APPROVED STM RESUB1 BLD2023-1219+STORMWATER REPORT+1.25.2024_4.14.15_PM+4021251RESUB BLD2023-1219 Jan 29 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 654 411 Ave S Single Family Residence 654 411 Ave S Edmonds, WA 98020 BLD 2023-1219 Stormwater Site Plan Report Prepared for: Jay and Merri Fulton Date: September 13, 2023 Revised: January 24, 2024 1/24-/2022 Prepared by: Rob Long, PE RAM Fnginininring, Inr, 19109 3611 Ave W, Suite 103, Lynnwood WA 98036 (425) 678-6960 RAMengineeringinc.com COMPLIES WITH APPLICABLE CITY STORMWATER CODE 03/21 /2024 Job No. 23-005 654 411 Ave S Single Family Residence Introduction: This summary report provides site design information for a single-family residence at 654 4t" Ave S. This report includes stormwater analysis to support permit review and approval. The property is located on the west side of 41" Ave S in the Northeast 1/4 of the Northeast 1/4 of Section 26, Township 27N, Range 3E, W.M. Site Address: Applicant: 654 4t" Ave S Jay Fulton and Merri Keefer Edmonds, WA 98020 8630 112th Lane NE Kirkland, WA 98033 Tax Parcel Number: 004009600101100 TABLE OF CONTENTS SECTION PAGES A. Project Overview.............................................................................................................................. 5 B. Existing Conditions Summary........................................................................................................... 1 C. Developed Site Hydrology................................................................................................................ 4 D. Soils Reports................................................................................................................................... 20 E. Construction SWPPPP Requirements................................................................................................ 2 F. Operation and Maintenance Guidelines............................................................................................ 5 R.4MEngineering, Inc. RAM No. 23-005 654 4th Ave S SFR Stormwater Site Plan Report Page A. PROJECT OVERVIEW: This report provides engineering information for the proposed construction of a single family residence on a 0.19 acre parcel; the project is located on the northwest corner of 41h Ave S and Erben Dr in the City of Edmonds. The applicants, Jay and Merri Fulton propose to remove the existing residence and all existing hard surface to construct a new single family residence with an attached garage and partially covered deck on the subject site. This report provides the evaluation for the new single family residential development. Summary of Minimum Requirements for Category 1 Project: Minimum Requirement #1 — Preparation of Stormwater Site Plan. The proposed site development consists of disturbing the entire 0.19 acres site with the removal of all existing improvements onsite. The project will create/replace about 3,874 sf of hard surface area; thus, the project is classified as a Category 1 project per the City's classification system. Per ECDC 18.30, Category 1 projects must comply with Minimum Requirements No. 1 through No. 5. The civil site development plans and this report have been prepared to address the projects impacts. Minimum Requirement #2 — Construction Stormwater Pollution Prevention (SWPPP). A construction Stormwater Pollution Prevention Plan (SWPPP) has been incorporated into the site development plans. A summary of the site's erosion control measures that evaluates the typical 13 elements of a SWPPP are included in section E. The total site disturbance area (0.19 ac) of the project will not exceed one acre, thus a formal Notice of Intent application for NPDES coverage will not be made to the Department of Ecology. Minimum Requirement #3 —Source Control of Pollution. Specific source controls are not required for single family residential sites. General requirements for these sites include preventing the discharge of pollutants to the City's storm drainage system per Edmonds City Code Chapter 7.200 (Illicit Discharges). This includes common household items such as pesticides, herbicides, fertilizers, detergents and fluids from vehicle maintenance. Single family residences shall incorporate DOE's S411 BMPs for landscape and lawn vegetation management. Lawn and vegetation management can include control of objectionable weeds, insects, mold, bacteria, and other pests with pesticides. Examples include weed control on golf course lawns, access roads, and utility corridors and during landscaping; sap stain and insect control on lumber and logs; rooftop moss removal; killing nuisance rodents; fungicide application to patio decks, and residential lawn/plant care. It is possible to release toxic pesticides such as pentachlorophenol, carbamates, and organometallics to the environment by leaching and dripping from treated parts, container leaks, product misuse, and outside storage of pesticide contaminated materials and equipment. Poor management of the vegetation and poor application of pesticides or fertilizers can cause appreciable stormwater contamination. RAMEngineering, Inc. RAM No. 23-005 654 41" Ave S SFR Stormwater Site Plan Report Page A-1 Minimum Requirement #4 —Preservation of Natural Drainage Systems and Outfalls. The natural flow path and outfall of the site has been significantly altered by the historic urban development. The site generally slopes in a northwesterly direction; runoff flows across the adjacent alley and private property towards 3rd Ave S. The curb and gutter system along the east side of 3rd Ave S collects and conveys runoff in a northerly direction to a catch basin at the southeast corner of the intersection of 3rd Ave S and Howell Way about 660 feet from the site. Stormwater collected in the City of Edmonds municipal separate storm sewer systems (MS4) pipe system continues north and then discharges to Shellabarger creek about 200 feet north of 3rd Ave S and Howell Way (900 feet from the site). Due to the fact there is no formal collection and conveyance system in the alley west of the site; the project will discharge the site stormwater runoff to the pipe and catch basin MS4 within 4th Ave S along the easterly boundary of the site. The stormwater system in 4th Ave S flows north to Howell Way and then is directed west to 3rd Ave S merging with the existing site flow path about 860 ft via the 4th Ave S route. Due to the fact the existing and developed flow paths mere within a % mile; the developed downstream path is within the same threshold discharge area. Additional discussion and maps of the downstream path are included in Section C below. Minimum Requirement #5 — Onsite Stormwater Management. The proposed project is a category 1 project, thus is subject to the City's on -site stormwater management BMPs found in "List No. 1" in the City's code. A site -specific geotechnical evaluation of the site's soil demonstrates that infiltration is a not a viable option for stormwater management onsite. The project geotechnical evaluation recommends infiltration not be used due to low infiltration rates encountered on site. Additionally, adequate flow length paths are not available for any dispersion type BMP. Only post construction soil amendment and BMP detention pipe are proposed for onsite stormwater BMP. A summary table of the project Stormwater Management BMPs are provided below. RAMEngineering, Inc. RAM No. 23-005 654 41" Ave S SFR Stormwater Site Plan Report Page A-2 MR#5 Stormwater Management BMP List No. 1 Evaluation Lawn and landscaped areas: BMP Viable Limitations / Infeasibility Criteria BMP T5.13: Post -Construction Soil Quality and Depth Yes BMP T5.13 shall be applied to the site post construction. (Volume V, Chapter 11) Roofs: BMP T5.30: Full Dispersion Infeasibility: A viable vegetated flow path 50 or 100 feet and (Volume V, Chapter 3) No less than 20% is not achievable onsite. BMP T5.10A: Downspout Full Infiltration Systems Infeasibility: The project geotechnical evaluation recommends (Volume V, Chapter 4) No infiltration not be used due to Hard Pan (type C) Soils BMP T5.14 Rain Gardens (Volume V, Chapter 11) or Infeasibility: The project geotechnical evaluation recommends BMP T7.30: Bioretention No infiltration not be used due to Hard Pan (type C) soils (Volume V, Chapter 7) BMP T5.1013: Downspout Dispersion Systems Infeasibility: A viable vegetated flow path 50 or 100 feet and (Volume V, Chapter 4) No less than 20% is not achievable onsite. Detention Vaults or Pipes A detention vault/pipe is viable and proposed to meet (Edmonds Stormwater Addendum) Yes Minimum Requirement No. 5. Infeasibility: The project geotechnical evaluation recommends BMP T5.10C: Perforated Stub -out infiltration not be used due to reasonable concerns about (Volume V, Chapter 4) No erosion and slope failure of nearby slopes. Existing slopes about 75 feet west of the subject site have been classified as "erosion hazard" slopes. Other Hard Surfaces: BMP T5.30: Full Dispersion Infeasibility: A viable vegetated flow path 50 or 100 feet and (Volume V, Chapter 3) No less than 20% is not achievable onsite. BMP T5.10A: Full Infiltration (Volume V, Chapter 4) Infeasibility: The project geotechnical evaluation recommends BMP T5.15: Permeable Pavement No infiltration not be used due to Hard Pan (type C) soils (Volume V, Chapter 5) BMP T5.14 Rain Gardens (Volume V, Chapter 11) or Infeasibility: The project geotechnical evaluation recommends BMP T7.30: Bioretention No infiltration not be used due to Hard Pan (type C) soils (Volume V, Chapter 7) BMP T5.12: Sheet Flow Dispersion Infeasibility: A viable vegetated flow path 50 or 100 feet and (Volume V, Chapter 3) No less than 20% is not achievable onsite. Detention Vaults or Pipes A detention vault/pipe is viable and proposed to meet (Edmonds Stormwater Addendum) Yes Minimum Requirement No. 5. RAMEngineering, Inc. RAM No. 23-005 654 41" Ave S SFR Stormwater Site Plan Report Page A-3 Parcel (Vicinity) Map: r..., ' C.orw _.. _.. _ La t11etA —seam --'- chLnr.1 Ci—'- soft — ROW — Otsw. T"Axt i - - -- --- or W 2/IJFw My01"of — Oew La ------- Vac ROW ---- ,eel -...—. E8691y10 ' MkwWter ORW SWI& WeLb llq/r.Iw/n).rJ.I), l4)J XJrY.d.Y l'.rp'•e'�rYM•+. SE-2347-03 0' 2 i 4.099 L-' IB Li �O x 4-109 0, STELLA' I '"�I� '2a SP S-98-01 2 PHI PH x L1J - '- 2a r;. 