Loading...
APPROVED ENG BLD2022-0527+Bond Worksheet+3.25.2024_4.25.29_PM+4156012Site Improvement Bond Quantity Worksheet S15 Webdate: 04/03/201� L14 King County Department of Permitting & Environmental Review 35030 SE Douglas Street, Suite 210 Snoqualmie, Washington 98065-9266 206-296-6600 TTY Relay 711 Project Name: Westgate Station Location: 9601 Edmonds Way, Edmonds, WA 98026 Clearing greater than or equal to 5,000 board feet of timber? yes X no If yes, Forest Practice Permit Number: (RCW 76.09) Page 1 of 9 Bond Quantities .xIs For alternate formats, call 206-296-6600. Date: 3/20/2024 Project No.: Activity No.: BLD2022-0527 Note: All prices include labor, equipment, materials, overhead and profit. Prices are from IRS Means data adjusted for the Seattle area or from local sources if not included in the RS Means database. Total Private and ROW Improvements $386,680.24 ENGINEERING DIVISION ROW Improvements: $41,455.70 APPROVED AS NOTED TESC Total : $37,539.45 Stormwater System Total: $81,504.00 03/21/2024 ROW/TESC/Storm Total: $160,499.15 ROW Bond: $160,499.15 + 20% contingency = $192,598.98 Inspection Fees: $386,680.24 x 3% = $11,600 Future Maintenance Bond Estimate $386,680.24 x 15% = $58,000 Unit prices updated: 3/2/2015 Version: 3/2/2015 Report Date: 3/20/2024 Site Improvement Bond Quantity Worksheet S15 Webdate: 04/03/201� Reference # Unit Price Unit Quantity # of Applications Cost EROSION/SEDIMENT CONTROL Number Backfill & compaction -embankment ESCA $ 6.00 CY Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 $ 80.00 Each Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3) $ 95.00 CY Ditching ESC-4 $ 9.00 CY Excavation -bulk ESC-5 $ 2.00 CY Fence, silt ESC-6 SWDM 5.4.3.1 $ 1.50 LF 423 1 635 Fence, Temporary (NGPE) ESC-7 $ 1.50 LF Hydroseeding ESC-8 SWDM 5.4.2.4 $ 0.80 SY Jute Mesh ESC-9 SWDM 5.4.2.2 $ 3.50 SY Mulch, by hand, straw, 3" deep ESCA0 SWDM 5.4.2.1 $ 2.50 SY Mulch, by machine, straw, 2" deep ESCA1 SWDM 5.4.2.1 $ 2.00 SY Piping, temporary, CPP, 6" ESC-12 $ 12.00 LF Piping, temporary, CPP, 8" ESCA3 $ 14.00 LF Piping, temporary, CPP, 12" ESC-14 $ 18.00 LF Plastic covering, 6mm thick, sandbagged ESCA5 SWDM 5.4.2.3 $ 4.00 SY 67 1 268 Rip Rap, machine placed; slopes ESCA6 WSDOT 9-13.1(2) $ 45.00 CY Rock Construction Entrance, 50'x15'x1' ESCA7 SWDM 5.4.4.1 $ 1,800.00 Each Rock Construction Entrance, 100'x15'x1' ESCA8 SWDM 5.4.4.1 $ 3,200.00 Each 1 1 3200 Sediment pond riser assembly ESC-19 SWDM 5.4.5.2 $ 2,200.00 Each Sediment trap, 5' high berm ESC-20 SWDM 5.4.5.1 $ 19.00 LF Sed. trap, 5' high, riprapped spillway berm section ESC-21 SWDM 5.4.5.1 $ 70.00 LF Seeding, by hand Sodding, 1" deep, level ground ESC-22 SWDM 5.4.2.4 $ 1.00 SY ESC-23 SWDM 5.4.2.5 $ 8.00 SY Sodding, 1" deep, sloped ground ESC-24 SWDM 5.4.2.5 $ 10.00 SY TESC Supervisor ESC-25 $ 110.00 HR 40 1 4400 Water truck, dust