APPROVED BLD BLD2024-1455+MECHANICAL PLANS+10.29.2024_10.56.09_AM+4587314SHEET INDEX
MECHANICAL REPAIR
M00.00 COVER SHEET
M01.01 FIRST FLOOR MECHANICAL REPAIR PLAN
M01.02 SECOND FLOOR MECHANICAL REPAIR PLAN
M01.03 THIRD FLOOR MECHANICAL REPAIR PLAN
PROJECT GENERAL NOTES
1. THE CONSTRUCTION DRAWINGS AND SPECIFICATIONS SHOW THE GENERAL INTENT OF THE FINISHED PRODUCTS. THE
CONTRACTOR SHALL PROVIDE ALL ELEMENTS NECESSARY TO PROVIDE A COMPLETE PROJECT INCLUDING ITEMS NOT
SHOWN IN THE CONSTRUCTION DRAWINGS WHICH CAN BE REASONABLY INFERRED FROM THE INTENT.
2. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND DIMENSIONS SHOWN OR IMPLIED PRIOR TO START OF
CONSTRUCTION AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES. NO ALLOWANCES WILL BE MADE FOR READILY
VISIBLE OR IDENTIFIABLE EXISTING CONDITIONS OR THE CONTRACTOR'S FAILURE TO ACCOMMODATE EXISTING
CONDITIONS IN THE BID.
3. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE MEANS AND METHODS OF CONSTRUCTION. INSTRUCTIONS
FROM THE OWNER, TENANT, AND PROJECT MANAGER SHALL NOT RELIEVE THE CONTRACTOR FROM THE
RESPONSIBILITY FOR THE MEANS AND METHODS OF CONSTRUCTION.
4. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR SITE SAFETY AT ALL TIMES DURING THE DEMOLITION AND
CONSTRUCTION OF THE PROJECT. INSTRUCTIONS FROM THE OWNER, TENANT, AND PROJECT MANAGER SHALL NOT
RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY FOR SITE SAFETY DURING THE DEMOLITION AND
CONSTRUCTION OF THE PROJECT.
5. THE INTENT OF THESE REPAIRS IS TO RETURN THE MECHANICAL SYSTEMS TO A SAFE, USABLE STATE.
6. DURING ALL DEMOLITION AND CONSTRUCTION PHASES THE CONTRACTOR SHALL COORDINATE ALL DEMOLITION AND
CONSTRUCTION ACTIVITIES WITH THE PROJECT MANAGER.
7. THE CONTRACTOR SHALL NOT STORE CONSTRUCTION MATERIALS, TOOLS, OR WASTE AT THE PROJECT WITHOUT
PRIOR CONSENT FROM THE OWNER'S PROJECT MANAGER.
8. CONTRACTOR SHALL ENSURE ALL BUILDING SYSTEMS FROM ALL TRADES MUST BE CLEAN, NEAT, COORDINATED AND
ORGANIZED IN A CRISP AND ORDERLY FASHION. ALL EXPOSED CONDUIT, PIPING, DUCTWORK, STRUCTURE, LIGHTING,
ETC. TO BE NEAT AND ORDERLY.
9. ALL WORK SHALL BE IN CONFORMANCE WITH ALL FEDERAL, STATE, AND LOCAL CODES. THE CONTRACTOR SHALL NOT
INSTALL ANY WORK KNOWN TO BE NONCONFORMING. THE CONTRACTOR SHALL SUBMIT A REQUEST FOR INFORMATION
TO THE ARCHITECT TO CLARIFY ANY WORK IN QUESTION. SPECIFICATIONS AND STANDARDS SHALL MEAN, AND ARE
INTENDED TO BE, THE LATEST EDITION, AMENDMENT OR REVISION OF SUCH REFERENCE STANDARD, IN EFFECT AS OF
THE DATE OF THE CONTRACT DOCUMENTS.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL DEMOLITION AND CONSTRUCTION PERMITS HAVE BEEN
OBTAINED PRIOR TO THE START OF THE WORK.
11. CONTRACTOR SHALL PROVIDE ALL NECESSARY TESTING AND COORDINATE ALL REQUIRED INSPECTIONS.
12. THE CONTRACTOR SHALL MAINTAIN THE SITE IN A CLEAN, ORDERLY, AND WORKMANLIKE CONDITION. DEBRIS AND
MATERIALS SHALL NOT BE ALLOWED TO ACCUMULATE ON THE SITE. DIRT, DEBRIS, AND OTHER MATERIALS SHALL BE
CLEANED FROM AREAS OUTSIDE OF THE SCOPE OF WORK DAILY AND IMMEDIATELY AFTER HAUL -OFF AND DELIVERIES.