1-024 I (8433) 'JJ .I.NUT ST _ 411 135 j 4.102 4t12 _�4 24 1-012 I ..._ .. THIRD AVENUE 1.003 i-025 -024 I CONDOMINIUM (7990) _ :-0e2 4-M HOWELL- WAY ' 0 1 N PL SP S-2-80 x 2 w 3 2 e 4 3 -" Y e e / 1 POINT BLAAFN 2DO202145001 16 „ 1 u 4 EDwA11hDs ,-0, SITE ,. z-,53;, Cw 1 24 +3 "4 v PH 1 SP S-se-018 n (10226) 2.106i,..: PH2 2t07 IF sr (1 26)r2�12c 8t5i 1.017 WO a 0170= 1-01e oo r a M _.._.. ci 3 � '(WM9-AVE}- 16 - w 3/01 03 01 SOU TH PA ADDITION STO EDMONL�'i PINE ; 02 ) 02)OA'03�C; 01 (01,03102 02 i 23 x0 xs xa t 22 .- 02 i" 03 N 02 1 2 00 a � +�v'2,�1 AA01H RE) 01 C oN0 CONDO A _uyF ]I WOO WAY 0. y E0 � d t3RSYTH 1 02 g 3S l4 33 ! 32 -.... r Ilk, 0�' �• :01 x 14 01 I ��0 2 N 506065201 3/ PARK ESTAT S'+� s rn 4 CONDO I GO�ryp 3/ le 1 S,, I 0 4 10 p f 'c /- - ON d 9 40 ¢ s %y Ot) a (10537 3 _ �s Q✓ TES (7043) 41 29 20 F21 17 m 3 ..s 10t f�'P. 701 7 p (7043) +6 w 4 2 '03".. F SEAVU + Je 06 e 2 CONDO ._.._... w � u sue.. _ (891x COOLS\ RD --._._..__. _..000LA _ -� _. 1504 ox 03 J 03 •^, Jf 'OS 01 _t f '�j a 6 I so 14 01 101 031 1_71, -7 01 0, E"1e02 03 SPAFN gB02195002 I 3 8 >.. f. 17 6E-647-03 A RAN Engineering, Inc. RAM No. 23-005 2-143 4 SHAMROCK PLAZA CONDO (68001 2.144 3 HIGHLAND PH 2 PARK PH 1 (8383) A I 654 41h Ave S SFR Stormwater Site Plan Report Page A-4 I fI _ E NO N3883 — oz 64'4L=13 a3eo j 'NYry '-om ias j� I o I was r/r ios 4-r rve sBs..: �.�u � la>7 � wvss x3 114zzyeaa� ✓I /i (Jl J 3i I ItlI.. I , raze n,C60fL 1M IBmN .9 wNd. _ (3Nn xu vM I � � . Nv1ia �3t3nwA ^ � N I I N � � Ntw a3nrinB 3e aL Saw' � / az i i `+dr.� v are3a aNiva I �raUsvrvaxsroN I - �� a•zrSYSAOJmrv°YwN�uvayi � ✓�// Ls3< NM •'BZ � 55yyJJ � I i O 3lNtl3S / 31YN l]YFS 1LpNr3U" 31b1 Si SL'IL (( ///� /SAVLYON3IaKV ¢ a NNs No ' a3rNio nr �i � vae .oz i � xnY3s Aarawrsr:'e�3O coa].ow 1 \�1/ avu�"�`m3 N'i'Brm Nm .o� •I sM J� vu N i ]ry an93ms _M--- II_ ---1 �+i 'J _ _ S[T .g3003LN0.]Nnt (dui m 1SRPoBav=t�3'OtbL3N! Y]L[ Sm � I'R I � I I �� � � �� i7Trl _ A n'iiw°"duanwsnw aarssrave I� C I a9 �, I I� s o031oloo9eoSoo mm oLaoi _ _ a w j I � LL 3".la L.-: (m Lo Ls+srauNsiro osne 1 : 111 am-aLoN ! i ' NI d® .al-.zn ; _ 3srroN o3sodoad F .rrl t - L]rxesr nresNi are w M ''-l: sla'deI �� l3NNrNoi �99Z3r{��/ ry hod I,,or'���' �� r3rry .y ���� . xoroaddY.rM3�ma ( 30) A N / nr7[ d 11e 9 OZ1.1 56[ 1fZLBZYI3 YaO aNB 53! ` 1 \ '4I * ZO- AO YYL30 339 3xL4]4/1 o I` 1 Jld.r ,C yll. ♦ r �) ! O ( )�) 1. BT'1103 ANOaddY II �,}. _ � I � ODOf 531 AYYYO� l9SB 4FS- h_—� --M1— o __ NIra9 ]3NNYNJ _ _ ( L s6 I o iMN-1z�L9s.9 [as NUazwz:.o ,�,,. I GI NU 9Z'[9 3/ •r dN 5 NM 5�1 �M � LBYBSBBLIy Wla ol 1 o I ooa oo95B S TIYAI ONdMYL3B NON 6107 ZL log r O-IM)r[993r.r .or x3 I I I as-Nv rrvB 31.f BL'69 Na �SYrZ d N L6L '0d `66 '"IOrI 600➢8 N BONON0301 MMVd A1L0 � o Q) co Q Q Lo Q) co co U C Q) 0) (10 CL B. EXISTING CONDITIONS SUMMARY Existing Conditions. The total site consists of 8,168 sf (0.19 acres) and is currently occupied by an existing single-family residence, and detached garage. The site's existing garage is accessed via an alley along the west boundary of the subject site. The existing house is surrounded by grass lawn and landscape areas. The site is surrounded by single family residences to the west, and north; and 4t" Ave S along the east boundary and Erben Dr along the southern boundary. (see aerial photo below). The site generally slopes in a northwesterly direction at a relatively flat to moderate slope with only 3 feet of drop across the site. No defined drainage courses are found on -site, and stormwater runoff would sheet flow west/northwesterly to the alley along the westerly boundary of the site. No stream or wetlands are located onsite; Shellabarger Creek is located about 1,200 feet northwest of the site. Additional discussion of the local drainage basin and downstream path is discussed in Section C of this report. Soils: In accordance with the project's site -specific geotechnical engineering evaluation by Earth Solutions NW, LLC the on -site soils consist of Everett very gravely sandy Loam (USCS: SP-SM and SP) advance outwash deposits. The subject site soils are generally consistent with Alderwood-Everett series soil. Full soils description is included in the project's site specific geotechnical engineering study by Earth Solutions NW, LLC. Aerial Photo (City of Edmonds GIS, 2022 photo) RAMEngineering, Inc. RAM No. 23-005 654 41" Ave S SFR Stormwater Site Plan Report Page B-1 C. DEVELOPED SITE HYDROLOGY. Developed Conditions. The proposed project includes the construction of a single family residence with an attached garage, partially covered deck, and associated driveway and utilities. All existing structures and impervious (hard) surface onsite will be removed/replaced with the site development; landscaping and grass lawn around the new residence will stabilize the site upon building construction. The project proposes to create and/or replace 3,874 sf of hard surface with the complete site development, all existing hard surface will be removed with the project site development. The following is a summary of the proposed new/replaced hard surface areas: Total Hard Surface to be Mitigated = 3,874 sf (0.07584 ac) Roof Area = 3,304 sf Walkway/Patio Area = 352 sf Driveway Area = 218 sf Total Pervious Surface (Lawn/Landscape) = 4,294 sf (0.0986 ac) Lot Lawn/Landscape Area = 4,294 sf In accordance with the Edmonds City Code (18.30) Category 1 projects shall meet MR#5 (see discussion in Section A above) and provide on -site stormwater management. To meet these criteria, the proposed hard surfaces of the site shall implement BMPs from "List No. 1" or meet the LID performance standard. As discussed above in the MR#5 evaluation above in Section A, an individual lot stormwater BMP detention pipe (Edmonds Storm water Addendum Section 6.3) will be utilized to manage the project's new/replaced hard surfaces. BMP T5.13: Post -Construction Soil Quality and Depth will be applied to the disturbed pervious areas of the site development. The total proposed new replaced hard surface of 3,874 sf will be mitigated with a detention pipe system. The onsite detention pipe systems have been sized in accordance with the Edmonds Stormwater Addendum simplified sizing approach, below is a summary of the system: Detention Pipe Sizing Calculations: ■ Hard Surface = ■ Required 18" Detention Pipe = ■ Provided 18" Detention Pipe = 3,874 sf 131.76 ft = (0.034 x 3,874 sf)1 132 ft 1. Per Edmonds Stormwater Addendum simplified sizing approach Section 6.3.1. Additionally, all disturbed pervious (lawn and landscape) areas will preserve or restore the health and water - holding capacity of the soils by compost -amending (Per DOE BMP T5.13: Post -Construction Soil Quality and Depth). See attached City of Edmonds Standard Detail SD-642 criteria for BMP T5.13: Post -Construction Soil Quality and Depth. RAMEngineering, Inc. 654 41" Ave S SFR RAM No. 23-005 Stormwater Site Plan Report Page C-1 UNDISTURBED NATIVE VEGETATION UNDISTURBED NATIVE SOIL 2" ORGANIC MULCH 3" OF COMPOST INCORPORATED INTO 5" OF SITE SOIL (TOTAL AMENDED DEPTH OF 9.5", FOR A SETTLED DEPTH OF 8") SUBSOIL SCARIFIED 4" BELOW COMPOST AMENDED LAYER (12" BELOW SOIL SURFACE) 2" ORGANIC MULCH 6" IMPORTED TOPSOIL MIX (COMPACTED DEPTH) SUBSOIL IS SCARIFIED 6" BELOW IMPORTED TOPSOIL MIX UNDISTURBED PLANTS (SEE NOTE 1) UNDISTURBED TURF (LAWN) AREAS (SEE NOTE 1) PLANTING BEDS TURF (LAWN) AREAS m 8" UNDISTURBED TURF/LAWN/LANDSCAPE UNDISTURBED NATIVE SOIL STEEP SLOPE NOTE: AMENDED SOILS SHOULD NOT BE INSTALLED ON FINISHED SLOPES EXCEEDING 33%. AREAS EXCEEDING 33% SHALL BE STABILIZED PER THE ENGINEER/GEOTECH OF RECORD. 3RASS: SEED OR SOD 1.75" OF COMPOST INCORPORATED NTO 6.25" OF SITE SOIL (TOTAL 4MENDED DEPTH OF 9.5", FOR A SETTLED DEPTH OF 8") SUBSOIL SCARIFIED 4" BELOW COMPOST AMENDED LAYER ,12" BELOW SOIL SURFACE) OPTION 2 — AMEND IN PLACE OR STOCKPILE AND AMEND GENERAL NOTES: PLANTING BEDS TURF (LAWN) AREAS 1. AREAS OF NO DISTURBANCE -GRASS: SHALL BE FENCED AND EXISTING ,� ���,������� SEED VEGETATIONANDSOIL BE O" R SHALL ON f II =_ — 1=III=III=I IT- aI IIIE-1II I �I T1=r�ll� 1T1=1T1�T1=1T1�T1�T1=ul IMPACTS. I I I I I I I —III —III— I I I I I I —I T I —I I III— T - II 6" IMPORTED 2. TO MEASURE SETTLED DEPTH, I I- —I I -III -III -III II -III -III -III -II L=JJl fJ1-JJJJ1 11= �J-11=L=�= II -III -II III-III-III-III=III II -III -III -III -II TOPSOIL MIX WATER SOIL SUFFICIENTLY TO FULLY SATURATE WITHOUT III=1Tf= 1TI= 1Tf— III -I �11=1TI=III=1(i= (COMPACTED CAUSING EROSION. 111- Tff 1Tf 1=111�Tf=1Tf=III=TfI=_ I11=III=111= -1 6' III-i DEPTH) 3. COMPOST SHALL MEET SPEC. =Ih Ilf / I \/ \�\ I //\\ III- III/� SUBSOIL IS11 REQUIREMENTS IN THE EDMONDS STORMWAT R 2017 RIFIED 6 ADDENDUM (CHECKLIST 7). BELOW IMPORTED 4. COMPACTION OF TOPSOIL (WHERE TOPSOIL MIX REQUIRED) TO BE TO 85% (MAX) OF THE MAXIMUM DRY DENSITY OPTION 3 — IMPORT TOPSOIL PER MODIFIED PROCTOR TEST (ASTM D 1557). -� POST CONSTRUCTION SOIL RaPIRioN2o2iE CITY OF EDMONDS QUALITY AND DEPTH PUBLIC WORKS STANDARD 4T1 D DEPARTMENT DETAIL Fs t . jag° APPROVED BY: R. ENGLISH S D — 642 RAAf Engineering, Inc. RAM No. 23-005 654 41h Ave S SFR Stormwater Site Plan Report Page C-2 Offsite Basin Analysis. The site is located in the Shellabarger Creek watershed basin. The Shellabarger Creek basin is an urban basin that collects stormwater runoff primarily from residential areas in the City Edmonds. Shellabarger Creek generally flows westerly and ultimately discharges to Puget Sound approximately 1.0 mile from the site (see attached watershed map). The subject site slopes in a northwesterly direction and runoff sheet -flows to the alley along the westerly boundary of the site. There is no stormwater collection or conveyance system in the alley and surface runoff continues to flow in a northwesterly direction towards 3rd Ave S. The curb and gutter system along the east side of 3rd Ave S collects and conveys runoff in a northerly direction to a catch basin at the southeast corner of the intersection of 3rd Ave S and Howell Way about 660 feet from the site. Stormwater collected in the City of Edmonds municipal separate storm sewer systems (MS4) pipe system continues north and then discharges to Shellabarger creek about 200 feet north of 3rd Ave S and Howell Way (900 feet from the site). Shellabarger creek travels in a westerly direction until it eventually discharges into the Puget Sound about 1.0 mile downstream of the site. Due to the fact there is no formal collection and conveyance system in the alley west of the site; the project will discharge the site stormwater runoff to the pipe and catch basin MS4 within 4th Ave S along the easterly boundary of the site. The stormwater system in 4th Ave S flows north to Howell Way and then is directed west to 3rd Ave S merging with the existing site flow path about 860 ft via the 4th Ave S route. Due to the fact the existing and developed flow paths mere within a % mile; the developed downstream path is within the same threshold discharge area. See the Downstream Drainage Facility Map and Watershed Basin Map delineating the downstream path to the discharge point in the Puget Sound attached below. Downstream Drainage Facility Map (City of Edmonds GIS) 1 �: CL:�= � O., ,�.