Loading...
REV1 RESPONSE 1 BLD-BLD2024-0191+10.2.2024_3.50.07_PM+453800002 OCTOBER 2024 Marissa Rutler - Planner City of Edmonds, Development Services- Planning Division 121 5th Ave N. Edmonds WA 98020 RE: BLD2024 -0191- REVISON 1 (915 Maple St. Edmonds WA 98020 ) -Planning Corrections Notice #1, dated September 11, 2024 Dear Marissa; This letter is my response to your referenced corrections notice for project BLD2024-0191 REVISION 1 My responses follow the same order as your corrections items. All changes on the new revised plan set, submitted with this letter, are clouded and marked revision #4. 1) Sheet A4 has been revised to show the extents of the required 1 hour rated construction for the eaves along the east wall of the new studio addition that cross the 5 ft property setback line. I have also updated detail 4/A4 to show the updated eaves assembly, and to reference the GA file number [ GA # RC 2602 ] This concludes my response to your 1 correction. Kit Newman - Principal Architect - Washington State Architect license # 7600 ARCHITECT7600 LLC • 112D 22ND AVENUE SEATTLE, WA 98122 • PH. 206.605.3277