Structural Observation Shear wallsC � ENGINEERING civil & structural engineering & planning STRUCTURAL OBSERVATION REPORT Project: Carranza Residence Purpose: Structural Observation Location: 9215 Olympic View Dr, Edmonds Date: 06/5/2024 CG Project: 24057.10 Report: 2 Client: Mario Carranza General Contractor: Keystone Field Rep: Dennis Titus, PE, SE PURPOSE AND SCOPE Updates to the framing system were required on our previous site visit. Please refer to CG Engineering Observation Report 1 dated 5/29/24. The framing contractor has completed the updates requested and no additional revisions are required for the structural framing system. Refer to the items below. 1. Window added to Bathroom —A window was added to the master bathroom which interrupts the shear wall. relocate shear wall as shown and add a MST37 holdown. COMPLETED 2. Unblocked Horizontal Sheathing Joint — At the kitchen there was a horizontal joint in the sheathing that was not blocked. Provide blocking and panel edge nailing at the joint. COMPLETED Shear connection — At this location both the supporting wall and top plate are 2x4. Provide A35 @ 24" oc from the top plate to the rim and install shear wall sheathing. COMPLETED 4. Back Wall Adjacent to Garage —At the back of the house the house, framing abuts the garage. Provide blocking between the studs at the top and extend the sheathing from the sill plate to the top of the wall and nailing as SW6 per plan. COMPLETED El This observation is the professional opinion of CG Engineering PLLC based on the information available during this assessment or evaluation. This report does not warrant or guarantee that all conditions were discovered at the time of the observation. This report was prepared subject to the standard of care applicable to professional services at the time the services were provided. 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph.425.778.8500 I f.425.778.5536 www.cgengineering.com