Loading...
APPROVED ENG BLD2023-1083+Transportation_Impact_Form+10.18.2023_6.23.24_AM+3846824APPENDIX A Page 1 of 2 Transportation Impact Analysis RECEIVED Oct 20 2023 CITY OF EDMONDS Worksheet DEVELOPMENT SERVICES BLD2023-1083 PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: Hopper Residence Owner/Applicant Daren & Kari Hopper Name 11924 42nd Dr SE Street/Mailing Address Everett City Telephone: 425-876-2265 WA State Applicant Contact Person: Jacob Strobl Name 1122NJSt Street/Mailing Address 98208 Tacoma Zip City Telephone: 206-661-3622 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Contact Name Telephone: E-mail: 1. PROJECT DESCRIPTION a. Location - Street address: 1005 Olympic Ave b. Specify existing land use: _ Vacant Land WA 98403 State Zip (Attach a vicinity map and site plan.) c. Specify proposed type and size of development: 1 single family home (# of residential units and✓or square footage of building) d. Date construction will begin and be completed: 12/1 /2024 e. Define proposed access locations: Driveway off private road with access to Olympic Ave f Define proposed sight distance at site egress locations: _Approximately 31 feet HANDOUT UPDATED 05.09.2023 APPENDIX A Page 2 of 2 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC 3.36.130. Check the applicable box below and calculate the fees as necessary: ❑ NO CHANGE C CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. ITE Land Use Category Per Unit Fee Rate New Use 210 -Single-family house $ 6,249.14 Prior Use Vacant Land $ 0 Units in square feet, Use Fee # of dwelling, etc. X 1 = $ 6,249.14 X = $ New Use Fee: $ - Prior Use Fee: $ 0 = FEE DUE: $ 6,249.14 ' X NEW DEVELOPMENT Project considered new development, but the fee state is correct. Per Unit Fee ITE Land Use Category Rate New Use $ ❑ INDEPENDENT FEE CALCULATION Units in square feet, FEE # of dwelling, etc. X = $ FEE DUE Impact/Mitigation Fee: 1 $ Independent Review Fee: $296.00 (+ peer review fee) 1 $ ENGINEERING DIVISION APPROVED AS NOTED 1 /11 /2024 City of Edmonds, Engineering Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 05.09.2023 2017-2019 - Impact Fee Rate Table Fee 2017 2018 2019 and beyond ITE Land Use Code - Description Calculation (w/ $2,543.01 (w/ $4,036.61 (w/ $5,530.21 cost per trip)* cost per tri )* cost er trip)* 110 - Light Industrial per sq. foot $3.64 $5.77 $7.91 140 - Manufacturing per sq. foot $2.72 $4.32 $5.92 151 - Mini -warehouse per sq. foot $0.97 $1.54 $2.10 210 - Single-family house per duwet ling $2,873.60 $4,561.37 $6,249.14 ni 220 - Apartment per duwetling $1,881.83 $2,987.09 $4,092.36 ni 230 - Condominium per dlwetling $1,525.81 $2,421.97 $3,318.13 ni 240 - Mobile home per duwetling $1,627.53 $2,583.43 $3,539.33 ni 251 - Senior Housing per dlwetling $584.89 $928.42 $1,271.95 ni 320 - Motel per room $1,525.81 $2,421.97 $3,318.13 420 - Marina per boat berth $457.74 $726.59 $995.44 444 - Movie theater per screens $31,905.90 $50,645.37 $69,384.85 492 - Health/fitness club per sq. foot $6.74 $10.98 $14.66 530 - High school per sq. foot $1.98 $3.15 $4.31 560 - Church per sq. foot $1.68 $2.67 $3.65 565 - Day care center per sq. foot $15.77 $25.02 $34.29 620 - Nursing home per bed $483.17 $766.96 $1,050.74 710 - General office per sq. foot $5.01 $7.95 $10.89 720 - Medical office per sq. foot $9.54 $15.14 $20.74 820 - Shopping center per sq. foot $3.26 $5.17 $7.08 826 - Specialty retail per sq. foot $2.06 $3.27 $4.48 850 - Supermarket per sq. foot $10.50 $16.84 $22.84 850 - Convenience market 15-16hrs per sq. foot $14.07 $22.38 $30.58 912 - Drive-in bank per sq. foot $15.97 $25.41 $34.73 932 - Restaurant: sit-down per sq. foot $10.04 $15.95 $21.84 933 - Fast food, no drive -up per sq. foot $22.28 $35.36 $48.44 934 - Fast food with drive -up per sq. foot $26.24 $41.66 $57.07 936 - Coffee/donut shop, no drive- per sq. foot $13.88 $22.04 $30.19 u 938 - Coffee/donut shop, drive -up, per sq. foot $25.56 $40.37 $55.58 no indoor seating per vehicle 945 - Gas station with convenience fueling $6,916.99 $10,979.58 $15,042.18 position EFFECTIVE EFFECTIVE EFFECTIVE 1/1/2017 1/1/2018 1/1/2019 *Note: ITE Trip Generation (9t' Edition) _> 4pm-6pm PM Peak Hour Trip Ends HANDOUT UPDATED 05.09.2023