REVIEWED PLN RESUB2 BLD2023-1391+GEO REPORT+7.17.2024_4.43.56_PM+4385057------- - - - - - - Reviewed by City of Edmonds ; Planning Division ; CRITICAL AREAS REPORT GEOLOGICALLY HAZARDOUS AREAS MATHAY-BALLINGER PARK IMPROVEMENTS ZGA Project No. 2814.00 3 June 2024 Prepared for: City of Edmonds Prepared by: Z*ipperGeo Geoprofessional Consultants ZipperGeo Geoprofessional Consultants ZGA Project No. 2814.00 3 June 2024 City of Edmonds Parks, Recreation, and Human Services 700 Main Street Edmonds, Washington 98020 Attention: Mr. Kyle Woods, Planner & Capital Projects Manager Subject: Critical Areas Report Geologically Hazardous Areas Mathay-Ballinger Park Improvements 24105 78th Place West Edmonds, Washington City Permit No. BLD2023-1391 Dear Mr. Woods: In accordance with your request and written authorization, Zipper Geo Associates, LLC (ZGA) has completed this Critical Areas Report on behalf of the City of Edmonds (the City) for the above -referenced project. This report has been prepared in general accordance with Chapter 23.40.090 of the Edmonds Community Development Code (ECDC), our proposal number P24153, dated 29 April 2024, and our Professional Services Agreement with the City, dated 1 May 2024. This evaluation was limited to Geologically Hazardous Areas as defined in ECDC 23.80.020. We appreciate the opportunity to be of service to you on this project. If you have questions concerning this report, or if we may be of further service, please contact the undersigned. Respectfully Submitted, Zipper Geo Associates, LLC ogw Signed 6/3/24 355 v JEFFREY S. TINKLEPAUGH Jeffrey S. Tinklepaugh, LG, LEG Senior Engineering Geologist James P. Georgis, LG, LEG Principal Engineering Geologist 19019 36th Ave West, Suite E I Lynnwood, WA 98036 1 Phone: 425.582.9928 1 zippergeo.com ZipperGeo Geoprofessional Consultants TABLE OF CONTENTS Page INTRODUCTION........................................................................................................................................ 1 Purpose...................................................................................................................................................1 SiteLocation............................................................................................................................................1 ProjectUnderstanding.............................................................................................................................1 PreviousInvestigations by Others............................................................................................................2 PHYSICAL SETTING................................................................................................................................. 2 SurfaceConditions...................................................................................................................................2 GeologicSetting.......................................................................................................................................3 SubsurfaceConditions.............................................................................................................................3 GroundwaterConditions.........................................................................................................................3 GEOLOGICALLY HAZARDOUS AREAS.................................................................................................. 4 ErosionHazard Areas...............................................................................................................................4 LandslideHazard Areas............................................................................................................................5 SeismicHazard Areas...............................................................................................................................6 MitigationSequencing.............................................................................................................................7 CONCLUSIONS AND RECOMMENDATIONS.......................................................................................... 9 RELIANCE AND LIMITATIONS................................................................................................................. 9 REFERENCES........................................................................................................................................... 9 Appendix A — Figures Figure 1: Vicinity Map Figure 2: Site and Exploration Plan Appendix B — Landau Associates Soil Classification Procedures, Test Pit Logs, and Grain Size Testing Results 19019 36th Ave West, Suite E I Lynnwood, WA 98036 1 Phone: 425.582.9928 1 zippergeo.com CRITICAL AREAS REPORT GEOLOGICALLY HAZARDOUS AREAS MATHAY-BALLINGER PARK IMPROVEMENTS 24105 78T" PLACE WEST EDMONDS, WASHINGTON 3 June 2024 INTRODUCTION Purpose This report has been prepared by Zipper Geo Associates, LLC (ZGA) on behalf of the City of Edmonds (the City) in support of planned improvements to Mathay-Ballinger Park. This report has been prepared in general accordance with Chapter 23.40.090 of the Edmonds Community Development Code (ECDC), our proposal number P24153, dated 29 April 2024, and our Professional Services Agreement with the City, dated 1 May 2024. Our scope of services was