� Wit'. ❑' "d- (Predeveloped flows are shown in red and developed flows shown in blue) RAMEngineering, Inc. RAM No. 23-005 654 41" Ave S SFR Stormwater Site Plan Report Page C-3 Watershed Basin Map: N v FIGURE B-1 C I T Y O F E D M O N D S /��� Lund's Gulch'"o,, /\1 ° i.a° WATERSHEDS I 3 I I Deer Creek ® Perrinville i I -- i Edmonds Marsh Puget Sound Meadowdale A -' Edmonds Way EL Puget Sound Piped Meadowdale B dd Fruitdale Shell Creek �aa�end Good Hope Pond J Shellabarger Halls Creek _Southwest Edmonds A 169th St S% 'Nil Hindley Creek Southwest Edmonds B Lake Ballinger Stilthouse Creek Out II CreekStiltltouse Creek / i - Lund's Gulch Talbot Park A -Taleot"6 Meadowdale A Talbot Park B i ` Meadowdale BTerrace Creek Terrace Creek I Northstream Westgate Pond Outfall Creek Willow Creek 'nville 0 1,010 2,000 4,000 6,000 8,000 ) a' -' Pug a P ;' / Feet OUnd cc 1 in = 2,000 ft Talbot Park A talb& m i Park B - t_I No warranty of arry sort, including accuracy, fitness, or merchantability I accompany this product. I March 30, 2010 r �� A SITE RAN Engineering, Inc. RAM No. 23-005 Fruitdale r lW UU[{:' Bet Dt 17Y1 A 196th St SW a I +� rthstrearn Casper.. S t. ,. 200th St SW `t J cCi Dayton St t Bowdoin Wy ,*Shell5bafgell✓— Pine St I�^ I � il4w Creek I Good Hope Pond Icicttt 2 E. �- Main St Shell Creek 206th St SW 212th St SW 3 _ ° Westgate Pond Halls Crieek - n c. r----------------220th St SW --- --- 3 224th St SW � I - —I I qN I S3a i i I 654 4t" Ave S SFR Stormwater Site Plan Report Page C-4 D. SOILS REPORTS: 1. Geotechnical Evaluation Letter Prepared by: Earth Solutions NW, LLC Date: April 12, 2023 Pages: 19 MAN =ngineering, Inc. RAM No. 23-005 654 4t" Ave S SFR Stormwater Site Plan Report Page D-1 April 12, 2023 ES-9113 Mr. Jay Fulton 8630 — 112t" Lane Northeast Kirkland, Washington 98033 Subject: Geotechnical Evaluation Proposed Single -Family Residence 654 — 4t" Avenue South Edmonds, Washington Earth Solutions NW«C Earth Solutions NW LLC Geotechnical Engineering, Construction Observation/Testing and Environmental Services Reference: Encompass Engineering & Surveying Boundary & Topographic Survey, Job No. 22730, dated January 30, 2023 Minard, J.P. Geologic Map MF-1541 (Edmonds East/West Quadrangles), dated 1983 Soil Survey of Snohomish County Area, Washington, issued July 1983 Palmer, S.P. et al. Liquefaction Susceptibility Map of Snohomish County, dated September 2004 Snohomish County Planning and Development Services Seismic Hazard Areas Map, dated February 1, 2016 City of Edmonds, Washington 1. Edmonds City Code (ECC) Chapter 23.80 2. Interactive GIS Mapping Portal Dear Mr. Fulton: As requested, Earth Solutions NW, LLC (ESNW) has prepared this geotechnical evaluation letter report for the proposed project. We performed our work in general accordance with the scope of services outlined in the proposal dated March 1, 2023, which was authorized on March 3, 2023. A summary of the subsurface exploration, laboratory analyses, and recommendations with respect to the proposed construction are provided in this letter report. 15365 N.E. 90th Street, Suite 100 0 Redmond, WA 98052 0 (425) 449-4704 0 FAX (425) 449-4711 Mr. Jay Fulton April 12, 2023 Protect & Site Description ES-9113 Page 2 The subject site is located immediately northwest of the intersection between 41h Avenue South and Erben Drive, in Edmonds, Washington. The project area consists of one tax parcel (Snohomish County Parcel No. 004096-001 -011 -00) and totals about 0.19 acres of land area. The approximate site location is depicted on Plate 1 (Vicinity Map). The property is currently developed with a single-family residence and associated improvements. Per the referenced topographic survey, the existing topography is relatively level, with an estimated maximum of about three feet of topographic relief across the property. The site is bordered to the north and west by existing residential development and to the south and east by Erben Drive and 41h Avenue South, respectively. We understand the existing structure and site improvements will be removed, and a new single- family residence with associated improvements will be constructed. At the time of letter report preparation, neither site plans nor specific building load values were available for review; however, we anticipate that the new single-family residence will consist of relatively lightly loaded wood framing supported on conventional foundations. Based on our experience with similar projects, we estimate wall loads of about 2 to 3 kips per linear foot and slab -on -grade loading of 150 pounds per square foot (psf) will be incorporated into the final design. Subsurface Conditions An ESNW representative observed, logged, and sampled two test pits on March 21, 2023. The test pits were advanced at accessible locations within the property boundaries using a mini- trackhoe and operator retained by ESNW. The test pits were completed to assess and classify the site soils, to characterize the groundwater conditions within areas proposed for new development, and to complete one small-scale Pilot Infiltration Test at a location designated by the client. The maximum exploration depth was approximately seven -and -one-half feet below the existing ground surface (bgs). The approximate locations of the test pits are depicted on Plate 2 (Test Pit Location Plan). Please refer to the attached test pit logs for a more detailed description of subsurface conditions. Representative soil samples collected at the exploration locations were analyzed in general accordance with Unified Soil Classification System (USCS) and United States Department of Agriculture (USDA) methods and procedures. Topsoil and Fill Topsoil at the test pit locations was observed extending between 30 and 36 inches bgs. The observed topsoil profiles were anomalously thick for typical topsoil thicknesses atop glacial drift deposits in the Puget Sound region. Scrap metal and PVC plastic debris were encountered within both test pit excavations and within the topsoil profiles, suggesting that the topsoil profile has been thickened by the addition of organic fill (thus resulting in the relatively thick topsoil sections observed). It is possible that deeper or shallower pockets of topsoil may be encountered locally across the site. Topsoil can be characterized by its dark brown color, the presence of fine organic material, and small root intrusions. Earth Solutions NW. LLC Mr. Jay Fulton ES-9113 April 12, 2023 Page 3 Neither structural fill nor non -organic fill were observed during the subsurface investigation. As noted above, topsoil fill was observed at both test locations. Native Soil Underlying the topsoil and fill, native soils were encountered and characterized as transitional bed deposits consisting primarily of medium dense to dense silty sand with gravel (USCS: SM). Thin laminations and interbeds of silt and sand as well as iron oxide staining were noted within the native deposits. Notably, cemented soils were not observed. The native transitional bed deposits extended to the termination depth of both test pits. Based on laboratory analyses of representative soil samples, the native transitional bed deposits have a fines content between about 11 and 19 percent and were primarily observed in a moist to wet condition at the time of exploration. Geologic Setting Geologic mapping of the area identifies transitional bed deposits (Qtb) as the primary geologic unit underlying the subject site. Vashon glacial till (Qvt) is mapped immediately south and east of the site, and Whidbey Formation sediments (Qw) are mapped immediately north and west of the site. Transitional bed deposits are characterized as both glacial and non -glacial deposits comprised mostly of massive, thick or thin beds and laminae of clay, silt, and fine to very fine sand deposited in lakes beyond the ice front and in fluvial systems prior to the advance of glacial ice. Vashon glacial till is described as a non -sorted mixture of clay, silt, sand, and gravel in variable amounts that was deposited directly beneath the glacier as it advanced over older sediment and bedrock. Whidbey Formation sediments consist of bedded, compact, commonly oxidized, medium to coarse grained sand, commonly exhibiting contorted bedding. USDA soil mapping indicates the site is underlain by Everett very gravelly sandy loam on 0 to 8 percent slopes. Everett series soils formed on terraces and outwash plains in glacial outwash soils. Per the referenced USDA soil survey, this soil unit maintains slow surface water runoff and a slight hazard of water erosion. In our opinion, the native soils observed during the subsurface exploration are representative of transitional bed deposits and are generally consistent with the geologic and soil mapping resources outlined in this section. Groundwater Natural groundwater seepage was not encountered during the March 2023 field exploration. However, groundwater seepage is common within glacially derived deposits. In our opinion, zones of perched groundwater should be expected within site excavations, especially if construction occurs during the wet season. Groundwater seepage rates and elevations may fluctuate depending on many factors, including precipitation duration and intensity, the time of year, and soil conditions. In general, groundwater flow rates are higher during the winter, spring, and early summer months. Earth Solutions NW. LLC Mr. Jay Fulton April 12, 2023 Geologically Hazardous Areas Review ES-9113 Page 4 ESNW reviewed ECC Chapter 23.80 to evaluate the presence of geologically