APPROVED ENG RESUB 6-BLD2022-1556+Bond_Quantity_Worksheet+9.19.2024_3.25.17_PM+4512406Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/2015
RESUB
Sep 20 2024
KiL'ang County DE oEPAR.MEN.P-M'EN-S-ERVCEs
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600.
206-296-6600 TTY Relay 711
Project Name: DIRT Holdings LLC Site Development
Location: 7509 212th St SW Edmonds, WA 98026
Clearing greater than or equal to 5,000 board feet of timber?
yes X no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
King County Bond Quantity Worksheet
Date: 6/5/2024
Project No.:
Activity No.:
BLD2022-1556
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
PERFORMANCE BOND AMOUNT:
$51,409 x 120% = $61,690.8
MAINTENANCE BOND AMOUNT:
$61,690.8 x 15% = $9,253.62
INSPECTION FEES:
$332,926.60 x 3.3% = $10,986.58
CITY OF EDMONDS
ENGINEERING DIVISION
APPROVED AS,,, NOTED
�/�GYn'"9/20/2024
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 9/19/2024
Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/2015
Reference #
Unit
Price
Unit
Quantity
# of
Applications
Cost
EROSION/SEDIMENT CONTROL
Number
Backfill & compaction -embankment
ESC-1
$ 6.00
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 80.00
Each
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 95.00
CY
Ditching
ESC-4
$ 9.00
CY
Excavation -bulk
ESC-5
$ 2.00
CY
Fence, silt
ESC-6
SWDM 5.4.3.1
$ 1.50
LF
1000
1
1500
Fence, Temporary (NGPE)
ESC-7
$ 1.50
LF
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.80
SY
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 3.50
SY
Mulch, by hand, straw, 3" deep
ESC-10
SWDM 5.4.2.1
$ 2.50
SY
Mulch, by machine, straw, 2" deep
ESC-11
SWDM 5.4.2.1
$ 2.00
SY
Piping, temporary, CPP, 6"
ESC-12
$ 12.00
LF
Piping, temporary, CPP, 8"
ESC-13
$ 14.00
LF
Piping, temporary, CPP, 12"
ESC-14
$ 18.00
LF
Plastic covering, 6mm thick, sandbagged
ESC-15
SWDM 5.4.2.3
$ 4.00
SY
Rip Rap, machine placed; slopes
ESC-16
WSDOT 9-13.1(2)
$ 45.00
CY
Rock Construction Entrance, 50'x15'x1'
ESC-17
SWDM 5.4.4.1
$ 1,800.00
Each
Rock Construction Entrance, 100'x15'x1'
ESC-18
SWDM 5.4.4.1
$ 3,200.00
Each
1
1
3200
Sediment pond riser assembly
ESC-19
SWDM 5.4.5.2
$ 2,200.00
Each
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 19.00
LF
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$ 70.00
LF
Seeding, by hand
Sodding, 1" deep, level ground
ESC-22
SWDM 5.4.2.4
$ 1.00
SY
ESC-23
SWDM 5.4.2.5
$ 8.00
SY
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 10.00
SY
TESC Supervisor
ESC-25
$ 110.00
HR
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 140.00
HR
WRITE -IN -ITEMS **** (see page 9)
CB Filter Socks
$ 100.00
Each
2
2
400
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
Page 2 of 9
King County Bond Quantity Worksheet
$ 5,100.00
$ 1,530.00
$ 6,630.00
A
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 9/19/2024
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Existing
Right -of -Way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant.
Cost
Quant
T Cost
Q,,nt
F Cost
GENERAL ITEMS
No.
