Loading...
1172619_Transportation_Impact_Form_07-13-2022_11_07_40_Pine Park 614 A1 Traffic Impact FormAPPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet .'C. i 1 -, PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: PINE PARK 614 (Owner)Applicant BK INVESTMENT GROUP, LLC Name 557 ROY STREET #125 Street/Mailing Address SEATTLE, WA 98109 City State Zip Telephone: 206.673.4543 Applicant Contact Person: JACOB YOUNG Name 10 DRAVUS STREET Street/Mailing Address SEATTLE, WA 98109 City State Zip Telephone: 206.535.7908 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): N/A N/A Firm Name Telephone: 1. PROJECT DESCRIPTION a. Location - Street address: 614-616 5TH AVENUE S Contact Name E-mail: (Attach a vicinity map and site plan.) b. Specify existing land Use: N/A. CREDIT FOR EXISTING USE CREDITED TO BUILDING C [BLD 2022-0412]. c. Specify proposed type and size of development: 1 LIVE/WORK TOWNHOUSE CONTAINING 1 DWELLING UNIT AND 500 SF COMMERCIAL AREA. (# Of residential Units and✓or square footage Of building) d. Date construction will begin and be completed: SUMMER 2022 -SUMMER 2023 e. Define proposed access locations: ALL ACCESS FROM EXISTING PRIVATE ALLEY SOUTH OF SITE APPENDIX A Page 2 of 2 f Define proposed sight distance at site egress locations: APPROX. 15 FT (UNOBSTRUCTED) IS PROVIDED AT THE EXISTING PRIVATE ALLEY'S INTERSECTION WITH 5TH AVENUE S. THIS IS PROPOSED TO REMAIN. 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. 0 CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. ITE Land Use Category I Per Unit Fee Rate TOWNHOUSE (SIM. TO 210) 6249.14 New Use GENERAL OFFICE (710) $ 10.89 X Prior Use $ X Units in square feet, # of dwelling, vfb. etc. Fee New Use Fee: $ 11,694.14 - Prior Use Fee: $ 0 = $11,694.141 ❑ NEW DEVELOPMENT Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X ❑ OTHER MITIGATION FEE RECOMMENDATION: INDEPENDENT FEE CALCULATION: $240.00 + consultant fee $ TOTAL TRANSPORTATION IMPACT FEE $ City of Edmonds, Engineering Division Approval Date 1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.