hazardous areas at the subject site. We also reviewed the City of Edmonds (City) online GIS resource, which depicts suspected geologically hazardous areas within city limits. Geologically hazardous areas in the City include areas susceptible to erosion, land sliding, earthquake, or other geological events. Based on our review, the site does not contain areas susceptible to erosion or landslide hazards. However, a fault strand associated with the Southern Whidbey Island Fault zone is located within about 500 feet (to the southwest) of the subject site. As such, seismic hazard is discussed in the following section. Seismic Hazard Areas Seismic hazard areas in the City are areas subject to severe risk of damage as a result of earthquake -induced ground shaking, slope failure, settlement, soil liquefaction, lateral spreading, or surface faulting. Liquefaction is a phenomenon that can occur within a soil profile as a result of an intense ground shaking or loading condition. Most commonly, liquefaction is caused by ground shaking during an earthquake. Soil profiles that are loose, cohesionless, and present below the groundwater table are most susceptible to liquefaction. During the ground shaking, the soil contracts, and porewater pressure increases. The increased porewater pressure occurs quickly and without sufficient time to dissipate, resulting in water flowing upward to the ground surface and a liquefied soil condition. Soil in a liquefied condition possesses very little shear strength in comparison to the drained condition, which can result in a loss of foundation support for structures. In our opinion, and consistent with the depiction on the referenced liquefaction susceptibility map, site susceptibility to liquefaction may be considered very low. The absence of a shallow groundwater table and the relatively dense and fine-grained characteristics of the native soil were the primary bases for this opinion. Fault mapping resources indicate an inferred Class B fault trace, in association with the Southern Whidbey Island Fault Zone, is located within about 500 feet (to the southwest) of the subject site, trending in a northwest -southeast orientation. Class B faults are defined as faults for which Quaternary -age (within the past 2,588,000 years) deformation is suspected but insufficient evidence has been gathered to support the determination. The locations and activity of Class B faults are inferred based on best available data but have not been confirmed. During the fieldwork, ESNW did not observe any evidence of faulting, deformation, or other disturbances within the native stratigraphy or surficial geomorphology. We also reviewed readily available LIDAR mapping resources for evidence of fault scarps or associated linear features on site and in the surrounding area. No evidence of surficial deformation was observed during LIDAR review. Earth Solutions NW. LLC Mr. Jay Fulton ES-9113 April 12, 2023 Page 5 With respect to the subject site, earthquake magnitude would be dictated by the type of earthquake event, e.g., shallow crustal, intra-plate, or subduction zone event. Although evidence of shallow faults and related lineaments have been identified throughout the Puget Sound region (Seattle Fault, South Whidbey Island Fault Zone, and others), evidence of surface fault expressions on or in the vicinity of the subject site has not been identified. In any case, seismic activity associated with a shallow crustal event would be expected to produce relatively low to moderate earthquake magnitude of relatively short duration. In terms of larger magnitude events associated with intra-plate and subduction zone events, distance between the source of these events and the site is expected to be greater. However, a longer duration of ground shaking would likely occur. Based on the field observations and analysis outlined above, it is our opinion the risk of surface rupture during a seismic event is very low to negligible, and the site does not meet the ECC definition of a seismic hazard area. Geotechnical Recommendations In our opinion, construction of the proposed single-family residence is feasible from a geotechnical standpoint. The geotechnical recommendations, conclusions, and considerations provided in the following sections are intended to support the proposed construction. In -situ and Imported Soil The in -situ soils encountered at the subject site generally have a moderate to high sensitivity to moisture and were generally in a moist to wet condition at the time of exploration. Soils anticipated to be exposed on site will degrade if exposed to wet weather and construction traffic. Compaction of the soils to the levels necessary for use as structural fill may be difficult or impossible during wet weather conditions. Soils encountered during site excavations that are excessively over the optimum moisture content will likely require aeration or treatment prior to placement and compaction. Conversely, soils that are substantially below the optimum moisture content will require moisture conditioning (by adding water) prior to use as structural fill. An ESNW representative should be contacted to evaluate the suitability of in -situ soils for use as structural fill at the time of construction. Imported soil intended for use as structural fill should be evaluated by ESNW during construction. The imported soil must be workable to the optimum moisture content, as determined by the Modified Proctor Method (ASTM D1557), at the time of placement and compaction. During wet weather conditions, imported soil intended for use as structural fill should consist of a well -graded, granular soil with a fines content of 5 percent or less (where the fines content is defined as the percent passing the Number 200 sieve, based on the minus three -quarter -inch fraction). Earth Solutions NW. LLC Mr. Jay Fulton April 12, 2023 Structural Fill ES-9113 Page 6 Structural fill is defined as compacted soil placed in foundation, slab -on -grade, roadway, permanent slope, retaining wall, and utility trench backfill areas. Soils placed in structural areas should be placed in loose lifts of 12 inches or less and compacted to a relative compaction of 95 percent, based on the laboratory maximum dry density as determined by the Modified Proctor Method (ASTM D1557). For soil placed in utility trenches underlying structural areas, compaction requirements are dictated by the local city, county, or utility district, and are typically specified to a relative compaction of at least 95 percent. Subgrade Preparation Following site stripping, ESNW should be contacted to observe the subgrade to confirm soil conditions are as anticipated and to provide supplementary recommendations for subgrade preparation, as necessary. In general, foundation subgrade on native cut surfaces should be compacted in situ to a minimum depth of one foot below the design subgrade elevation. Where encountered, existing fill soils should be removed and/or reworked to the specifications of structural fill previously detailed in this letter report. Topsoil and organic -rich soils are not suitable for structural support and should be removed from areas proposed for new structural loading. Uniform compaction of structural fill and the foundation and slab subgrade areas will establish a relatively consistent subgrade condition below the foundation and slab elements. Supplementary recommendations for subgrade improvement may be provided at the time of construction and would likely include further mechanical compaction or overexcavation and replacement with suitable structural fill. Void Space Restoration The process of removing the existing structures may produce voids where existing foundations are removed and where crawl space areas may have been present. Complete restoration of voids from old foundation areas must be executed as part of the subgrade preparation activities. The following guidelines for preparing subgrade areas should be incorporated into the final design: • Where voids and related demolition disturbances extend below planned subgrade elevations, restoration of these areas should be completed. Structural fill should be used to restore voids or unstable areas resulting from the removal of existing structural elements. • Recompact, or overexcavate and replace, areas of existing fill exposed at the design subgrade elevations. Overexcavations should extend into competent native soils and structural fill should be utilized to restore subgrade elevations, as necessary. • ESNW should confirm subgrade conditions, as well as the required level of recompaction and/or overexcavation and replacement, during site preparation activities. ESNW should also evaluate the overall suitability of prepared subgrade areas following site preparation activities. Earth Solutions NW. LLC Mr. Jay Fulton April 12, 2023 Foundations ES-9113 Page 7 The proposed residential structure can be supported on conventional spread and continuous footings bearing on undisturbed (competent) native soil, compacted native soil or structural fill, or new structural fill placed atop a competent subgrade surface. Thick sections of topsoil fill were encountered at the test pit locations extending at least 30 to 36 inches bgs in the western portion of the site. Where encountered, the existing organic -rich fill soils should be removed from structural areas of the site. In general, competent native soil suitable for support of foundations will likely be encountered beginning at depths of about three feet bgs. Where loose or unsuitable soil conditions are encountered at foundation subgrade elevations, compaction of the soils to the specifications of structural fill or overexcavation and replacement with suitable structural fill will likely be necessary. An ESNW representative should be contacted to confirm the suitability of foundation subgrades at the time of construction. Provided the structures will be supported as described above, the following parameters may be used for design of the new foundations: • Allowable soil bearing capacity 2,500 psf • Passive earth pressure • Coefficient of friction 300 pcf NE,I K A one-third increase in the allowable soil bearing capacity can be assumed for short-term wind and seismic loading conditions. The passive earth pressure and coefficient of friction values include a safety factor