Loading...
BLD2024-0804+Geotechnical_Report+Infiltration Tests.6.14.2024_2.03.13_PM+4324101BLD2024-0804 RECEIVED 6/18/24 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PanGE(9P O R A T E D Geotechnical & Earthquake Engineering Consultants June 23, 2022 Project No. 22-237 HBRE Investments Attn: Augustus Bukowski 1951 3rd Avenue West Seattle, WA 98119 Subject: Infiltration Testing Report Proposed Townhomes 310 Daley Street, Edmonds, Washington Dear Mr. Bukowski: As requested, PanGEO, Inc. completed an infiltration assessment of the site soils to assist the project team with the drainage design at the above referenced property. Our service consisted of excavating two test pits, performing two Small Pilot Infiltration Tests (PITS), and preparing this summary report. In summary, the two small pilot infiltration tests completed at the site at depths of about 5 feet and 4'/2 feet yielded steady-state infiltration rates of approximately 0.00 and 0.13 inches per hour, respectively. We appreciate the opportunity to be of service. Please call if you have any questions. Sincerely, Michael H. Xue, P.E. Principal Geotechnical Engineer 3213 Eastlake Avenue E, Ste B Seattle, WA 98102 Tel (206) 262-0370 www.pangeoinc.com TABLE OF CONTENTS 1.0 INTRODUCTION................................................................................................................... 1 2.0 SITE AND PROJECT DESCRIPTION............................................................................... 1 3.0 SUBSURFACE EXPLORATIONS....................................................................................... 1 4.0 SITE GEOLOGY AND SUBSURFACE CONDITIONS ..... 2 4.1 SITE GEOLOGY....................................................................................................................... 2 4.2 SOIL CONDITIONS................................................................................................................... 3 4.3 GROUNDWATER..................................................................................................................... 4 5.0 INFILTRATION TESTING AND RECOMMENDATIONS ..... 4 5.1 TEST METHOD........................................................................................................................ 4 5.2 CORRECTION FACTORS.......................................................................................................... 5 5.3 LONG TERM INFILTRATION RATE FOR DESIGN....................................................................... 5 5.4 CONSTRUCTION CONSIDERATIONS......................................................................................... 6 6.0 LIMITATIONS....................................................................................................................... 7 7.0 LIST OF REFERENCES....................................................................................................... 9 LIST OF ATTACHMENTS Figure 1 Vicinity Map Figure 2 Site and Exploration Plan Appendix A Summary Test Pit Logs Figure A-1 Terms and Symbols for Boring and Test Pit Logs Figure A-2 Log of Test Pit PIT- I Figure A-3 Log of Test Pit PIT-2 22-237 310 Daley St, Edmonds -Infiltration Rpt.doc i PanGEO, Inc. INFILTRATION TESTING REPORT 310 - DALEY STREET I+ DMONDS, WASHINGTON 1.0 INTRODUCTION As requested, PanGEO, Inc. completed an infiltration assessment and testing of the site soils to assist the project team with the drainage design at the above referenced property. Our service consisted of excavating two test pits, performing two Small Pilot Infiltration Tests (PITS), and preparing this summary report. The intent of our work is to evaluate the infiltration feasibility of the site soils and to provide a design infiltration rate, if feasible, for the design of the proposed infiltration system to be constructed at the site. 2.0 SITE AND PROJECT DESCRIPTION The