13. THE CONTRACTOR SHALL PRE -PUNCH WALK THE PROJECT AREA WITH THE SUB -CONTRACTORS TO ENSURE THE
SPACE IS READY FOR THE OWNER PUNCH WALK.
14. THE CONTRACTOR SHALL PROTECT ALL ADJACENT MATERIALS TO REMAIN DURING DEMOLITIONS AND CONSTRUCTION
ACTIVITIES. DAMAGE TO EXISTING TO REMAIN ELEMENTS CAUSED BY DEMOLITION AND CONSTRUCTION ACTIVITIES
SHALL BE REPAIRED TO A LIKE NEW CONDITION AT NO ADDITIONAL EXPENSE TO THE OWNER.
15. THE CONTRACTOR SHALL PROTECT THE BUILDING'S MECHANICAL SYSTEM FROM DUST AND DEBRIS AT ALL TIMES
DURING DEMOLITION AND CONSTRUCTION ACTIVITIES.
16. THE CONTRACTOR SHALL VISIT THE PROJECT SITE DURING THE BID PHASE TO BECOME FAMILIAR WITH THE EXISTING
CONDITIONS AND THE PROJECT REQUIREMENTS. NO CHANGE ORDERS WILL BE GRANTED FOR ITEMS READILY VISIBLE
DURING THE JOB WALK OR FOR ITEMS REASONABLY INFERRED FROM THE DESIGN INTENT OF THE CONSTRUCTION
DOCUMENTS.
17. THE INTENT OF THE PROJECT IS TO FURNISH AND INSTALL PTAC UNITS AND EXHAUST FANS DEVICES IN ACCORDANCE
WITH THE PLANS AND SPECIFICATIONS. ALL DRAWINGS ARE SCHEMATIC IN NATURE AND THE REQUIRED INSTALLATION
IS NOT LIMITED TO THE ELEMENTS SHOWN AND DESCRIBED ON THE DRAWINGS AND IN THE SPECIFICATIONS. THE
CONTRACTOR SHALL PROVIDE AND INSTALL ALL NECESSARY APPURTENANCES TO PROVIDE A COMPLETE AND
OPERATIONAL SYSTEM. ALL WORK, LABOR, DEVICES, EQUIPMENT, APPURTENANCES, ETC. REQUIRED TO MAKE THE
SYSTEM OPERATIONAL SHALL BE INCLUDED IN THE BID.
18. IT IS THE CONTRACTORS RESPONSIBILITY TO OBTAIN CLARIFICATION OF ANY APPARENT CONFLICT OR INCONSISTENCY
IN THE BID DOCUMENTS. THE CONTRACTOR ACCEPTS RESPONSIBILITY TO CORRECT (AT THE CONTRACTOR'S COST)
ANY SUCH ITEMS TO MEET THE INTENT AS INTERPRETED BY THE ARCHITECT.
19. CONTRACTOR SHALL COORDINATE ALL WORK WITH THE OWNER. CONTRACTOR SHALL SCHEDULE ALL WORK TO
COORDINATE WITH OTHER CONTRACTORS ON THE SITE, INCLUDING BUT NOT NECESSARILY LIMITED TO ELECTRICAL
AND LOW VOLTAGE CONTRACTORS REPAIRING THE ELECTRICAL SYSTEMS AND DEVICES.
NORTH
OBTAIN ELECTRICAL
PERMIT FROM
STATE LABOR &
INDUSTRIES
ALL WORK SUBJECT
TO FIELD
INSPECTION FOR
CODE COMPLIANCE
APPROVED
MECHANICAL REPAIRS FOR
EDMONDS HOTEL
22127 HIGHWAY 99
EDMONDS, WASHINGTON 98026
VICINITY MAP
NOT TO SCALE
The scope of this permit is to replace HVAC and ventilation equipment that
has been damaged. Approval of this permit in no way constitutes that
replaced equipment will comply with the forthcoming change of occupancy
permit. Additional equipment or alterations may be required.
PLANS MUST BE
ON JOB SITE
City Of Edmonds
Building Department
Work MECHANICAL
Address 22127 HIGHWAY 99
--------------------------------------------
Owner NEW START
Approved Date 11 /07/2024
Building Official Grit,,-
Permit Number BLD2024-1455
Manufactures Specs shall be on -site
at the time of inspection.