of 1.5. With structural loading as expected, total settlement in the range of one inch is anticipated, with differential settlement of about one-half inch. Most of the anticipated settlement should occur during construction as dead loads are applied. Slab -on -Grade Floors Slab -on -grade floors for the proposed residence should be supported on competent, firm, and unyielding subgrades comprised of competent native soil or compacted structural fill. Unstable or yielding subgrade areas should be recompacted or overexcavated and replaced with suitable structural fill prior to slab construction. As noted previously in this letter report, areas with existing fill soil should be removed and/or reworked to the specifications of structural fill. Organic -rich soils should be removed from slab subgrades prior to slab construction. A capillary break consisting of at least four inches of free -draining crushed rock or gravel should be placed below each slab. The free -draining material should have a fines content of 5 percent or less (percent passing the Number 200 sieve, based on the minus three-quarter inch fraction). In areas where slab moisture is undesirable, installation of a vapor barrier below the slab should be considered. If a vapor barrier is to be utilized, it should be a material specifically designed for use as a vapor barrier and should be installed in accordance with the specifications of the manufacturer. Earth Solutions NW. LLC Mr. Jay Fulton ES-9113 April 12, 2023 Page 8 Retaining Walls Retaining walls must be designed to resist earth pressures and applicable surcharge loads. The following parameters may be used for retaining wall design: • Active earth pressure (unrestrained condition) • At -rest earth pressure (restrained condition) • Traffic surcharge* (passenger vehicles) • Passive earth pressure • Coefficient of friction • Seismic surcharge * Where applicable. t Where H equals the retained height (in feet). 35 pcf 55 pcf 70 psf (rectangular distribution) 300 pcf 0.40 8H psft The above passive earth pressure and coefficient of friction values include a safety factor of 1.5. Additional surcharge loading from adjacent foundations, sloped backfill, or other loads should be included in the retaining wall design. Retaining walls should be backfilled with free -draining material that extends along the height of the wall and a distance of at least 18 inches behind the wall. The upper 12 inches of the wall backfill may consist of a less permeable soil, if desired. Drainage should be provided behind retaining walls such that hydrostatic pressures do not develop. If drainage is not provided, hydrostatic pressures should be included in the wall design. A perforated drainpipe should be placed along the base of the wall and connected to an approved discharge location. A typical retaining wall drainage detail is provided on Plate 3. Drainage Groundwater seepage is likely to be encountered within site excavations depending on the time of year grading operations take place. Temporary measures to control surface water runoff and groundwater during construction would likely involve interceptor trenches, interceptor swales, and sumps. ESNW should be consulted during preliminary grading to identify areas of seepage and provide recommendations to reduce the potential for seepage -related instability. Finish grades must be designed to direct surface drain water away from structures. Water must not be allowed to pond adjacent to structures. The grade adjacent to the buildings should be sloped away at a gradient of at least 2 percent for a horizontal distance of at least four feet. In our opinion, a foundation drain should be installed along building perimeter footings. A typical foundation drain detail is provided on Plate 4. Earth Solutions NW. LLC Mr. Jay Fulton April 12, 2023 Infiltration Feasibility ES-9113 Page 9 ESNW completed one small-scale Pilot Infiltration Test (PIT) at test location TP-2 at a depth of approximately four -and -one-half feet bgs. The small-scale PIT was completed in general accordance with the applicable requirements of the 2019 Stormwater Management Manual for Western Washington (2019 SWMMWW), which has been adopted by the City for flow control design. Based on the results of the PIT, the measured (short-term) infiltration rate recorded at the conclusion of the infiltration testing was 0.8 inches per hour (in/hr). Per the 2019 SWMMWW, a series of correction factors must be applied to the measured rate to calculate an appropriate design rate. The following correction factors were selected: • Site variability, CFv 0.7 • Test method, CFT 0.5 • Maintenance, CFm 0.9 Upon incorporation of the correction factors, a design (long-term) infiltration rate of 0.25 in/hr is recommended for this site. Because this rate is relatively low, full infiltration is not considered feasible from a geotechnical standpoint; however, small-scale (or limited -scale) flow control BMP implementation may be feasible depending on BMP type, location, and depth. In any case, overflow provisions are recommended for any flow control BMP design element on this site, and in the event overflow provisions are not or cannot be incorporated into the design, it is our opinion infiltration should not be considered feasible from a geotechnical standpoint. Regarding groundwater protection, and in accordance with the subsurface characterization criteria for infiltration BMPs (outlined in Chapter 5 of Volume V of the 2019 SWMMWW), shallow samples of topsoil were collected and are being held in our laboratory for future organic content and cation exchange capacity analyses, upon request. The samples will be discarded after 60 days unless requested otherwise by the client. ESNW can provide additional consulting services and design considerations regarding infiltration and/or BMP feasibility, upon request. ESNW should be contacted to confirm suitable native soils are exposed at the design facility subgrade elevation(s) and location(s) during construction. Earth Solutions NW. LLC Mr. Jay Fulton April 12, 2023 Seismic Design ES-9113 Page 10 The 2018 International Building Code (2018 IBC) recognizes the most recent edition of the Minimum Design Loads for Buildings and Other Structures manual (ASCE 7-16) for seismic design, specifically with respect to earthquake loads. Based on the soil conditions encountered at the test pit locations, the parameters and values provided below are recommended for seismic design per the 2018 IBC. Parameter Value Site Class D* Mapped short period spectral response acceleration, Ss (g) 1.283 Mapped 1-second period spectral response acceleration, S1 (g) 0.451 Short period site coefficient, Fa 1.0 Long period site coefficient, Fv 1.849t Adjusted short period spectral response acceleration, SMs (g) 1.283 Adjusted 1-second period spectral response acceleration, Sm1 (g) 0.834t Design short period spectral response acceleration, SIDS (g) 0.856 Design 1-second period spectral response acceleration, SD1 (g) 0.556t Assumes medium dense to dense native soil conditions, encountered to a maximum depth of seven -and -one-half feet bgs during the March 2023 field exploration, remain dense to at least 100 feet bgs. t Values assume Fv maybe determined using linear interpolation per Table 11.4-2 in ASCE 7-16. As indicated in the table footnote, several of the seismic design values provided above are dependent on the assumption that site -specific ground motion analysis (per Section 11.4.8 of ASCE 7-16) will not be required for the subject project. ESNW recommends the validity of this assumption be confirmed at the earliest available opportunity during the planning and early design stages of the project. Further discussion between the project structural engineer, the project owner, and ESNW may be prudent to determine the possible impacts to the structural design due to increased earthquake load requirements under the 2018 IBC. ESNW can provide additional consulting services to aid with design efforts, including supplementary geotechnical and geophysical investigation, upon request. Liquefaction susceptibility is discussed in the Seismic Hazard Areas section in this report. Earth Solutions NW. LLC Mr. Jay Fulton April 12, 2023 Limitations & Additional Services ES-9113 Page 11 This letter report has been prepared for the exclusive use of Mr. Jay Fulton and his representatives. The recommendations and conclusions provided in this letter report are professional opinions consistent with the level of care and skill that is typical of other members in the profession currently practicing under similar conditions in this area. A warranty is neither expressed nor implied. If the design assumptions outlined herein either change or are incorrect, ESNW should be contacted to review the recommendations provided in this letter report. ESNW should be contacted to review the final design to confirm that our geotechnical recommendations have been incorporated into the plans. ESNW should be retained to provide earthwork observations and testing services during construction. Variations in the soil and groundwater conditions observed at the exploration locations may exist and may not become evident until construction. ESNW should reevaluate the conclusions provided in this letter report if variations are encountered. We appreciate the opportunity to be of service to you and trust this letter meets your current needs. Should you have any questions, or require additional information, please call. Sincerely, EARTH SOLUTIONS NW, LLC b'1W6-- �Ly Brian C. Snow, G.I.T. Senior Staff Geologist 04/12/2023 Keven D. Hoffmann, P.E. Associate Principal Engineer Attachments: Plate 1 — Vicinity Map Plate 2 — Test Pit Location Plan Plate 3 — Retaining Wall Drainage Detail Plate 4 — Footing Drain Detail Test Pit Logs Grain Size Distribution Earth Solutions NW. LLC - \ 2 O - _._._..._._._._._._._._._._._... _... _... - ... -.-.-._.� _ _ CaspersStreet_ 2 �C, ?-yVista Place z ' B(aCkett's _- -- - i ¢ _ Aloha Street Z ° a Caro /• Cr D' l Way° Landing a' D g _- _ _ 2 z a s �• __ _ _ aT DP Q Glen Street < ZGlen Street Glen Street �Da ley Street w zDaley Street 4 Daley Street _ dos S Ednlo_nd5 11 -,, =Sprague Street Sprague Street / o - - `x\ _ - Edmonds WA 524 Edmonds Street _ Ferry Terminal \ � J a � t _ /• _ _— y'\ �\ � Bell Street r_ __ _ a _ ''Edmonds°° Edmon�ds Main Street_ Main S[reeL � Main Street Ic ,}r/(z Dayton Street Dayton Street Cfeek 94 M. /• /! Mapleway, �1 '. 