Backfill & Compaction- embankment
GI - 1
$ 6.00
CY
Backfill & Compaction- trench
GI - 2
$ 9.00
CY
78
702.00
Clear/Remove Brush, by hand
GI - 3
$ 1.00
SY
Clearing/Grubbing/Tree Removal
GI - 4
$ 10,000.00
Acre
0.75
7,500.00
Excavation - bulk
GI - 5
$ 2.00
CY
2500
5,000.00
Excavation - Trench
GI - 6
$ 5.00
CY
78
390.00
200
1,000.00
Fencing, cedar, 6' high
GI - 7
$ 20.00
LF
Fencing, chain link, vinyl coated, 6' high
GI - 8
$ 20.00
LF
265
5,300.00
Fencing, chain link, gate, vinyl coated, 20
GI - 9
$ 1,400.00
Each
1
1,400.00
Fencing, split rail, 3' high
GI - 10
$ 15.00
LF
Fill & compact - common barrow
GI - 11
$ 25.00
CY
Fill & compact - gravel base
GI - 12
$ 27.00
CY
Fill & compact - screened topsoil
GI - 13
$ 39.00
CY
Gabion, 12" deep, stone filled mesh
GI - 14
$ 65.00
SY
Gabion, 18" deep, stone filled mesh
GI - 15
$ 90.00
SY
Gabion, 36" deep, stone filled mesh
GI - 16
$ 150.00
SY
Grading, fine, by hand
GI - 17
$ 2.50
SY
Grading, fine, with grader
GI - 18
$ 2.00
SY
Monuments, 3' long
GI - 19
$ 250.00
Each
Sensitive Areas Sign
GI - 20
$ 7.00
Each
Sodding, 1" deep, sloped ground
GI - 21
$ 8.00
SY
Surveying, line & grade
GI - 22
$ 850.00
Day
1
850.00
5
4,250.00
Surveying, lot location/lines
GI - 23
$ 1,800.00
Acre
Traffic control crew ( 2 flaggers)
GI - 24
$ 120.00
HR
40
4,800.00
Trail, 4" chipped wood
GI - 25
$ 8.00
SY
Trail, 4" crushed cinder
GI - 26
$ 9.00
SY
Trail, 4" top course
GI - 27
$ 12.00
SY
Wall, retaining, concrete
GI - 28
$ 55.00
SF
Wall, rockery
I GI - 29
$ 15.00
SF
Page 3 of 9 SUBTOTAL 6,742.00 24,450.00
*KCC 27A authorizes only one bond reduction.
King County Bond Quantity Worksheet
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 9/19/2024
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
ROAD IMPROVEMENT
No.
AC Grinding, 4' wide machine < 1000sy
RI - 1
$ 30.00
SY
AC Grinding, 4' wide machine 1000-20M
RI - 2
$ 16.00
SY
AC Grinding, 4' wide machine > 2000sy
RI - 3
$ 10.00
SY
AC Removal/Disposal
RI - 4
$ 35.00
SY
80
2,800.00
Barricade, type III ( Permanent)
RI - 6
$ 56.00
LF
Curb & Gutter, rolled
RI - 7
$ 17.00
LF
Curb & Gutter, vertical
RI - 8
$ 12.50
LF
98
1,225.00
Curb and Gutter, demolition and disposal
RI - 9
$ 18.00
LF
98
1,764.00
Curb, extruded asphalt
RI - 10
$ 5.50
LF
Curb, extruded concrete
RI - 11
$ 7.00
LF
Sawcut, asphalt, 3" depth
RI - 12
$ 1.85
LF
250
462.50
Sawcut, concrete, per 1" depth
RI - 13
$ 3.00
LF
Sealant, asphalt
RI - 14
$ 2.00
LF
Shoulder, AC, ( see AC road unit price )
RI - 15
$ -
SY
Shoulder, gravel, 4" thick
RI - 16
$ 15.00
SY
Sidewalk, 4" thick
RI - 17
$ 38.00
SY
76.221
2,896.36
250
9,500.00
Sidewalk, 4" thick, demolition and disposa
RI - 18
$ 32.00
SY
55
1,760.00
Sidewalk, 5" thick
RI - 19
$ 41.00
SY
Sidewalk, 5" thick, demolition and disposa
RI - 20
$ 40.00
SY
Sign, handicap
RI - 21
$ 85.00
Each
1
85.00
Striping, per stall
RI - 22
$ 7.00
Each
13
91.00
Striping, thermoplastic, ( for crosswalk )
RI - 23
$ 3.00
SF
Striping, 4" reflectorized line
RI - 24
$ 0.50
LF
Page 4 of 9 SUBTOTAL 10,907.86 9,676.00
*KCC 27A authorizes only one bond reduction.