PROJECT SCOPE OF WORK
REPAIR OF PTAC (HVAC) UNITS AND EXHAUST FANS DAMAGED BY ILLICIT DRUG ACTIVITIES. THE DECONTAMINATION
PROCESS IS COMPLETE AND ALL SPACES HAVE BEEN TESTED WITH THE RESULTS OF ALL TESTS BEING BELOW THE STATE
STANDARD. DECONTAMINATION EFFORTS INCLUDED THE REMOVAL OF THE PTAC UNITS AND EXHAUST FANS. ELECTRICAL
WIRING, AND JUNCTION BOXES ARE IN PLACE. THIS SCOPE OF WORK IS TO REPAIR THE DAMAGE BY INSTALLING PTAC
UNITS AND EXHAUST FANS AS REQUIRED AND FURTHER DOCUMENTED IN THE DRAWINGS AND SPECIFICATIONS.\
PER WASHINGTON STATE EXISTING BUILDING CODE CHAPTER 2, REPAIR IS THE RECONSTRUCTION, REPLACEMENT, OR
RENEWAL OF ANY PART OF AN EXISTING BUILDING FOR THE PURPOSE OF ITS MAINTENANCE OR TO CORRECT DAMAGE.
THIS PROJECT IS REPAIR, THE REPLACEMENT OF THE EXISTING PTAC UNITS AND EXHAUST FANS FOR THE PURPOSE OF
CORRECTING DAMAGE CAUSED BY DAMAGE FROM ILLICIT DRUG CONTAMINATION.
PER WASHINGTON STATE EXISTING BUILDING CODE SECTION 407.1: EXISTING MECHANICAL SYSTEMS UNDERGOING
REPAIR SHALL NOT MAKE THE BUILDING LESS COMPLIANT THAN IT WAS BEFORE THE DAMAGE OCCURRED. THE PTAC
UNITS AND EXHAUST FANS SPECIFIED FOR THIS PROJECT ARE MORE ENERGY EFFICIENT THAN THE ORIGINAL PTAC UNITS
AND EXHAUST FANS FROM 1996, WHEN THE BUILDING WAS ORIGINALLY CONSTRUCTED.
PER THE CITY OF EDMONDS' PUBLISHED WORK EXEMPT FROM A BUILDING PERMIT HANDOUT PERMITS SHALL NOT BE
REQUIRED FOR ITEM 2B MECHANICAL REPLACEMENT OF ANY PART THAT DOES NOT ALTER APPROVAL OF EQUIPMENT OR
MAKE SUCH EQUIPMENT UNSAFE.
SNOHOMISH COUNTY
(PROPERTY OWNER)
3000 ROCKEFELLER AVE.
EVERETT, WA 98201
DIRECT ALL CONTACT THROUGH THE PROJECT MANAGER
SNOHOMISH COUNTY, FACILITIES & FLEET MANAGEMENT
(PROJECT MANAGER & ARCHITECT)
SNOHOMISH COUNTY
FACILITIES AND FLEET MANAGEMENT
3000 ROCKEFELLER AVE.
EVERETT, WA 98201
PROJECT MANAGER AND ARCHITECT: LANCE MEINHOLD, RA
425-312-0796
LANCE. MElNHOLD@SNOCO.ORG
DEFERRED SUBMITTTALS
THE FOLLOWING ITEMS ARE DEFERRED SUBMITTALS TO BE SUBMITTED TO THE AUTHORITY HAVING JURISDICTION AT
A LATER DATE.
• NONE ANTICIPATED
FOR ITEMS MARKED "BY CONTRACTOR," CONTRACTOR SHALL PROVIDE COMPLETE DESIGN DRAWINGS AND
DOCUMENTATION STAMPED BY A LICENSED ENGINEER. DRAWINGS SHALL BE SUBMITTED TO ARCHITECT FOR REVIEW.
FOLLOWING REVIEW BY THE ARCHITECT, CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING DRAWINGS AND
DOCUMENTATION TO THE AUTHORITY HAVING JURISDICTION AND FOR ANY REQUIRED PLAN CHECK OR PERMIT FEES.
BY SEPARATE PERMIT
• ALL OTHER SCOPE OF WORK. THIS SCOPE IS FOR MECHANICAL SYSTEMS ONLY.
