Loading...
REV2 APPROVED BLD2021-0755+Plumbing_Plan+2.13.2023_3.59.46_PM+3367402D U_ LO 00 E� Y co E J 0 C n (1 2 3 4 5 (6 7 (8 n9 10 12 13 1 WASTE AND VENT PLAN - 2ND FLOOR SCALE: 1/8" = V-0" PLUMBING GENERAL NOTES: 1. CERTAIN EQUIPMENT REQUIREMENTS NOTED ON THESE DRAWINGS WERE DERIVED FROM OWNER -FURNISHED COORDINATION DRAWINGS. CONTRACTOR TO VERIFY ACTUAL OWNER -FURNISHED EQUIPMENT CONNECTION REQUIREMENTS AND SCOPE OF WORK. CONTRACTOR TO PROVIDE INSTALLATION OF ALL OWNER SUPPLIED PLUMBING FIXTURES. 2. CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING SANITARY, DOMESTIC, AND GAS LINES. VERIFY AVAILABLE INVERT DEPTHS PRIOR TO BEGINNING WORK. 3. CONTRACTOR TO VERIFY INVERTS OF MANHOLES AND DOCUMENT WHETHER BACKCHECK VALVE IS REQUIRED. 4. PROVIDE ISOLATION VALVES ON ALL PLUMBING FIXTURES AND EQUIPMENT FOR SERVICE. 5. PROVIDE CLEANOUTS ON ALL BRANCH PIPING OVER 8' IN LENGTH AND CHANGES IN DIRECTION OF 135' OR MORE. 6. DOMESTIC PLUMBING MAINS TO BE COPPER IF OVER 2". 7. PROVIDE 8' SUDS RELIEF OFFSET ON SUD PRODUCING RISERS. SEE SHEET P6.2 FOR DETAIL. 8. ROUTE PLUMBING AS CLOSE TO THE PARKING CEILING AS POSSIBLE. SLOPE AT 1/4" PER FOOT. 9. PLUMBING CONTRACTOR HAS THE OPTION TO WET VENT RESTROOM GROUPS, OR MODIFY STACK PLUMBING SYSTEM. THE ALTERNATE PLUMBING DESIGN MUST COMPLY WITH THE 2018 UPC PLUMBING KEYNOTES: 1. ROUTE 1" CONDENSATE LINE (INSULATED) TO TAILPIECE OF NEAREST APPROVED SINK/LAV. 2. 2" SS FROM ABOVE. 3. 3" SS FROM ABOVE. 4. 4" SS DOWN IN WALL. 5. 4" RD UP AND DOWN IN WALL. 6. 5" RD UP AND DOWN IN WALL. 7. 5" RD UP IN WALL ABOVE. 8. 5" RD DOWN IN WALL. 9. 8" SS DOWN. 10. ROUTE 2" SS DOWN THROUGH DECK, TO LEVEL BELOW. PROVIDE CAST IRON P-TRAP AND PIPING FROM SINK THROUGH ROOF DECK. PROVIDE AIR ADMITTANCE VALVE BELOW SINK. 11. CONNECT 3/4" CONDENSATE DRAIN TO HVAC EQUIPMENT AND ROUTE TO CONDENSATE RISER. CCD 003 41741 GISTSR�� \� FSS/oNAL 01 /24/2023 38 NORTHWEST DAVIS, SUITE 300 PORTLAND, OR 97209 503.245.7100 1505 5TH AVE, SUITE 300 SEATTLE, WA 98101 206.576.1600 1014 HOWARD STREET SAN FRANCISCO, CA 94103 415.252.7063 © ANKROM MOISAN ARCHITECTS, INC. DC ENGINEERING Careful listening. Dynamic solutions. www.dcengineering.net Phone:208.288.2181 Project:21 AMA01 (D CV O 00 M 0 0 Z _Z 0 = Q W o LL 0 O 0 Z O > > J Q J 0 -0 01-0 O N _ 0 O Z m LU �* Z N U) Q U LU QN LU REVISION DATE REASON FOR ISSUE D 01-07-22 SITE DEV. COMMENTS 9 05-25-22 RFI#15 11 06-07-22 RFI#27/CCD#2 12-30-22 CCD 003 23 01-24-23 RFI# 199 PLUMBING WASTE & VENT PLAN — SECOND FLOOR CONSTRUCTION SET DATE PROJECT NUMBER 05.21.21 184470 SHEET NUMBER P2. E� Y co E J J 0 1 2 3 4 5 6 7 8 9 10 12 13 1 WASTE AND VENT PLAN - 3RD FLOOR SCALE: 1/8" = V-0" PLUMBING GENERAL NOTES: 1. CERTAIN EQUIPMENT REQUIREMENTS NOTED ON THESE DRAWINGS WERE DERIVED FROM OWNER -FURNISHED COORDINATION DRAWINGS. CONTRACTOR TO VERIFY ACTUAL OWNER -FURNISHED EQUIPMENT CONNECTION REQUIREMENTS AND SCOPE OF WORK. CONTRACTOR TO PROVIDE INSTALLATION OF ALL OWNER SUPPLIED PLUMBING FIXTURES. 2. CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING SANITARY, DOMESTIC, AND GAS LINES. VERIFY AVAILABLE INVERT DEPTHS PRIOR TO BEGINNING WORK. 3. CONTRACTOR TO VERIFY INVERTS OF MANHOLES AND DOCUMENT WHETHER BACKCHECK VALVE IS REQUIRED. 4. PROVIDE ISOLATION VALVES ON ALL PLUMBING FIXTURES AND EQUIPMENT FOR SERVICE. 5. PROVIDE CLEANOUTS ON ALL BRANCH PIPING OVER 8' IN LENGTH AND CHANGES IN DIRECTION OF 135' OR MORE. 6. DOMESTIC PLUMBING MAINS TO BE COPPER IF OVER 2". 7. PROVIDE 8' SUDS RELIEF OFFSET ON SUD PRODUCING RISERS. SEE SHEET P6.2 FOR DETAIL. 8. ROUTE PLUMBING AS CLOSE TO THE PARKING CEILING AS POSSIBLE. SLOPE AT 1/4" PER FOOT. 9. PLUMBING CONTRACTOR HAS THE OPTION TO WET VENT RESTROOM GROUPS, OR MODIFY STACK PLUMBING SYSTEM. THE ALTERNATE PLUMBING DESIGN MUST COMPLY WITH THE 2018 UPC PLUMBING KEYNOTES: 1. ROUTE 1" CONDENSATE LINE (INSULATED) TO TAILPIECE OF NEAREST APPROVED SINK/LAV. 2. 2" SS UP AND DOWN IN WALL. 3. 3" SS UP AND DOWN IN WALL. 4. 4" RD UP AND DOWN IN WALL. 5. 5" RD UP AND DOWN IN WALL. 6. 5" RD UP IN WALL ABOVE. 7. 5" RD DOWN IN WALL. 8. CONNECT 3/4" CONDENSATE DRAIN TO HVAC EQUIPMENT AND ROUTE TO CONDENSATE RISER. 41741 GISTER�� FSS/oNAL 01 /24/2023 38 NORTHWEST DAVIS, SUITE 300 PORTLAND, OR 97209 503.245.7100 1505 5TH AVE, SUITE 300 SEATTLE, WA 98101 206.576.1600 1014 HOWARD STREET SAN FRANCISCO, CA 94103 415.252.7063 © ANKROM MOISAN ARCHITECTS, INC. DC ENGINEERING Careful listening. Dynamic solutions. www.drengineering.net Phone:208.288.2181 Project:21 AMA01 (D CV O 00 M 0 0 Z _Z 0 = Q W o LL 0 O 0 Z_ 0 > > J Q J 0 —0 01-0 O N _ 0 O Z m LU �* Z N U) Q U LU QN LU REVISION DATE REASON FOR ISSUE A 08-20-21 CITY COMMENTS #01 D 01-07-22 SITE DEV. COMMENTS 9 05-25-22 RFI#15 23 01-24-23 RFI# 199 PLUMBING WASTE & VENT — THIRD FLOOR CONSTRUCTION SET DATE PROJECT NUMBER 05.21.21 184470 MBER P27.3 Y co E J J 0 PLUMBING GENERAL NOTES: 1. CERTAIN EQUIPMENT REQUIREMENTS NOTED ON THESE DRAWINGS WERE DERIVED FROM OWNER -FURNISHED T1 , COORDINATION DRAWINGS. CONTRACTOR TO VERIFY ACTUAL 2 n3 n4 5 6 7 $ �9 i o 12 13 OWNER -FURNISHED EQUIPMENT CONNECTION REQUIREMENTS _ — AND SCOPE OF WORK. CONTRACTOR TO PROVIDE INSTALLATION OF ALL OWNER SUPPLIED PLUMBING FIXTURES. 2. CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING SANITARY, DOMESTIC, AND GAS LINES. VERIFY AVAILABLE INVERT DEPTHS PRIOR TO BEGINNING WORK. 3. CONTRACTOR TO VERIFY INVERTS OF MANHOLES AND DOCUMENT WHETHER BACKCHECK VALVE IS REQUIRED. 4. PROVIDE ISOLATION VALVES ON ALL PLUMBING FIXTURES AND EQUIPMENT FOR SERVICE. 5. PROVIDE CLEANOUTS ON ALL BRANCH PIPING OVER 8' IN LENGTH AND CHANGES IN DIRECTION OF 135' OR MORE. 6. DOMESTIC PLUMBING MAINS TO BE COPPER IF OVER 2". 7. PROVIDE 8' SUDS RELIEF OFFSET ON SUD PRODUCING RISERS. SEE SHEET P6.2 FOR DETAIL. 