project site consists of an approximate 0.17-acre parcel in downtown Edmonds, Washington (see Figure 1, Vicinity Map). The site is currently occupied by a single -story house in the west half of the parcel (304 Daley Street), and a single -story duplex with a detached garage in the east half of the parcel (312 and 316 Daley Street). The site is bordered by 3rd Avenue North to the west, Daley Street to the north, single-family residences to the south, and a private alley to the east. The grade gently slopes down from about Elevation 54.5 feet in the east end of the site, to about Elevation 52.5 feet in the west end. We understand that you plan to remove the existing building at 312/316 Daley Street and construct a new 4-unit townhome building. We also understand that you plan to convert the exiting building at 304 Daley Street into an office building under a separate permit. Based on review of the preliminary plans, the proposed townhome building will be a 3-story, wood -frame structure. We predict that site grading for the proposed project will include cuts and fill up to about 4 feet for the foundation construction. We understand it is planned to infiltrate surface water from the proposed improvements into the site soils, if feasible. The approximate layout of the site is shown on the attached Figure 2, Site and Exploration Plan. 3.0 SUBSURFACE EXPLORATIONS Two test pits (PIT-1 and PIT-2) were excavated at the project site on May 26, 2022. PIT-1 was excavated to about 5 feet below the existing ground surface for infiltration. PIT-2 was initially 22-237 310 Daley St, Edmonds -Infiltration Rpt.doc l PanGEO, Inc. Infiltration Assessment Proposed Townhomes: 310 — Daley Street, Edmonds, Washington June 23, 2022 excavated to about 41/2 feet for infiltration testing and was then excavated to at about 8 feet deep after the test to look for groundwater mounding or seepage. The approximate test pit locations are shown on the attached Figure 2. The relative in -situ density of cohesionless soils, or the relative consistency of fine-grained soils, was estimated from the excavating action of the excavator, probing the sidewalls with a %2-inch diameter steel rod, and the stability of the test pit sidewalls. Where soil contacts were gradual or undulating, the average depth of the contact was recorded in the log. After the infiltration test was completed, the excavations were backfilled with the excavated soils and the surface was tamped and re -graded smooth. A geologist from our firm was present throughout the boring and infiltration test program to observe the explorations, assist in sampling, and to document the soil samples obtained from the explorations and perform the tests. The summary boring and test pit logs are included in Appendix A. 4.0 SITE GEOLOGY AND SUBSURFACE CONDITIONS 4.1 SITE GEOLOGY Based on our review of the Geologic Map of the Edmonds East and Part of the Edmonds West Quadrangles, Washington (Minard, 1983), and the Composite Geologic Map of the Sno-King Area (Booth et al, 2004) the site is underlain by Pre -Fraser deposits (geologic map unit Qpf) with Whidbey Formation (Qw) mapped to the southwest of the site. Pre -Fraser deposits are typically massive to laminated silts and clays with variable oxidation and bedded sands and gravels. This unit is diamict in parts and typically dense to hard. Pre -Fraser deposits generally exhibit a low infiltration capacity. The Whidbey Formation generally consists of bedded, commonly oxidized, medium -to -coarse - grained sand, and are typically dense to very dense. This unit is similar to the younger Vashon Advance Outwash deposits but is characterized by its stratigraphic position and generally heterogenous grain size. The Whidbey Formation generally has moderate infiltration capability. 