SPECIAL INSPECTIONS
w
w
wzco
� w �
� m
LU N N
00 N
Q N O
O O
Q O
Uz
C
RECEIVED
Nov 05 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
O
H
,Wn
V
Q
O
J
00
0
w
ON
o
~
O
z
w
O
o
O
p
o•
o•
Z
Q
w
z
Q
Q
Q
o
U
0
p
Q
W
=
Z
O
=
W
N_
LLj
:2
=
CV
p
CV
Lu
DRAWING TITLE:
COVER SHEET
DRAWN BY:
CHECKED BY:
PER THE WASHINGTON STATE BUILDING CODE, THE OWNER SHALL ENGAGE A THIRD PARTY SPECIAL INSPECTOR FOR O 0 ■ O 0
ITEMS AS FOLLOWS:
• NONE ANTICIPATED
4�
— -- — — — — — -- — — — —I — — — — — — --- — — — -- — — — — -- — — — --- — — — — — — — — — --- — — — -- — — — — -- — — — --- — — — — — —
J— — — — — — -- — — — —I — — — — — — --- — — — -- — — — — -- — — — --- — — — — — — — — — --- — — — -- — — — — -- — — — --- — — — — — — � — — 'G
�I I I I I I II
I mI PTAC -- — — — — — - F OF,
I I I I
FRONT DESK i OFFICE i i
I I WELLNESS
1310SF I 1310SF STAFF BREAK I ROOM STAFF
i I ROOM i 104 i LAUNDRY
11031
I 134 SF 105 I I I I IN w
122 SF 211 SF
I I I I I I w
S I SHARED
11f U
BATHROOM BATHROOM z Lu
i I I I i STAIR#2 Lu Z U)
-- � ---- I II II II II II II F-10-911I / mHELP CENTER 52 SF 45 SF ~ 109 SF
— — — — —�, C LU
NT�T T r �ITT—r �r
211 SF CORRIDOR Q co N
oI co
- N - - ------+-�--- - -I VESTIBULE - ----�---- -�-----+-- - -- - ----- - - - - - - - - - --+------- --- - + - - --- - - - - - - -—+-- o Q
i i i 112 i i i i I i i I i i i i I i MECH ROOM i
U I MULTI -PURPOSE I I I I I I 571SF
Q LOUNGE I I I
l a I I ELEVATOR .I I MULTI -PURPOSE
ELEC.PANEL
201 SF
118
334 SF I I I I I I 36 SF
I I I I I SPRINKLER
ELEVATOR
MACHINE
ROOM STAIR #1 (2) n
I j I I 34 SF
--PTAC— I ----- I ------ I —----- I-----—I---—I———— I —---— I ------ I ------ I ——--- I -------I------- I --— I /�
J- - - - - - -- - -----I---- - -------- - — - — - - --------------- --- - - - - - - - - - - - - - ----------------------------------�---- �B
--------- - ---- - -----I-- - - - - - --- ------------ ---- --------- -------- ------------- - - --------- ---- -- - -------------------�--
NORTH
FIRST FLOOR MECHANICAL REPAIR PLAN
SCALE: 1/8" = 1'-0" 0 1' 2' 4' 8' 16'
MECHANICAL REPAIR KEYNOTES
1. EXISTING PTAC UNIT TO REMAIN.
2. PROVIDE AND INSTALL FRIEDRICH MODEL PVH12K3FC AT THIS LOCATION.
MECHANICAL REPAIR PLAN GENERAL NOTES
1. REFER TO KEY PLAN ON A00.00 FOR LOCATION WITHIN THE BUILDING.
2. ALL EXISTING, OPERATIONAL MECHANICAL SYSTEMS AND DEVICES ARE TO
REMAIN.
3. FIELD VERIFY ALL CONDITIONS IN THE FIELD DURING THE PRE -BID MEETING.
4. LOCATIONS SHOWN ON PLANS ARE APPROXIMATE AND INTENDED TO
INDICATE THE NUMBER OF DEVICES TO THE REPAIRED. THE INTENT OF THE
PROJECT IS TO INSTALL PTAC UNITS AND EXHAUST FANS AT ALL EXISTING
LOCATIONS WHERE SUCH ITEMS WERE REMOVED DUE TO THE ILLICIT DRUG
DECONTAMINATION PROCESS. NO ADDITIONAL DEVICES ARE INTENDED AS A
PART OF THIS SCOPE OF WORK.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL DEMOLITION
AND CONSTRUCTION PERMITS HAVE BEEN OBTAINED PRIOR TO THE START
OF THE WORK.
6. THE CONTRACTOR SHALL MAINTAIN THE SITE IN A CLEAN,ORDERLY, AND
WORKMANLIKE CONDITION. DEBRIS AND MATERIALS SHALL NOT BE ALLOWED
TO ACCUMULATE ON THE SITE. DIRT, DEBRIS, AND OTHER MATERIALS SHALL
BE CLEANED FROM AREAS OUTSIDE OF THE SCOPE OF WORK DAILY AND
IMMEDIATELY AFTER HAUL -OFF AND DELIVERIES.
7. THE CONTRACTOR SHALL PROTECT ALL ADJACENT MATERIALS TO REMAIN
DURING DEMOLITIONS AND CONSTRUCTION ACTIVITIES. DAMAGE TO EXISTING
TO REMAIN ELEMENTS CAUSED BY DEMOLITION AND CONSTRUCTION
ACTIVITIES SHALL BE REPAIRED TO A LIKE NEW CONDITION AT NO
ADDITIONAL EXPENSE TO THE OWNER.
