Loading...
REVIEWED BLD2022-1104+Structural_Calculations+8.17.2022_2.16.35_PM+3057341BUILT engineering STRUCTURAL CALCULATIONS Project: Park Pine 614 Building B 614-616 5th Avenue S Edmonds, WA 98020 Architect: Citizen Design 10 Dravus St Seattle, WA 98109 Engineer: Built Engineering 539 Broadway, #305 Tacoma, WA 98402 BLD2022-1104- B101 BLD2022-1103- B102 BLD2022-1102- B103 RECEIVED 9/1 /22 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT .,.,.,.,.,.,.,.,.,.,., REVIEWED BY - CITY OF EDMONDS BUILDING DEPARTMENT BUILT engineering CRITERIA Gravity roof dead total floor dead bldgs , 'B TPO membrane 3/8" plywood wood battens 1/2" plywood 1-3/4x7-1/4 LVL @ 12" oc R38 Polyiso Spray Insulation 1/2" gyp. wallboard miscellaneous dead + snow vinyl flooring 6" MPP panel miscellaneous total dead + live walls cement fiber siding 1/2" plywood 2x6 @ 16"oc R21 insulation 1/2" gyp. wallboard miscellaneous 539 Broadway, #305 Tacoma, WA 98402 tel - 253-985-5008 0.5 1.1 0.2 1.5 3.7 1.5 2.2 1.3 11% 12.0 psf 37.0 psf 1.0 18.5 1.5 7% 21.0 psf 61.0 psf live live USE 10 PSF FOR TJI FLOOR 2.5 1.5 1.7 0.8 2.2 1.3 13% 10.0 psf snow 25.0 psf residential 40.0 psf 9/23/2021 Page of BUILT engineering Lateral wind wind importance factor basic wind speed wind exposure topographical factor (Kzt) seismic seismic importance factor latitude longitude mapped spectral response accel. at short periods (Ss) seismic design category response modification factor (R) 1.0 98 mph B 1.00 1.0 47.806 ° -122.378 ° 1.284 g (from USGS) D 6.5 (plywood shearwalls) 539 Broadway, #305 Tacoma, WA 98402 9/23/2021 tel - 253-985-5008 Page of ¢�o Park Pine 614 Latitude, Longitude: 47.80560076,-122.37778011 FT Q Puget Sound Express _j Edmonds Shelleberger Marsh Creek Point Edwards Condominiums Go gle Date Design Code Reference Document Risk Category Site Class Pine St Edmonds City Park Alder St eWalnut Street Coffee Holly Dr o� .+ s D m DN Hemlock Way N V) Pine St OSHPD Alder St Walnut St Cedar St =r Spruce St Spruce St > � Hemlock St < U) Laurel St 9/2/2021, 9:06:12 AM ASCE7-16 11 D - Default (See Section 11.4.3) Type Value Description SS 1.284 MCER ground motion. (for 0.2 second period) St 0.451 MCER ground motion. (for 1.0s period) SMS 1.541 Site -modified spectral acceleration value SMt null -See Section 11.4.8 Site -modified spectral acceleration value SIDS 1.027 Numeric seismic design value at 0.2 second SA SID1 null -See Section 11.4.8 Numeric seismic design value at 1.0 second SA Type Value Description SDC null -See Section 11.4.8 Seismic design category Fa 1.2 Site amplification factor at 0.2 second Fv null -See Section 11.4.8 Site amplification factor at 1.0 second PGA 0.545 MCEG peak ground acceleration FPGA 1.2 Site amplification factor at PGA PGAM 0.655 Site modified peak ground acceleration TL 6 Long -period transition period in seconds SsRT 1.284 Probabilistic risk -targeted ground motion. (0.2 second) SsUH 1.409 Factored uniform -hazard (2% probability of exceedance in 50 years) spectral acceleration SsD 2.079 Factored deterministic acceleration value. (0.2 second) S1 RT 0.451 Probabilistic risk -targeted ground motion. (1.0 second) S1 UH 0.504 Factored uniform -hazard (2% probability of exceedance in 50 years) spectral acceleration. S1 D 0.837 Factored deterministic acceleration