Loading...
APPROVED ENG BLD2023-1474+Transportation_Impact_Form+11.21.2023_10.20.15_PM+3914501RECEIVED Nov 27 2023 BLD2023-1474 CITY OF EDA DEVELOPMENT DEPARTM c 1a PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Form #E82 INFORMATION FOR Transportation Impact Analysis Requirements TRANSPORTATION IMPACT FEES SHALL BE COLLECTED from any applicant seeking development approval from the city as provided in ECC Chapter 3.36. This shall include, but is not limited to, the development of residential, commercial, retail, office space, and includes the expansion or change of existing uses that create a demand for additional public facilities. PAYMENT OF FEES Impact fees shall be paid at the time of issuance of the building permit or city business license. EXEMPTIONS ECC 3.36.040 identifies particular development activities in which exemptions may apply. Please refer to this code section for additional information. The director shall make the final determination as to whether the exemption is applicable. TRANSPORTATION IMPACT ANALYSIS (TIA) WORKSHEET or TRAFFIC STUDY When applicable, one of the following shall be submitted with your land use or building permit application: Appendix A - For projects that generate less than 25 peak -hour trips, complete the TIA worksheet found in Appendix A. -or- Appendix B - For projects that generate more than 25 peak -hour trips, provide a traffic study that complies with and addresses Appendix B. The traffic study shall be prepared by a qualified professional in the field of transportation engineering. TIMING AND CALCULATION OF FEES Impact fees shall be assessed based upon the impact fee rates in effect at the time of issuance of the building permit, including but not limited to, change of use permit or remodel permit. In the event the development activity does not require a building permit, impact fees will be assessed at the time of issuance of the business license. The 2017-2019 Impact Fee Rate Table incorporated herein shall be used to determine the applicable ITE Land Use Category and associated per unit impact fee rate.' • CHANGE IN USE Impact Fee for NEW use — Impact fee for PREVIOUS use = Impact feet When calculating impact fees for a change in use of an existing building or dwelling unit, including any alteration, expansion, replacement or new accessory building, the impact fee shall be the applicable impact fee for the ITE land use of the new use, less an amount equal to the applicable impact fee for the ITE land use of the prior use, established at the time the prior use was permitted. Refer to Fee Rate Tables, incorporated herein. If the previous use was permitted prior to 9/12/04 (adoption of Ordinance 3516), the 2004 Impact Fee Rate Table shall be used. • INDEPENDENT FEE CALCULATION An Independent Fee Calculation may be submitted in accordance with ECC 3.36.130 if none of the fee categories or fee amounts set forth in the 2017-2019 Impact Fee Rate Table describe or capture the impacts of a new development.3 Updated on 0510912023 Page I of'2 Form #E82 TYPES OF PROJECTS THAT DO NOT TRIGGER IMPACT FEES The following list is intended to provide examples of projects that are exempted from the payment of street impact fees as identified in ECC 3.36.040. The examples provided do not involve a change in use and do not expand the usable space or add any residential units and therefore, do not create additional demand on the roadway system. Traffic impact fees will not be required as a condition of development approval for these types of projects. Z A project that involves demolition of one single family residential unit and replacement with one new single family residential unit on the same lot and within 12 months of demolition. ❑ A residential remodel that does not increase the number of residential units. ❑ A residential addition (e.g. garage, etc.) that does not increase the number of residential units. ❑ Decks, fences, retaining walls, etc. ❑ Accessory dwelling unit (ADU). (Approval of an ADU is regulated by the Edmonds Community Development Code, which limits the total number of individuals living at the property to one "family" as defined in the code) TYPES OF PROJECTS THAT DO TRIGGER IMPACT FEES The following project examples do increase the number of residential units or involve commercial or other activity using the roadway system and therefore, do create additional demand on the roadway system. Street impact fees shall be required as a condition of development approval for these types of projects. ❑ Construction of a single-family residence on a previously undeveloped, vacant or subdivided lot. ❑ Demolition of a single-family residence and construction of a commercial, mixed -use or multi -family facility or duplex on the same property. ❑ A tenant improvement that changes the use from general office to medical office. ❑ Remodel of an existing multi -family building that increases the number of residential units. Note: This information should not be used as a substitute for City codes and regulations. Edmonds City Code may be viewed at http://www.codepublishing.com/WA/Edmonds/. The applicant is responsible for ensuring compliance with the fees and regulations that are applicable at the time of submittal. If you have a specific question about a certain aspect of your project, please contact the Engineering Division at 121 5th Ave N or (425) 771-0220. Please note that other local, state, and/or federal permits or approvals may be required. Impact fee rates can also be referenced in ECC 3.36.125. No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. Additional fee for Independent Fee Calculation: Refer to Fee Schedule. Updated on O510912023 Page 2 of 2 APPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: Maplewood Estates Lot B Owner/Applicant Christopher Kiel Name 14019 52nd AVE W Unit A Applicant Contact Person: Christopher Kiel Name 14019 52nd Ave W Unit A Street/Mailing Address Street/Mailing Address Edmonds Wa 98026 Edmonds Wa 98026 City State Zip Telephone: 425-923-5414 City Telephone: 425-923-5414 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Contact Name Telephone: E-mail: i 1. PROJECT DESCRIPTION a. Location - Street address: 8817 194th St Sw b. Specify existing land use: State Zip (Attach a vicinity map and site plan.) One SFR to be replaced with a new SFR c. Specify proposed type and size of development: 1 new 3161 sq ft SFR (# of residential units and/or square footage of building) d. Date construction will begin and be completed: When Permits are approved e. Define proposed access locations: 1 new driveway entering on 194th ST SW f Define proposed sight distance at site egress locations: 100' + in both directions HANDOUT UPDATED 05.09.2023 APPENDIX A Page 2 of 2 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC 3.36.130. Check the applicable box below and calculate the fees as necessary: R NO CHANGE DEMO SFR AND BUILD NEW SFR ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. ITE Land Use Category Per Unit Fee Rate New Use $ Prior Use $ Units in square feet, Use Fee # of dwelling, etc. X = $ X = $ New Use Fee: $ - Prior Use Fee: $ = FEE DUE: $ ' ❑ NEW DEVELOPMENT Per Unit Fee ITE Land Use Category Rate FNew Use $ ❑ INDEPENDENT FEE CALCULATION Units in square feet, # of dwelling, vfb, etc. X Impact/Mitigation Fee: 1 $ Independent Review Fee: $296.00 (+ peer review fee) 1 $ ENGINEERING DIVISION APPROVED AS NOTED Jell tVgAt".,au 01 /29/2024 VV FEE DUE FEE DUE City of Edmonds, Engineering Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 05.09.2023