Loading...
REV2 REVIEWED BLD2023-0553+Revision Scope+3.13.2024_11.21.18_AM+4126729BLD2023-0553 REVISION (� Mar 13 2024 l..l '� I pp �i I REVIEWED BY CITY OF EDMONDS UN/.BACH :BUILDING DEPARTMENT? .............................................. Arch i t e c t 7711 1 C+I ttle, WA 981179 206.427.3871 . umbachdwumbachdw�hotmail.com 03.13.24 City of Edmonds Re: Revisions to BLD2023-0553 Site Information: PARCEL # PROJECT ADDRESS PROJECT # OWNER ZONING OVERLAY ECA PARCEL AREA PROPOSED USE 27031300101000 9215 Olympic View Dr Marta Gadda & Mario Carranza RS-12 STEEP SLOPE (NO CHANGE IN FOOTPRINT) .23 ACRES SINGLE FAMILY This memo supersedes the memo dated 03.04.24. This memo is provided in conjunction with the updated 75% demolition form and updated plan set dated 03.12.24. Project Revision: The attached updated 75% demolition form is being provided in response to city inspector's concerns regarding the 75% limit as outlined in the 10.26.23 version of that form. The first thing to note about the update is that the project budget numbers have been revised to reflect the actual construction contract. The original form was submitted well before the owners had a contractor on board and before any contract or subcontract pricing was available. The numbers on the original form were derived from an overall cost per square foot that was apportioned based on the line -item costs from a recent new single-family home for which a complete construction budget was available. When the foundation revision came up in October it was decided to continue with the original estimate numbers just to keep things simple. For this new revision the line items have been substituted with values from the actual construction contract. The earlier numbers were weighted more heavily in some of the areas that we are replacing (HVAC, cabinets and windows, for instance) simply because the template budget had higher relative costs in those areas. This updated version accurately the actual pricing. Line item percentages have also been modified to reflect existing construction that was demolished beyond the prescribed percentages, as well as some areas where Less demolition was required and where the existing structure was left in place and simply reinforced. These revised numbers reflect field measurements of existing conditions as of 03.08.24 and related to new sheet A2.02 in the plan set which diagrams the percentages of wall framing and siding. Other modifications have been made to the plan set to reflect changes in window dimensions and locations. • Floor Framing has been reduced to 26%. This reflects the actual area of floor framing that was completely removed and replaced. These areas are indicated on the revised demolition plan on sheet A2.0. The rest of the floor framing was Left in place and reinforced. • Floor insulation was completely removed from the calculation. That's because there was no existing insulation to be demolished. There is new insulation in the floor slab, but there was no analogous component removed. • Wall framing and siding have been increased. These areas were demolished to a higher degree than was proposed for practicality and constructability reasons. Wall framing has been increased to 59% and siding has been increased to 21 %. These areas are diagramed on new sheet A2.02 0 Roof framing, similar to floor framing, was left largely intact and reinforced. The ridge board was replaced with a beam, but the existingjoists were all left in place. Roof framing has been reduced to 5%. Plumbing and HVAC have been increased to 100%. Electrical has been increased to 95% (the old panel is still there). Please let me know if there are further questions. VM16,�� ci.�a 2of2