value. (1.0 second) PGAd 0.734 Factored deterministic acceleration value. (Peak Ground Acceleration) CRS 0.911 Mapped value of the risk coefficient at short periods CR1 0.896 Mapped value of the risk coefficient at a period of 1 s CO D Pine St rt` Map data 02021 BUILT engineering SEISMIC DESIGN BLDG B ASCE 7-16 Equivalent Lateral Force Procedure Occupancy Category II Table 1-1 Seismic Design Category D Table 11.6-1 Importance Factor 1.00 Table 11.5-1 Site Class D Table 20.3-1 Ss 128.40 %g S1 45.10 %g Fa 1.20 Table 11.4-1 Fv 1.85 Table 11.4-2 Ct 0.02 Table 12.8-2 x 0.75 Table 12.8-2 hn 30.00 feet (height to highest level) SMs = Fa*Ss 1.5408 Eq. 11.4-1 SMi = Fv*S1 0.8344 Eq. 11.4-2 Sys = (2/3)*SMs 1.0272 g Eq. 11.4-3 SD1 _ (2/3)*SM1 0.5562 g Eq. 11.4-4 Period Ta = Ct*hn"x 0.2564 s Eq. 12.8-7 To 0.1083 s per section 11.4.5 Ts 0.5415 s per section 11.4.5 Sa 1.0272 g per section 11.4.5 R 6.5 Table 12.2-1 Do 3 Table 12.2-1 Cd 4 Table 12.2-1 Section 9.5.5 ok? Yes Table 12.6-1 Equivalent Lateral Force Procedure (section 12.8) Cs 0.1580 Eq.12.8-2 W, weight 54,117 lb per table below QE 8,552lb Eq.12.8-1 Vertical Force Distribution (section 12.8.3) k = 1.00 Floor Floor Floor Wall Wall Total (LRFD) (ASD) Level Hx Area Wt. Wt. Length Wt. Wt. WxHx Cvx QE 0.7QE (ft) (ft2) (psf) (k) (ft) (k) (k) (k-ft) (%) (k) (k) roof 30.00 600 12 7.2 100 3.8 11.0 330.8 32.0 2.74 1.92 third 21.00 600 21 12.6 100 7.9 20.5 430.0 41.7 3.56 2.49 second 12.00 600 21�12.6 100 9.5 22.1 264.6 25.6 2.19 1.53 balcony 12.00 81 7 0.6 0 0.0 0.6 6.8 0.7 0.06 0.04 now 10 psf, overall seismic reduced @ ea 539 Broadway Ste. 305 level, lateral okay Tacoma, WA 98402 tel. 253-985-5008 54.1 1032.1 100.0 8.55 5.99 9/22/2021 Page of WIND CRITERIA ASCE7-16Ch.27DirectionalProcedure V = 98 mph Kd = 0.85 Exposure = B G = 0.85 h = 30 ft KZt = 1.00 Roof Slope = FLAT : 12 = 0 ° PRESSURE COEFFICIENTS (Cp) Windward Wall = 0.8 Windward Roof = N/A Leeward Wall = -0.5 Leeward Roof = N/A 1 PRESSURE (PSF) q = 0.00256KZKZtKdV2 Ht Kz qz 0•6xGz1 Gh PWW PLW PWALL PROOF 0-15 0.57 11.9 7.1 4.9 3.7 8.6 15-20 0.62 13.0 7.8 5.3 3.7 9.0 20-25 0.66 13.8 8.3 5.6 3.7 9.4 25-30 0.70 14.6 8.8 8.8 6.0 3.7 9.7 N/A 30-35 0.73 15.3 9.2 6.2 3.7 10.0 35-40 0.76 15.9 9.5 6.5 3.7 10.2 40-45 0.79 16.5 9.9 6.7 3.7 10.5 45-50 0.81 16.9 10.2 6.9 3.7 10.6 BLDG B ROOF LATERAL - SEISMIC IN () Rho = 1.3 Plate = 8' Wind = 9.7x4.5'=44 plf Zp�*-a * Xl h (-)—I (n Do 00 0 U)—*mow^ rn�— rn iw w w CON�(n-w0 �(741«�� � (f) CA) U i v -p� w N (J)C w O Rxn Lwal I Vplf SW OT HD H:W 44(125) 0.4(1.3) 0.8(2.6) 30 30 13(43) 26(86) SW1 SW1 DL= (12"10"15+8"10"15)".6=1.8K, nK— l 04C — OC4O—A \AIAI 1 O BLDG B THIRD FLOOR LATERAL - SEISMIC IN () *Rho = 1.3 *Plate = 9' *Wind = 8.5'x9psf=77 �zpOw�G� .ZXJ v � W N(CnNOD00 N o CnwWW cn w + N W A v W �I Q �W N(nNoo� co —6 , i9 � w W W N — cn — W m CD O W � II U) w O DL=0 8*10*15+12*10*15+21 *10*15)*.6=3.6 77 161 Rxn 1.1(2.9) 2.2(5.8) Lwall 30 30 VPlf 36(97) 73(193) SW SW1 SW1 OT - -(1.7) HD - _ H:W - - BLDG B SECOND FLOOR LATERAL - SEISMIC IN () * Rho = 1.3 " Plate = 11' " Wind = 8.6"10'=86 II �2�(CnCOW W N N p O< Ui N OCR�� W V N � N 1 U* 000 � 1 C U1 (n W m cn 0 N -4=N(nN—W N p � * W � N �c:NGJNWC) cyl N W 2 � 4 v C w Cf) 4�k o w=� 0M m� DL=(10*12*15+10*21 *15X2+30' 1.1(2.9) 2.2(5.8) 86 125 ZO " Rxn 2.0(4.1) 4.0(8.2) Lwall 30 30 VPlf 67(137) 134(274) D SW SW1 SW2 < OT -(1.6) 1.2(3.2+1.7=4.9) 0 HD - - H:W - - m X m p r O n n C x 07 BUILDING B ROOF FRAMING KEY BUILDING B SECOND FLOOR FRAMING KEY 2FORTEWEB" Roof, RJ 1 1 piece(s) 1 3/4" x 7 1/4" 2.0E Microllam@ LVL @ 12" OC PASSED J 0 0 All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal. Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (Ibs) 388 @ 20' 1/2" 1595 (2.25") Passed (24%) 1.0 D + 1.0 S (All Spans) Shear (Ibs) 357 @ 1' 3/4" 2772 Passed (13%) 1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-Ibs) 1886 @ 10' 2 1/2" 4255 Passed (44%) 1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in) 0.768 @ 10' 2 1/2" 0.983 Passed (L/307) 1.0 D + 1.0 S (All Spans) Total Load Defl. (in) 1.198 @ 10' 2 1/2" 1.311 Passed (L/197) 1.0 D + 1.0 S (All Spans) • Deflection criteria: LL (L/240) and TL (L/180). • Allowed moment does not reflect the adjustment for the beam stability factor. • A 4% increase in the moment capacity has been added to account for repetitive member usage. Bearing Length Supports Available Required Loads to Supports (Ibs) Accessories Dead Snow Factored 1 - Stud wall - HF 5.50" 4.25' 1.50" 143 255 398 1 1/4" Rim Board 2 - Stud wall - HF 3.50" 2.25" 1.50" 141 251 392 1 1/4" Rim Board • Kim noara is assumea to carry an ioaas appnea airecay aoove it, Dypassing the memoer Deing aesigneo. Lateral Bracing Bracing Intervals Comments Top Edge (Lu) 152" o/c Bottom Edge (Lu) 20' 1" o/c -Maximum allowable bracing intervals based on applied load. Vertical Load ' Location (Side) Spacing Dead (0.90) Snow (1.15) Comments 1 - Uniform (PSF) 0 to 20' 3" 12" 14.0 25.0 roof System : Roof Member Type : Joist Building Use : Residential Building Code : IBC 2018 Design Methodology : ASD Member Pitch : 0.12/12 Weyerhaeuser Notes Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by Built Engineering, PLLC ForteWEB Software Operator Job Notes Brice Parrish Built Engineering (253) 985-5008 briceparrish@gmaii.com 8/15/2022 8:20:45 PM UTC ForteWEB v3.4, Engine: V8.2.2.122, Data: V8.1.2.2 Weyerhaeuser File Name: Pine Park Bldg B Page 2/8 2FORTEWEB" Roof, R1 1 piece(s) 4 x 8 DF No.1 PASSED Overall Length: tU FF FBI All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal. Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (Ibs) 1202 @ 1 1/2" 6563 (3.00") Passed (18%) 1.0 D + 1.0 S (All Spans) Shear (Ibs) 997 @ 10 1/4" 3502 Passed (28%) 1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-Ibs) 2857 @ 5' 3820 Passed (75%) 1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in) 0.161 @ 5' 0.325 Passed (L/725) 1.0 D + 1.0 S (All Spans) Total Load Defl. (in) 0.259 @ 5' 0.313 Passed (L/452) 1.0 D + 1.0 S (All Spans) • Deflection criteria: LL (L/360) and TL (5/16"). • Allowed moment does not reflect the adjustment for the beam stability factor. • Applicable calculations are based on NDS. Bearing Length Supports Available Required Loads to Supports (Ibs) Accessories Dead Snow Factored 1 - Trimmer - HF 3.00" 3.00" F 1.50" 452 750 1202 None 2 - Trimmer - HF 3.00" 3.00" 1 1.50" 452 750 1202 None Lateral Bracing Bracing Intervals comments Top Edge (Lu) 10' o/c Bottom Edge (Lu) 10' o/c -Maximum allowable bracing intervals based on applied load. Vertical Loads Tributary Width Dead (0.90) Snow (1.15) Comments 0 - Self Weight (PLF) 0 to 10, N/A 6.4 -- 1 - Uniform (PSF) 0 to 10, 6' 14.0 25.0 roof System: Wall Member Type : Header Building Use : Residential Building Code : IBC 2018 Design Methodology : ASD Weyerhaeuser Notes 911111111111111111 Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by Built Engineering, PLLC ForteWEB Software Operator Job Notes Brice Parrish Built Engineering (253) 985-5008 briceparrish@gmaii.com 8/15/2022 8:20:45 PM UTC ForteWEB v3.4, Engine: V8.2.2.122, Data: V8.1.2.2 Weyerhaeuser File Name: Pine Park Bldg B Page 3/8 2FORTEWEB" Second Floor, SJ1 1 piece(s) 14" TIM 210 @ 16" OC PASSED All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal. Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (Ibs) 663 @ 2 1/2" 1134 (2.25") Passed (58%) 1.00 1.0 D + 1.0 L (All Spans) Shear (Ibs) 650 @ 3 1/2" 1945 Passed (33%) 1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-Ibs) 3223 @ 10' 1/2" 4490 Passed (72%) 1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in) 0.359 @ 10' 1/2" 0.492 Passed (L/658) 1.0 D + 1.0 L (All Spans) Total Load Defl. (in) 0.448 @ 10' 1/2" 0.983 Passed (L/526) 1.0 D + 1.0 L (All Spans) TJ-ProT"' Rating 49 40 Passed • Deflection criteria: LL (L/480) and TL (L/240). • Allowed moment does not reflect the adjustment for the beam stability factor. • A structural analysis of the deck has not been performed. • Deflection analysis is based on composite action with a single layer of 23/32" Weyerhaeuser Edger" Panel (24" Span Rating) that is glued and nailed down. • Additional considerations for the TJ-ProTm Rating include: 1/2" Gypsum ceiling, Perpendicular Partitions. Supports Bearing Length Loads to Supports (Ibs) Accessories Total Available Required Dead Floor Live Factored 1 - Stud wall - SPF 3.50" 2.25" 1.75" 134 536 669 1 1/4" Rim Board 2 - Stud wall - SPF 3.50" 2.25" 1.75" 134 536 669 1 1/4" Rim Board • Kim uoam is assumea m carry an icaas appueo aireary aoove a, Dypassmg me memoer Deing oesignea. Lateral Bracing Bracing Intervals Comments Top Edge (Lu) 4' 5" o/c Bottom Edge (Lu) 19' 11" o/c •TJI joists are only analyzed using Maximum Allowable bracing solutions. -Maximum allowable bracing intervals based on applied load. Vertical Load Location Spacing Dead (0.90) Floor Live (1.00) Comments 1 - Uniform (PSF) 0 to 20' 1" 16" 10.0 40.0 floor System : Floor Member Type : Joist Building Use : Residential Building Code : IBC 2018 Design Methodology : ASD Weyerhaeuser Notes Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by Built Engineering, PLLC ForteWEB Software Operator Job Notes Brice Parrish Built Engineering (253) 985-5008 briceparrish@gmaii.com 8/15/2022 8:20:45 PM UTC ForteWEB v3.4, Engine: V8.2.2.122, Data: V8.1.2.2 Weyerhaeuser File Name: Pine Park Bldg B Page 4 / 8 W FO R T E W E B MEMBER REPORT PASSED Second Floor, S1 1 piece(s) 5 1/2" x 9" 24F-V4 OF Glulam Overall Length: 11' 10 W (. 11' 4" b 1 o a All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal. Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (Ibs) 3104 @ 11' 8 1/2" 10725 (3.00") Passed (29%) 1.0 D + 1.0 S (All Spans) Shear (Ibs) 2787 @ 10' 10" 10057 Passed (28%) 1.15 1.0 D + 1.0 S (All Spans) Pos Moment (Ft-Ibs) 6520 @ 5' 10" 17078 Passed (38%) 1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in) 0.086 @ 5' 10 1/2" 0.386 Passed (L/999+) 1.0 D + 1.0 S (All Spans) Total Load Defl. (in) 0.271 @ 5' 10 3/4" 0.579 Passed (L/513) 1.0 D + 1.0 S (All Spans) • Deflection criteria: LL (L/360) and TL (L/240). • Allowed moment does not reflect the adjustment for the beam stability factor. • Critical positive moment adjusted by a volume factor of 1.00 that was calculated using length L = 11' 7". • The effects of positive or negative camber have not been accounted for when calculating deflection. • The specified glulam is assumed to have its strong laminations at the bottom of the beam. Install with proper side up as indicated by the manufacturer. • Applicable calculations are based on NDS. Supports Bearing Length Loads to Supports (Ibs) Accessories Total Available Required Dead Snow Factored 1 - Trimmer - HF 3.00" 3.00" 1.50" 1874 1178 3052 None 2 - Trimmer - HF 3.00" 3.00" 1.50" 1894 1210 3104 None Lateral Bracing sm Bracing Intervals Comments Top Edge (Lu) 11' 10" o/c Bottom Edge (Lu) 11, 10" o/c -Maximum allowable bracing intervals based on applied load. Dead Snow Vertical Loads Location Tributary Width (0.90) (1.15) Comments 0 - Self Weight (PLF) 0 to 11' 10" N/A 12.0 1 - Uniform (PSF) 0 to 11' 10" 20' 10.0 - wall 2 - Uniform (PSF) 0 to 11' 10" 3' 10.0 25.0 canopy 3 - Point (lb) l' 3" N/A 452 750 Linked from: Rl, Support 1 4 - Point (lb) 10' 10" N/A 452 750 Linked from: Rl, Support 2 Notes System: Wall Member Type : Header Building Use : Residential Building Code : IBC 2018 Design Methodology : ASD Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by Built Engineering, PLLC ForteWEB Software Operator Job Notes Brice Parrish Built Engineering (253) 985-5008 briceparrish@gmaii.com 8/15/2022 8:20:45 PM UTC ForteWEB v3.4, Engine: V8.2.2.122, Data: V8.1.2.2 Weyerhaeuser File Name: Pine Park Bldg B Page 5/8 2FORTEWEB" Second Floor, S2 2 piece(s) 2 x 8 HF No.2 PASSED PF 0 All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal. 0 Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (Ibs) 1065 @ 1 1/2" 3645 (3.00") Passed (29%) 1.0 D + 0.75 L + 0.75 S (All Spans) Shear (Ibs) 758 @ 10 1/4" 2175 Passed (35%) 1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-Ibs) 1545 @ 3' 3" 2234 Passed (69%) 1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in) 0.053 @ 3' 3" 0.208 Passed (L/999+) 1.0 D + 0.75 L + 0.75 S (All Spans) Total Load Defl. (in) 0.091 @ 3' 3" 0.313 Passed (L/825) 1.0 D + 0.75 L + 0.75 S (All Spans) • Deflection criteria: LL (L/360) and TL (L/240). • Allowed moment does not reflect the adjustment for the beam stability factor. • Applicable calculations are based on NDS. Bearing Length Supports Available Required Loads to Supports (Ibs) Accessories Dead Floor Live Snow Factored 1 - Trimmer - HF 3.00" 3.00" F 1.50" 444 585 244 1065 None 2 - Trimmer - HF 3.00" 3.00" 1 1.50" 444 585 244 1065 None Lateral Bracing Bracing Intervals comments Top Edge (Lu) 6' 6" o/c Bottom Edge (Lu) 6' 6" o/c -Maximum allowable bracing intervals based on applied load. Vertical Loads Tributary Width Dead (0.90) Floor Live (1.00) Snow (1.15) Comments 0 - Self Weight (PLF) 0 to 6' 6" N/A 5.5 1 - Uniform (PSF) 0 to 6' 6" 11' 10.0 - - wall 2 - Uniform (PSF) 0 to 6' 6" 3' 7.0 60.0 25.0 balcony System: Wall Member Type : Header Building Use : Residential Building Code : IBC 2018 Design Methodology : ASD Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by Built Engineering, PLLC ForteWEB Software Operator Job Notes Brice Parrish Built Engineering (253) 985-5008 briceparrish@gmaii.com 8/15/2022 8:20:45 PM UTC ForteWEB v3.4, Engine: V8.2.2.122, Data: V8.1.2.2 Weyerhaeuser File Name: Pine Park Bldg B Page 6 / 8 2FORTEWEB" Second Floor, S3 1 piece(s) 3 1/2" x 9" 24F-V4 DF Glulam PASSED FM I 6' 6" 1❑ ❑2 All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal. Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (Ibs) 4319 @ 4" 6024 (4.25") Passed (72%) 1.0 D + 0.525 E + 0.75 L + 0.75 S (All Spans) Shear(lbs) 3867 @ 1'2 1/2" 8904 Passed (43%) 1.60 1.0 D + 0.525 E + 0.75 L + 0.75 S (All Span Pos Moment (Ft-Ibs) 10583 @ T 3" 15120 Passed (70%) 1.60 1.0 D + 0.525 E + 0.75 L + 0.75 S (All Spans) Neg Moment (Ft-Ibs) -7871 @ T 3" 11655 Passed (68%) 1.60 0.6 D - 0.7 E (All Spans) Live Load Defl. (in) 0.157 @ T 7 1/4" 0.225 Passed (L/516) __ 1.0 D + 0.525 E + 0.75 L + 0.75 S (All Spans) Total Load Defl. (in) 0.187 @ 3' 7 3/8" 0.338 Passed (L/433) 1.0 D + 0.525 E + 0.75 L + 0.75 S (All Spans) • Deflection criteria: LL (L/360) and TL (L/240). • Allowed moment does not reflect the adjustment for the beam stability factor. • Critical positive moment adjusted by a volume factor of 1.00 that was calculated using length L = 6' 9". • Critical negative moment adjusted by a volume factor of 1.00 that was calculated using length L = 6' 9". • The effects of positive or negative camber have not been accounted for when calculating deflection. • The specified glulam is assumed to have its strong laminations at the bottom of the beam. Install with proper side up as indicated by the manufacturer. • Applicable calculations are based on NDS. System : Floor Member Type : Flush Beam Building Use : Residential Building Code : IBC 2018 Design Methodology : ASD Bearing Length Loads to Supports (Ibs) Total Available Required Dead Floor Live Snow Seismic Factored Supports Accessories 1 - Stud wall- HF 5.50" 4.25" 3.05" 887 1153 480 4282/-4282 4360/- 1 1/4" Rim Board 2465 2 - Stud wall - HF 5.50" 4.25" 2.23" 800 632 263 3258/-3258 3182/ 1 1/4" Rim Board 1800 • Rim Board is assumed to carry all loads applied directly above it, bypassing the member being designed. Lateral Bracing Bracing Intervals Comments Top Edge (Lu) 73" o/c Bottom Edge (Lu) T 3" o/c -Maximum allowable bracing intervals based on applied load. Dead Floor Live Snow Seismic Vertical Loads Location (Side) Tributary Width (0.90) (1.00) (1.15) (1.60) Comments 0 - Self Weight (PLF) 1 1/4" to 7' 3 3/4" N/A 7.7 1 - Uniform (PSF) 0 to 7' 5" (Top) 18' 10.0 - wall 2 - Point (Ib) T 3" (Top) N/A - - - 7540 seismic with overstrength 3 - Point (Ib) 3' 3" (Top) N/A 200 1200 500 - deck post reaction (20 sf trib) 4 - Uniform (PSF) 0 to 3' 3" (Front) 3' 10.0 60.0 25.0 - deck ForteWEB Software Operator Job Notes Brice Parrish Built Engineering (253) 985-5008 briceparrish@gmaii.com 8/15/2022 8:20:45 PM UTC ForteWEB v3.4, Engine: V8.2.2.122, Data: V8.1.2.2 Weyerhaeuser File Name: Pine Park Bldg B Page 7 / 8 aFORTE'CM Second Floor, rim beam at entry canopy 1 piece(s) 5 1/2" x 7 1/2" 24F-V4 DF Glulam PASSED I All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal. 0 Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (Ibs) 