Loading...
BLD2023-0623+Blower door test+4.10.2024_1.12.23_PM+4188439Property address: 1cj�_ ` I�t1nP� � rC l.C-�YY1L�Y1L�— --- Builder/registered design professional name: �Vl �., V e Y Buildcrlreg. design pro. signature: I (per Conditioned floor area:fill (p building permit) LJ ermit) R-Values R303.1.1 Ceiling/ Vaulted R-_.._ _ Floors: Over unconditioned space R- Attic. Attic R-�7 Slabon-grade floor R-...— Walls: Above grade R. Z Fully insulated slab? YiN (Circle one) Doors: R- R- R- Below, int. R- --' `— - -- Below, ext. R- U-V_alue of Windows, Skylights and Doors (R303.1.1.3) Average area weighted U-value from Glazing Worksheet Average U- Fuel Normalization {Tables R406.and Energy Credits (Table R406.3 System Type Number (1 to S) _ (Select one) i Energy Credits selected (1 to 7) Fuel Normalization Credit + Total Energy Credits = Total Credits —� _ _ _ Heating, Cooling and Domestic Hot Water System _ Type (Manufacturer and Model Number) Efficiency } Hooting Cooling DHW -- — -- --- grain water treat recovery — -- --. _ Onsite Renewable Energy Electric Power System_ _ System type — System design capacity k1N Rated annual generation —_—_ _ kWhlyr _ Appliances Energy Star? Manufacturer on_d_ Model (Cycle on Dish washer Y or N Refrigerator _ —Y or N Washer .—Yor N Dryer — — Y or N Vcnt¢d or unvenred? If vented, GEF ra:m Gas fireplace / heating stove (Section R402.4.2) Fireplace efficiency (FE) Heating or Decorative? (Circle one) HVAC System Duct Leakage Testing (R403.3) Circleonc All ductwork and air handler in conditioned space? (See Option 4.2) Y or N ,All ductwork in unconditioned spaces buried and tested at 3% total leakage, and air Y or;,! ,handler in conditioned space? (See Option 4.1.) ,All ductwork & handler air outside conditioned space insulated to minimum R-8? Y or Air handler present at duct leakage test? (Total leakage 4% if yes, 3% If no) Y or "I HVAC leakage to outside test conducted at final? Y or i'•i IDo HVAC duct leakage tests include GPS and time stamp verification? _ Y or HVAC system !eakage test calculated design target: _ CFM @ 25 HVAC system leakage test measured results: CFM @ 25= Ij— Building Leakage Testing (R402.4.1.2) ,Dwelling unit leakage test calculated design target: ACH @ SO. -- Dwelling unit leakage test, measured results: t G ACH @ 50 -_- Whole Building Leakage test (R2 non -corridor only) design target: CFM/sf @ 5G =a. Whole Building Leakage test (112 non -corridor only) measured: CFM/sf @ SG ? :Do building leakage tests include GPS and time stamp verification? Y or i-!_ Whole House Ventilation System Measured Flow Rates (Pd1505.41RC-WA) Cir,- cle.:. ,Are the system controls correctly labeled? Y C. i•! jThe Whole House Ventilation (WHV) system operation and maintenance (0&!U1) Y or r: linstructions were provided to the building owner? (Provided to: - - -- _ on ------ - --- Whole House Ventilation System Type: (Circle one) (1) Whole house exhaust fan, location (2) Balanced HRV/ ERV, location For R2 low-rise, serves more than nnc unit? (3) Supply or HRV WHV integral to the air handler. Describe system control sequence of operations or reference to design submittal: Specify run-time: hours per day _ CFM, WHV calculated design minimum flow rate per plan submittal: WHV measured min flow rate at commissioning: Exhaust CFM, Supply CFM 4Do WHV flow tests include GPS & time stamp verification? Y 0. ;e HRV/ERV sensible heat recovery efficiency: 'Commissioning Notes: Other Mandatory Requirements circle one All other mandatory requirements of WSEC-R have been met? Y cr N B D1. INSTALLED Building Products Residential Building Air Leakage Test (Blower Door 'hest) Results Permit #: House address or lot numi er. City, Ivic)nd Cored. Floor Area (fe): q 2 2 Z Zip: c}) LO -- Age at l?ause: ,wa)U caiA - Source (circle one): PTans astirnated Measured Results shall be ra orted as Air Changes per Hour at 50 ;pascals (ACHsa) and shall be ealouiated as follovj, ACHso y (CI=M50 X 60)f Volume Where: _ GFM5o = Blower door fan flow at 60 pascal pressure difference Volume = Conditioned Floor Area of the housing unit X ceiling freight Slower Door Test Resulf� ACH50 I S 2C? M�5Q#'a —'c c' q2 2. 2 X I 1 , 14(6414 z Ring (circle one if applicable): Open OA Blower Door Farr Location: Cab f c%W. C� �' V9Jeather Conditions: r city t I Certify that these blower door results are accurate and determined using standard irtdu�s- 3 Company Name: �C�C,k C i L, ckf ATIZ L LD J_,..__.— Technician: �'Ict i in TactInician Signature: Date: C, t , c LL Phone Number. _ 2015Wlashington State Energy Code raferaHeef 11402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate, of not exceeding 5 air changes per hour. Testing shale be conducted with a blower door at a pressure of 0.2 inches Ew.g. (s0 Pascals), Whare required by the code ojft%lal, testing snail be canducted by an appraued third party. A written rennY� of tbe. reses3is of rJte lest shall bet slaned a gargy SgndukW# fett 'gnA i3taved shall be performed at any time s&r creadan of all penetrations of the building thermal envelope, once, visual inspection has confrmd sealing (see Table R402.4.1.1), operable windows and doors manufactured by small bz,qne shall be pramitttrd to be sealed off at the. frame prior w the test, PACIFIC PARTNERS INSULATION SOUTH, A SDI COMPANY, LI.C. 5207187TH STREET E SULDING A, TACOMA, WA 98445 a P (253) 292 2315 • F (253) 341-Q94 W WW.PACfFICPARTN ERSINSUiATIONSOUTH.COM