1'a x Maple Street MIaple Street Yost Park POrt Of __-_ _ T�-- o Alder street Plea Edmonds lStreet Morino -_---_- - d Walnut Walnut street Walnut street __ c _ -_-Edmonds _J�o 1 Holly Dnve JJ edar scree .v n Howell Way t Spruce Site' M > Spruce Street _ 01 0 -_ __ --- -rnSI T E � Hemlock Way,' ^ Pane sweet —. City Pork w EdmondsIr' Laurel street 2tsth Soeetsoum�je5up- i�•-- Pine Street m Pine,SReet s Pine street 216th Street Southwesty - wood Way l W 0 q Streaet southwest 217th 3 dmncS 'o n o d Pn Streeta;' s a < 0 9 0 113 . = a Bella Coola Road x \ \ \ > m elm sweet Fai Eim Street _ _ A elm`r'a� .. Oo _ No?h- = 09 WA 104 as oaa Kul Rob" v � a v Qas e �, _ 3 224th Street Southwest o i... Q _-^ _-, 3 Aagon9u. Edmonds mROav Fa "South-, o0 are =a DoO�he \ O ---- �Po NosC�Deer DrN p /�L;n�Jn CIA Q�\ _ _ P '= Sherwood -_- r ek Forest Edm° y W.00dway "� WA 10 __ m G9 900 p o o 6 0, 232nd Street Southwest c o 93o Y Reference: NORTHsollutions Earth 1 Snohomish County, Washington Observation/Testing00! Open StreetMap.org 40 Vicinity Map Fulton Property Edmonds, Washington Drawn MRS Date 04/07/2023 Proj. No. 9113 NOTE: This plate may contain areas of color. ESNW cannot be responsible for any subsequent misinterpretation of the information Checked BCS Date April 2023 Plate 1 resulting from black & white reproductions of this plate. i 69 _ � ` 701 69 - W TP=2 — ; 'I72 70 _—I 72 ERBEN DRIVE LEGEND TP-1 Approximate Location of — . — ESNW Test Pit, Proj. No. ES-9113, Mar. 2023 Subject Site = Existing Building NOTE: The graphics shown on this plate are not intended for design purposes or precise scale measurements, but only to illustrate the approximate test locations relative to the approximate locations of existing and / or proposed site features. The information illustrated is largely based on data provided by the client at the time of our study. ESNW cannot be responsible for subsequent design changes or interpretation of the data by others. NORTH 0 15 30 60 1 "=30' � � Scale in Feet Test Pit Location Plan Fulton Property Edmonds, Washington NOTE: This plate may contain areas of color. ESNW cannot be Drawn MRS Date 04/07/2023 Pro No. 9113 responsible for any subsequent misinterpretation of the information 1 resulting from black & white reproductions of this plate. Checked BCS Date April 2023 Plate 2 18" Min. 0 0 o 0 o O °o o �p � �° �0 .0 po o °o�0 0o0 ° ��o 0 �oo 0 0 0 00° 0000�oo 00000 o 0 0 0 0 oo .0 o, o 8 0 00 o o oo O 0 0 0 0 o o o o O o0 o oo op o° 0 o o 0 0 0 0 o 0 0 0 o0 00° 0 o o 00 0 op oo 0 o o o 0 0 0o Oo 0 0 Oo0o O oo o 00 00 0 0 oo o p o o�oo ...0. 00 0 0 8 0 0 0 0 oo 0 0 0 000 o0 o 000 o 0 0 0 g o Ooop o 0 0o 00 p o oo 0 0 o So o0 0 0 0 0 o 0 0 00 o o 00 0 000 8 Oo 0 & o p 0o0o o Oo .0 0 0�?, NOTES: • Free -draining Backfill should consist of soil having less than 5 percent fines. Percent passing No. 4 sieve should be 25 to 75 percent. • Sheet Drain may be feasible in lieu of Free -draining Backfill, per ESNW recommendations. • Drain Pipe should consist of perforated, rigid PVC Pipe surrounded with 1-inch Drain Rock. LEGEND: Q 00o O p o000 Free -draining Structural Backfill -inch Drain Rock %. of of of ti Structural Fill Perforated Rigid Drain Pipe (Surround in Drain Rock) SCHEMATIC ONLY - NOT TO SCALE NOT A CONSTRUCTION DRAWING Retaining Wall Drainage Detail Fulton Property Edmonds, Washington Drawn MRS Date 04/07/2023 Proj. No. 9113 Checked BCS Date April 2023 1 Plate 3 Perforated Rigid Drain Pipe (Surround in Drain Rock) NOTES: • Do NOT tie roof downspouts to Footing Drain. • Surface Seal to consist of 12" of less permeable, suitable soil. Slope away from building. LEGEND: FTT Surface Seal: native soil or other low -permeability material. 1-inch Drain Rock .tilti?ti?ti:' SCHEMATIC ONLY - NOT TO SCALE NOT A CONSTRUCTION DRAWING Drawn MRS Date 04/07/2023 Proj. No. 9113 Checked BCS Date April 2023 Plate 4 W I ,1� �� Well -graded gravel with Moisture Content Symbols m CU > GW or without sand, little to 0 c no fines Dry - Absence of moisture, dusty, dry to Cement grout U U j L 11 the touch ATD = At time surface seal 0 O o o of drilling g Bentonite o p o01 00(lo Poorly graded gravel with Damp Perceptible moisture, likely below chips o Z v UU o 0 0 0 GP or without sand, little to optimum MC Static water i LO C o Q�oQ no fines level (date) eall Co ° Moist - Damp but no visible water, likely o a) H a) at/near optimum MC - Filter pack with 65 0 a) tav, 0 0 uD op o GM Silty gravel with or without Wet - Water visible but not free draining, blank casing section o 0 2 � O Q 0 sand likely above optimum MC Screened casing o or Hydrotip with U) ° 0 .0 o Saturated/Water Bearing - Visible free filter pack o U) 0 � Clayey gravel with or water, typically below groundwater table End cap O -0-0 � ° L L LL C7 ^ GC without sand Terms Describing Relative Density and Consistency _ 0 co Z Coarse -Grained Soils: Test Symbols & Units Well -graded sand with u� O SW or without gravel, little to = Density SPT blows/foot Fines Fines Content ( ) oo N o c IL o°o°o°o°o°o °°°°°°°°°°° no fines Very Loose < 4 O LO U ._ U (n o MC =Moisture Content (%) Loose 4 to 9 ':: ca � 0 to , •:: •..:•.;: , . Poorly graded sand with DD = Dr Density cf Medium Dense 10 to 29 Y Y (P ) a)o v Sp or without gravel, little to o Z no fines Dense 30 to 49 Str = Shear Strength (tsf) 0 a)Very Dense _> 50 O U) PID = Photoionization Detector (ppm) co a� '.:' . SM Silty sand with or without o Lo c c :;: .::'•:. ;.. gravel Fine -Grained Soils: OC = Organic Content (%) e . •;. Consistency SPT blows/foot CEC = Cation Exchange Capacity (meq/100 g) : Very Soft < 2 � � SC Clayey sand with or LL = Liquid Limit (%) Soft 2 to 3 ^ without gravel Medium Stiff 4 to 7 PL = Plastic Limit (%) (%) Stiff 8 to 14 PI = Plasticity IndexLO CD Silt with or without sand IVIL or gravel; sandy or Very Stiff 15 to 29 gravelly silt Hard _> 30 0 0 0 U 0 F/// Clay of low to medium Y Component Definitions > a)—.1 plasticity; plasticity; lean clay with cn M t. or without sand or gravel; Descriptive Term Size Range and Sieve Number 00 cn E sandy or gravelly lean clay Boulders Larger than 12" — — _ � rn . — J U .5 Cobbles 3" to 12" �o _ OL Organic clay or silt of Zo — low plasticity Gravel 3" to No. 4 (4.75 mm) -0 to J �_ — Coarse Gravel 3" to 3/4" Fine Gravel 3/4" to No. 4 (4.75 mm) Elastic silt with or without d Sand No. 4 (4.75 mm) to No. 200 (0.075 mm) 0 0 o MH sand or gravel; sandy or Coarse Sand No. 4 (4.75 mm) to No. 10 (2.00 mm) c O (n g gravelly elastic silt Medium Sand No. 10 (2.00 mm) to No. 40 (0.425 mm) IL 2 >, - Fine Sand No. 40 (0.425 mm) to No. 200 (0.075 mm) 0 °o U O Clay of high plasticity; Silt and Clay Smaller than No. 200 (0.075 mm) o -0 LO CH fat clay with or without Modifier Definitions o E sand or gravel; sandy or J gravelly fat clay —_ Percentage by fn Weight (Approx.) Modifier CY OH Organic clay or silt of medium to high plasticity < 5 Trace (sand, silt, clay, gravel) 5 to 14 Slightly (sandy, silty, clayey, gravelly) o> ca o PT Peat, muck, and other 15 to 29 Sandy, silty, clayey, gravelly = �U) — = highly organic soils Q _> 30 Very (sandy, silty, clayey, gravelly) Classifications of soils in this geotechnical report and as shown on the exploration logs are based on visual — field and/or laboratory observations, which include density/consistency, moisture condition, grain size, and ii FILL Made Ground plasticity estimates, and should not be construed to imply field or laboratory testing unless presented herein. Visual -manual and/or laboratory classification methods of ASTM D2487 and D2488 were used as an identification guide for the Unified Soil Classification System. Earth Solutions NW L�c Earth Solutions NWLLC Geotechnical Engineering, Construction Observation/Testing and Environmental Services EXPLORATION LOG KEY r Earth Solutions NW, LLC 15365 N.E. 90th Street, Suite 100 Redmond, Washington 98052 Telephone: 425-449-4704 Fax: 425-449-4711 PROJECT NUMBER ES-9113 DATE STARTED 3/21/23 COMPLETED 3/21/23 EXCAVATION CONTRACTOR NW Excavating LOGGED BY BCS CHECKED BY KDH NOTES SURFACE CONDITIONS Lawn grass TEST PIT NUMBER TP-1 PAGE 1 OF 1 PROJECT NAME Fulton Prooert GROUND ELEVATION 70 ft LATITUDE 47.8044 LONGITUDE-122.3793 GROUND WATER LEVEL: V AT TIME OF EXCAVATION AFTER EXCAVATION W CL _ wJ ~W CO TESTS _ Q O MATERIAL DESCRIPTION p CL fy Q Z 0 co 0.0 Dark brown TOPSOIL (Fill) -abundant small to medium root intrusions TPSL 1 -probed 18" MC - 19.0 -scrap metal debris intermixed brown silty SAND, potential relic weathered zone 2.5 Gray silty SAND with gravel, dense, moist to wet -light to moderate iron oxide staining MC = 22.8 -thin interbeds of silt/sand SM -decreasing fines content -probed 3" MC = 17.0 6.0 Test pit terminated at 6.0 feet below existing grade. No groundwater encountered during excavation. No caving observed. LIMITATIONS: Ground elevation (if listed) is approximate; the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum. Do not rely on this test log as a standalone document. Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. J J W d F 2 0] J Q Uj W Z W Earth Solutions NW, LLC TEST PIT NUMBER TP-2 YPRII 15365 N.E. 90th Street, Suite 100 PAGE 1 OF 1 Redmond, Washington 98052 Telephone: 425-449-4704 Fax: 425-449-4711 PROJECT NUMBER ES-9113 PROJECT NAME Fulton Property DATE STARTED 3/21/23 COMPLETED 3/21/23 GROUND ELEVATION 70 ft EXCAVATION CONTRACTOR NW Excavating LATITUDE 47.80429 LONGITUDE-122.37944 LOGGED BY BCS CHECKED BY KDH GROUND WATER LEVEL: NOTES SZ AT TIME OF EXCAVATION SURFACE CONDITIONS Lawn grass AFTER EXCAVATION w _ ~W _ wJ CO TESTS Q O MATERIAL DESCRIPTION p CL W Q Z 0 0.0 Dark brown TOPSOIL (Fill) MC = 22.2 -abundant medium to large root intrusions to 2.5' TPSL -scattered PVC fragments 2.5 MC = 20.7 2.5 67.5 Brown silty SAND with gravel, medium dense to dense, moist MC = 11.2 Fines = 11.4 [USDA Classification: very gravelly loamy SAND] -probed 8" -infiltration test MC = 13.0 Fines = 18.4 [USDA Classification: gravelly loamy SAND] 5.0 SM -increased post-test moisture content MC = 21.3 [USDA Classification: gravelly sandy LOAM] 7.5 MC=14.3 7.5 62.5 Fines = 19.1 Test pit terminated at 7.5 feet below existing grade. No groundwater encountered during excavation. No caving observed. LIMITATIONS: Ground elevation (if listed) is approximate; the test location was not surveyed. Coordinates are approximate and based on the WGS84 datum. Do not rely on this test log as a standalone document. Refer to the text of the geotechnical report for a complete understanding of subsurface conditions. Earth Solutions NW, LLC GRAIN SIZE DISTRIBUTION 15365 N.E. 90th Street, Suite 100 WWI Redmond, Washington 98052 Telephone: 425-449-4704 Fax: 425-449-4711 PROJECT NUMBER ES-9113 PROJECT NAME Fulton Property U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS I HYDROMETER 6 4 3 2 1Z 1 1 /23/8 3 4 6 810 1416 20 30 40 50 60 100140 200 100 95 90 85 80 75 70 65 H x cD 60 w � 55 m w 50 z LL 45 z w 40 w a 35 30 25 20 15 10 5 0 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS COBBLES GRAVEL SAND SILT OR CLAY fine coarse medium fine E. CONSTRUCTION SWPPP REQUIREMENTS: The project will require grading to construct the proposed building and utilities (including the stormwater control facilities). Standard erosion control measures are proposed to be used during construction. The primary erosion and sediment control BMP during construction will be proper soil stabilization methods. Exposed soils shall be stabilized by application of effective BMPs that protect the soil from the erosive forces of raindrops, flowing water, and wind. Applicable practices include, but not limited to, temporary and permanent seeding, sodding, mulching, plastic covering, erosion control fabrics, matting, the early application of gravel base on areas to be paved, and dust control. The contractor shall select a soil stabilization method best suited for the particular situation. Stockpiles must be stabilized and protected with sediment trapping measures. In addition, site containment of exposed soils shall be sustained by using silt fence barriers along the down -slope boundaries of the site's disturbance areas. See the site development plan for details. Construction Stormwater Pollution Prevention Plan (SWPPP): The following is a summary of the site's erosion control measures that evaluates the typical DOE 13 elements of a SWPPP: Element 1: Mark Clearing Limits: Clearing limits have been delineated on the engineering site development plans. BMP Recommended: Utilized: BMP C233: Silt Fence Element 2: Establish Construction Access: A construction access has been delineated on the engineering site development plans. BMP Recommended: BMP C105: Stabilized Construction Access Element 3: Control Flow Rates: Due to the relatively small size of the site's disturbance areas (less than 0.5 ad; it is recommended to maintain sheet flow dispersion (through downslope perimeter silt fencing) and not install collect swales and a sediment trap that would concentrate runoff flows. During construction silt fencing will provide attenuation of site runoff and upon project completion and stabilization (established lawns and landscape of exposed soils). BMP Recommended: No site specific BMP prescribed. Element 4: Install Sediment Controls: Filter fabric fence has been delineated and detailed on the engineering site development plans. At a minimum, silt fence will be installed along the down gradient perimeter of the disturbed area that will receive sediment -laden runoff. BMP Recommended: BMP C233: Silt Fence Element 5: Stabilize Soils: Soils will be stabilized per the TESC notes listed on the engineering site development plans. BMP Recommended: BMP C120: Temporary and Permanent Seeding and BMP C123: Plastic Covering RAMEngineering, Inc. RAM No. 23-005 654 41" Ave S SFR Stormwater Site Plan Report Page E-1 Element 6: Protect Slopes: Exposed slopes shall be stabilized per the TESC notes listed on the engineering site development plans. BMP Recommended: BMP C120: Temporary and Permanent Seeding and BMP C123: Plastic Covering Element 7: Protect Drain Inlets: Drain inlet protection will be installed on all catch basins that will receive sediment -laden runoff. See the engineering site development plans for locations and detail. BMP Recommended: BMP C220: Inlet Protection Element 8: Stabilize Channels and Outlets: This element is not applicable since there are no temporary channels or outlets proposed. BMP Recommended: BMP C209: Outlet Protection Element 9: Control Pollutants: Pollutants shall be managed as described in the TESC notes listed on the engineering site development plans. BMP Recommended: BMP C151: Concrete Handling Element 10: Control De -Watering: Highly turbid or contaminated de -watering water shall be handled separately from stormwater. The water from all de -watering systems for trenches and foundations shall be treated or disposed of prior to discharging from the site. BMP Recommended: No site specific BMP prescribed. Element 11: Maintain BMPs: BMPs shall be maintained and removed at the end of the project as follows: i. All temporary and permanent erosion and sediment control BMPs shall be inspected, maintained and repaired in accordance with the Drainage Manual or as approved or required by the City to assure continued performance of their intended function in accordance with BMP specifications. ii. The applicant may remove temporary BMPs when they are no longer needed. iii. All temporary erosion and sediment control BMPs shall be removed within 30 days after construction is completed and the City has determined that the site is stabilized. BMP Recommended: BMP C150: Materials on Hand Element 12: Manage the Project: The owner of the site is responsible for managing the installation and maintenance of the site BMPs. BMP Recommended: BMP C150: Materials on Hand and BMP C162: Scheduling. Element 13. Protect Low Impact Development BMPs: No LID stormwater BMPs are proposed. BMP Recommended: No site specific BMP prescribed. Conclusion: The total site disturbance area (0.19 ac.) of the project is less than one acre, thus a formal Department of Ecology Notice of Intent application for NPDES Construction Stormwater Permit coverage is not required. The final site development construction plans include specific grading and drainage improvement notes and details. With proper installation, maintenance, and inspections of the proposed construction the project should have minimal impact on the surrounding environment. RAMEngineering, Inc. RAM No. 23-005 654 41" Ave S SFR Stormwater Site Plan Report Page E-2 F. OPERATION AND MAINTENANCE GUIDELINES: These guidelines are intended to provide operation and maintenance instructions for the project's storm drainage control facilities. The owner is responsible for maintenance of storm drainage facilities within the property (private property owner system); the owner is not responsible for maintenance within the public right-of-way (City system). Private property owner is responsible for properly maintaining the stormwater infrastructure on their property to ensure it operates as designed. The City has developed an inspection program to ensure private property owners are properly maintaining their stormwater systems. This manual is not comprehensive; although it explains the intended operation of the various components of the drainage system, and suggests a routine of inspection and maintenance, it cannot anticipate every problem. Once a historical record of maintenance is established, it may be prudent to alter the routine. It is recommended that maintenance records be kept, and that the records be reviewed periodically. The onsite detention tank system, control structure, junction catch basins, and onsite conveyance pipes are to be privately maintained by the project residence. Maintenance shall include the removal of sediment from the detention tank system, using a vactor truck or equally effective method. Regular inspections of the control structure within the catch basin shall be conducted to detect if non -routine maintenance is required due to sediment or debris blocking or clogging the fixed orifice or standpipe inlet. Regular sediment removal from the catch basins with a vactor truck or equally effective method shall be conducted as determined by regular inspections. Regular inspection and maintenance of the storm filter should occur according to the attached maintenance tables from the Washington State Department of Ecology Stormwater Manual (2019- Volume V). Semi-annual inspections shall be conducted to ensure proper operations of the drainage system. The inspections should occur prior to the winter rain season (Oct/Nov), leaving sufficient time to correct any detected maintenance problems, and at the end of the season (April/May) to determine the effect of the season's runoff. Once a historical basis is developed the frequency of inspection may be modified as necessary. Sediment can build up inside control structures and catch basins, blocking or restricting flow to the inlet. To prevent this problem, these structures should be routinely cleaned. Regular inspections of control structures should be conducted to detect the need for non -routine cleanout. MAINTENANCE REQUIREMENTS ECDC Section 18.30.090 requires privately -owned stormwater management facilities, such as LID BMPs be properly maintained. The owner of the property is the responsible party for such maintenance. The system must be kept in good working order. The entire system should be inspected once per year. An improperly maintained BMP may cause private property or street flooding. RAMEngineering, Inc. RAM No. 23-005 Contact the City Engineering Division for maintenance information. The City may make periodic inspections of BMPs to ensure they are operating properly. ECDC Section 18.30.100 contains the enforcement provisions the City can use to ensure the system is properly maintained. 