8. ROUTE PLUMBING AS CLOSE TO THE PARKING CEILING AS POSSIBLE. SLOPE AT 1/4" PER FOOT. 9. PLUMBING CONTRACTOR HAS THE OPTION TO WET VENT RESTROOM GROUPS, OR MODIFY STACK PLUMBING SYSTEM. THE ALTERNATE PLUMBING DESIGN MUST COMPLY WITH THE 2018 UPC PLUMBING KEYNOTES: 1 WASTE AND VENT PLAN - 4TH FLOOR SCALE: 1/8" = V-0" M 1. ROUTE 1" CONDENSATE LINE (INSULATED) TO TAILPIECE OF NEAREST APPROVED SINK/LAV. 2. 2" SS UP AND DOWN IN WALL. 3. 3" SS UP AND DOWN IN WALL. 4. 4" RD UP AND DOWN IN WALL. 5. 5" RD UP AND DOWN IN WALL. 6. CONNECT 3/4" CONDENSATE DRAIN TO HVAC EQUIPMENT AND ROUTE TO CONDENSATE_ RISER. 41741 ��C/ 0'� ��GISTER�� \� �G FSS/oNAL 01 /24/2023 38 NORTHWEST DAVIS, SUITE 300 PORTLAND, OR 97209 503.245.7100 1505 5TH AVE, SUITE 300 SEATTLE, WA 98101 206.576.1600 1014 HOWARD STREET SAN FRANCISCO, CA 94103 415.252.7063 © ANKROM MOISAN ARCHITECTS, INC. DC ENGINEERING Careful listening. Dynamic solutions. www.dcengineering.net Phone:208.288.2181 Project:21 AMA01 (D CV O 00 M 0 0 Z _Z 0 = Q W o LL 0 O 0 0 3: z_ O > > J Q J 0 —0 01-0 O N _ 0 O Z m LU �* U) Z N Q U LU QN LU REVISION DATE REASON FOR ISSUE A 08-20-21 CITY COMMENTS #01 9 05-25-22 RFI#15 23 01-24-23 RFI# 199 PLUMBING WASTE & VENT — FOURTH FLOOR CONSTRUCTION SET DATE PROJECT NUMBER 05.21.21 184470 MBER P 2 Y co E J L J 0 1 2 3 4 5 6 7 T 9 10 12 (13 i I I I I I I I 1 WASTE AND VENT PLAN - 5TH FLOOR SCALE: 1/8" = 1'-0" L M'. PLUMBING GENERAL NOTES: 1. CERTAIN EQUIPMENT REQUIREMENTS NOTED ON THESE DRAWINGS WERE DERIVED FROM OWNER -FURNISHED COORDINATION DRAWINGS. CONTRACTOR TO VERIFY ACTUAL OWNER -FURNISHED EQUIPMENT CONNECTION REQUIREMENTS AND SCOPE OF WORK. CONTRACTOR TO PROVIDE INSTALLATION OF ALL OWNER SUPPLIED PLUMBING FIXTURES. 2. CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING SANITARY, DOMESTIC, AND GAS LINES. VERIFY AVAILABLE INVERT DEPTHS PRIOR TO BEGINNING WORK. 3. CONTRACTOR TO VERIFY INVERTS OF MANHOLES AND DOCUMENT WHETHER BACKCHECK VALVE IS REQUIRED. 4. PROVIDE ISOLATION VALVES ON ALL PLUMBING FIXTURES AND EQUIPMENT FOR SERVICE. 5. PROVIDE CLEANOUTS ON ALL BRANCH PIPING OVER 8' IN LENGTH AND CHANGES IN DIRECTION OF 135' OR MORE. 6. DOMESTIC PLUMBING MAINS TO BE COPPER IF OVER 2". 7. PROVIDE 8' SUDS RELIEF OFFSET ON SUD PRODUCING RISERS. SEE SHEET P6.2 FOR DETAIL. 8. ROUTE PLUMBING AS CLOSE TO THE PARKING CEILING AS POSSIBLE. SLOPE AT 1/4" PER FOOT. 9. PLUMBING CONTRACTOR HAS THE OPTION TO WET VENT RESTROOM GROUPS, OR MODIFY STACK PLUMBING SYSTEM. THE ALTERNATE PLUMBING DESIGN MUST COMPLY WITH THE 2018 UPC PLUMBING KEYNOTES: 1. ROUTE 1" CONDENSATE LINE (INSULATED) TO TAILPIECE OF NEAREST APPROVED SINK/LAV. 2. 2" SS UP AND DOWN IN WALL. 3. 3" SS UP AND DOWN IN WALL. 4. 4" RD UP AND DOWN IN WALL. 5. 5" RD UP AND DOWN IN WALL. 6. 3" RD/OD UP TO RD-1/OD-1 ABOVE. 7. 2" V UP. 8. 4" V UP. 9. CONNECT 3/4" CONDENSATE DRAIN TO HVAC EQUIPMENT AND ROUTE TO CONDENSATE RISER. 