1011 @ 2" 8181 (3.50") Passed (12%) 1.0 D + 1.0 S (All Spans) Shear (Ibs) 906 @ 11" 8381 Passed (11%) 1.15 1.0 D + 1.0 S (All Spans) Pos Moment (Ft-Ibs) 4278 @ 8' 9 1/2" 11859 Passed (36%) 1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in) 0.429 @ 8' 9 1/2" 0.863 Passed (L/482) 1.0 D + 1.0 S (All Spans) Total Load Defl. (in) 0.658 @ 8' 9 1/2" 1.150 Passed (L/314) 1.0 D + 1.0 S (All Spans) • Deflection criteria: LL (L/240) and TL (L/180). • Allowed moment does not reflect the adjustment for the beam stability factor. • Critical positive moment adjusted by a volume factor of 1.00 that was calculated using length L = 17' 3". • The effects of positive or negative camber have not been accounted for when calculating deflection. • The specified glulam is assumed to have its strong laminations at the bottom of the beam. Install with proper side up as indicated by the manufacturer. • Applicable calculations are based on NDS. Bearing Length Loads to Supports (Ibs) Accessories Total Available Required Dead Snow Total 1 - Stu�wall- 3.50" 3.50" 1.50" 352 659 1011 Blocking 2 - Stud wall - SPF 3.50" 3.50" 1.50" 352 659 1011 Blocking • Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. Lateral Bracing Bracing Intervals Comments Top Edge (Lu) 17' 7" o/c Bottom Edge (Lu) 17' 7" o/c -Maximum allowable bracing intervals based on applied load. Vertical Loads Location (Side) Tributary Width Dead (0.90) Snow (1.15) Comments 0 - Self Weight (PLF) 0 to 17' 7" N/A 10.0 1 - Uniform (PSF) 0 to 17' 7" (Front) 3' 10.0 25.0 canopy System : Roof Member Type : Drop Beam Building Use : Residential Building Code : IBC 2018 Design Methodology : ASD Member Pitch : 0/12 Weyerhaeuser Notes Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by Built Engineering, PLLC ForteWEB Software Operator Job Notes Brice Parrish Built Engineering (253) 985-5008 briceparrish@gmaii.com 11/29/2021 10:43:16 PM UTC ForteWEB v3.2, Engine: V8.2.0.17, Data: V8.1.0.16 Weyerhaeuser File Name: Pine Park Bldg A Page 16 / 18 aFORTE'CM Third Floor, deck rim beam 1 piece(s) 6 x 10 DF No.2 PASSED f All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal. Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (Ibs) 1451 @ 3 1/2" 5156 (1.50") Passed (28%) 1.0 D + 1.0 L (All Spans) Shear (Ibs) 1274 @ 1' 1" 5922 Passed (22%) 1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-Ibs) 4716 @ 6' 9 1/2" 6032 Passed (78%) 1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in) 0.226 @ 6' 9 1/2" 0.433 Passed (L/689) 1.0 D + 1.0 L (All Spans) Total Load Defl. (in) 0.281 @ 6' 9 1/2" 0.650 Passed (L/556) 1.0 D + 1.0 L (All Spans) • Deflection criteria: LL (L/360) and TL (L/240). • Allowed moment does not reflect the adjustment for the beam stability factor. • Lumber grading provisions must be extended over the length of the member per NDS 4.2.5.5. • Applicable calculations are based on NDS. Supports or Bearing Length Loads to Supports (Ibs) Accessories Total Available Required Dead Floor Live Total 1 - Hanger on 9 1/2" DF beam 3.50" Hanger- 1.50" 290 1223 1513 See note 2 - Hanger on 9 1/2" DF beam 3.50" Hanger- 1.50" 290 1223 1513 See note ' • At hanger supports, the Total Bearing dimension is equal to the width of the material that is supporting the hanger • 1 See Connector grid