654 41h Ave S SFR Stormwater Site Plan Report Page F-1 Appendix V-A: BMP Maintenance Tables Ecology intends the facility -specific maintenance standards contained in this section to be conditions for determining if maintenance actions are required as identified through inspection. Recognizing that Permittees have limited maintenance funds and time, Ecology does not require that a Permittee perform all these maintenance activities on all their stormwater BMPs. We leave the determination of importance of each maintenance activity and its priority within the stormwater program to the Permittee. We do expect, however, that sufficient maintenance will occur to ensure that the BMPs continue to operate as designed to protect ground and surface waters. Ecology doesn't intend that these measures identify the facility's required condition at all times between inspections. In other words, exceedance of these conditions at any time between inspections and/or maintenance does not automatically constitute a violation of these standards. However, based upon inspection observations, the Permittee shall adjust inspection and maintenance schedules to minimize the length of time that a facility is in a condition that requires a maintenance action. Table V-A.3: Maintenance Standards - Closed Detention Systems (Tanks/Vaults) Maintenance Results Expected Component Defect Conditions When Maintenance is Needed When Maintenance is Performed Plugged Air Vents One-half of the cross section of a vent is blocked at Vents open and any point or the vent is damaged. functioning. Accumulated sediment depth exceeds 10% of the diameter of the storage area for 1/2 length of storage vault or any point depth exceeds 15% of All sediment and debris Debris and Sediment diameter. removed from storage (Example: 72-inch storage tank would require area. cleaning when sediment reaches depth of 7 inches for more than 1/2 length of tank.) Storage Area Any openings or voids allowing material to be Joints Between transported into facility. All joint between Tank/Pipe Section (Will require engineering analysis to determine tank/pipe sections are sealed. structural stability). Tank Pipe Bent Out of Any part of tank/pipe is bent out of shape more than Tank/pipe repaired or Shape 10% of its design shape. (Review required by replaced to design. engineer to determine structural stability). Cracks wider than 1/2-inch and any evidence of soil Vault replaced or particles entering the structure through the cracks, repaired to design Vault Structure Includes or maintenance/inspection personnel determines specifications and is Cracks in Wall, Bottom, that the vault is not structurally sound. structurally sound. Damage to Frame and/or Top Slab Cracks wider than 1/2-inch at the joint of any No cracks more than inlet/outlet pipe or any evidence of soil particles 1/4-inch wide at the joint entering the vault through the walls. of the inlet/outlet pipe. RAMEngineering, Inc. RAM No. 23-005 654 41h Ave S SFR Stormwater Site Plan Report Page F-2 Table V-A.3: Maintenance Standards - Closed Detention Systems (Tanks/Vaults) Maintenance Results Expected Component Defect Conditions When Maintenance is Needed When Maintenance is Performed Cover Not in Place Cover is missing or only partially in place. Any open Manhole is closed. manhole requires maintenance. Mechanism cannot be opened by one maintenance Locking Mechanism Not person with proper tools. Bolts into frame have less Mechanism opens with Manhole Working than 1/2 inch of thread (may not apply to self-locking proper tools. lids). Cover Difficult to One maintenance person cannot remove lid after Cover can be removed Remove applying normal lifting pressure. Intent is to keep and reinstalled by one cover from sealing off access to maintenance. maintenance person. Ladder is unsafe due to missing rungs, Ladder meets design Ladder Rungs Unsafe misalignment, not securely attached to structure standards. Allows maintenance person wall, rust, or cracks. safe access. See Table V-A.5: See Table V-A.5: Maintenance Standards -Catch See Table V-A.5: Catch Basins Maintenance Standards Basins Maintenance Standards Catch Basins Catch Basins Table V-A.4: Maintenance Standards - Control Structure/Flow Restrictor Maintenance Defect Condition When Maintenance Results Expected When Component is Needed Maintenance is Performed Trash and Debris (Includes Material exceeds 25% of sump Control structure orifice is not Sediment) depth or 1 foot below orifice blocked. All trash and debris plate. removed. Structure is not securely attached to manhole wall. Structure securely attached to wall and outlet pipe. General Structure is not in upright position (allow up to 10% from Structure in correct position. plumb). Structural Damage Connections to outlet pipe are Connections to outlet pipe are watertight; structure repaired or not watertight and show signs of replaced and works as designed. rust. Structure has no holes other than Any holes - other than designed designed holes. holes - in the structure. Cleanout gate is not watertight Gate is watertight and works as or is missing. designed. Gate cannot be moved up and Gate moves up and down easily down by one maintenance and is watertight. Cleanout Gate Damaged or Missing person. Chain/rod leading to gate is Chain is in place and works as missing or damaged. designed. Gate is rusted over 50% of its Gate is repaired or replaced to surface area. meet design standards. Control device is not working Plate is in place and works as Orifice Plate Damaged or Missing properly due to missing, out of designed. place, or bent orifice plate. Obstructions Any trash, debris, sediment, or Plate is free of all obstructions and vegetation blocking the plate. works as designed. RAMEngineering, Inc. RAM No. 23-005 654 41h Ave S SFR Stormwater Site Plan Report Page F-3 Table V-A.4: Maintenance Standards - Control Structure/Flow Restrictor Maintenance Defect Condition When Maintenance Results Expected When Component is Needed Maintenance is Performed Any trash or debris blocking (or Pipe is free of all obstructions and Overflow Pipe Obstructions having the potential of blocking) the overflow pipe. works as designed. See Table V-A.3: Maintenance See Table V-A.3: Maintenance See Table V-A.3: Maintenance Manhole Standards - Closed Detention Standards - Closed Detention Standards - Closed Detention Systems (Tanks/Vaults) Systems (Tanks/Vaults) Systems (Tanks/Vaults) Catch Basin See Table V-A.5: Maintenance See Table V-A.5: Maintenance See Table V-A.5: Maintenance Standards - Catch Basins Standards - Catch Basins Standards - Catch Basins Table V-A.S: Maintenance Standards - Catch Basins Maintenance Results Expected When Component Defect Conditions When Maintenance is Needed Maintenance is performed Trash or debris which is located immediately in front of the catch basin opening or is blocking inletting capacity of the basin by more than 10%. No Trash or debris located immediately in Trash or debris (in the basin) that exceeds 60 percent of front of catch basin or on the sump depth as measured from the bottom of basin grate opening. to invert of the lowest pipe into or out of the basin, but in no case less than a minimum of six inches clearance No trash or debris in the Trash & Debris from the debris surface to the invert of the lowest pipe. catch basin. Trash or debris in any inlet or outlet pipe blocking more Inlet and outlet pipes free than 1/3 of its height. of trash or debris. Dead animals or vegetation that could generate odors No dead animals or that could cause complaints or dangerous gases (e.g., vegetation present within methane). the catch basin. General Sediment (in the basin) that exceeds 60 percent of the sump depth as measured from the bottom of basin to invert of the lowest pipe into or out of the basin, but in no No sediment in the catch Sediment case less than a minimum of 6 inches clearance from basin the sediment surface to the invert of the lowest pipe. Top slab has holes larger than 2 square inches or Top slab is free of holes cracks wider than 1/4 inch. (Intent is to make sure no and cracks. Structure Damage material is running into basin). to Frame and/or Top Slab Frame not sitting flush on top slab, i.e., separation of Frame is sitting flush on more than 3/4 inch of the frame from the top slab. Frame the riser rings or top slab and firmly attached. not securely attached Maintenance person judges that structure is unsound. Basin replaced or Fractures or Grout fillet has separated or cracked wider than 1/2 inch repaired to design standards. Cracks in Basin and longer than 1 foot at the joint of any inlet/outlet pipe Walls/ Bottom or any evidence of soil particles entering catch basin Pipe is regrouted and through cracks. secure at basin wall. RAMEngineering, Inc. RAM No. 23-005 654 41h Ave S SFR Stormwater Site Plan Report Page F-4 Table V-A.S: Maintenance Standards - Catch Basins Maintenance Results Expected When Component Defect Conditions When Maintenance is Needed Maintenance is performed Settlement/ If failure of basin has created a safety, function, or Basin replaced or repaired to design Misalignment design problem. standards. Vegetation growing across and blocking more than 10% No vegetation blocking of the basin opening. opening to basin. Vegetation Vegetation growing in inlet/outlet pipe joints that is more No vegetation or root than six inches tall and less than six inches apart. growth present. Contamination and See Table V-A.1: Maintenance Standards -Detention No pollution present. Ponds Pollution Cover Not in Place Cover is missing or only partially in place. Any open Cover/grate is in place, meets design standards, catch basin requires maintenance. and is secured Locking Mechanism cannot be opened by one maintenance Mechanism opens with Catch Basin Mechanism Not person with proper tools. Bolts into frame have less than proper tools. Cover Working 1/2 inch of thread. One maintenance person cannot remove lid after Cover Difficult to applying normal lifting pressure. Cover can be removed by Remove (Intent is keep cover from sealing off access to one maintenance person. maintenance.) Ladder Rungs Ladder is unsafe due to missing rungs, not securely Ladder meets design standards and allows Ladder Unsafe attached to basin wall, misalignment, rust, cracks, or maintenance person safe sharp edges. access. Grate opening Grate with opening wider than 7/8 inch. Grate opening meets Unsafe design standards. Trash and Debris Trash and debris that is blocking more than 20% of Grate free of trash and Metal Grates (If grate surface inletting capacity. debris. Applicable) Grate is in place, meets Damaged or Grate missing or broken member(s) of the grate. the design standards, and Missing. is installed and aligned with the flow path. Washington State Department of Ecology 2019 Stormwater Management Manual for Western Washington (2019 SWMMWW) Publication No.19-10-021 RAMEngineering, Inc. RAM No. 23-005 654 41h Ave S SFR Stormwater Site Plan Report Page F-5 ENGINEERING, INC. Civil Engineering /Land Planning