41741 ��C/ 0'� ��GISTFE FSS/oNAL � 01 /24/2023 38 NORTHWEST DAVIS, SUITE 300 PORTLAND, OR 97209 503.245.7100 1505 5TH AVE, SUITE 300 SEATTLE, WA 98101 206.576.1600 1014 HOWARD STREET SAN FRANCISCO, CA 94103 415.252.7063 © ANKROM MOISAN ARCHITECTS, INC. DC ENGINEERING Careful listening. Dynamic solutions. www.dcengineering.net Phone:208.288.2181 Project:21 AMA01 CV O 00 M 0 0 Z _Z 0 = Q W o LL 0 O 0 Z O > > J Q J 0 —0 01-0 O N _ 0 O Z m LU �* Z N U) Q U LU QN LU REVISION DATE REASON FOR ISSUE A 08-20-21 CITY COMMENTS #01 C 02-08-22 CITY COMMENTS #03 9 05-25-22 RFI#15 23 01-24-23 RFI# 199 PLUMBING WASTE & VENT — FIFTH FLOG CONSTRUCTION SET DATE PROJECT NUMBER 05.21.21 184470 S79MT15MBER p E� Y co E J J 0 PLUMBING GENERAL NOTES: 1. CERTAIN EQUIPMENT REQUIREMENTS NOTED ON THESE DRAWINGS WERE DERIVED FROM OWNER -FURNISHED COORDINATION DRAWINGS. CONTRACTOR TO VERIFY ACTUAL OWNER -FURNISHED EQUIPMENT CONNECTION REQUIREMENTS AND SCOPE OF WORK. CONTRACTOR TO PROVIDE INSTALLATION OF ALL OWNER SUPPLIED PLUMBING FIXTURES. 1 2 3 4 5 6 7 8 9 10 12 13 2. CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING SANITARY, DOMESTIC, AND GAS LINES. VERIFY AVAILABLE INVERT DEPTHS PRIOR TO BEGINNING WORK. 3. CONTRACTOR TO VERIFY INVERTS OF MANHOLES AND DOCUMENT WHETHER BACKCHECK VALVE IS REQUIRED. 4. PROVIDE ISOLATION VALVES ON ALL PLUMBING FIXTURES AND EQUIPMENT FOR SERVICE. 5. PROVIDE CLEANOUTS ON ALL BRANCH PIPING OVER 8' IN LENGTH AND CHANGES IN DIRECTION OF 135' OR MORE. 6. DOMESTIC PLUMBING MAINS TO BE COPPER IF OVER 2". 7. PROVIDE 8' SUDS RELIEF OFFSET ON SUD PRODUCING RISERS. SEE SHEET P6.2 FOR DETAIL. 8. ROUTE PLUMBING AS CLOSE TO THE PARKING CEILING AS POSSIBLE. SLOPE AT 1/4" PER FOOT. 9. PLUMBING CONTRACTOR HAS THE OPTION TO WET VENT RESTROOM GROUPS, OR MODIFY STACK PLUMBING SYSTEM. THE ALTERNATE PLUMBING DESIGN MUST COMPLY WITH THE 2018 UPC 0 I WASTE AND VENT PLAN - 6TH FLOOR SCALE: 1/8" = V-0" F G 0 PLUMBING KEYNOTES: 1. ROUTE 1" CONDENSATE LINE (INSULATED) TO TAILPIECE OF NEAREST APPROVED SINK/LAV. 2. 2" SS DOWN IN WALL. 3. 3" SS DOWN IN WALL. 4. 4" RD DOWN IN WALL. 5. 5" RD DOWN IN WALL. 6. 4" RD/OD UP TO RD-1/OD-1 ABOVE. 7. 3" RD/OD UP TO RD-1/OD-1 ABOVE. 8. SEE ARCHITECTURAL PLANS AND ADDITIONAL MATERIAL FOR SALON EQUIPMENT. 9. VENT THROUGH ROOF LOCATION. COMBINE PLUMBING STACKS IN THIS AREA AND ROUTE UP THROUGH ROOF. SEE SHEET P6.2 FOR VENT STACK DETAIL AND SIZING INFO. 10. 2" V FROM BELOW. 11. 4" V FROM BELOW. 12. CONNECT 3/4" CONDENSATE DRAIN TO HVAC EQUIPMENT AND ROUTE TO CONDENSATE RISER. �O of wASMi� 0 41741 �� ��GISTER�� FSS/oNAL � 01 /24/2023 38 NORTHWEST DAVIS, SUITE 300 PORTLAND, OR 97209 503.245.7100 1505 5TH AVE, SUITE 300 SEATTLE, WA 98101 206.576.1600 1014 HOWARD STREET SAN FRANCISCO, CA 94103 415.252.7063 © ANKROM MOISAN ARCHITECTS, INC. DC ENGINEERING Careful listening. Dynamic solutions. www.dcengineering.net Phone:208.288.2181 Project:21 AMA01 