8. CONTRACTOR SHALL COORDINATE ALL WORK WITH THE OWNER.
CONTRACTOR SHALL SCHEDULE ALL WORK TO COORDINATE WITH OTHER
CONTRACTORS ON THE SITE, INCLUDING BUT NOT NECESSARILY LIMITED TO
ELECTRICAL AND LOW VOLTAGE CONTRACTORS REPAIRING THE ELECTRICAL
SYSTEMS AND DEVICES.
SYMBOLS LEGEND
DRAWING REFERENCE
# KEYNOTE
PTAC PTAC (PACKAGED TERMINAL AIR CONDITIONER) UNIT
THROUGH WALL (OPENING IS EXISTING) - FIELD VERIFY SIZE
CONTRACTOR TO PROVIDE AND INSTALL
HEAT PUMP WITH ELECTRIC HEAT
240 VAC, 60 HZ, LCDI 6-20P
CORROSION PROTECTION FRONT AND REAR COILS
BASIS OF DESIGN: FRIEDRICH PVH09K3F (R32) WITH CONDENSATE KIT
PROVIDE WEATHERPROOF SEALS, FLASHING, ETC. AS REQUIRED
® CEILING MOUNTED EXHAUST FAN
EXHAUST INTO EXISTING CEILING DUCT PER EXISTING CONDITION
BASIS OF DESIGN: GREENHECK MODEL SP-1390
FIELD VERIFY CONDITIONS DURING PRE -BID SITE MEETING
O
Lu
C�
�
Q
Q
1-0
Q
CV
O
J
00
0
Lu
ooll
O
~
O
z
Lu
O
0
0
V)
�
o.
Z
_
Q
w
Z
Q
Q
2
C�
p
U_
Z
�
=
�O
Z
U
W
N
Lu
:�i
=
CV
n
CV
Lu
DRAWING TITLE:
MECHANICAL REPAIR
FLOOR PLAN
DRAWN BY:
CHECKED BY:
mol.01
, T
T
, , T
T
T
T
T
T
f
T
T
T
T
T
T
T
f
I I I I I I I I I I I I I I I I I I I I
- -- - - - - - -- - - - - ------- - - - -- __.--- -
I I I PTAC I PTAC I I I I
I PTAC PTAC PTAC PTA—C-1 PTAC PTAC PTAC PTAC PTAC PTAC PTAC PTAC PTAC I G�
---- - - - - - -T- I - -- - - - -- -- - - - -- - - - - - - - - - -- - - -- - - - - -- -- - - - -- - - - - -- - - - - - - - -- - - ��
TENANT ROOM �,
TYPE A TENANT ROOM TENANT ROOM
201 TENANT ROOM TENANT ROOM TENANT ROOM TENANT ROOM TENANT ROOM TYPE 1 TENANT ROOM TENANT ROOM TYPE 1 TENANT ROOM TENANT ROOM TENANT ROOM TENANT ROOM TENANT ROOM
251 SF TYPE 2 TYPE 2 TYPE 2 TYPE 2 TYPE 2 210 TYPE 2 TYPE 2 216 TYPE 2 TYPE 2 TYPE 2 TYPE 2 TYPE 2
I
2530SF 204 SF 208 SF 208 SF 208 SF 250 SF 208 SF 208 SF 250 SF 208 SF 208 SF 208 SF 208 SF 215 SF
I
w
Lu
BATHROOM BATHROOM BATHROOM ® BATHROOM BATHROOM ® ®BATHROOM f� BATHROOM® [gATHROOM a BATHROOgE ZPATHROOM BATHROOIE [gATHROOM BATHRO01& BATHROOM BATHROOM Q Lu
I I 1-1 202 1® L��J3 1 204 1 206 1 208-1 210 1 212 1 214 1 216 1 218 1 220 1 222 1 224 1 ®226 1 STAIRS #2 w z
—_ ______ _ `\I __ �/ I_ S_ _ ___ _ -_ El7L.0 __ _ —_fir _I, ,,,,, ,I __ _ _ �',--r�1 1 I 11 liniq '�I__ __ ___ __,i rl=� E (� V�I I I� _ _ __I I_.._�_ /
�r-F- I I 1 / 1iFJ ,� I r-F- II 1 \\ 111 / 1 �� r m
Lu
CORRIDOR I I I D o 0
I I I I I I I I I I I I I
- - --- - - --- - - --- ----- -- ---- -- - -- --- - ---- - - — ---- - - -------- - - - - - - - --I-- - - ---- ��
�� I o
1
-- - - - - — - — -
S#1 IR STA
I IR BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM
` 215 1 ®® 217 1 219 1 ®® 221 1 IN � 223 1 ®® 225 1
I I I ,
ELEVATOR = I II
TENANT ROOM TENANT ROOM TENANT ROOM TENANT ROOM TENANT ROOM TENANT ROOM TENANT ROOM TENANT ROOM TENANT ROOM
i TYPE 2 TYPE 2 TYPE 2 TYPE 2 TYPE 2 TYPE A
TYPE 2 TYPE 2 TYPE 2 TYPE 2 TENANT ROOM
TENANT ROOM
205 SF 208 SF 208 SF TENAYPE 1NT 208 SF 208 SF TYPE 1 208 SF 208 SF 208 SF 208 SF
STORAGE 211 217 251 SF
230 I 250 SF 250 SF
I i
PTAC PTAC PTAC PTAC PTAC PTAC PTAC PTAC PTAC PTAC
,B
J
--------------- ------- ------- -------- ------- I I I I I I I I I I I I I I I I I I I
— —— — PTAC -- — — — — PTAC — — -- — — — ---- — '
I I I I I I I I I I I I I I I I I I I
I I I I I I I I I I I I I I I I I I I I
NORTH
SECOND FLOOR MECHANICAL REPAIR PLAN
SCALE: 1 /8" = 1'-0" 0 1' 2' 4' 8' 16'
