REVIEWED BLD2023-0553+75% Form+6.7.2023_9.34.39_AM+3593441Permit # BLD2023-0553
RECEIVED
o1,n 07 2023
41
OF F.D.b
p
\+ J
' Address:
9215 OLYMPIC VIEW DR
Home Owner:
MARTA GADDA & MARIO CARRANZA
Contractor: Not yet selected
This form may be used to help establish the percentage of demolition work performed to an existing
home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing
home's replacement cost (50% in a flood zone), the structure will be required to be rebuilt to the
standards of new construction. See ECDC 19.00.045
Replacement cost of existing home $ $550,000
How was the value determined? Gross floor area cost per s.f.
Component
Value of
Existing
Component
Percentage
removed
Replacement
cost of removed
component
Notes
Foundation
51,319
5%
$2,566
Floor Framing
16,899
65%
$10,984
Floor Insulation
2,080
0%
$0
Wall Framing
61,271
20%
$12,254
Wall Insulation
8,319
100%
$8,319
Siding
30,103
100%
$30,103
Roof Framing
20,654
65%
$13,425
Roofing
25,219
0%
$0
Attic Insulation
10,399
100%
$10,399
Windows
56,715
100%
$56,715
Doors
30,129
100%
$30,129
Plumbing
1 37,102
90%
$33,392
Electrical
37,085
90%
$33,376
HVAC
50,749
90%
$45,674
Drywall
21,306
90%
$19,175
Cabinets
28,295
100%
$28,295
Painting, Flooring
and Finishes
41,552
100%
$41,552
Other
20,805
40%
Tota 1
550,000
$384,681
Percentage
Owner
Contractor
(Total of Coluptn 4 divided by Column 2) equals 69.9% %
■ 1.The construction project involves demolition of a significant portion of the existing structure.
Structures that are demolished to the level that meets or exceeds 75% of the replacement cost ■
■ of the structure will not be allowed by city code to be rebuilt except to full -on standards for new
construction. Reference Edmonds Community Development Code section 19.00.045. ■
■ Demolition of portions of the structure is limited to that clearly shown on the approved permit
plans, and will be verified by the building inspector. ■
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
�♦ ..,
n� - ,.,.,...,. I.
REVIEWED.,.,.,
Date (�"// ,4 BY
CITY OF EDMONDS
3 BUILDING DEPARTMENT.
Date......................... I .....................
€
APPROVED
PLANS MUST BE
ON JOB SITE
ALL WORK SUBJECT
TO FIELD
INSPECTION FOR
CODE COMPLIANCE
.................................
' The following documentation shall be available on
site for the building inspector:
®COE APPROVED ARCHITECTURAL PLAN SET
❑ COE APPROVED STRUCTURAL PLAN SET
❑COE REVIEWED CALCULATION PACKET
'[]ENERGY CREDIT WORKSHEET
❑ SITE PLAN
; ❑ CIVIL PLAN
;X Approved 75% form
:❑
.......... ,.,.,.................,..............