limited to an evaluation of the presence/absence of Geologically Hazardous Areas as defined in ECDC 23.80 within the project area and recommendations for mitigating measures to reduce impacts to such critical areas, if necessary. Site Location Mathay-Bal linger Park is located at 24105 78th Place West, in Edmonds, Snohomish County, Washington (the Site). The Site is adjoined to the north and west by the Old Everett Traction Co. Right of Way and to the south and east by residential properties. The Site is accessed from the south from 78th Place West. The Site is located just over 1,000 feet to the west of Lake Ballinger. The location of the Site is depicted on Figure 1, Vicinity Map. Project Understanding ZGA was provided with a set of preliminary civil drawings for the Mathay-Ballinger Park Site Improvements, prepared by CG Engineering, revision dated 10 April 2024. From a review of these plans, we understand that the proposed site improvement will include: • Asphalt resurfacing of the existing parking area at the north end of 78th Place West; • Construction of new asphalt surfaces for additional parking spaces, walking paths, and maintenance access roads connecting 78th Place West to an existing asphalt -paved trail (the Interurban Trail) located to the north of the Site within the Old Seattle -Everett Traction Co. Right of Way; • Construction of a new single -stall restroom near the 78th Place West parking area; • Construction of new concrete pads for benches, picnic tables, and a new play area; • Minor regrading and fill placement; and • Utility improvements including new stormwater infiltration galleries and associated catch basins and below ground piping. Page 1 1 Critical Areas Report Geologically Hazardous Areas Mathay-Bal linger Park Improvements 3 June 2024 ZipperGeo Geoprofessional Consultants These improvements are generally depicted in Figure 2, Site and Exploration Plan. Previous Investigations by Others Our scope of services did not include a subsurface investigation. For the purposes of this report, we have utilized geologic information from readily available, published resources, our field observations from a site reconnaissance, and Site -specific subsurface data previously collected by Landau Associates. The results of Landau Associates previous geotechnical investigations are summarized in the following document: • Summary of Geotechnical Engineering Services, Moth ay -Ballinger Park Project, Edmonds, Washington, prepared by Landau Associates, dated 27 December 2023. According to this report, on May 24, 2023, Landau Associates advanced four test pits (TP-1 through TP-4) and completed one small-scale pilot infiltration test (PIT; PIT-1) at the Site, in the approximate locations indicated on Figure 2, Site and Exploration Plan. Test pits were advanced to depths of approximately 9 to 10 % feet below ground surface (bgs). PIT-1 was completed at a depth of approximately 3 feet bgs and was then extended to a depth of approximately 10 % feet bgs. Four soil samples (one from each test pit and from PIT-1) were submitted for grain size distribution and moisture content analysis. Landau Associates recorded their subsurface observations in test pit logs, which are enclosed in Appendix B. The results of moisture content analyses are presented on the boring logs. The results of grain size analyses are presented on a separate plot (Landau Figure 9), which is also enclosed in Appendix B. PHYSICAL SETTING Surface Conditions According to a survey by Pacific Coast Surveys, the park area is generally level with an overall gentle slope to the south and a total vertical relief of approximately 6 feet from elevation 328 feet above sea level (asl) near the north end of the park area to 322 feet asl near the parking area to the south. The Site includes portions of a steeper slope that adjoins the park to the north with a total vertical relief of approximately 6 to 10 feet with an asphalt -paved or gravel -surfaced trail located along the top of the slope. Slopes generally do not exceed 15% within the park area except for in limited, localized areas (15% represents a threshold slope within the ECDC for Erosion Hazard Areas). Slopes along the northern portion of the site, adjoining the trail, generally do exceed 15%, and in the westerly half of the Site often exceed 40% (40% represents a threshold slope within the ECDC for Landslide Hazard Areas). We conducted a reconnaissance of the Site on 8 May 2024. The majority of the park area is surfaced with grass. An asphalt parking area is located at the south end of the Site at the terminus of 781" Place Southwest. An asphalt sport court is located to the east of the parking area. A wood chip surfaced play Page 12 Critical Areas Report Geologically Hazardous Areas Mathay-Bal linger Park Improvements 3 June 2024 ZipperGeo Geoprofessional Consultants area is centrally located within the park. Numerous mature trees are scattered throughout the park. A gravel access road is located at the north end of the park extending up the slope and connecting to the paved portion of the Interurban Trail. Dense undergrowth consisting mainly of blackberries is located at the northeasterly end of the park and along the slope below the trail. We did not observe visible evidence of surface water, groundwater seepage, active erosion, or landsliding during