Loading...
REV2 REVIEWED BLD2023-0553+75% Form+3.13.2024_11.21.19_AM+4126730Permit # BLDG2023-0553 Address: 9215 Olympic View Dr Home Owner: Marta Gadda and Mario Caranza Contractor: Keystone Remodeling REVISION Mar 13 2024 BLD2023-0553 ........... REVIEWED BY CITY OF EDMONDS BUILDING DEPARTMENT. This form may be used to help establish the percentage of demolition work performed to an existing home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing home's replacement cost (50% in a flood zone), the structure will be required to be rebuilt to the standards of new construction. See ECDC 19.00.045 Replacement cost of existing home $ 324,395 How was the value determined? contractor estimate Value of Percentage Existing removed C ornnonPnt Replacement Notes cost of removed component Foundation $S1,319 90.0% $46,187 Floor Framing $7,000 26.0% $1,820 Floor Insulation $0 0.0% $0 Wall Framing $25,S00 59.0% $15,045 Wall insulation $3,500 100.0% $3,500 Siding $19,456 21.0% $4,086 Roof Framing $8,500 5.0% $425 Roofing $2S,219 0.0% $0 Attic Insulation $4,S00 100.0% $4,500 Windows $13,863 100.0% $13,863 Doors $7,134 100.0% $7,134 Plumbing $3S,000 100.0% $35,000 Electrical $20,400 9S.0% $19,380 HVAC $18,885 100.0% $18,885 _ Drywall $14,328 100.0% $14,328 Cabinets $22,117 100.0% $22,117 Painting, Flooring and Finishes $26,869 100.0% $26,869 Other $20,805 40.0% $8,322 Total $324,395 $241,461 Percentage Removed (Total o Column 4 divided by Column 2) equals 74.43 Duo Owner Date 3 f•2 'Z Contractor MLO*�_,000LF*VDateV