Loading...
APPROVED ENG BLD2023-1219+Transportation_Impact_Form+9.28.2023_4.07.35_PM+3811291APPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet ")C. I gq" PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: 654 4th Ave S SFR ��. Owner/Applicant OQ�� Jay Fulton and Merri Fulto _ 2 Name 32 � � �1 8630 112th Lane NE �G Street/Mailing Address Kirkland WA 98033 Applicant Contact Person: Same as Owner/Applicant Name Street/Mailing Address City State Zip City Telephone: (425) 827-4470 Telephone: Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): RAM Engineering, Inc. Rob Long, PE Firm Name Contact Name Telephone: (425) 678-6960 1. PROJECT DESCRIPTION a. Location - Street address: 654 4th Ave S State Zip E-mail: RobL@RAMengineeringlnc.com (Attach a vicinity map and site plan.) b. Specify existing land use: Single Family Residential c. Specify proposed type and size of development: One Single Family Residential (# of residential units and/or square footage of building) d. Date construction will begin and be completed: Start May 2024 / End May 2025 e. Define proposed access locations: Access off alley that connects to Erben Dr. APPENDIX A Page 2 of 2 f Define proposed sight distance at site egress locations: Garage acess off alley, adequate access sight distance. 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. ® CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. ITE Land Use Category New Use I SFR, ITE 210 Prior Use I SFR, ITE 210 Per Unit Fee Rate $ 6,249.14 I X $ 6,249.14 I X Units in square feet, Fee # of dwelling, vfp, etc. 1 = $ 6,249.' 1 = $ 6,249.' New Use Fee: $ 6,249.14 - Prior Use Fee: $ 6,249.14 = $ 0 i ❑ NEW DEVELOPMENT Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X ❑ OTHER MITIGATION FEE RECOMMENDATION: INDEPENDENT FEE CALCULATION: $240.00 + consultant fee $ ENGINEERING DIVISION APPROVED AS NOTED TOTAL TRANSPORTATION IMPACT FEE $ tV4af4,-&1t 12/08/2023 City of Edmonds, Engineering Division Approval Date 1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.