REV2 BLD2021-0755+SCOPE OF CHANGES+2.13.2023_3.59.46_PM+3367401Jr
DC ENGINEERING
Careful listening. Dynamic solutions. -
Addendum for Anthology of Edmonds
www.dcengineering.net
Project Date: February 13, 2023 Services Performed For:
Project Name Anthology of Edmonds Ankrom Moisan
38 Northwest Davis, Suite 300
RFI-199 — Condensate Line changes Portland, OR 97209
This ADDENDUM supersedes the original SPECIFICATIONS and DRAWINGS dated 3/4/2022
wherein it contradicts them; all other conditions remain unchanged.
Refer to attached drawing sheets for additional information and locations.
Drawings
PLUMBING DRAWINGS
P2.2 — PLUMBING WASTE AND VENT PLAN — SECOND FLOOR
• Floor drains in HVAC closets were removed.
• Keynote #11 was added.
P2.3 — PLUMBING WASTE AND VENT PLAN —THIRD FLOOR
• Floor drains in HVAC closets were removed.
• Keynote #8 was added.
P2.4 — PLUMBING WASTE AND VENT PLAN — FOURTH FLOOR
• Floor drains in HVAC closets were removed.
• Keynote 46 was added.
P2.5 — PLUMBING WASTE AND VENT PLAN — FIFTH FLOOR
• Floor drains in HVAC closets were removed.
• Keynote 49 was added.
P2.6 — PLUMBING WASTE AND VENT PLAN — SIXTH FLOOR
• Floor drains in HVAC closets were removed.
• Keynote #12 was added.
Addendum for Ankrom Moisan, Anthology of Edmonds • 2/13/2023 Page 1 of 2
P6.0 —PLUMBING DETAILS
Detail #15 was added to show HVAC condensate connection.
P6.2 — PLUMBING RISER DIAGRAMS
Riser diagrams #13 and #14 were revised to show condensate connections at each level.
END OF ADDENDUM
Addendum for Ankrom Moisan, Anthology of Edmonds • 2/13/2023 Page 2 of 2