22-237 310 Daley St, Edmonds -Infiltration Rpt.doc 2 PanGEO, hic. Infiltration Assessment Proposed Townhomes: 310 — Daley Street, Edmonds, Washington June 23, 2022 4.2 SOIL CONDITIONS For a detailed description of the subsurface conditions encountered at each exploration location, please refer to our summary exploration logs provided in Appendix A. The stratigraphic contacts indicated on the logs represent the approximate depth to boundaries between soil units. Actual transitions between soil units may be more gradual or occur at different elevations. The descriptions of groundwater conditions and depths are likewise approximate. The following is a generalized description of the soils encountered in the test pits. UNIT 1: Topsoil / Fill Both test pits encountered approximately 2 to 3 feet of fill below surface vegetation. The fill encountered in the test pits generally consisted of loose, silty, poorly graded sand with some gravel and organic material. UNIT 2: Pre -Fraser Deposits - Qpf Directly below the fill in PIT-1, we observed dense to very dense, moderately cemented, silty sand with gravel. The upper 2 feet of this unit showed indications of weathering, including iron oxide staining, a disturbed appearance, and was less dense. We interpreted this unit as the Pre -Fraser Possession Drift deposits mapped near the area based on its similarities with glacial till and its proximity to the Whidbey Formation deposits observed in PIT-2. This unit was only observed in PIT-1 and extended to the maximum exploration depth of 5 feet. UNIT 3: Whidbey Formation — Qw Directly below the fill in PIT-2, we observed medium dense to dense, medium -grained sand with trace silt and gravel. We interpreted this unit as the mapped Pre -Fraser Whidbey Formation deposits within the project vicinity based on its heterogenous grain size and oxidized appearance. This unit was only observed in PIT-2, and extended to the maximum exploration depth of 8 feet. Our subsurface descriptions are based on the conditions encountered at the time of our exploration. Soil conditions between our exploration locations may vary from those encountered. The nature and extent of variations between our exploratory locations may not become evident until construction. If variations do appear, PanGEO should be requested to reevaluate the recommendations in this report and to modify or verify them in writing prior to proceeding with earthwork and construction. 22-237 310 Daley St, Edmonds -Infiltration Rpt.doc 3 PanGEO, Iric. Infiltration Assessment Proposed Townhomes: 310 — Daley Street, Edmonds, Washington June 23, 2022 4.3 GROUNDWATER Groundwater or seepage was not observed in PIT-1 at the time of our exploration. However, we observed minor groundwater seepage at the bottom of PIT-2 at about 71/4 feet below grade, following the infiltration testing procedure. It should be noted that groundwater levels will fluctuate depending on the season, amount of rainfall, surface water runoff, tides, and other factors. Generally, the water level is higher and seepage rates are greater in the wetter, winter months (typically October through May). 5.0 INFILTRATION TESTING AND RECOMMENDATIONS Two field infiltration tests, PIT-1 and PIT-2 were performed at the project site on May 26, 2022. The test locations are indicated on the attached Figure 2. The test method and the results are discussed below. 