c� N O M 0 0 z _z O = Q W o LL O o 0 LLJ z_ O LU > J Q J O -0 0 N _ 0 O z m LU �* z N U) Q U LU QN LU REVISION DATE REASON FOR ISSUE A 08-20-21 CITY COMMENTS #01 B 10-28-21 CITY COMMENTS #02 C 02-08-22 CITY COMMENTS #03 9 05-25-22 RFI#15 23 01-24-23 RFI# 199 PLUMBING WASTE & VENT — SIXTH FLOOR CONSTRUCTION SET DATE PROJECT NUMBER 05.21.21 184470 BER p r c c c c c CLASS C STEEL GRATE COVER WHERE APPLICABLE - DISCHARGE POWER SUPPLY PIPING CORD —A BALL VALVE TO FIXTURES (TYPICAL) cr n n 4 0 4 0 INLET STRAINER W/ BLOW -DOWN VALVE 0 REDUCED PRESSURE TYPE Z) o BACKFLOW PREVENTER, z w �> _ 0 FIXED AIR GAP FITTING N Q WITH DRAIN TO FLOOR SINK INCOMING COLD WATER �I REDUCED PRESSURE BACKFLOW PREVENTER aa7_1��i��C� WASHING WATER HAMMER MACHINE BOX ARRESTOR WADE MODE' HOSE BIBBS z< 1� FLOOR 2" TRAP AND WASTE PIPE 3" WASTE WASHING MACHINE PLUMBING DETAIL ♦.i SCALE: NTS 2" VENT 3" WASTE 2" VENT SUMP PUMP SUMP PUMP DETAIL SCALE: NTS 1 Ml AIM nAn INDIRECT WASTE DRAIN OR FLOOR SINK DISCHARGE PIPE - SEE PLAN FOR CONTINUATION CONCRETE FLOOR SLAB D p D p D p D p D CHECK VALVE WITH BANDED CONNECTIONS m SUMP PIT CONTRUCTED III OF A CORR. GALV. PIPE OR EQUAL OF PVC OR FIBERGLASS CONSTRUCTION INDIRECT DRAIN PIPING - CLUSTER CLOSELY TOGETHER VENT FLOOR �r P ARM WASTE INDIRECT WASTE DRAIN DETAIL V SCALE: NTS FINISHE BRASS CLEANOUT D PLUG W/ COUNTER GRADE SUNK HEAD. (TYPICAL) 12"x12"0-1/2" THICK CONC. PAD TROWEL SMOOTH AND EDGE. (TYPICAL) WASTE LINE, LENGTH TO SUIT. (TYPICAL) 1/8 BEND 1/8 BEND 2 WAY SANITARY CLEANOUT FITTING p —1 9 WASTE LINE DOUBLE GRADE CLEANOUT DETAIL SCALE: NTS MANUFACTURERS OUTSIDE CONCENTRIC VENT WALL BY CONTRACTOR FLASH & SEAL PENETRATION WATER TIGHT REDUCING BUSHING INTAK E AIR 0 EXHAUST AIR —> 2=1 � EXHAUST AIR INTAKE AIR a �\ 18"MIN. INTAK ABOVE ELBOW CLAMP s FINSHED Eq�� GRADE GRADE I- _ .= I IIII I11=III—I11=� a = I,Illlll�illlll��lll—II 7 CONCENTRIC VENT THROUGH WALL DETAIL SCALE: NTS ROOF MEMBRANE W/ CAST IRON DOME STONE BALLAST CAST IRON DOME 6,01 RNP INSULATION INTEGRAL WITH ADJUSTABLE COLLAR FLASHING RING ATTACHED TO BODY °ae ° o qa B oho m° db sa�aFd I A os o$ o °�° oc Cato o pe ° °o ° — A&c _o I I STEEL DECK Le I I REVERSIBLE DECK COLLAR STAIR -STEP ADJUSTMENT I UNDERDECK CLAMP CONNECT PIPE AFTER FINAL CONNECT PIPE AFTER FINAL ADJUSTMENT IS MADE ROOF DRAIN BODY ADJUSTMENT IS MADE ROOF DRAIN BODY PRIMARY ROOF DRAIN 10 PRIMARY/OVERFLOW ROOF DRAIN DETAIL SCALE: NTS 62.5" A �-r� �.�,. �.�-,ice 1 r ,�-�� �-,�� �.�,r� �-.� A err err rye rr� err 7­r-7 7' ri i GALVANIZED DIAMOND COVER PLAN PLATE COVERS WITH BOLT -DOWN LOCKS PROVIDE GASKET SEALED CAP FOR OUTLET TEE, FOR INTERIOR INSTALLATION ONLY 1.5"-5" 3.5" ADJUSTMENT SLOTS ADJUSTABLE PROVIDE GASKET .11 SEALED CAP FOR INLET INLET TEE, FOR SAMPLING TEE INTERIOR INSPECTION/SAMPLING INSTALLATION ONLY BAFFLES TEE — SEE NOTE 3 INLET _ _ WATER LEVEL _ — OUTLET o GRIT/SLUDGE > RETAINER WEIR � a Y E a° E a L 2.75" - I 17.5" 8" 22.5" 14.5" , NOTES: SECTION A -A > 1. USE UTILITY VAULT COMPANY INC. MODEL #25—SA OR EQUAL. PRECAST VAULT SHALL HAVE KNOCKOUTS AT ALL PIPE OPENINGS. IF KNOCKOUTS ARE NOT PRESENT, THEN PIPE OPENINGS SHALL BE CORE —DRILLED. PIPE OPENINGS SHALL BE `00 2" LARGER THAN THE PIPE DIAMETER. 