control ESC-26 SWDM 5.4.7 $ 140.00 HR 40 1 5600 WRITE -IN -ITEMS **** (see page 9) 4,000 Gallon Storage Tank $ 5,000.00 Each 1 1 5000 Temporaary CB Inserts $ 150.00 Each 6 1 900 High Visibility Fence $ 3.00 LF 1 2958 11 8874 ESC SUBTOTAL: 30% CONTINGENCY & MOBILIZATION: ESC TOTAL: COLUMN: Page 2 of 9 Bond Quantities .xIs $ 28,876.50 $ 8,662.95 $ 37,539.45 A Unit prices updated: 3/2/2015 Version: 3/2/2015 Report Date: 3/20/2024 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right -of -Way Future Public Right of Way & Drainage Facilities Private Improvements Unit Price Unit Quant. Cost Quant. Cost Quant. Cost GENERAL ITEMS No. Backfill & Compaction- embankment GI - 1 $ 6.00 CY 410 2,460.00 Backfill & Compaction- trench GI - 2 $ 9.00 CY Clear/Remove Brush, by hand GI - 3 $ 1.00 SY Clearing/Grubbing/Tree Removal GI - 4 $10,000.00 Acre Excavation - bulk GI - 5 $ 2.00 CY 950 1,900.00 Excavation - Trench GI - 6 $ 5.00 CY Fencing, cedar, 6' high GI - 7 $ 20.00 LF Fencing, chain link, vinyl coated, 6' high GI - 8 $ 20.00 LF Fencing, chain link, gate, vinyl coated, 20' GI - 9 $ 1,400.00 Each Fencing, split rail, 3' high GI - 10 $ 15.00 LF Fill & compact - common barrow GI - 11 $ 25.00 CY Fill & compact - gravel base GI - 12 $ 27.00 CY Fill & compact - screened topsoil GI - 13 $ 39.00 CY Gabion, 12" deep, stone filled mesh GI - 14 $ 65.00 SY Gabion, 18" deep, stone filled mesh GI - 15 $ 90.00 SY Gabion, 36" deep, stone filled mesh GI - 16 $ 150.00 SY Grading, fine, by hand GI - 17 $ 2.50 SY 241 602.50 401 1,002.50 Grading, fine, with grader GI - 18 $ 2.00 SY 972 1,944.00 Monuments, 3' long GI - 19 $ 250.00 Each Sensitive Areas Sign GI - 20 $ 7.00 Each Sodding, 1" deep, sloped ground GI - 21 $ 8.00 SY Surveying, line & grade GI - 22 $ 850.00 Day Surveying, lot location/lines GI - 23 $ 1,800.00 Acre Traffic control crew ( 2 flaggers) GI - 24 $ 120.00 HR 40.00 Trail, 4" chipped wood GI - 25 $ 8.00 SY Trail, 4" crushed cinder GI - 26 $ 9.00 SY Trail, 4" top course GI - 27 $ 12.00 SY Waii, retaining, concrete GI - 28 $ 55.00 SF 1260 69,300.00 RAIN GARDEN WALLS Wall, rockery GI - 29 $ 15.00 SF Page 3of9 SUBTOTAL 642.50 606.50 Unit prices updated: 03/02/2015 "KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Bond Quantities .xls Report Date: 3/20/2024 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Unit Price Unit Quant. Cost Quant. Cost Quant. Cost ROAD IMPROVEMENT No. AC Grinding, 4' wide machine < 1000sy RI - 1 $ 30.00 SY AC Grinding, 4' wide machine 1000-2000 RI - 2 $ 16.00 SY AC Grinding, 4' wide machine > 2000sy RI - 3 $ 10.00 SY AC Removal/Disposal RI - 4 $ 35.00 SY 114 3,990.00 Barricade, type III ( Permanent) RI - 6 $ 56.00 LF Curb & Gutter, rolled RI - 7 $ 17.00 LF Curb & Gutter, vertical RI - 8 $ 12.50 LF Curb and Gutter, demolition and disposal RI - 9 $ 18.00 LF 337 6,066.00 Curb, extruded