below for additional information and/or requirements. Lateral Bracing Bracing Intervals Comments Top Edge (Lu) 13' o/c Bottom Edge (Lu) 13' o/c -Maximum allowable bracing intervals based on applied load. System : Floor Member Type : Drop Beam Building Use : Residential Building Code : IBC 2018 Design Methodology : ASD Connector: Simpson Strong -Tie Support Model Seat Length Top Fasteners Face Fasteners Member Fasteners Accessories 1 - Face Mount Hanger HU68 2.50" N/A 10-16d 4-16d 2 - Face Mount Hanger HU68 2.50" N/A 10-16d 4-16d • Refer to manufacturer notes and instructions for proper installation and use of all connectors. Vertical Loads Location (Side) Tributary Width Dead (0.90) Floor Live (1.00) Comments 0 - Self Weight (PLF) 3 1/2" to 13' 3 1/2" N/A 13.2 1 - Uniform (PSF) 0 to 13' 7" (Front) 3' 10.0 60.0 deck Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by Built Engineering, PLLC ForteWEB Software Operator Job Notes Brice Parrish Built Engineering (253) 985-5008 briceparrish@gmaii.com 11/29/2021 10:43:16 PM UTC ForteWEB v3.2, Engine: V8.2.0.17, Data: V8.1.0.16 Weyerhaeuser File Name: Pine Park Bldg A Page 18 / 18 MPP ASD Reference Design Values Major Strength Direction I Minor Strength Direction F16-2 2 37 6.2 1,110 16 0.82 2,190 210 2.8 0.17 695 F16-3 3 37 9.3 1,870 51 1.23 2,190 355 9 0.26 695 F16-4 4 37 12.3 3,325 122 1.64 2,925 630 21 0.34 930 F16-5 5 37 15.4 5,200 238 2.05 3,650 985 42 0.43 1,160 F16-6 6 37 18.5 7,500 410 2.46 4,375 1,420 72 0.69 1,390 F16 F16-7 7 37 21.6 10,200 652 2.66 5,100 1,930 114 0.81 1,630 F16-8 8 37 24.7 13,325 973 3.04 5,825 2,525 170 0.91 1,860 F16-9 9 37 27. 16,850 1,385 3.42 6,575 3,200 242 1.04 2,090 F16-10 10 37 30.8 20,825 1,900 3.8 7,300 3,950 333 1.15 2,320 F16-11 MMJLM� 37 33.9 25,175 2,529 4.18 8,025 4,775 443 J==JJ6m 2,550 F16-12 12 37 37.0 29,975 3,283 4.56 8,750 5,675 575 1.38 2,775 SIMPLE SPAN DESIGN - 6"MPP PANEL L (ft) 19.5 W (plf) 61 W (live, plf) 40 El 4.10E+08 V 0.59475 M 2.89941 Vr 4.3 k Mr 7.5 k-ft defl (total) 0.48 L/ 483 690.6386 defl (live) 0.32 L/ 737 USE 6" F16 MPP PANEL BLDG B BALCONY POST/CONNECTION t- BLDG B POST IN WALL AT BALCONY Shape: 5.25X7FS Material: PSL Length: 8 ft I Joint: N2 J Joint: N4 Envelope Code Check: 0.587 (LC 3) Report Based On 97 Sections .633 at 0 ft A k )I f(y) fa -1.898 at 6 ft 1.393 at 6 ft ksi -1.393 at 6 ft 017at0ft ksi -.052 at 6 ft AWC NDS-18: ASD Code Check Max Bending Check 0.587 (LC 3) Location 6 ft Equation 3.9-1 CD 1 RB 4.938 Cr 1 Cfu 1 Fc' Ft' Fb' Fv' E' (ksi) Cm Ct Vy M PROVIDE (2) STEEL ANGLES W/ (4) 1/43-1/2 SDS SCREWS EACH SIDE OF POST, AND (4) EACH ANGLE TO FLOOR, CAP=2.4K 1.867 at 6 ft -.622 at 0 ft 3.734 at 6 ft -.213 at 4.5 ft Max Shear Check 0.331 (LC 3) Location 6 ft Max Defl Ratio L/3831 CL .997 CV 1 CP .734 CF In Out 1.834 1 1 1 1.75 1 1 1 2.5 1 1 1 .23 1 1 1800 1 1 Lb 8 ft 8 ft le/d 18.28613.714 Sway No No Le -Bending Top 8 ft Le -Bending Bot 8 ft -1 k-ft BEARING AND SHEAR CHECK OF 6" PILE CAP SHEAR AREA=140 inA2, W= 1620 dead,1600 live, 500 snow. Wu=4.7 k/ft. Vu = 11.8k each side of pile cap. phiVc= 11.9k. OK. Considering a 10" wide rectangular beam with d=15" and (2) #4 bars, phiMn=38.2 k-ft. Considering simply supported span @ 5'-0" Mu=14.7 k-ft. moment is okay. Bearing area = 36 in12. 4.7*5=23.5k/36=652 psi <.85fc ok