5.1 TEST METHOD The field infiltration tests were conducted in general accordance with the procedure for Small - Scale Pilot Infiltration Test (PIT) as outlined in section B.3.2 of the June 2017 — Edmonds Stormwater Addendum. In general, the test consisted of the following procedure: • A test pit was excavated to the approximate design bottom of the proposed infiltration facilities with a minimum bottom area of 12 square feet. • The test pit was pre-soaked by maintaining a water level of at least 12 inches above the bottom of the pit. • At the end of pre-soak period, a flow meter was used to monitor the amount of water needed to maintain a constant head of 12 inches for at least one hour and until at least a point at which a constant volume of water per time unit was achieved. • At the end of the constant head test, we measured the falling head infiltration rate by shutting off the water flow and recording the drop in water level over regular time intervals for one hour or until all of the water was infiltrated. The field infiltration rate was then calculated based on the final measured volume per time unit, and the surface area of the hole. Based on the site conditions, test equipment and method, and test results, we selected a constant head rate of 0.0 inches per hour and 0.13 inches per hour as the field infiltration rate for PIT-1 and PIT-2, respectively. The results of our test are summarized in Table 1, below. 22-237 310 Daley St, Edmonds - Infiltration Rpt.doc 4 PanGEO, Iric. Infiltration Assessment Proposed Townhomes: 310 — Daley Street, Edmonds, Washington June 23, 2022 5.2 CORRECTION FACTORS The infiltration rates calculated based on field measurements are considered short-term rates and should be reduced through correction factors for design. The corrections factors account for site variability, test method, and number of locations tested, degree of long-term maintenance, and degree of influent control to prevent siltation and bio-buildup. The correction factors are outlined in Appendix B.2 of the June 2017 — Edmonds Stormwater Addendum, and are summarized and discussed below: • Site Variability (CF,) — A range of 0.33 to 1.0 is provided in the Edmonds Stormwater Addendum. Based on the test pits excavated across the project site, the soil conditions at the site vary slightly at the proposed infiltration depth. However, within the footprint of the proposed infiltration facility, the soils remained consistent. In our opinion, a CFI of 1.0 is appropriate for this site. • Test Method (CFt) — For small scale infiltration tests, we assume CFt = 0.5. • Degree of influent control to prevent siltation and bio-buildup (CFm) — Assuming a good degree of control, we assume CFm of 0.9. The Total Correction Factor (CFT) is then calculated as: CFT = CFI x CFt x CFm = 0.45. 5.3 LONG TERM INFILTRATION RATE FOR DESIGN With the Total Correction Factor (CFT) of 0.45, the long-term design rate can be calculated from the field measured rates. Table 1, below, details the infiltration data collected and the long-term design rates calculated for each location. During installation of the infiltration facility, the soil conditions at bottom of the excavation shall be verified by a qualified professional, to verify that the excavation is sufficiently to penetrate into the sand unit of the Formation as observed in test nit PIT-2. 22-237 310 Daley St, Edmonds -Infiltration Rpt.doc 5 PanGEO, hlc. Infiltration Assessment Proposed Townhomes: 310 — Daley Street, Edmonds, Washington June 23, 2022 TABLE 1: Small Pilot Infiltration Test Data Corrected for Long Term Design Rate Field Pre -Soak Long Term Test Test Test Measured Correction Duration Design Rate Location Stage Duration Rate Factor (hrs) (in/hr) (in/hr) PIT-1 at 5 6 Constant 1 hour 0 0.45 0.0 feet Head PIT-2 at 4.5 6 Constant 1 hour 0.13 0.45 0.06 feet Head 5.4 CONSTRUCTION CONSIDERATIONS Infiltration facilities are post -construction facilities which are designed to improve the quality and manage the volume of stormwater runoff by encouraging natural infiltration on -site. In order to protect the infiltration receptor soils from becoming clogged with sediment and/or becoming compacted during construction, we recommend the following measures be implemented during construction: • The infiltration facilities should be constructed as late in the schedule as feasible and should