CITY OF EDMONDS BLD2023-0553
Oct 27 2023 ;
BUILDING DEPARTMENT!
l.13.1i
............................................i
CITY OFEE D S .�j
DEVELOPMN RVICE� ,r
DEPARTr E T '
' Address: 9215 OLYMPIC VIEW DR
Home Owner:
Permit # BLD2023-0553
MARTA GADDA & MARIO CARRANZA
Contractor: Keystone Remodeling Inc
This form may be used to help establish the percentage of demolition work performed to an existing
home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing
home's replacement cost (50% in a flood zone), the structure will be required to be rebuilt to the
standards of new construction. See ECDC 19.00.045
Replacement cost of existing home $ $550,000
How was the value determined? Gross floor area cost per s.f.
Total replacement Percent replaced Replacement cost
Foundation
$51,319
90.0%
$46,197
Floor Framing
$16,899
50.0%
$3,450
Floor Insulation
$2,080
100.0%
$2,080
Wall Framing
$61,271
20.0%
$12,254
Wall Insulation
$8,319
100.0%
$8,319
Siding
$30,103
10.0%
$3,010
Roof Framing
$20,654
65.0%
$13,425
Roofing
$25,219
0.0%
$0
Attic Insulation
$10,399
100.0%
$10,399
Windows
$56,715
100.0%
$56,715
Doors
$30,129
100.0%
$30,129
Plumbing
$37,102
90.0%
$33,392
Electrical
$37,085
90.0%
$33,377
HVAC
$50,749
90.0%
$45,674
Drywall
$21,306
100.0%
$21,306
Cabinets
$28,295
100.0%
$28,295
Painting, Flooring and
Finishes
$41,552
100.0%
$41,552
Other
$20,805
40.0%
$8,322
Total
$550,001
$402,886
Percentage Re4oveo(Total of Col
Owner,
4 divided by Column 2) equals 73.25 %
73.25°r5
e 10.26.23
Contractor V uoj,'� Date 10/27/23