MECHANICAL REPAIR KEYNOTES
1. EXISTING PTAC UNIT TO REMAIN.
MECHANICAL REPAIR PLAN GENERAL NOTES
1. REFER TO KEY PLAN ON A00.00 FOR LOCATION WITHIN THE BUILDING.
2. ALL EXISTING, OPERATIONAL MECHANICAL SYSTEMS AND DEVICES ARE TO
REMAIN.
3. FIELD VERIFY ALL CONDITIONS IN THE FIELD DURING THE PRE —BID MEETING.
4. LOCATIONS SHOWN ON PLANS ARE APPROXIMATE AND INTENDED TO
INDICATE THE NUMBER OF DEVICES TO THE REPAIRED. THE INTENT OF THE
PROJECT IS TO INSTALL PTAC UNITS AND EXHAUST FANS AT ALL EXISTING
LOCATIONS WHERE SUCH ITEMS WERE REMOVED DUE TO THE ILLICIT DRUG
DECONTAMINATION PROCESS. NO ADDITIONAL DEVICES ARE INTENDED AS A
PART OF THIS SCOPE OF WORK.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL DEMOLITION
AND CONSTRUCTION PERMITS HAVE BEEN OBTAINED PRIOR TO THE START
OF THE WORK.
6. THE CONTRACTOR SHALL MAINTAIN THE SITE IN A CLEAN,ORDERLY, AND
WORKMANLIKE CONDITION. DEBRIS AND MATERIALS SHALL NOT BE ALLOWED
TO ACCUMULATE ON THE SITE. DIRT, DEBRIS, AND OTHER MATERIALS SHALL
BE CLEANED FROM AREAS OUTSIDE OF THE SCOPE OF WORK DAILY AND
IMMEDIATELY AFTER HAUL —OFF AND DELIVERIES.
7. THE CONTRACTOR SHALL PROTECT ALL ADJACENT MATERIALS TO REMAIN
DURING DEMOLITIONS AND CONSTRUCTION ACTIVITIES. DAMAGE TO EXISTING
TO REMAIN ELEMENTS CAUSED BY DEMOLITION AND CONSTRUCTION
ACTIVITIES SHALL BE REPAIRED TO A LIKE NEW CONDITION AT NO
ADDITIONAL EXPENSE TO THE OWNER.
8. CONTRACTOR SHALL COORDINATE ALL WORK WITH THE OWNER.
CONTRACTOR SHALL SCHEDULE ALL WORK TO COORDINATE WITH OTHER
CONTRACTORS ON THE SITE, INCLUDING BUT NOT NECESSARILY LIMITED TO
ELECTRICAL AND LOW VOLTAGE CONTRACTORS REPAIRING THE ELECTRICAL
SYSTEMS AND DEVICES.
SYMBOLS LEGEND
DRAWING REFERENCE
&_\�
KEYNOTE
PTAC PTAC (PACKAGED TERMINAL AIR CONDITIONER) UNIT
THROUGH WALL (OPENING IS EXISTING) — FIELD VERIFY SIZE
CONTRACTOR TO PROVIDE AND INSTALL
HEAT PUMP WITH ELECTRIC HEAT
240 VAC, 60 HZ, LCDI 6-20P
CORROSION PROTECTION FRONT AND REAR COILS
BASIS OF DESIGN- FRIEDRICH PVH09K3F (R32) WITH CONDENSATE KIT
PROVIDE WEATHERPROOF SEALS, FLASHING, ETC. AS REQUIRED
® CEILING MOUNTED EXHAUST FAN
EXHAUST INTO EXISTING CEILING DUCT PER EXISTING CONDITION
BASIS OF DESIGN- GREENHECK MODEL SP—B90
FIELD VERIFY CONDITIONS DURING PRE —BID SITE MEETING
CIII
0
11
LLJ
0
Q
Q
CV
O
J
00
0
L u
011
O
O
z
LLJ
o
0
Cl�
(/)
n�.