King County Bond Quantity Worksheet
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 9/19/2024
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quat T Cost
Quant. Cost
Quant. Cost
ROAD SURFACING
No.
4" Rock = 2.5 base & 1.5" top course 9 1/2" Rock= 8" base & 1.5" top course)
Additional 2.5" Crushed Surfacing
RS- 1
$ 3.60
SY
HMA 1/2" Overlay, 1.5"
RS-2
$ 14.00
SY
HMA 1/2" Overlay 2"
RS- 3
$ 18.00
SY
HMA Road, 2", 4" rock, First 2500 SY
RS - 4
$ 28.00
SY
HMA Road, 2", 4" rock, Qty. over 2500 SY
RS - 5
$ 21.00
SY
HMA Road, 3", 9 1/2" Rock, First 2500 SY
RS - 6
$ 42.00
SY
HMA Road, 3", 9 1/2" Rock, Qty Over 250
RS - 7
$ 35.00
SY
Not Used
RS - 8
Not Used
RS - 9
HMA Road, 6" Depth, First 2500 SY
RS - 10
$ 33.10
SY
80
2,648.00
HMA Road, 6" Depth, Qty. Over 2500 SY
RS - 11
$ 30.00
SY
HMA 3/4" or 1", 4" Depth
RS - 12
$ 20.00
SY
Gravel Road, 4" rock, First 2500 SY
RS - 13
$ 15.00
SY
Gravel Road, 4" rock, Qty. over 2500 SY
RS - 14
$ 10.00
SY
PCC Road (Add Under Write -Ins w/Desigi
RS - 15
Thickened Edge
RS - 17
$ 8.60
LF
Page 5 of 9 SUBTOTAL 2,648.00
*KCC 27A authorizes only one bond reduction.
King County Bond Quantity Worksheet
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 9/19/2024
Site Improvement Bond Quantity Worksheet web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. T Cost
Quant. Cost
DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Avera e of 4' cover was assumed. Assume perforated PVC is same price as soli
Access Road, R/D
D - 1
$ 21.00
SY
Bollards - fixed
D - 2
$ 240.74
Each
Bollards - removable
D - 3
$ 452.34
Each
* (CBs include frame and lid)
CB Type I
D - 4
$ 1,500.00
Each
1
1,500.00
CB Type IL
D - 5
$ 1,750.00
Each
CB Type 11, 48" diameter
D - 6
$ 2,300.00
Each
2
4,600.00
for additional depth over 4'
D - 7
$ 480.00
FT
4
1,920.00
CB Type 11, 54" diameter
D - 8
$ 2,500.00
Each
for additional depth over 4'
D - 9
$ 495.00
FT
CB Type 11, 60" diameter
D - 10
$ 2,800.00
Each
2
5,600.00
for additional depth over 4'
D - 11
$ 600.00
FT
5
3,000.00
CB Type 11, 72" diameter
D - 12
$ 3,600.00
Each
3
10,800.00
for additional depth over 4'
D - 13
$ 850.00
FT
18
15,300.00
Through -curb Inlet Framework (Add)
D - 14
$ 400.00
Each
Cleanout, PVC, 4"
D - 15
$ 150.00
Each
Cleanout, PVC, 6"
D - 16
$ 170.00
Each
Cleanout, PVC, 8"
D - 17
$ 200.00
Each
Culvert, PVC, 4"
D - 18
$ 10.00
LF
Culvert, PVC, 6"
D - 19
$ 13.00
LF
Culvert, PVC, 8"
D - 20
$ 15.00
LF
Culvert, PVC, 12"
D - 21
$ 23.00
LF
Culvert, CMP, 8"
D - 22
$ 19.00
LF
Culvert, CMP, 12"
D - 23
$ 29.00
LF
Culvert, CMP, 15"
D - 24
$ 35.00
LF
Culvert, CMP, 18"
D - 25
$ 41.00
LF
Culvert, CMP, 24"
D - 26
$ 56.00
LF
Culvert, CMP, 30"
D - 27
$ 78.00
LF
Culvert, CMP, 36"
D - 28
$ 130.00
LF
Culvert, CMP, 48"
D - 29
$ 190.00
LF
Culvert, CMP, 60"
1 D - 30
$ 270.00
1 LF
Culvert, CMP, 72"
1 D - 31
1 $ 350.00
1 LF
Page 6 of 9 SUBTOTAL 1,500.00 41,220.00
*KCC 27A authorizes only one bond reduction.
