Loading...
ENG2023-0598+Utility_Application+11.21.2023_10.01.42_PM+3914491-LFof EDA40�V s t INC. i 3'� J SECTION A WATER AVAILABILITY APPLICATION Complete and submit this form through www.MyBuildingPermit.com. Submit as a new application using the following prompts: Application Type — Utilities, Activity Type — Utility Availability, Scope of Work — Water Main. Applicant Contact/Applicant Name Phone Number Email Address City State Zip Property Information Project Name Address City State Zip Parcel No. Does the property currently have water service? ❑ Yes (City of Edmonds water) ❑ No Describe project (number of buildings, number of units, number of stories per building): In what phase is the project? ❑ Design Review ❑ Building Permit ❑ Preliminary Plat ❑ Rezone or Other Associated permit application number(s), if applicable: SECTION B Applicability Exemptions from Utility Availability Study: 1) Single-family residence; 2) Multi -family project of four units or less with combo water/fire lines; 3) Short plat subdivision (four single-family lots or less). Please check one of the following: ❑ A utility availability study IS NOT requested/required. The applicant certifies that this project is exempt from needing a study as described above and is not requesting a full utility availability study at this time. Please sign below and submit this form through www.MyBuildingPermit.com. ❑ A utility availability study IS requested/required for the project, and associated fees will be due. Please submit the complete application through www.MyBuildingPermit.com. APPLICANT SIGNATURE: ��— DATE: APPLICANT PRINTED Form Updated 3/28/2023