not be constructed until after the upstream areas are stabilized. • Heavy equipment traffic on prepared subgrades should be limited, especially during wet weather. • If fine grained sediment is deposited or tracked onto the infiltration system subgrade, it should be removed using an excavator with a grade plate, a small dozer or a vacuum truck. • The subgrade should be scarified prior to placing fill to prevent sealing of the receptor soils. • Structural fill and aggregate base materials should be end -dumped at the edge of the fill area and the material pushed out over the subgrade. 22-237 310 Daley St, Edmonds -Infiltration Rpt.doc 6 PanGEO, Inc. Infiltration Assessment Proposed Townhomes: 310 — Daley Street, Edmonds, Washington June 23, 2022 • Grading of the infiltration galleries should be accomplished using low -impact earth - moving equipment to prevent compaction of the underlying soils. Wide tracked vehicles such as excavator, small dozers and bobcats are suggested. • The infiltration system subgrade soils should be reviewed after excavation to verify the soils encountered are as anticipated. Test Pit Backfill. It should be noted that the backfill in the test pit locations was not compacted to a dense condition or the requirements of structural fill. As such, during construction of the project, the earthwork contractor should locate the test pits, remove the loose backfill and replace it with properly compacted structural fill, if they are located with the structural loading areas. 6.0 LIMITATIONS We have prepared this report for Augustus Bukowski and the project design team. Recommendations contained in this report are based on a site reconnaissance, a subsurface exploration program, review of pertinent subsurface information, and our understanding of the project. The study was performed using a mutually agreed -upon scope of work. Variations in soil conditions may exist between the locations of the explorations and the actual conditions underlying the site. The nature and extent of soil variations may not be evident until construction occurs. If any soil conditions are encountered at the site that are different from those described in this report, we should be notified immediately to review the applicability of our recommendations. Additionally, we should also be notified to review the applicability of our recommendations if there are any changes in the project scope. The scope of our work does not include services related to construction safety precautions. Our recommendations are not intended to direct the contractors' methods, techniques, sequences or procedures, except as specifically described in our report for consideration in design. Additionally, the scope of our work specifically excludes the assessment of environmental characteristics, particularly those involving hazardous substances. This report has been prepared for planning and design purposes for specific application to the proposed project in accordance with the generally accepted standards of local practice at the time this report was written. No warranty, express or implied, is made. 22-237 310 Daley St, Edmonds -Infiltration Rpt.doc 7 PanGEO, Iric. Infiltration Assessment Proposed Townhomes: 310 — Daley Street, Edmonds, Washington June 23, 2022 This report may be used only by the client and for the purposes stated, within a reasonable time from its issuance. Land use, site conditions (both off and on -site), or other factors including advances in our understanding of applied science, may change over time and could materially affect our findings. Therefore, this report should not be relied upon after 24 months from its issuance. PanGEO should be notified if the project is delayed by more than 24 months from the date of this report so that we may review the applicability of our conclusions considering the time lapse. It