2. LOCATE VAULT WITHIN 20' OF DRIVE FOR ACCESS BY MAINTENANCE VEHICLES. n 3. PVC INSPECTION AND SAMPLING TEE SHALL BE A MINIMUM OF 6" OR MATCH OUTLET PIPE, WHICHEVER IS GREATER. a INSTALL GASKETED CAP ON TOP OF THE SAMPLING TEE, FOR INTERIOR INSTALLATIONS ONLY. c 4. FILL WITH CLEAN WATER PRIOR TO START-UP OF THE SYSTEM. 5. GRAY AND BLACK WATER SHALL BE CARRIED BY SEPARATE SIDE SEWER. E 6. PIPE CONNECTION TO VAULT: KOR-N-SEAL OR EQUAL FOR CORE -DRILLED OPENINGS, OR SAND COLLAR FOR KNOCKOUT a OPENING. SEAL ALL PIPE CONNECTIONS WITH NONSHRINK GROUT. v 7. INTERIOR OIL/WATER SEPARATORS SHALL HAVE VENTING PER LATEST EDITION OF UNIFORM PLUMBING CODE REQUIREMENTS. 8. PRIOR TO STARTUP, OIL/WATER SEPARATOR SHALL PASS 1 % PER DAY LEAK TEST WHERE ONLY A MAXIMUM OF 1 % OF DEAD STORAGE REDUCTION IS ALLOWED WITHIN A 24 HOUR PERIOD PER THE UNIFORM PLUMBING CODE (LATEST EDITION) 9. ACCESS LID SHALL HAVE SLIP RESISTANT TREATMENT. CD Y 4 i SAND AND OIL INTERCEPTOR DETAIL SCALE: NTS OVERFLOW ROOF DRAIN ""Inn nI nnI/ MIRO SPACEF REQUIR LAY co 2" - [��_ — SIDE VIEW FRONT VIEW TOP VIEW 11 MIRO BLOCK DETAIL SCALE:NTS AQUASTAT (IF REQUIRED BY CODE) FOR CONTROL OF PUMP FLOW STRAINER REDUCING TEE IN -LINE CIRCULATING PUMP (SEE SCHEDI BALL VALVE OR LUG BUTTERFLY VALVE Q RECIRC PUMP DETAIL V SCALE: NTS HORIZONTAL PIPING CHART PIPE SIZE PIPE SUPPORT DISTANCE 1 /2" 6' 3/4" 8' 1 " 8' 1 1l4" 10, 1-1/2" 10, 2" 10, 12"x12"x3-1 /2" THICK CONC. PAD TROWEL SMOOTH AND EDGE. (TYF"^"' WASTE LIN LENGTH TC SUIT. (TYPI 1/8 BEND WASTE LIN GRADE CLEANOUT CLEANOUT DETAILS SCALE: NTS FOR CONTINUATION AND SIZE, SEE FLOOR PLAN - - UNION DIAL TYPE PRESSURE GAUGE (0-100 PSIG) GAS COCK (TYPICAL) GROUND JOINT UNION - CHECK VALVE FROM GAS SUPPLY Fil THREADED CLEANOUT CAP (LINE SIZE) FLOOR CLEANOUT CHROME WALL COVER AND SCREW WALL CLEANOUT SINGLE PLY ROOF JACK FURNISHED AND INSTALLED BY ROOFING CONTRACTOR. SEAL WATERTIGHT TO VENT STACK. FINISHE D FLOOR ND MAY EXTEND AS WASTE OR VENT. PLUGGED TEE W/ CLEANOUT. FINISHE D FLOOR ND 3" VTR \ 2" VENT STACK - I NOTE: LOCATE VENT A MINIMUM OF -0" FROM ANY AIR INTAKES. 10' 9 VENT THROUGH ROOF DETAIL SCALE: NTS MANUAL SHUT-OFF VALVE WITH AN 1/8" N.P.T. PLUGGED TAPPING ACCESSIBLE FOR TEST GAGE CONNECTION TO BE INSTALLED UPSTREAM OF THE GAS SUPPLY CONNECTION TO THE APPLIANCE. FLEXIBLE STEEL 6" TRAP CONNECTION TO (DRIP LEG) EQUIPMENT/ CONTROLS 12 GAS CONNECTION DETAIL SCALE: NTS MEMBRANE ROOFING MATERIAL RIGID ROOF INSULATION METAL DECKING VVI I I IIIV UUILUIIVl7 LIVVLLIJrL Q TRAP PRIMER DETAIL SCALE: NTS �O of WASMi� 0 41741 �� ��GISTER�� FSS/ONAL 01 /24/2023 38 NORTHWEST DAVIS, SUITE 300 PORTLAND, OR 97209 503.245.7100 1505 5TH AVE, SUITE 300 SEATTLE, WA 98101 206.576.1600 1014 HOWARD STREET SAN FRANCISCO, CA 94103 415.252.7063 © ANKROM MOISAN ARCHITECTS, INC. DC ENGINEERING Careful listening. Dynamic solutions. www.dcengineering.net Phone:208.288.2181 Project:21 AMA01 CD CV O 00 0) 0 Z _Z 0 = Q W o O 0� 0 0 Z 0 > > J Q J �_ 0 C) 0 N _ _o o z m W � Z N U) Q U rr QN LU REVISION DATE REASON FOR ISSUE A 08-20-21 CITY COMMENTS #01 B 10-28-21 CITY COMMENTS #02 23 01-24-23 RFI# 199 PLUMBING DETAILS CONSTRUCTION SET DATE PROJECT NUMBER 05.21.21 184470 S NUMBER P6.0 c c c c L 3" VTR (MIN.) o . I o Iv v > � N v 1� 1-1/2"V I O (V U) _ N 1-1/2"V �> O > N� (V U) N CV I 1-112" V � `> I � O > N� (V Cn N co I I\ ` 1-112" V � `> I 0 I NU_ (V (n U_ N � Y co E J J 0 c m 5' LAVATORY 1 RISER SCALE: NTS 4V LAVATORY 8 RISER SCALE: NTS i (MIN.) J� I > N I- I 2 V � I WC I CV co I co 2" V 1 `> WC I NL CV Ch I � 2" V � `> I� WC Cn I Cn U_ CV Ch I � 2" V 1 `> WC I cn N co CV I I` 2" V `> T VTR (MIN.) J� CV r� I 1-1/2"V �� 1 I � I I I BTISH I > `-" N CV N I I r.� 1-1/2" V I BTISH Q > C_n N I N � r. BTISH I I > W N I CV I r.� BTISH I I I > �U_ W� N I N CO I` `> 2" V I WCO \ I WCO \ I WCO I WCO S WC ED BTISH ] KS 3" SS / 2" SS / 2" SS / 3 WFU 2 WFU 2 WFU 15 WFU 10 WFU � 10 WFU WATER BATH TUB/ KITCHEN 2 CLOSET RISER 3 SHOWER RISER 4 SINK RISER SCALE: NTS SCALE: NTS SCALE: NTS 3" VTR (MIN.) 2"V ��j I WC I N:D N CO CO 2" V �, N,> WC I N� N co 11 2° v �N, > I WC I N� N CO I I` 2" V `> I(WCO WC A 3" SS 3 WFU 12 WFU WAT E R 9 CLOSET RISER SCALE: NTS 8 WFU T VTR (MIN.) r� 1-1/2" V I I i BUSH Cn > u) � N (V N I I r. I BTISH I > cn U_ N N I r. 1-1/2" V 1 `> I BTISH r1 U)=) U)U_ N CO Y \---- $.o' 04 BATH TUB/ f 1 SHOWER RISER %J SCALE: NTS 8 WFU 15 WFU " VTR (MIN.) CV I� I 2" V N, y 1 WB I > `-" U_ N CV M I� 2" V � `> WB I > �� (Vco CV I� 2" V -J `> WB I I > w� N <,•) I� 2" V � `> WB I > CnU_ Cn N C'j I I` 2" V `> WASHER 5 BOX RISER SCALE: NTS WCO I I > 1-1/2"V o �y > N LL (V CV I I N (n M co I I 1-1/2" V OI WCO U__�f A 2" SS / 2 WFU 10 WFU 6 LAVATORY RISER SCALE: NTS 3" VTR (MIN.) JAL I J� co I WC 2"V WC I I M co WC 2"V �`v1 o WC� , > co M M CV I I WC 2" V WC ( I 1 I p N co I I WC 1 � 1 2" V r WC I > U N co V "' I WC I 'Q I I WCO 3" SS 6 WFU 30 WFU WAT E R 7 CLOSET RISER SCALE: NTS T VTR (MIN.) 3" VTR (MIN.) 1 T VTR (MIN.) I T VTR (MIN.) OCIFDIFS U_ I N N N N �O I N I I 1-1/2"V � 2"V � I I N 1-1/2"V r.� 1-1/2"V �� 1 I 1 1 I 1-1/2" V I �> KS WB I I 1 SS CIFDIFS I I CIFDIFS I co = I co > `" >cli `n U_I Ico U_ N N I N CO > 0 L.L I I N N N N � 1112"V I N, N, 2„V 1 `�> ram`` r� 11/2"V 1 \`> ti! 1-1/2" V 1-1/2"V �> KS WB I I I SS I 1 CIFDIFS CIFDIFS I > cn I v> > I I > cn M N Cn � N Cn � I = N (n � N V I NCO > (� U_Cn I N V CV CV > U_ 1 I o N COii: I 0 I�� 1-1/2"V I�> 2"V 1 > I `�` r� 1-1/2"V I 1-1/2"V 1-1/2"V �> KS WB I I I SS I 1 CIFDIFS I CIFDIFS I > Tf I > N Cn U_N N (n j CO N CO M O) > N U I � N =� Cn N N > co I I I N No I I I I I`� 1-1/2" V 2" V > ♦ I 1-1/2" V f WCO �r WCO 2, V — `r> 2„ V `� > �r WCO I O I � \"`��� Wco �.r I O KS WB lO ICwwcO SS CIFDIFS /A /A CIFDIFS /A 2" SS / 2" SS I / �. � � WFU / / 2 WFU 3 WFU / 011 cc i KITCHEN 11 SINK RISER SCALE: NTS 12 WFU WASHER 12 BOX RISER SCALE: NTS 2 WFU '00/.