LF
Culvert, Concrete, 36"
D - 38
$ 150.00
LF
Culvert, Concrete, 42"
D - 39
$ 175.00
LF
Culvert, Concrete, 48"
D - 40
$ 205.00
LF
Culvert, CPP, 6"
D - 41
$ 14.00
LF
Culvert, CPP, 8"
D - 42
$ 16.00
LF
Culvert, CPP, 12"
D - 43
$ 24.00
LF
Culvert, CPP, 15"
D - 44
$ 35.00
LF
Culvert, CPP, 18"
D - 45
$ 41.00
LF
Culvert, CPP, 24"
D - 46
$ 56.00
LF
Culvert, CPP, 30"
D - 47
$ 78.00
LF
Culvert, CPP, 36"
D - 48
$ 130.00
LF
Ditching
D - 49
$ 9.50
CY
Flow Dispersal Trench (1,436 base+)
D - 50
$ 28.00
LF
French Drain (3' depth)
D - 51
$ 26.00
LF
Geotextile, laid in trench, polypropylene
D - 52
$ 3.00
SY
Mid -tank Access Riser, 48" dia, 6' deep
D - 54
$ 2,000.00
Each
Pond Overflow Spillway
D - 55
$ 16.00
SY
Restrictor/Oil Separator, 12"
D - 56
$ 1,150.00
Each
1
1150
Restrictor/Oil Separator, 15"
D - 57
$ 1,350.00
Each
Restrictor/Oil Separator, 18"
D - 58
$ 1,700.00
Each
Riprap, placed
D - 59
$ 42.00
CY
Tank End Reducer (36" diameter)
D - 60
$ 1,200.00
Each
Trash Rack, 12'
D - 61
$ 350.00
Each
Trash Rack, 15"
D - 62
$ 410.00
Each
Trash Rack, 18"
D - 63
$ 480.00
Each
Trash Rack, 21"
D - 64
$ 550.00
Each
Page 7 of 9 SUBTOTAL
1150
Page of 9— Unit prices updated: 03/02/2015
Check out the DDES Web site at www.kinpcounty.pov/permits Version: 03/02/2015
614 5th Ave S_KC BQ_REV 4 Report Date: 11/10/2023
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
RESUB
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private Nov 13
CITY OF El
Improvements DEVEp PART
2023
MONDS
SERVICES
ET
Unit Price
Unit
Quant. Price
Quant F Cost
Quant. Cost
PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders
No.
2" AC, 2" top course rock & 4" borrow
PL - 1
$ 21.00
SY
NA
NA
2" AC, 1.5" top course & 2.5" base course
PL - 2
$ 28.00
SY
NA
NA
4" select borrow
PL - 3
$ 5.00
SY
NA
NA
1.5" top course rock & 2.5" base course
PL - 4
$ 14.00
SY
NA
NA
UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Estimate
Utility Pole(s) Relocation
UP-1
Lump Sum
Street Light Poles w/Luminaires
UP-2
$ 7,500.00 Each
WRITE -IN -ITEMS
(Such as detention/water quality vaults.)
No.
Stormwater Vault
WI-1
$ 380,000.00
Each
Block Wall
WI - 2
$ 16.00
SY
BioPod Biofilter System
WI - 3
$ 15,000.00
Each
2
30,000.00
Remove OHP, Install UGP
WI-4
$ 5,000.00
LS
1
$ 5,000.00
1
$ 5,000.00
New 1" Water Service/Meter/Connection
WI-5
$ 1,500.00
LS
14
$ 21,000.00
6" Concrete Driveway
WI-6
$ 65.00
SY
30
$ 1,950.00
14
$ 910.00
Trench Drain
WI - 7
$ 500.00
LS
2
$ 1,000.00
Stormwater Infiltration Trench
W 1 - 8
$ 2,000.00
LS
2
$ 4,000.00
Water Service Lines
WI - 9
$ 300.00
Each
14
$ 4,200.00
1" Water Meter & Service Tap
WI - 10
$ 2,970.00
Each
14
$ 41,580.00
Sanitary Sewer Cleanout, PVC, 6"
W 1 - 11
$ 170.00
Each
4
$ 680.00
Sanitary Sewer PVC, 6"
W 1 - 12
$ 13.00
LF
287
$ 3,731.00
Street Tree Grate
W I - 13
$ 500.00
Each
4
$ 2,000.00
SUBTOTAL
SUBTOTAL (SUM ALL PAGES):
30%CONTINGENCY & MOBILIZATION:
GRANDTOTAL:
COLUMN:
B
27,950.00
87,355.80
26,206.74
113,562.54
47,780.00
47,780.00
14,334.00
62,114.00
C
D
45,321.00
155,925.00
46,777.50
202,702.50
Page 8 of 9
Site Improvement Bond Quantity Worksheet
Original bond computations prepared by:
Name:
PE Registration Number:
Firm Name:
Address:
Stabilization/Erosion Sediment Control (ESC)
Existing Right -of -Way Improvements
Future Public Right of Way & Drainage Facilities
Private Improvements
Calculated Quantity Completed
Pine Park 614
614-616 5th Ave S Edmonds
(First $7,500 of bond* shall be cash.)
Perf,..,,apc-,An )Ad* o..49WAt I (A+B+C+D) = TOTAL
Maintenance/Defect Bond* Total
in_uax•»�a:�Y•�►��:�aw�l►�e>t:i•�.L�:�ani.>tr�•�i.F
Date:
Tel. #:
Project No
Web date: 04/03/2015
RESUB
Nov 13 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
11 / 10/202 SPARTMENT
BLDG2022-0694
FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND* MINIMUM BOND* AMOUNT PUBLIC ROAD & DRAINAGE
AMOUNT REQUIRED FOR RECORDING OR MAINTENANCE/DEFECT BOND*
TEMPORARY OCCUPANCY AT
13,697.5 SUBSTANTIAL COMPLETION ***
113.562.5 = $189, 374.00
Minimum is $2000.
62,114.0
FS
FILL/GRADE PERMIT
PERFORMANCE BOND AMOUNT:
$189,374 x 120% = $227,249.00
SUBDIVISION
PERFORMANCE BOND AMOUNT:
$392,076.50 x 120% = $470,491.80
INSPECTION FEES:
$392,076.50 x 3.3% = $12,939.00
FUTURE MAINTENANCE BOND AMOUNT:
$470,491.80 x 15% = $70,574.00
* NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County.
** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
*** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY
Page 9 of 9 Unit prices updated: 03/02/2015
Check out the DDES Web site at www.kinpcounty._poy/permits Version: 03/02/2015
614 5th Ave S_KC BQ_REV 4 Report Date: 11/10/2023