Design Clarification Memo
Carranza Residence
Project No. 22373.10
DCM No. 1
To: David Eli
From: Dennis Titus, PE, SE
CC: Mario Carranza
Date: 5/6/24
Construction is underway for the Carranza residence. We understand that the inspector had questions regarding
some items that varied from the approved structural plans. Please refer to the responses below. If you have any
questions, please feel free to contact us.
1. Column C2 was not provided at the entry door. Provide a C2 column (3 cripple studs, HF Stud) per the
structural plans at this location.
2. We understand that there is a question of how the shear will transfer from the trusses. Refer to detail
1/S6.1 .
1 250 4th Avenue South, Suite 2(
Carranza Residence
Design Clarification
3. We understand that HF#2 columns were used instead of HF#1. This is acceptable.
May 6, 2024
Page 2 of 2
4. We understand that (4) 2x4 and (1) 2x6 were used at the column shown below instead of the C4 (46)
specified on the plan. This is acceptable.
3: ,
4x8 HF#2 ;- 6 3/4 x 19 112 GLB
HaR
5W4
�13
6 ; 4
,r
(RIDGE)
SISTER NEW 2x8 HF42
TO EXIST 2x4 @ 24"
OC ROOF JOISTS
5. A header and columns were requested for an opening in the basement wall framing. Headers not
specified on the plan should be 46 HF#2 as specified in plan note 8 on 52.2.
6. We understand that there is a question regarding new sheathing. At all locations where new or existing
shear walls are specified on the plans, new sheathing shall be provided if there is no existing sheathing.
Horizontal siding is not adequate at the specified shear wall locations.