asphalt RI - 10 $ 5.50 LF Curb, extruded concrete RI - 11 $ 7.00 LF 337 2,359.00 698 4,886.00 REVISED PER 2/14/24 Sawcut, asphalt, 3" depth RI - 12 $ 1.85 LF 377 697.45 COMMENTS Sawcut, concrete, per 1" depth RI - 13 $ 3.00 LF 72 216.00 Sealant, asphalt RI - 14 $ 2.00 LF Shoulder, AC, ( see AC road unit price ) RI - 15 $ - SY Shoulder, gravel, 4" thick RI - 16 $ 15.00 SY Sidewalk, 4" thick RI - 17 $ 38.00 SY 169 6,422.00 401 15,238.00 Sidewalk, 4" thick, demolition and disposal RI - 18 $ 32.00 SY 169 5,408.00 Sidewalk, 5" thick RI - 19 $ 41.00 SY Sidewalk, 5" thick, demolition and disposal RI - 20 $ 40.00 SY Sign, handicap RI - 21 $ 85.00 Each 1 85.00 Striping, per stall RI - 22 $ 7.00 Each 13 91.00 Striping, thermoplastic, ( for crosswalk) I RI - 23 $ 3.00 SF Striping, 4" reflectorized line I RI - 24 $ 0.50 LF Page 4 of 9 24,461.00 20,997.45 Unit prices updated: 03/02/2015 "KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Bond Quantities As Report Date: 3/20/2024 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Unit Price Unit Quant. Cost Quant. Cost QuantT Cost ROAD SURFACING No. 4" Rock = 2.5 base & 1.5" top course 9 1/2" Rock= 8" base & 1.5" top course Additional 2.5" Crushed Surfacing RS - 1 $ 3.60 SY HMA 1/2" Overlay, 1.5" RS - 2 $ 14.00 SY HMA 1/2" Overlay 2" RS - 3 $ 18.00 SY HMA Road, 2", 4" rock, First 2500 SY RS - 4 $ 28.00 SY HMA Road, 2", 4" rock, Qty. over 2500 SY RS - 5 $ 21.00 SY HMA Road, 3", 9 1/2" Rock, First 2500 S RS - 6 $ 42.00 SY HMA Road, 3", 9 1/2" Rock, Qty Over 250 RS - 7 $ 35.00 SY Not Used RS - 8 Not Used RS - 9 HMA Road, 6" Depth, First 2500 SY RS - 10 $ 33.10 SY 205 6,785.50 HMA Road, 6" Depth, Qty. Over 2500 SY RS - 11 $ 30.00 SY HMA 3/4" or 1 ", 4" Depth RS - 12 $ 20.00 SY Gravel Road, 4" rock, First 2500 SY RS - 13 $ 15.00 SY Gravel Road, 4" rock, Qty. over 2500 SY RS - 14 $ 10.00 SY PCC Road (Add Under Write -Ins w/Desig RS - 15 Thickened Edge IRS - 17 $ 8.60 LF Page 5 of 9 SUBTOTAL 6,785.50 Unit prices updated: 03/02/2015 "KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Bond Quantities .xls Report Date: 3/20/2024 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Unit Price Unit Quant. Cost Quant. Cost Quant. Cost DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe. Access Road, R/D D - 1 $ 21.00 SY Bollards - fixed D - 2 $ 240.74 Each Bollards - removable D - 3 $ 452.34 Each " (CBs include frame and lid) CB Type I D - 4 $ 1,500.00 Each 7 10,500.00 CB Type IL D - 5 $ 1,750.00 Each CB Type II, 48" diameter D - 6 $ 2,300.00 Each 1 2,300.00 for additional depth over 4' D - 7 $ 480.00 FT 2 960.00 CB Type II, 54" diameter D - 8 $ 2,500.00 Each for additional depth over 4' D - 9 $ 495.00 FT CB Type II, 60" diameter D - 10 $ 2,800.00 Each for additional depth over 4' D - 11 $ 600.00 FT CB Type II, 72" diameter D - 12 $ 3,600.00 Each for