BLD2024-1340+Supplementals_Demolition_-_Asbestos+10.10.2024_4.16.10_PM+4553723Ov FDAI
� OM
v �
4 ;P
Inc. 189,
Jurisdiction: Edmonds
Project Name: Bathroom
Application ID: 1559726
Supplemental Name: Demolition - Asbestos
Asbestos
MyBuildingPermit.com
Asbestos is a carcinogen that is easily transported by air and breathed into the lungs so it must be handled very carefully. Prior to
performing any renovation or demolition, Puget Sound Clean Air Agency (Clean Air Agency) and Washington Department of Labor
and Industries (L&I) regulations require an asbestos survey be performed to determine if there are asbestos -containing materials in
the work area or structure. The asbestos survey must be conducted by an EPA certified (AHERA) Building Inspector and be kept on
the work site during the entire demolition project, including site cleanup.
A Clean Air Agency "notification", which may entail a waiting period of up to 10 days, is required for
a) All complete -structure demolition projects
b) All renovation projects exceeding 750 square feet or $75,000 valuation
c) All single family dwelling renovation projects containing asbestos that are not performed by the homeowner living in the residence.
All asbestos must be removed by an x I certified asbestos aoatemem conirac_ before any demolition activities begin and be
properly disposed of in accordance with state regulations.
For more information, please contact ruget aouna dean Air Age- through their web site at ww.pscieanair.org/asDestosorby
phone at 1-800-552-3565 and the Department of Labor and Ind— through their website at
http://www.Ini.wa.gov/TradesL!censing/LicensingReq/Asbest, or by phone at 360-902-5435.
Did you have an AHERA Asbestos Survey done?
YES
Enter the PSCAA number obtained through Puget Sound Clear Air.
If you have not applied for one yet go to: www.gscleanair.oru/asbestos
If your project does not require obtaining a PSCAA #, please enter NA and state why it is exempt.
NA: No asbestos found in project scope