is the client's responsibility to see that all parties to this project, including the designer, contractor, subcontractors, etc., are made aware of this report in its entirety. The use of information contained in this report for bidding purposes should be done at the contractor's option and risk. Any party other than the client who wishes to use this report shall notify PanGEO of such intended use and for permission to copy this report. Based on the intended use of the report, PanGEO may require that additional work be performed and that an updated report be reissued. Noncompliance with any of these requirements will release PanGEO from any liability resulting from the use this report. We appreciate the opportunity to be of service. Sincerely, of wash\ f <; 21034819 N��sed Ge osepapcevidfi7 Joe Dapcevich, L.G. Staff Geologist 6A"leae? Michael H. Xue, P.E. Principal Geotechnical Engineer 22-237 310 Daley St, Edmonds -Infiltration Rpt.doc 8 PanGEO, hic. Infiltration Assessment Proposed Townhomes: 310 — Daley Street, Edmonds, Washington June 23, 2022 7.0 LIST OF REFERENCES Booth, D. B., Cox, B.F., Troost, K. A., and Shimel, S. A., 2004, The Composite Geologic Map of Sno-King Area, Central Puget Lowland, Washington: scale 1: 24, 000. Minard, J.P., 1983, Geologic Map of the Edmonds East and Part of the Edmonds West Quadrangles, Washington: United States Geological Survey, scale 1:24000. City of Edmonds, 2017, Appendix B, Edmonds Stormwater Addendum. 22-237 310 Daley St, Edmonds -Infiltration Rpt.doc 9 PanGEO, Iric. Pagel Way kle"y Ln Hint ky In r' a ao p caspers st Puget Gntrer In VRa P Sound D 2 � Z .c Abrti' St v Z =a .-dip .,ay a �_ r v:r, A. PI s4� Project Site v r ,�kn �: 'c, 2 e b 8 tec lens � �5 _aNy �1 landny J I CirK l:enYr Ptaytwlrt fy�o Sva911e St Z ra loos 2 Ily3 C.. Cenlrr Q Bra lens P a 2 Pbyteld Landry 1; uth' n P Z P E nd. NW 95th St ? ;bn - A MtaA. Bell 5! Edn.•nd soundE.- C-1e^ Etinonds Ednknds %yme North Gatan E Omtu J Biurc F.- l _ E And.— Ve Caybn St pa,.pn cl i e u < r � Abpk St N D A Wei G 7a f Aldef St 'e 4 C Beck L� a r. "'Arad St �yonw oe �Eamo as __ Alo unll�kz a "�It, L'1 icr— ce'ar -f Hxnmors Bothell y �ShOrBInE Lkx _:��.h'oo�invilb iFf lKe � a P„i nomela, lc� a' - Niysyale Ile^A�aD �embck Wav Kl�kl�iii.l F liii�.i� Base Map: ESRI Topographic 6ellevue ' 'v �:attl� Map Not to Scale RmGEG) Infiltration Test VICINITY MAP 310 Daley Street I N C D R P D R AT ED Edmonds, Washington Project No. 22-237 Figure No. 1 yy / R PIT-1 0WV Z63: i O / \O / K / PEAK FF]Olir / ELEV - 8181 FT / Le end DALEY SJREET Y. •t ,, •j T� i !•' 1 0 Y� "+ W A L K � � •1 ,1 \ 1} 4Y. 1 ww. 5:T J"` f \ � �'r• �s' ,i y .I• / l / / \ 196 -y� t ,:• O 1Y ET / ` • r � • \ i , 'yam,., / �11 • �zti4a r /' /' rm r rf�F.6� J t }, '�l l 7�._ `9 ''r, ♦ � ,�1�11 i ------- I +.••rg„u:✓5;; 1 � PpRCH / A,' ♦♦ r l • 111� 1ff •{• /� PIT—L / ?•*+~'/tar{ r. FINISHED FLOOR ( j 66 ♦♦♦ , •,11 ' ' , s' �1AH ELEV. - 54.81 FT, f 1 I' ET ♦ 11) // ,r i'•�t y i M 53.16 PEAK HEIGHT 11 O �♦ ••T: I 1�1 ._.:r�'ir:Y :.\ }� s• ELEV. 66.89 FT. -----'tY ET /7 ♦ �; • ♦�' N 51a9 ((r 6 �1• BUILDING 1 O 0 �♦ ,' ; y ti L ,F 304 DALEY ST. EyECTRIC METER O 1♦ s P \ ♦♦ bb��• " w� " i'1'y 2'`i t .' PORC �� ♦ / :1♦ wir :,•".fir` ', '\'+� / 46 ( \\ / , ��/ y♦♦ �\ /!'' �.�rr'a ice,,„ 26 / M 1t qa- oT BUILDING �♦ / ♦♦ 111, / O /• _ � 3' 2/316 DALEY ST. �♦ - \x/'/ \.\ 1♦♦ PEAK CHT e / \ O \\ i ♦♦ /) ELEV'♦. ,.r +� .DTI O t ♦r\ #107 At, 111 : GARAGE 2 , tir `�: ri•v'.::.:{t; ro:� �7yR•+•4 \ ,N •TCH n.cL:\, ..b}•�':'�,'yt t. f k yt I� Project Site °���tr -.:.•' :�,: `.,., r�/�. t>, I Vim')/•i•�:\: Sri �' ♦/S .., 1�.. �:'«CY.•SM �J TOP OF TRANSFORMER Pro osed Structures '� f`' •°``' _ "•• r� .`: i'°f+ ,!i' %;y ^ • •`C- 1•• .� p /• `a •_ + •+ 1 fr. .:ti�'S:w1P."c :k Mfr. F:�+jw: -•' "V �f F'r :'.'.'•.Ri,'.'.<. ELEV. 89.06 FT. r "'/r. ra vn: �.tz!