additional depth over 4' D - 13 $ 850.00 FT Through -curb Inlet Framework (Add) D - 14 $ 400.00 Each Cleanout, PVC, 4" D - 15 $ 150.00 Each Cleanout, PVC, 6" D - 16 $ 170.00 Each 20 3,400.00 Cleanout, PVC, 8" D - 17 $ 200.00 Each Culvert, PVC, 4" D - 18 $ 10.00 LF 604 6,040.00 Culvert, PVC, 6" D - 19 $ 13.00 LF 518 6,734.00 INCLUDES COST FOR Culvert, PVC, 8" D - 20 $ 15.00 LF 212 3,180.00 PIPING IN TRENCH Culvert, PVC, 12" D - 21 $ 23.00 LF AND RAIN GARDEN Culvert, CMP, 8" D - 22 $ 19.00 LF Culvert, CMP, 12" D - 23 $ 29.00 LF Culvert, CMP, 15" D - 24 $ 35.00 LF Culvert, CMP, 18" D - 25 $ 41.00 LF Culvert, CMP, 24" D - 26 $ 56.00 LF Culvert, CMP, 30" D - 27 $ 78.00 LF Culvert, CMP, 36" D - 28 $ 130.00 LF Culvert, CMP, 48" D - 29 $ 190.00 LF Culvert, CMP, 60" D - 30 $ 270.00 LF Culvert, CMP, 72" D - 31 $ 350.00 LF Page 6 of 9 SUBTOTAL 33,114.00 Unit prices updated: 03/02/2015 "KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Bond Quantities .xls Report Date: 3/20/2024 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 DRAINAGE CONTINUED Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Culvert, Concrete, 8" D - 32 $ 25.00 LF Culvert, Concrete, 12" D - 33 $ 36.00 LF Culvert, Concrete, 15" D - 34 $ 42.00 LF Culvert, Concrete, 18" D - 35 $ 48.00 LF Culvert, Concrete, 24" D - 36 $ 78.00 LF Culvert, Concrete, 30" D - 37 $ 125.00 LF Culvert, Concrete, 36" D - 38 $ 150.00 LF Culvert, Concrete, 42" D - 39 $ 175.00 LF Culvert, Concrete, 48" D - 40 $ 205.00 LF Culvert, CPP, 6" D - 41 $ 14.00 LF Culvert, CPP, 8" D - 42 $ 16.00 LF Culvert, CPP, 12" D - 43 $ 24.00 LF Culvert, CPP, 15" D - 44 $ 35.00 LF Culvert, CPP, 18" D - 45 $ 41.00 LF Culvert, CPP, 24" D - 46 $ 56.00 LF Culvert, CPP, 30" D - 47 $ 78.00 LF Culvert, CPP, 36" D - 48 $ 130.00 LF Ditching D - 49 $ 9.50 CY Flow Dispersal Trench (1,436 base+) D - 50 $ 28.00 LF French Drain (3' depth) D - 51 $ 26.00 LF Geotextile, laid in trench, polypropylene D - 52 $ 3.00 SY Mid -tank Access Riser, 48" dia, 6' deep D - 54 $ 2,000.00 Each Pond Overflow Spillway D - 55 $ 16.00 SY Restrictor/Oil Separator, 12" D - 56 $ 1,150.00 Each Restrictor/Oil Separator, 15" D - 57 $ 1,350.00 Each Restrictor/Oil Separator, 18" D - 58 $ 1,700.00 Each Riprap, placed D - 59 $ 42.00 CY Tank End Reducer (36" diameter) D - 60 $ 1,200.00 Each Trash Rack, 12" D - 61 $ 350.00 Each Trash Rack, 15" D - 62 $ 410.00 Each Trash Rack, 18" D - 63 $ 480.00 Each Trash Rack, 21" D - 64 $ 550.00 Each Page 7of9 SUBTOTAL Unit prices updated: 03/02/2015 "KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Bond Quantities .xls Report Date: 3/20/2024 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Unit Price Unit Quant. Price Quant. Cost Quant. Cost PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders No. 2" AC, 2" top course rock & 4" borrow PL - 1 $ 21.00 SY NA NA 2" AC, 1.5" top course & 2.5" base cours PL - 2 $ 28.00 SY NA NA 972 27216 4" select borrow PL - 3 $ 5.00 SY NA NA 1.5" top course rock & 2.5" base course PL - 4 $ 14.00 SY NA NA UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Estimate Utility Pole(s) Relocation UP-1 Lump Sum Street Light Poles w/Luminaires UP-2 $ 7,500.00 Each WRITE -IN -ITEMS (Such as detention/water quality vaults.) No. Yard Drain WI-1 $ 400.00 Each 3 1,200.00 6" DIP Culvert WI-2 $ 26.00 LF 183 4,758.00 8" DIP Culvert WI-3 $ 30.00 LF 80 2,400.00 2"-3" Washed Rock WI-4 $ 10.00 CY 211 2,110.00 INF TRENCH/R.G. Lenz 50-50 Sand Blend WI-5 $ 40.00 CY 20 800.00 INF TRENCH Bioretention Soil Mix W I - 6 $ 40.00 CY 64 2,560.00 RAIN GARDEN 48" SSMH W I - 7 $ 3,500.00 Each 3 10,500.00 DCDA Vault W I - 8 $10,000.00 Each 1 10,000.00 FDC WI-9 $ 1,000.00 Each 1 1,000.00 FH Assembly W I - 10 $ 1,500.00 Each 21 3,000.00 8" GV WI - 11 $ 1,500.00 Each 41 6,000.00 1 "-2" Water Meter W I - 12 $ 300.00 Each 21 600.00 SUBTOTAL SUBTOTAL (SUM ALL PAGES): 30%CONTINGENCY & MOBILIZATION: GRANDTOTAL: COLUMN: Page 8 of 9 "KCC 27A authorizes only one bond reduction. Bond Quantities As 31,889.00 9,566.70 41,455.70 B C D 202,861.95 60,858.59 263, 720.54 Unit prices updated: 03/02/2015 Version: 03/02/2015 Report Date: 3/20/2024 Sheet 9 not used. Site Improvement Bond Quantity Worksheet Original bond computations prepared by: Name: Greg Guillen, PE, SE PE Registration Number: 25385 Firm Naan Address: CG Engineering \ 250 4th Ave S #200, Edmonds, WA 98020 Stabilization/Erosion Sediment Control (ESC) Existing Right -of -Way Improvements Future Public Right of Way & Drainage Facilities Private Improvements Calculated Quantity Completed Total Right -of Way and/or Site Restoration Bond*/** (First $7,500 of bond* shall be cash. Performance Bond* Amount (A+B+C+D) = TOTTW Maintenance/Defect NAME OF -PERSON PREPARING BOND* REDUCTION: (\A) (B) (C) (D) (A+ Date: Tel. #: Project No: FINANCIAL GUARANTEE REQU PERFORMANCE BOND* MINIMUM BOND* OUNT AMOUNT REQUIRED FO CORDING OR TEMPO OCCUPANCY AT $ 37,539.5 SUB NTIAL COMPLETION *** $ 41,455.7 $ ,720.5 78,995.2 (T) $ 342,715.7 Minimum is $2000. T x 0.30 $ 102,814.7 Minimum 1'sSS000. ENTS Date: Web date: 04/03/2015 3/20/2024 425.77 00 3LD2022-0527 PUBLIC ROAD & DRAINAGE MAINTENANCE/DEFECT BOND* +C) x 10,363.9 mum is $2000. * NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County. ** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required. The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included. Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity. *** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes. REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY Page 9 of 9 Unit prices updated: 03/02/2015 Check out the DDES Web site at www.kin_pcountypoy/permits Version: 03/02/2015 Bond Quantities .xIs Report Date: 3/20/2024