Loading...
APPROVED ENG TRANS Traffic Impact Analysis (Bertrand - February 2024)RECEIVED of an 2 E �62 024s BLD2024-0117 Inc_ I R9v PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Approved by: APPENDIX A Page I of 2 Transportation Impact Analysis Worksheet Name of Proposed Project: Gyro Makers Owner/Applicant Naseem Ghunaim Name 10016 Edmonds Way. Ste #A. Applicant Contact Person: Nos Narin Name 9031 21 ST AVE SW Street/Mailing Address Street/Mailing Address Edmonds WA 98020 SEATTLE WA 98106 City Telephone: State Zip City Telephone: 206 322 4323 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Telephone: 1. PROJECT DESCRIPTION Contact Name E-mail: State Zip a. Location - Street address: 10016 Edmonds Way. Ste #A. Edmonds, WA 98020 Please see sheet CS of the plan set for site plan. (Attach a vicinity map and siteplan.) b. Specify existing land use: 539 Other Retail Trade NEC c. Specify proposed type and size of development: Tenant improvment. Alterations for proposed B-cafe 1325 sq ft (# of residential units and/or square footage of building) d. Date construction will begin and be completed: Date determined by issuance of construction and health e Define proposed access locations: Access is in the front and back of the buildi f. Define proposed sight distance at site egress locations: No change HANDOUT UPDATED 05.09.2023 APPENDIX A Page 2 of 2 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC 3.36.130. Check the applicable box below and calculate the fees as necessary: X NO CHANGE SHOPPING CENTER TO SHOPPING CENTER EX CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. Units in ITE Land Use Category Per Unit Fee square feet, Use Fee Rate # of dwelling, etc. New Use = $ .�i���i�.nnn�r.�� ti7�el�i�1. ■l�� New Use Fee: $ - Prior Use Fee: $ = FEE DUE 0.0 ❑ NEW DEVELOPMENT Per Unit Fee ITE Land Use Category Rate FNew Use $ ❑ INDEPENDENT FEE CALCULATION Units in square feet, # of dwelling, vfb, etc. X Impact/Mitigation Fee: 1 $ Independent Review Fee: $296.00 (+ peer review fee) 1 $ FEE DUE FEE DUE ENGINEERING DIVISION APPROVED AS NOTED City of Edmonds, Engineering Division Approval 3/04/2024 ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 05.09.2023