Z
-=
<
w
z
Q
V)
Q
CZ
0
U
o
Z
_
0
=
�O
Z
U
W
c�
L�
:�i
=
CV
0
CV
w
DRAWING TITLE:
MECHANICAL REPAIR
FLOOR PLAN
DRAWN BY:
CHECKED BY:
M02.01
I
I
I
I
I
I
I
I
I
NORTH
5 1 , 6 ` 7 1
I I I I I I I I I I I I I I I I I I I
-- - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - -- - - -- - - - - - -
PTAC I PTAC I PTAC I PTAC I I I PTAC I PTAC I PTAC I PTAC I
------------------------------------ - ------------------------- - -�- - ----------------------------- ----- '�
I I I PTAC I PTAC I PTAC I I I I I PTAC I PTAC I I I I I PTAC I PTAC I I '
TENANT ROOM I I I I I TENANT ROOM
---------T- - -I - - - I- - - -T- - - - - - - T- -TfPE1 ----r- - - -- - - - I- - - -T- - - -T-- - - T_ - - --- - -I - - - T- F
ANT
TENTYPE ROOM TENANT ROOM TENANT ROOM TENANT ROOM 306 TENANT ROOM TENANT ROOM TENANT ROOM TENANT ROOM TENANT ROOM TYPE 1A
250 SF 322
301 I TYPE 1 I TYPE 1 I TYPE 1 I I TYPE 1 I TYPE A I TENANT ROOM I TENANT ROOM I TYPE 1 I TYPE 1 I TYPE 1 I 250 SF I TENANT ROOM I TENANT ROOM
251 SF r 303 304 308 310 TYPE 2 TYPE 2 316 318 320 TYPE 2 TYPE 2
253 SF 195 SF 250 SF 250 SF 221 SF 312 314 250 SF 250 SF 250 SF III 324 326
I I I I I I 208 SF I 208 SF I I I I I 208 SF I 215 SF
I I I I I I I I I I I I I I I I LLI
BATHROOM BATHROOM U
BATHROOM El QATHROOM BATHROOM EI&THROOM BATHROOM EI&ATHROOM BATHROONG I BATHROOM I BATHROOM® 0ATHROOM BATHR001I &THROOM BATHROOM STAIRS#2 V) z W
I I 141
SF I 3021 ® I 3061 I 3041 I 3061 I 3081 I 3061 I 3121 I 314-1 I 3161 I 3181 I 3201 I 322-1 I 324-1 I 3261 I 328 I Q w 0
- - — - — - — - - � - — - — - -I I- - — - — - __T -- — - — - — - T — - - - r - — - - - T - — - — - -I - — - — - —I- — - — - - __T -- — - — - — - 7 — - — - — - — T - - - --- - — - — - — - T - — - — - — -I — - — - — - — r — - — - T PE/ wCORRIDOR Q � o
It I I I I I I I I I I I I
- - - -- ---- 19 i .\-- -- STAIRS#1--t------- I---�----�- L---------+--------+--� - ----------- --�/ Dk Q o
I I I 329 I I BATHROOM I BATHROOM I BATHROOM I BATHROOM I BATHROOM I BATHROOM I BATHROOM I BATHROOM I BATHROOM BATHROOM I BATHROOM
305 1 ® 307 1 ®® 309 1 311 1 ® 313-1 315 1 ®® 317 1 319 1 ®® 321 1 323 1 [DIED 325 1 f
ELEVATOR 1 Nd I
o
I I I I I I it I I I I I I I I I I I I I
TENANT ROOM TENANT ROOM TENANT ROOM TENANT ROOM
TYPE 2 TYPE 2 TYPE 2 TYPE 2 TENANT ROOM
I I I STORAGE I I I 305 I I TENANT ROOM I TENANT ROOM I 313 I 315 I TENANT ROOM I TENANT ROOM I TENANT ROOM I 325 I TYPE A I I
205 SF TENANT ROOM TYPE 1 TYPE 1 208 SF 208 SF TYPE 1 TYPE 1 TYPE 1 TENANT ROOM 208 SF
330 327
I I I 95 SF I I I I TYPE 1A I 250 SF I 250 SF I I I 250 SF I 250 SF I 250 SF I TYPE 1A I 254�SF I I
-
----t-�---------�----�---t- 249SF-�----�-----------�----�--- I---t--250SF-�-------t
- - - -- j ----- I - - - I - - - -- - - - -�- PTAC -----4----4-----I- PTAC -I --PTAC--------------- I� -PTAC
- - - - -- - - - - - - ---------- - - --- - - t -PTAC -�- -PTAC .. PTAC- - - - - - - - ----PTAC -�- PTAC - � - PTAC -- PTAC - -- - - - - - -
