Loading...
REVIEWED BLD2023-0553+75% Form+6.7.2023_9.34.39_AM+3593441Permit # BLD2023-0553 RECEIVED o1,n 07 2023 41 OF F.D.b p \+ J ' Address: 9215 OLYMPIC VIEW DR Home Owner: MARTA GADDA & MARIO CARRANZA Contractor: Not yet selected This form may be used to help establish the percentage of demolition work performed to an existing home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing home's replacement cost (50% in a flood zone), the structure will be required to be rebuilt to the standards of new construction. See ECDC 19.00.045 Replacement cost of existing home $ $550,000 How was the value determined? Gross floor area cost per s.f. Component Value of Existing Component Percentage removed Replacement cost of removed component Notes Foundation 51,319 5% $2,566 Floor Framing 16,899 65% $10,984 Floor Insulation 2,080 0% $0 Wall Framing 61,271 20% $12,254 Wall Insulation 8,319 100% $8,319 Siding 30,103 100% $30,103 Roof Framing 20,654 65% $13,425 Roofing 25,219 0% $0 Attic Insulation 10,399 100% $10,399 Windows 56,715 100% $56,715 Doors 30,129 100% $30,129 Plumbing 1 37,102 90% $33,392 Electrical 37,085 90% $33,376 HVAC 50,749 90% $45,674 Drywall 21,306 90% $19,175 Cabinets 28,295 100% $28,295 Painting, Flooring and Finishes 41,552 100% $41,552 Other 20,805 40% Tota 1 550,000 $384,681 Percentage Owner Contractor (Total of Coluptn 4 divided by Column 2) equals 69.9% % ■ 1.The construction project involves demolition of a significant portion of the existing structure. Structures that are demolished to the level that meets or exceeds 75% of the replacement cost ■ ■ of the structure will not be allowed by city code to be rebuilt except to full -on standards for new construction. Reference Edmonds Community Development Code section 19.00.045. ■ ■ Demolition of portions of the structure is limited to that clearly shown on the approved permit plans, and will be verified by the building inspector. ■ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . �♦ .., n� - ,.,.,...,. I. REVIEWED.,.,., Date (�"// ,4 BY CITY OF EDMONDS 3 BUILDING DEPARTMENT. Date......................... I ..................... € APPROVED PLANS MUST BE ON JOB SITE ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE ................................. ' The following documentation shall be available on site for the building inspector: ®COE APPROVED ARCHITECTURAL PLAN SET ❑ COE APPROVED STRUCTURAL PLAN SET ❑COE REVIEWED CALCULATION PACKET '[]ENERGY CREDIT WORKSHEET ❑ SITE PLAN ; ❑ CIVIL PLAN ;X Approved 75% form :❑ .......... ,.,.,.................,..............