Loading...
REV1 REVIEWED BLD2023-0553+75% FORM+10.27.2023_1.28.19_PM+3866471REVISION .......... .RE�BwEo............. p CITY OF EDMONDS BLD2023-0553 Oct 27 2023 ; BUILDING DEPARTMENT! l.13.1i ............................................i CITY OFEE D S .�j DEVELOPMN RVICE� ,r DEPARTr E T ' ' Address: 9215 OLYMPIC VIEW DR Home Owner: Permit # BLD2023-0553 MARTA GADDA & MARIO CARRANZA Contractor: Keystone Remodeling Inc This form may be used to help establish the percentage of demolition work performed to an existing home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing home's replacement cost (50% in a flood zone), the structure will be required to be rebuilt to the standards of new construction. See ECDC 19.00.045 Replacement cost of existing home $ $550,000 How was the value determined? Gross floor area cost per s.f. Total replacement Percent replaced Replacement cost Foundation $51,319 90.0% $46,197 Floor Framing $16,899 50.0% $3,450 Floor Insulation $2,080 100.0% $2,080 Wall Framing $61,271 20.0% $12,254 Wall Insulation $8,319 100.0% $8,319 Siding $30,103 10.0% $3,010 Roof Framing $20,654 65.0% $13,425 Roofing $25,219 0.0% $0 Attic Insulation $10,399 100.0% $10,399 Windows $56,715 100.0% $56,715 Doors $30,129 100.0% $30,129 Plumbing $37,102 90.0% $33,392 Electrical $37,085 90.0% $33,377 HVAC $50,749 90.0% $45,674 Drywall $21,306 100.0% $21,306 Cabinets $28,295 100.0% $28,295 Painting, Flooring and Finishes $41,552 100.0% $41,552 Other $20,805 40.0% $8,322 Total $550,001 $402,886 Percentage Re4oveo(Total of Col Owner, 4 divided by Column 2) equals 73.25 % 73.25°r5 e 10.26.23 Contractor V uoj,'� Date 10/27/23