Loading...
RESUB 2-BLD2024-0515-Engineering Details-10.25.2024O O O 0 O O O O O O 0 O O O O O O O d:: O O 9. O a' q FILTER SOCK WITH J OVER FLOW HOLES • . (TYP) a •• 4 •. a a • ead.•. O CITY OF EDMONDS PUBLIC WORKS DEPARTMENT `St. 189'-' BLD2024-0515 RESUB Oct 25 2024 DEV 1111 NT INDICES DEPARTMENT FILTER SOCK WITH OVER FLOW HOLES (TYP) lki 3 / NOTES: CATCH BASIN 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN THIS APPLICATION AT ALL TIMES DURING CONSTRUCTION PERIOD. 2. ANY SEDIMENT IN CATCH BASIN INSERT SHALL BE REMOVED WHEN INSERT IS ONE—THIRD FULL. 3. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN. TEMPORARY SEDIMENT TRAP FOR CATCH BASINS APPROVED BY: R. ENGLISH REVISION DATE JANUARY 2018 STANDARD DETAIL ER-902 2" x 2" WOOD/STEEL FILTER FABRIC SECURED TO 2" x 2" 14 GA WIRE FABRIC EQUAL 0 I N a N NATIVE BACKFILL MATERIAL- 8„ I FILTER FABRIC MATERIAL IN CONTINOUS ROLLS USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE 2" x 2" WOOD/STEEL POSTS -\ WIRE MESH FENCE TO SUPPORT FILTER FABRIC BURY BOTTOM OF FILTER MATERIAL 8" TO 12" 6' MAX NOTES: 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN AND ENSURE PROPER EROSION CONTROL THROUGHOUT PROJECT. 2. SILT FENCE TO BE PLACED DOWNSLOPE OF CONSTRUCTION ACTIVITY. CITY OF EDMONDS PUBLIC WORKS DEPARTMENT `St. 189\-' CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN FILTER FABRIC FENCE FILTRATION SYSTEMS APPROVED BY: R. ENGLISH REVISION DATE JANUARY 2018 STAN DARD D ETAI L ER-900