our visit. According to the Natural Resources Conservation Service (NRCS) Web Soil Survey database', shallow soils at the Site belong to the Alderwood Series. Alderwood soils are generally described by the NRCS as gravelly, sandy loam derived from glacial drift deposits. Alderwood soils are recognized by the ECDC as prone to erosion when slopes exceed the 15% threshold. Geologic Setting Surficial geologic conditions for the Site are depicted on the Geologic Map of the Edmonds East and Part of the Edmonds West Quadrangles, Washington (Minard,1983). The surficial geology of the Site is mapped as Vashon Till (Qvt), which is generally classified as a poorly sorted (well graded), non -stratified mixture of clay, silt, sand, pebbles, and cobbles with occasional boulders. Unweathered Vashon Till typically exhibits an overall high density and low permeability, although layers or lenses of coarse grained sediment may occur within the unit. Also mapped in the vicinity of the site is the Vashon Recessional Outwash (Qvr) geologic unit, which is generally classified as stratified sand and gravel with minor silt and clay layers. Vashon Recessional Outwash typically exhibits a low to medium density and high permeability, although layers or lenses of fine-grained sediment may occur within the unit. Subsurface Conditions During test pit explorations, Landau Associates observed geologic conditions beneath the Site to depths of up to 10 % feet. According to their report and boring logs, subsurface conditions at the Site generally consist of 3 to 4 inches of topsoil over loose to medium dense or medium stiff, damp to moist, gray to light brown, sand with varying amounts of silt, gravel and cobbles to silt with varying amounts of sand, gravel, and cobbles. Landau Associates interpreted that these conditions were representative of the Vashon Recessional Outwash geologic unit described by Minard. All test pits were terminated within the Vashon Recessional Outwash unit. Groundwater Conditions Landau Associates reported that they did not observe groundwater within their field explorations. We expect that shallow groundwater beneath the Site generally flows towards Lake Ballinger (to the east) at a higher elevation than that of the water level within the lake. According to the City, the water level within ' https://websoilsurveV.nres.usda.gov/app/WebSoilSurveV.aspx Page 13 Critical Areas Report Geologically Hazardous Areas Mathay-Bal linger Park Improvements 3 June 2024 ZipperGeo Geoprofessional Consultants Lake Ballinger is typically below 280 feet2 asl except in flood conditions. 280 feet in elevation is approximately 40 feet below the lowest elevation at the Site. Therefore, the exact depth to groundwater below the Site is unknown but is expected to be greater than 10%feet and less than 40 feet. Groundwater levels should be expected to vary throughout the year depending on site use, precipitation rates, and local geologic conditions, with the highest groundwater levels generally occurring during late winter and early spring. GEOLOGICALLY HAZARDOUS AREAS ECDC 23.80.050(B) requires that a Critical Areas Report address geologically hazardous areas that are within the project area and all geologically hazardous areas within 200 feet of the project area or that have the potential to be affected by the proposal. Figure 2, Site and Exploration Plan, depicts the approximate extent of geologically hazardous areas identified by this assessment within the scope of the project's survey, provided by Pacific Coast Surveys. In addition to these areas, we reviewed portions of the King County West 2021 LiDAR digital elevation model, reviewed geologic hazard inventories from the Washington Geologic Information Portal (WGIP), and performed a site reconnaissance to assess the potential presence of geologically hazardous areas beyond the survey area. Our extended review did not identify geologically hazardous areas beyond the project survey bounds shown in Figure 2 that may adversely affect or be adversely affected by the proposed park improvements. Erosion Hazard Areas Erosion Hazard Areas are defined in ECDC 23.80.020(A) as those areas identified by the U.S. Department of Agriculture's Natural Resources Conservation Service as having a "moderate to severe," "severe," or "very severe" rill and inter -rill erosion hazard. Erosion hazard areas are also those areas impacted by shoreland and/or stream bank erosion. Within the city of Edmonds erosion hazard areas include: 1. Those areas of the city of Edmonds containing soils that may experience severe to very severe erosion hazard. This group of soils includes, but is not limited to, the following when they occur on slopes of 15 percent or greater: a. Alderwood soils (15 to 25 percent slopes); b. Alderwood/Everett series (25 to 70 percent slopes); c. Everett series (15 to 25 percent slopes); 2. Coastal and stream erosion areas which are subject to the impacts from lateral erosion related to moving water such as stream channel migration and shoreline retreat; https://www.edmondswa.gov/government/departments/public works and utilities/stormwater utility system/1 ake ballinger water level Page 14 Critical Areas Report Geologically Hazardous Areas Mathay-Bal linger Park Improvements 3 June 2024 ZipperGeo Geoprofessional Consultants 3. Any area with slopes of 15 