King County Bond Quantity Worksheet
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 9/19/2024
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
No.
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
Culvert, Concrete, 8"
D - 32
$ 25.00
LF
Culvert, Concrete, 12"
D - 33
$ 36.00
LF
Culvert, Concrete, 15"
D - 34
$ 42.00
LF
Culvert, Concrete, 18"
D - 35
$ 48.00
LF
Culvert, Concrete, 24"
D - 36
$ 78.00
LF
Culvert, Concrete, 30"
D - 37
$ 125.00
LF
Culvert, Concrete, 36"
D - 38
$ 150.00
LF
Culvert, Concrete, 42"
D - 39
$ 175.00
LF
Culvert, Concrete, 48"
D - 40
$ 205.00
LF
Culvert, CPP, 6"
D - 41
$ 14.00
LF
Culvert, CPP, 8"
D - 42
$ 16.00
LF
Culvert, CPP, 12'
D - 43
$ 24.00
LF
44
1056
Culvert, CPP, 15"
D - 44
$ 35.00
LF
Culvert, CPP, 18"
D - 45
$ 41.00
LF
Culvert, CPP, 24"
D - 46
$ 56.00
LF
Culvert, CPP, 30"
D - 47
$ 78.00
LF
Culvert, CPP, 36"
D - 48
$ 130.00
LF
Ditching
D - 49
$ 9.50
CY
Flow Dispersal Trench (1,436 base+)
D - 50
$ 28.00
LF
French Drain (3' depth)
D - 51
$ 26.00
LF
Geotextile, laid in trench, polypropylene
D - 52
$ 3.00
SY
Mid -tank Access Riser, 48" dia, 6' deep
D - 54
$ 2,000.00
Each
Pond Overflow Spillway
D - 55
$ 16.00
SY
Restrictor/Oil Separator, 12"
D - 56
$ 1,150.00
Each
Restrictor/Oil Separator, 15"
D - 57
$ 1,350.00
Each
Restrictor/Oil Separator, 18"
D - 58
$ 1,700.00
Each
Riprap, placed
D - 59
$ 42.00
CY
Tank End Reducer (36" diameter)
D - 60
$ 1,200.00
Each
Trash Rack, 12"
D - 61
$ 350.00
Each
Trash Rack, 15"
D - 62
$ 410.00
Each
Trash Rack, 18"
D - 63
$ 480.00
Each
Trash Rack, 21"
D - 64
$ 550.00
Each
Page 7 of 9 SUBTOTAL 1056
*KCC 27A authorizes only one bond reduction.
King County Bond Quantity Worksheet
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 9/19/2024
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Price
Quant. T Cost
Quant. Cost
PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders
No.