�. .PT :+.:f�:r:+,'. a:+q+•�r r.4�:Y:. :� _ /.� ' 17. 1' -r.;i"1 •:.:',}��ri+r': i�J ti: " V� .:.ti.'„;r 3� rit / a �9 •.r ;) • •• � •.' � ./: y, nth, ' 'i- ,itiV., 7 : fs:.F'y� •t ri`+.r,_' a ».r.-'i•, rf: .9 .;t• _ ':.�•,i, I,y.,. � •�y^ r-.°. 'S'.t.!iJ�' Existing Structures r: p .�' +fit . r „-. ir'�-•;;.-.;a,;'r;. ;,'' �,,: Scale: Approx. Infiltration Test Pit Location '` �''!`�"''`t '''�r ..�� ,, �•.t ,. BLDG. y 1 inch - 12 feet Note: Base map modified from Topographic Survey provided by Chadwick & Winters, 7/29/2021 APPENDIX A SUMMARY TEST PIT LOGS RELATIVE DENSITY / CONSISTENCY SAND / GRAVEL SILT / CLAY SPT Approx. Relative SPT Approx. Undrained Shear DensityN-values Density (%) Consistency N-values Strength (psf) Very Loose <4 <15 Very Soft <2 <250 Loose 4 to 10 15.35 Soft 2 to 4 250.500 Med. Dense 10 to 30 35.65 Med. Stiff 4 to 8 500.1000 Dense 30 to 50 65.85 Stiff 8 to 15 1000.2000 Very Dense >50 85.100 Very Stiff 15 to 30 2000.4000 Hard >30 >4000 UNIFIED SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP DESCRIPTIONS •�' GW: Well -graded GRAVEL Gravel GRAVEL (<5% fines) '' •••••I...................................................... 50% or more of the coarse GP : Poorly -graded GRAVEL fraction retained on the #4 sieve. Use dual symbols (eg. ............................. o ° .....:...................................................... GM Silty GRAVEL GP -GM) for 5% to 12% fines. o GRAVEL(>12/ofines) •••••••••••••••••••••••••••••• GC : ........................••• Clayey GRAVEL ...................................................................... .......................................................... SW: Well -graded SAND "" Sand SAND (<5/o fines) 50% or more of the coarse SP Poorly -graded SAND fraction passing the 94 sieve. Use dual symbols SP-SM) •• ••� �• ;; ; SM : Silty SAND for 5%to12%fines. o •SAND(>12/o fines) ••••••••••••••••••••••••••••••••••••••••••••••••••••••••• SC : Clayey SAND •• ...............................•• ............................. ............................................................ MIL : : SILT Liquid Limit < 50 CL : ............................................................ ...................................................... Lean CLAY Silt and Clay =— _— OL : Organic SILT or CLAY 50%or more passing #200 sieve :.................................. ......................................................... MH : Elastic SILT Liquid Limit > 50 CH Fat CLAY ..............................-................................. OH ............................................................ Organic SILT or CLAY _ , HighlyOrganic Soils PT : PEAT Notes: 1. Soil exploration to s contain material descriptions based on visual observation and field tests using a system modified from the Uniform Soil Classification System (USCS). Where necessary laboratory tests have been conducted (as noted in the "Other Tests" column), unit descriptions may include a classification. Please refer to the discussions in the report text for a more complete description of the subsurface conditions. 2. The graphic symbols given above are not inclusive of all symbols that may appear on the borehole logs. Other symbols may be used where field observations indicated mixed soil constituents or dual constituent materials. DESCRIPTIONS OF SOIL STRUCTURES Layered: Units of material distinguished by color and/or Fissured: Breaks along defined planes composition from material units above and below Slickensided: Fracture planes that are polished or glossy Laminated: Layers of soil typically 0.05 to 1 mm thick, max. 1 cm Blocky: Angular soil lumps that resist breakdown Lens: Layer of soil that pinches out laterally Disrupted: Soil that is broken and mixed Interlayered: Alternating layers of differing soil material Scattered: Less than one per foot Pocket: Erratic, discontinuous deposit of limited