Loading...
APPROVED ENG PLN RESUB1 BLD2023-1033+Site_Plan+9.7.2023_10.19.37_AM+3768991IN )E FULL WIDTH %RESS/EGRESS DETAIL NOTES: 1D THE MINIMUM LENGTH SHALL BE EXTENDED AS NECESSARY TO ENSURE MATERIAL IS NOT TRACKED OFF SITE AND/OR INTO THE PUBLIC RIGHT-OF-WAY. 2 ATB DRIVEWAY RAMP AND/OR SITE ACCESS ROAD 15' WIDE MIN. SEE TABLE BELOW FOR REQUIRED LENGTH. NOTES: 1. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIV ;ZTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL., A MOUNTABLE BERM WITH 5.1 SLOPES WILL BE PERMITTED. 2. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL QUARRY SPALLS AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY MUST 13E REMOVED IMMEDIATELY. 3. WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO LEAVING THE SITE. WHEN WASHING IS USED, IT SHALL BE DONE ON AN AREA STABILIZED WITH QUARRY SPALLS AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 4. INSPECTION AND NEEDED MAINTENANCE SMALL BE PROVIDED AFTER EACH RAIN. PROJECT MIN LENGTH OF (FEET) *PROVIDE ATS OR ASPHALT SIZE QUARRY SPALLS* TRANSITION WHERE FRONTAGE < 1/4 ACRE 30 ROAD IS AN ARTERIAL. LENGTH TO BE DETERMINED < 1 ACRE 50 BY CITY INSPECTOR. CITY INSPECTION REQUIRED ON < 3 ACRE 100 ALL EROSION CONTROL METHODS > 3 ACRE 100 BEFORE OTHER WORK CAN BEGIN REVISION DATE CITY OF EDMONDS STABILIZED CONSTRUCTION JANUARY 201E ENTRANCE R PUBLIC WORKS STANDARD Its 2" x 2" WOOD/STEEL -\ FILTER FABRIC SECURED TO2"x2'14GA WIRE FABRIC EQUAL NATIVE BACKFILL MATERIAL -/ 6 8- FILTER FABRIC MATERIAL IN CONTINOUS ROLLS USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE 2" x 2" WOOD/STEEL POSTS WIRE MESH FENCE TO SUPPORT FILTER FABRIC BURY BOTTOM OF FILTER MATERIAL 8" TO 12" 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN AND ENSURE PROPER EROSION CONTROL THROUGHOUT PROJECT. 2. SILT FENCE TO BE PLACED DOWNSLOPE OF CONSTRUCTION ACTIVITY. DEPARTMENT DETAIL Est 1g9� APPROVED BY: R. ENGLISH ER-90 s f . 18g OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE Tree protection fence shall remain in place for the duration of project per ECDC 23.10.070(C). Signage designating tree protection areas with the following text shall be installed on fence at least every 15 feet: Tree and Soil Protection Area, Entrance Prohibited Report violations to: (425) 771-0220 APPLICANT SHALL RETAIN A CERTIFIED ARBORIST ON SITE FOR ANY WORK WITHIN TREE PROTECTION FENCE PURSUANT TO ECDC 23.10.070.C.3 APPROVED BY PLANNING Sep 07 2023 V ENGINEERING DIVISION APPROVED AS NOTED 09/15/2023 ***IF ANY WORK IS REQUIRED IN THE RIGHT-OF-WAY (ROW), A ROW PERMIT IS REQUIRED.*** Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs d ur--tn ect-: CITY OF EDMONDS PUBLIC WORKS DEPARTMENT OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. REVISION DATE JANUARY 2€318 (IC) STANDARD - DETAIL I ER-900 I$ _r I I� FILTER SOCK WITH �(lS lf�lD (ol (p14 r (OTVE) FLOW HOLES CATCH BASIN �. CAP SEWER WITH, 3 TWIST PLUG. N ®T �� k S r7o - 2CATSIN 1. CONTRACTOR/DEVELOPER SHALL MAINTAI - W-2 JTS ARE REQUIRED IN THE PAVED ROAD, THIS APPLICATION AT ALL TIMES DURING .OWING IS REQUIRED: CONSTRUCTION PERIOD. hes shall be combined and full width or half 2. ANY SEDIMENT IN CATCH BASIN INSERT �fr� lay will be required depending on the extent SHALL BE REMOVED WHEN INSERT ISI�l-C_ got nce. Where utility patches fall entirely within ONE—THIRD FULL lane, the overlay shall extend to the 3. CITY INSPECTION REQUIRED ON ALL of roadway. Where utility patches extend into EROSION CONTROL METHODS BEFORE fall width overlayOTHER WORK CAN BEGIN. is required. l - REVISION DATE 4z t . CITY OF EDMONDS TEMPORARY � JANU,4RY 2018 = � SEDIMENT TRAP PUBLIC WORKS FOR CATCH BASINS STANDARD DEPARTMENT DETAIL �� 4 FS t 18 9 0 APPROVED BY: R. ENGLISH E R— 9 O 2 4� Ne tits RESTORATION LIMITS TO BE DETERMINEDC ---.. BY CITY ENGINEERING INSPECTOR _ 89° C5Z, oC;;, a, �30_�00� I u — a ,,I ukr. ALL DISTURBED SOILS SHALL BE ,j COMPOST AMENDED PER CITY OF EDMONDS STANDARD DETAIL SD-642 OR I 1 ` APPROVED EQUAL. } f � '14C� 1 ArUs ! I AfI4 ftT ! _ 0e2t Amgt�v- 0 if late 3: CO tj t � 'L�� Z,5 E� I 0 co dj 00M���ozz I &I Nei � IUJ - _ ! 0. N I � I THERE IS A CITY STORM MAIN ALONG THE EAST SIDE OF {� THE SUBJECT SITE. NO LAND " DISTURBANCE APPROVED _ o EAST OF THE STRUCTURE �� -- PROPOSED FOR DEMOLITION. II to (f ID 46TX e dr� Ice --ft �160 All y 9 l ;x \0k a 0 10 +2l0 ; 4 = i�,5 4 4 l0�iZ� j I t,i.�G�, � lnlo.5 k2��� 2cx 51 I P $LD2023-1033 I RESUB Sep 07 2023 CITY OF EDMONDS DEVELOPMENT SERVICES I 1 DEPARTMENT SITE PLAN aqt� 0 ,107.75 �Il:,lO 1::� L'ef [�u ri, a - - I