Loading...
FIR2024-0101+SECTION & ELEVATION VIEW 10.15.2024_2.48.04_PM+4561457REVISION SYM 2.75 it T�K RELEASE WITH TANK ANSULR102 PIPE & CONDUIT BY ANSUL DISTRIBUTOR PL=6.0 PL=6.5 PL=14.3 PL=3.0 PL=16.8 PL=48.1 148.0 MARK: H - 1 - SECTION 1 PLAN VIEW 9.9 15.5 52.0 �-- 2.75 MARK: H - 1 - SECTION 1 I ELEVATION VIEW i - 3.313 PL=1.5 4.38 PL=1.5 L=12.75 � PL=1.5 12.0 X- 24.0 � 54.0 DUCT COLLAR(S) SHIPPED LOOSE. FIRE SYSTEM DISTRIBUTOR TO PIPE DUCT AND/OR SECOND PLENUM NOZZLE(S) IN COLLAR(S) AND ADD DETECTORS WHERE NECESSARY. PROPRIETARY INFORMATION NOTICE; THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL TRADE SECRET INFORMATION OF THE COMPANY AND REMAINS THE PROPERTY OF THE COMPANY AND IS TO BE RETURNED UPON REQUEST, NEITHER IT NOR THE INFORMATION IT CONTAINS MAY BE REPRODUCED OR DISCLOSED TO PERSONS NOT HAVING A NEED —TO —KNOW CONSISTENT WITH THE PURPOSE OF LOAN OF THE DOCUMENT WITHOUT WRITTEN PERMISSION, INSTALLED I SUPPLIED TO I V SUPPLIED I ANSUL PART# I DESCRIPTION (APART E PARTS DISTRIBUTOR PARTS Hood Mark: H - 1 - SECTION 1 Exhaust Collar: (1) 9 X 27 Hood Model: XXEW-148-S HOOD SECTION USED DISTRIBUTOR RESPONSIBILITIES FLOW POINTS -COORDINATION OF JOB INSTALLATION WITH JOB CONTRACTOR 15 GAS VALVE HOOKUP TO RELEASE MECHANISM *VERIFY GAS VALVE SIZE AND TYPE WITH JOBSITE CONTACT TOTAL SYSTEM USED -REMOTE PULL STATION HOOKUP RELEASE MECHANISM. FLOW POINTS -CHARGING, TESTING, AND CERTIFICATION OF SYSTEM. 1 C PIPING AND NOZZLES FROM FACTORY STUBOUTS �J -MODIFY APPLIANCE DROPS IF SHELVES OR SALAMANDERS ON AVAILABLE SYSTEM THE APPLIANCE INTERFERE WITH NOZZLE DISCHARGE. FLOW POINTS -SUPPLY PIPING BETWEEN MULTIPLE HOODS. 22 COORDINATE WITH HOOD INSTALLER FOR PROPER ORIENTATION OF MULTIPLE HOODS. Job Name: Tirinis Pantry Sales Order Number: 9146139-130 - - 1-3 i UL 300 FIRE PROTECTION SYSTEM 1 2812023 RECEIVED ftIRSEIDES 1001802007 Oct 16 2024 CITY OF EDMONDS ALE DEVELOPMENT SERVICES DEPARTMENT D ]DRAWING N0. B