extent Numerous: More than one per foot Homogeneous: Soil with uniform color and composition throughout BCN: Angle between bedding plane and a plane normal to core axis COMPONENT DEFINITIONS COMPONENT SIZE / SIEVE RANGE COMPONENT SIZE / SIEVE RANGE Boulder: > 12 inches Sand Cobbles: 3 to 12 inches Coarse Sand: #4 to #10 sieve (4.5 to 2.0 mm) Gravel Medium Sand: #10 to #40 sieve (2.0 to 0.42 mm) Coarse Gravel: 3 to 3/4 inches Fine Sand: #40 to #200 sieve (0.42 to 0.074 mm) Fine Gravel: 3/4 inches to #4 sieve Silt 0.074 to 0.002 mm Clay <0.002 mm TEST SYMBOLS for In Situ and Laboratory Tests listed in "Other Tests" column. ATT Atterberg Limit Test Comp Compaction Tests Con Consolidation DID Dry Density DS Direct Shear %F Fines Content GS Grain Size Perm Permeability PP Pocket Penetrometer R R-value SG Specific Gravity TV Torvane TXC Triaxial Compression UCC Unconfined Compression SYMBOLS Sample/In Situ test types and intervals ®2-inch OD Split Spoon, SPT (140-lb. hammer, 30" drop) B3.25-inch OD Spilt Spoon (300-lb hammer, 30" drop) Non-standard penetration test (see boring log for details) Thin wall (Shelby) tube Grab Rock core ® Vane Shear MONITORING WELL SZ Groundwater Level at time of drilling (ATD) 1 Static Groundwater Level Cement / Concrete Seal Bentonite grout / seal Silica sand backfill Slotted tip Slough Bottom of Boring MOISTURE CONTENT Dry Dusty, dry to the touch Moist Damp but no visible water Wet Visible free water PanGEO Terms and Symbols for I N C O R P O R A T E D Boring and Test Pit Logs Figure A-1 Phone: 206.262.0370 Test Pit Logs Project No: Project Name: Project Location: Excavated: 22-237 Proposed Residential Development 310 Daley Street, Edmonds, WA 5/26/2022 by Hilltop Excavation Test Pit No. PIT-1 Location: 47.81362,-122.37759 (WGS84) Approximate ground surface elevation: 52.5 feet (Topographic Survey) Depth ft Material Description Loose, dark brown, silty, fine SAND with trace gravel, moist; numerous roots 0-2 and organics [Topsoil / Fill] Medium dense to dense, brown -gray, slightly silty, f-m SAND with trace gravel, 2 — 41/2 moist; minor iron oxide staining [Weathered Pre -Fraser Deposits] ........................................................................................................................................................................................................................................................ Very dense, gray -blue, silty, f-m SAND with some f-m gravel, moist; moderately 41/2 — 5 cemented [Pre -Fraser Deposits - Qpf] fvt Yf Image of PIT-1 at approximately 5 feet below the existing ground surface (testing depth). Groundwater seepage was not observed during excavation. Logged by: J. Dapcevich PmGEO I N C O R P O R A T E D Geotechnlcal 8 Earthquake Eng/nearing Consultants Figure A-2 Test Pit Logs Project No: Project Name: Project Location: Excavated: 22-237 Proposed Residential Development 310 Daley Street, Edmonds, WA 5/26/2022 by Hilltop Excavation Test Pit No. PIT-2 Location: 47.81364,-122.37709 (WGS84) Approximate ground surface elevation: 54.5 feet (Topographic Survey) Depth ft Material Description 0 — 3'/z Loose, dark brown, silty, fine SAND with trace gravel, moist; numerous tree roots and organics [Topsoil / Fill] Medium dense to dense, brown -gray, medium SAND with trace silt and gravel, moist; iron oxide staining [Whidbey Formation - Qw] 3'/z — 8 - Becomes very moist at 4 feet, and gray -blue at 41/2 feet - Occasional lenses of m-c sand from 6 to 8 feet t 1 t ;r Image of PIT-2 at approximately 4%2 feet below the existing ground surface (testing depth). PIT-2 was excavated to approximately 8 feet below grade following the infiltration test. Minor groundwater seepage was observed at about 73/4 feet below grade. Logged by: J. Dapcevich PmGEI@ I N C O R P O R A T E D Geotechnlcal 8 Earthquake Eng/nearing Consultants Figure A-3