\ MW SERVICE 15 SINK RISER SCALE: NTS PLUMBING GENERAL NOTES: 1. CERTAIN EQUIPMENT REQUIREMENTS NOTED ON THESE DRAWINGS WERE DERIVED FROM OWNER -FURNISHED COORDINATION DRAWINGS. CONTRACTOR TO VERIFY ACTUAL OWNER -FURNISHED EQUIPMENT CONNECTION REQUIREMENTS AND SCOPE OF WORK. CONTRACTOR TO PROVIDE INSTALLATION OF ALL OWNER SUPPLIED PLUMBING FIXTURES. 2. CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING SANITARY, DOMESTIC, AND GAS LINES. VERIFY AVAILABLE INVERT DEPTHS PRIOR TO BEGINNING WORK. 3. CONTRACTOR TO VERIFY INVERTS OF MANHOLES AND DOCUMENT WHETHER BACKCHECK VALVE IS REQUIRED. 4. PROVIDE ISOLATION VALVES ON ALL PLUMBING FIXTURES AND EQUIPMENT FOR SERVICE. 5. PROVIDE CLEANOUTS ON ALL BRANCH PIPING OVER 8' IN LENGTH AND CHANGES IN DIRECTION OF 135' OR MORE. 6. DOMESTIC PLUMBING MAINS TO BE COPPER IF OVER 2". 7. PROVIDE 8' SUDS RELIEF OFFSET ON SUD PRODUCING RISERS. SEE SHEET P6.2 FOR DETAIL. 8. ROUTE PLUMBING AS CLOSE TO THE PARKING CEILING AS POSSIBLE. SLOPE AT 1/4" PER FOOT. 9. PLUMBING CONTRACTOR HAS THE OPTION TO WET VENT RESTROOM GROUPS, OR MODIFY STACK PLUMBING SYSTEM. THE ALTERNATE PLUMBING DESIGN MUST COMPLY WITH THE 2018 UPC VENT PIPING SIZING TABLE TO COMBINE VENTS FOR MINIMAL VENT THRU ROOF PENETRATIONS, USE THE FOLLOWING FIXTURE VENT FIXTURE UNITS WATER CLOSETS 3 LAVATORIES 1 BATHTUB 2 KITCHEN SINK 2 CLOTHES WASHER 3 PIPE MAX. FIXTURE UNITS REMARKS 4" 256 3" 84 2-1/2" 48 2" 24 1-1/2" 8 DO NOT USE FOR WATER CLOSET COMBINED VENTING SCHEDULE NOTE: AT CONTRACTORS OPTION, VTR'S MAY BE COMBINED PER THE COMBINED VENTING SCHEDULE ON THIS SHEET. THIS CONTRACTOR IS RESPONSIBLE FOR COORDINATING/ VERIFYING COMBINED VENTS. NOTE: CONTRACTOR TO COORDINATE EXACT PLACEMENT OF WCO IN PRIVATE BATHROOMS W/ARCHITECT AND GENERAL CONTRACTOR PRIOR TO INSTALLATION. PROVIDE RATED CLEANOUT WHEN LOCATED IN RATED WALL. (TYP ALL UNITS) 41741 o&sS%O � A N L 01 /24/2023 • 38 NORTHWEST DAVIS, SUITE 300 PORTLAND, OR 97209 503.245.7100 1505 5TH AVE, SUITE 300 SEATTLE, WA 98101 206.576.1600 1014 HOWARD STREET SAN FRANCISCO, CA 94103 415.252.7063 © ANKROM MOISAN ARCHITECTS, INC. DC ENGINEERING Careful listening. Dynamic solutions. www.drengineering.net Phone:208.288.2181 Project:21 AMA01 CD N O 00 M 0 0 Z _Z 0 = Q o3: w o O 0 0 �Lu 3 Z 0 LU > J Q O O N _ 0 o~ Z m W � Z N U) Q LU Q N U LU REVISION DATE REASON FOR ISSUE A 08-20-21 CITY COMMENTS #01 9 05-25-22 RFI#15 23 01-24-23 RFI# 199 PLUMBING RISER DIAGRAMS CONSTRUCTION SET DATE PROJECT NUMBER 05.21.21 184470 SHEET NUMBER p