Loading...
REV 1 APVD BLD BLD2024-1090_EOR Letter_11.14.2024_3.42.55_PM_4620266BLD2024-1090 Ccivil & structural ENGINEERING engineering & planning MEMORANDUM 11/15/2024 FRAMING REVISION PER FOR REVISIONS To: Marc Adams fTE From: Dennis Titus, PE, SE, Principal Date: November 6th, 2024 Re: Willyma #1 Framing Revisions REVISION Nov 15 2024 CG Engineering was retained by Marc Adams to evaluate the framing installation for a dry rot repair. The building is a townhouse located at 20815 761h Ave W, Edmonds, WA 98026. The existing building is a two-story building with tuck - under parking and is framed with wood members supported on wood framed walls and wood beams. The wood joists were not framed in accordance with the structural drawings by CG Engineering dated 8/20/24 and additional framing will be required to resolve the issue. A new 2x10 HF#2 joist shall be installed beside the existing 2x10 joist that has a splice at its midspan. The new joist span between the beams and shall bear on top of them. Please contact CG Engineering if there are any discrepancies with this memorandum. 1110612024 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph.425.778.8500 1 f.425.778.5536 www.cgengineering.com WiIlyma #1— 24247.10 November 6, 2024 Framing Revisions Page 2 of 2 Photo 1— Framing Issue C � ENGINEERING 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph.425.778.8500 I f.425.778.5536 www.cgengineering.com