Loading...
APPROVED ENG BUILDING A ONLY RESUB3 BLD2022-0923+Transportation_Impact_Form+8.31.2023_5.30.34_PM+3759913RESUB 8/31 /202-Y . CITY OF EDMOND DEVELOPMENT SERVICES DEPARTMEN-k rM ,C. 184 BLD2022-0923 BLD2022-0921 & BLD2022-0922 APPENDIX A Page 1 of 2 J Transportation Impact Analysis Worksheet PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: PINE PARK 614 - BUILDING A Owner pplicant Applicant Contact Person: BK INVESTMENT GROUP, LLC JACOB YOUNG Name Name 557 ROY STREET #125 10 DRAVUS STREET Street/Mailing Address Street/Mailing Address SEATTLE, WA 98109 SEATTLE, WA 98109 City State Zip City Telephone: 206.673.4543 Telephone: 206.535.7908 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): N/A N/A Firm Name Telephone: Contact Name E-mail: State Zip 1. PROJECT DESCRIPTION BUILDING "A" ONLY a. Location - Street address: 614-616 5TH AVENUE S l (Attach a vicinity map and site plan.) b. Specify existing land Use: 1950 SF GENERAL OFFICE AND 990 SF ICE CREAM PARLOR (SIMILAR TRAFFIC IMPACT AS FAST FOOD WITHOUT DRIVETHROUGH). CREDIT APPLIED TO BUILDING C. c. Specify proposed type and size of development: 3 LIVE/WORK TOWNHOUSES w/ 500 SF COMMERCIAL SPACE EACH. (# of residential units and/or square footage of building) d. Date construction will begin and be completed: SUMMER 2023 - SUMMER 2024 e. Define proposed access locations: ALL ACCESS FROM EXISTING PRIVATE ALLEY SOUTH OF SITE BUILDING "A" ONLY APPENDIX A Page 2 of 2 f. Define proposed sight distance at site egress locations: APPROX. 15 FT (UNOBSTRUCTED) IS PROVIDED AT THE EXISTING PRIVATE ALLEY'S INTERSECTION WITH 5TH AVENUE S. THIS IS PROPOSED TO REMAIN. 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. 0 CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. ITE Land Use Category I Per Unit Fee Rate TOWNHOUSE (SIM. TO 210) 6249.14 / DU New Use GENERAL OFFICE (710) $ 10.89 / SF X Prior Use CREDITAPPLIED $ X TO BUILDING C. Units in square feet, # of dwelling, vfp, etc. 3 UNITS (DU) 1500 SF Fee New Use Fee: $ 35,082.412 - Prior Use Fee: $ o = $ 35,082.42 ' ❑ NEW DEVELOPMENT Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X ❑ OTHER MITIGATION FEE RECOMMENDATION: INDEPENDENT FEE CALCULATION: $240.00 + consultant fee $ TOTAL TRANSPORTATION IMPACT FEE $ ENGINEERING DIVISION APPROVED AS NOTED City of Edmonds, Engineering Division Approval 0/06/2023 1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. 2017-2019 - Impact Fee Rate Table Fee 2017 2018 (w/ 4,036.61 2019 and beyond ITE Land Use Code - Description Calculation (w/ $2 543.01 costr (w/ $5,530.21 cost per trip) trip) cost per trip) 110 - Light Industrial per sq. foot $3.64 $5.77 $7.91 140 - Manufacturing per sq. foot $2.72 $4.32 $5.92 151 - Mini -warehouse per sq. foot $0.97 $1.54 $2.10 210 - Single-family house per dwelling $2,873.60 $4,561.37 $6,249.14 uni 220 - Apartment per dweltling $1,881.83 $2,987.09 $4,092.36 uni 230 - Condominium per dwelling $1,525.81 $2,421.97 $3,318.13 uni 240 - Mobile home per dowelling $1,627.53 $2,583.43 $3,539.33 251 - Senior Housing per dowelling $584.89 $928.42 $1,271.95 320 - Motel per room $1,525.81 $2,421.97 $3,318.13 420 - Marina per boat berth $457.74 $726.59 $995.44 444 - Movie theater per screens $31,905.90 $50,645.37 $69,384.85 492 - Health/fitness club per sq. foot $6.74 $10.98 $14.66 530 - High school per sq. foot $1.98 $3.15 $4.31 560 - Church per sq. foot $1.68 $2.67 $3.65 565 - Day care center per sq. foot $15.77 $25.02 $34.29 620 - Nursing home per bed $483.17 $766.96 $1,050.74 710 - General office per sq. foot $5.01 $7.95 $10.89 720 - Medical office per sq. foot $9.54 $15.14 $20.74 820 - Shopping center per sq. foot $3.26 $5.17 $7.08 826 - Specialty retail per sq. foot $2.06 $3.27 $4.48 850 - Supermarket per sq. foot $10.50 $16.84 $22.84 850 - Convenience market 15-16hrs per sq. foot $14.07 $22.38 $30.58 912 - Drive-in bank per sq. foot $15.97 $25.41 $34.73 932 - Restaurant: sit-down per sq. foot $10.04 $15.95 $21.84 933 - Fast food, no drive -up per sq. foot $22.28 $35.36 $48.44 934 - Fast food with drive -up per sq. foot $26.24 $41.66 $57.07 936 - Coffee/donut shop, no drive- per sq. foot $13.88 $22.04 $30.19 UP 938 - Coffee/donut shop, drive -up, per sq. foot $25.56 $40.37 $55.58 no indoor seating per vehicle 945 - Gas station with convenience fueling $6,916.99 $10,979.58 $15,042.18 position EFFECTIVE EFFECTIVE EFFECTIVE 1/1/2017 1/1/2018 1/1/2019 2004 - Impact Fee Rate Edmonds Road Jmpact f ee Rate Sfucly TABLE 4 IMPACT FEE RATES (1) (2) (3) (4) (5) (6) Trip ITE ITE Land Use Trip % New Length Net New Trips per Impact Fee Per Unit @0 $ Code Category Rater Trips' Factor' Unit of Measure 763.66 per Trip 110 Light Industrial 0.98 100% 1.59 1.56 1,000 sq ft 1.19 per square foot 140 Manufacturing 0.74 100% 1.59 1.18 1,000 sq ft 0.90 per square foot 151 Mini -warehouse 0.26 100% 1.59 0.41 1,000 scl ft 0.32 per square foot 210 Single family 1.01 100% 1.09 1.10 dwelling 840.72 per dwelling unit House 1 220 Apa•tment 0.62 100% 1.15 0.71 dwelling 544.49 per dwelling unit 230 Condominium 0.54 100% 1.15 0.62 dwelling 474.24 per dwelling unit 240 Mobile Home 0.56 100% 1.09 0.61 dwelling 466.14 per dwelling unit 310 Hotel 0.61 100% 1.25 0.76 room 582.29 per room 320 Motel 0.47 100% 1.25 0.59 room 448.65 per room 420 Marina 0.19 100% 0.97 0.18 berth 140.74 per boat berth 430 Golf course 0.30 100% 1.00 0.30 acre 229.10 per acre 444 Movie Theater 3.80 100% 0.72 2.74 1,000 sq ft 1.36 per square foot 492 Racquet club 1.83 100% 0.97 1.78 1,000 sq ft 3.58 per square foot 530 High School 1.02 100% 0.62 0.63 1.000 sq ft 0.48 per square foot 560 Church 0.66 100% 1.15 0.76 1,000 .-q ft 0.58 per square foot 610 Hosaital 0.92 100% 1.56 1.44 1,000 sq ft 1.10 per square foot 620 Nursing home 0.20 100% 0.87 0.17 bed 132.88 per bed 710 General Office 1.49 100% 1.59 2.37 1 WU sq it 1.81 -er square foot 720 Mecical office 3.615 100% 1.50 5.49 1,000 sq it 4.19 per square foot 820 Shoaping Center 3.74 81 % 0.40 1.21 1,000 sq ft 0.93 per square foot 832 Restaurant: sit 10.86 56% 1.06 6.45 1,000 sq ft 4.92 per square foot dohn 833 Fast food, no 26.15 52% 0.62 8.43 1,000 sq ft 6.44 per square toot drive -up 834 Fast food, w/ 33.48 51% 0.62 10.59 1,000 sq ft 8.08 per square foot dri,.e-up 844 Gas station 14.SG 60% 0.53 4.63 pump 3,535.82 per of 84S Gas station 13.38 47% O.S3 3.33 pump 2,545.2G per vfl)' w/convenience 850 Supermarket 11.51 S5% 0.65 4.11 1,000 sq ft 3.14 per square foot 851 Convenience 53.73 39% 0.40 8.38 1,000 sq ft 6.40 per square foot market-24 fir 912 Dri,.e-in Bank 1 54.77 51 % 0.47 13.13 1,000 sq ft 10.03 per square foot 2 ITE Trip Generation (6th Edition): 4.6 PM Peak Hour Trip Ends ' Excludes pass -by trips: see 'Trip Generation Handbook. An HE Proposed Recommended Practice' (1988) ' Rafic to average trip length. ° vfp: vehicle fueling positlon Henderson, City of Edmonds. Washington YounC & April 15, 2003 Company Pogo 18 EFFECTIVE 9/12/2004