z
I I I I I I I I I I I I I I I I I I I
THIRD FLOOR MECHANICAL REPAIR PLAN
SCALE: 1/8" = 1'-0" - -
d
MECHANICAL REPAIR KEYNOTES
1. EXISTING PTAC UNIT TO REMAIN.
MECHANICAL REPAIR PLAN GENERAL NOTES
1. REFER TO KEY PLAN ON A00.00 FOR LOCATION WITHIN THE BUILDING.
2. ALL EXISTING, OPERATIONAL MECHANICAL SYSTEMS AND DEVICES ARE TO
REMAIN.
3. FIELD VERIFY ALL CONDITIONS IN THE FIELD DURING THE PRE -BID MEETING.
4. LOCATIONS SHOWN ON PLANS ARE APPROXIMATE AND INTENDED TO
INDICATE THE NUMBER OF DEVICES TO THE REPAIRED. THE INTENT OF THE
PROJECT IS TO INSTALL PTAC UNITS AND EXHAUST FANS AT ALL EXISTING
LOCATIONS WHERE SUCH ITEMS WERE REMOVED DUE TO THE ILLICIT DRUG
DECONTAMINATION PROCESS. NO ADDITIONAL DEVICES ARE INTENDED AS A
PART OF THIS SCOPE OF WORK.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL DEMOLITION
AND CONSTRUCTION PERMITS HAVE BEEN OBTAINED PRIOR TO THE START
OF THE WORK.
6. THE CONTRACTOR SHALL MAINTAIN THE SITE IN A CLEAN,ORDERLY, AND
WORKMANLIKE CONDITION. DEBRIS AND MATERIALS SHALL NOT BE ALLOWED
TO ACCUMULATE ON THE SITE. DIRT, DEBRIS, AND OTHER MATERIALS SHALL
BE CLEANED FROM AREAS OUTSIDE OF THE SCOPE OF WORK DAILY AND
IMMEDIATELY AFTER HAUL -OFF AND DELIVERIES.
7. THE CONTRACTOR SHALL PROTECT ALL ADJACENT MATERIALS TO REMAIN
DURING DEMOLITIONS AND CONSTRUCTION ACTIVITIES. DAMAGE TO EXISTING
TO REMAIN ELEMENTS CAUSED BY DEMOLITION AND CONSTRUCTION
ACTIVITIES SHALL BE REPAIRED TO A LIKE NEW CONDITION AT NO
ADDITIONAL EXPENSE TO THE OWNER.
8. CONTRACTOR SHALL COORDINATE ALL WORK WITH THE OWNER.
CONTRACTOR SHALL SCHEDULE ALL WORK TO COORDINATE WITH OTHER
CONTRACTORS ON THE SITE, INCLUDING BUT NOT NECESSARILY LIMITED TO
ELECTRICAL AND LOW VOLTAGE CONTRACTORS REPAIRING THE ELECTRICAL
SYSTEMS AND DEVICES.
SYMBOLS LEGEND
DRAWING REFERENCE
# 1\ KEYNOTE
PTAC PTAC (PACKAGED TERMINAL AIR CONDITIONER) UNIT
THROUGH WALL (OPENING IS EXISTING) - FIELD VERIFY SIZE
CONTRACTOR TO PROVIDE AND INSTALL
HEAT PUMP WITH ELECTRIC HEAT
240 VAC, 60 HZ, LCDI 6-20P
CORROSION PROTECTION FRONT AND REAR COILS
BASIS OF DESIGN: FRIEDRICH PVH09K3F (R32) WITH CONDENSATE KIT
PROVIDE WEATHERPROOF SEALS, FLASHING, ETC. AS REQUIRED
O
U_
w
® CEILING MOUNTED EXHAUST FAN
C�
EXHAUST INTO EXISTING CEILING DUCT PER EXISTING CONDITION
Q
BASIS OF DESIGN: GREENHECK MODEL SP-1390
J
FIELD VERIFY CONDITIONS DURING PRE -BID SITE MEETING
Q
W
O
0
w
cn
V)
0
z
w
O
Q
U
0
z
Q
W
U
LU
w
=
:2
F-
1-0
CV
00
CT
z
O
C�, z
O* _
Q Q
2 �
o p
= z
I� O
CV
Cv p
N Lu
DRAWING TITLE:
MECHANICAL REPAIR
FLOOR PLAN
DRAWN BY:
CHECKED BY:
M03-01