2" AC, 2" top course rock & 4" borrow
PL - 1
$ 21.00
SY
NA
NA
2" AC, 1.5" top course & 2.5" base cours
PL-2
$ 28.00
SY
NA
NA
2110
59080
4" select borrow
PL - 3
$ 5.00
SY
NA
NA
1.5" top course rock & 2.5" base course
PL-4
$ 14.00
SY
NA
NA
UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Estimate
Utility Pole(s) Relocation
UP-1
Lump Sum
Street Light Poles w/Luminaires
UP-2
$ 7,500.00 Each
WRITE -IN -ITEMS
(Such as detention/water quality vaults.)
No.
Stormwater Vault
WI - 1
$ 380,000.00
Each
Block Wall
WI - 2
$ 16.00
SY
Yard Drain
WI - 3
$ 225.00
CY
12" Ductile Iron Pipe
WI - 4
$ 45.00
LF
86.5
3892.5
6" Ductile Iron Pipe
WI - 5
$ 35.00
LF
49
1,715.00
Arch Tank Detention System
W I - 6
$ 45,000.00
LS
1
45,000.00
Bio Pod Basic Treatment Unit
W I - 7
$ 25,000.00
Each
1
25,000.00
Water System-1" Poly Service Line
WI - 8
$ 21.50
LF
250
5375
40
860.00.2-.
Side Sewer- 6" ADS Pipe
W I - 9
$ 45.00
LF
34
1530
161
7,245.00
Side Sewer Cleanouts
WI-11
$ 250.00
1 Each
1
250
51
1,250.00
Tree Grates
wi - 10
$ 800.00
1 Each
2
1600
SUBTOTAL 12,647.50
SUBTOTAL (SUM ALL PAGES): 34,445.36
30% CONTINGENCY & MOBILIZATION: 10,333.61
GRANDTOTAL: 44,778.97
COLUMN: B C
Page 8 of 9
*KCC 27A authorizes only one bond reduction.
King County Bond Quantity Worksheet
140,150.00 && a9
216,552.00 24`—
64,714.05 4444-05-
281,517.60 2R�� FF
D
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 9/19/2024
Site Improvement Bond Quantity Worksheet
Original bond computations prepared by:
Name:
PE Registration Number:
Firm Name:
Address:
Lauren Golembiewski
Glacier Environmental Services, Inc
7509 212th St SW Edmonds, WA
Stabilization/Erosion Sediment Control (ESC)
Existing Right -of -Way Improvements
Future Public Right of Way & Drainage Facilities
Private Improvements
Calculated Quantity Completed
TESC
Total Right -of Way and/8F Site ReGtGFA*'AR PARWI**
(Firmer $z Rnn of hnnit shall he rash.)
Pe, fa, cm ice Bond* Armetint (A+B+C+D) = TOTAL
Maintenance/Defect Bond Total
NAME OF PERSON PREPARING BOND" REDUCTION:
Web date: 04/03/2015
Date: 6/5/2024
Tel. #: 425-355-2826
Project No: BLD2022-1556
FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND"
MINIMUM BOND' AMOUNT PUBLIC ROAD & DRAINAGE
AMOUNT
REQUIRED FOR RECORDING OR MAINTENANCE/DEFECT BOND'
TEMPORARY OCCUPANCY AT
(A)
$
6,630.0
SUBSTANTIAL COMPLETION ***
(B)
$
44,779.0
PERFORMANCE BOND AMOUNT:
(C)
$
-
$51,409 x 120% = $61,690.8
MAINTENANCE BOND AMOUNT:
$61,690.8 x 15% = $9,253.62
(A+B) $ r 51,409.0
(T) �- $ 332,926.60 1-83Cr5 IT, o.399, 5i-o
Minimum is $2000.
INSPECTION FEES:
$332,926.60 x 3.3% = $10,986.58
Date:
(B+C) x
0.25 --$ 14,494.7
Minimum is $2000.
* NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County.
NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
REQUIRED BOND" AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY
Page 9 of 9 Unit prices updated: 03/02/2015
Check out the DDES Web site at www.kin_gcountV._goy/permits Version: 03/02/2015
King County Bond Quantity Worksheet Report Date: 9/19/2024