percent or greater and impermeable soils interbedded with granular soils and springs or ground water seepage; and 4. Areas with significant visible evidence of ground water seepage, and which also include existing landslide deposits regardless of slope. Alderwood soils occur on the Site on slopes of 15% or greater. These areas therefore qualify as Erosion Hazard Areas. The approximate extent of Erosion Hazard Areas at the Site is depicted in Figure 2, Site and Exploration Plan. Planned Site improvements overlap with mapped Erosion Hazard Areas in the northern portion of the Site, where the access road will approach the existing paved asphalt trail, and in one other localized area to the south of the existing play area. Adverse effects of construction will be mitigated by implementingthe temporary erosion control measures outlined in Sheets C2.1 and C2.2 of the preliminary civil plan set. Permanent stormwater systems will be designed in accordance with the Stormwater Management Manual for Western Washington (Washington State Department of Ecology, 2019) and generally appear sufficient for the scope of site regrading and new impermeable surfaces. Permanent erosion control will be accomplished by revegetation of affected areas with appropriate ground cover or installation of erosion resistant surfacing. It is our opinion that conditions do not warrant a minimum setback from identified erosion hazard areas. Landslide Hazard Areas Landslide Hazard Areas are defined in ECDC 23.80.020(B) as areas potentially subject to landslides based on a combination of geologic, topographic, and hydrologic factors. They include areas susceptible because of any combination of soil, slope (gradient), slope aspect, structure, hydrology, or other factors. Within the city of Edmonds potential landslide hazard areas include: 1. Areas of ancient or historic failures in Edmonds which include all areas within the earth subsidence and landslide hazard area as identified in the 1979 report of Robert Lowe Associates and amended by the 1985 report of GeoEngineers, Inc., and further discussed in the 2007 report by Landau Associates; 2. Coastal areas mapped as class u (unstable), uos (unstable old slides), and urs (unstable recent slides) in the Department of Ecology Washington coastal atlas; 3. Areas designated as quaternary slumps, earthflows, mudflows, or landslides on maps published by the United States Geological Survey or Washington State Department of Natural Resources; 4. Any slope of 40 percent or steeper that exceeds a vertical height of 10 feet over a 25-foot horizontal run. Except for rockeries that have been engineered and approved by the engineer as having been built according to the engineered design, all other modified slopes (including slopes where there are breaks in slopes) meeting overall average steepness and height criteria should be considered potential landslide hazard areas); Page 15 Critical Areas Report Geologically Hazardous Areas Mathay-Bal linger Park Improvements 3 June 2024 5. Any slope with all three of the following characteristics: a. Slopes steeper than 15 percent; ZipperGeo Geoprofessional Consultants b. Hillsides intersecting geologic contacts with a relatively permeable sediment overlying a relatively impermeable sediment; and c. Springs or ground water seepage; 6. Any area potentially unstable as a result of rapid stream incision or stream bank erosion; 7. Any area located on an alluvial fan, presently subject to, or potentially subject to, inundation by debris flow or deposition of stream -transported sediments; and 6. Any slopes that have been modified by past development activity that still meet the slope criteria. The Site is not associated with nor in the vicinity of mapped landslide hazards per the Washington Geologic Information Portal (WGIP) landslide hazard inventory3. However, portions of the slope at the northwestern margin of the Site exceed 40% slope with a vertical height of over 10 feet and a horizontal run of at least 25 feet. These areas therefore qualify as Landslide Hazard Areas. The approximate extent of Landslide Hazard Areas at the Site is depicted in Figure 2, Site and Exploration Plan. Planned Site improvements are located downslope from Landslide Hazard Areas where they will not impart a surcharge load and are setback far enough from the toe of the slope that they are unlikely to reduce the lateral support of said slope. The risk that construction of the proposed Site improvements will have an adverse effect on the stability of nearby Landslide Hazard Areas is low. Additionally, proposed Site improvements do not include continuously occupied structures within the likely runout area of a landslide originating from the Landslide Hazard Areas identified in the vicinity. It is our opinion that conditions do not warrant a minimum setback from identified landslide hazard areas. In our opinion, no mitigation appears necessary. Seismic Hazard Areas Seismic Hazard Areas are defined in ECDC 23.80.020(C) as areas subject to severe risk of damage as a result of earthquake -induced ground shaking, slope failure, settlement, soil liquefaction, lateral spreading, or surface faulting. These areas are designated as having a "high" and "moderate to high" risk of liquefaction as mapped on the Liquefaction Susceptibility Map of Snohomish County by the Washington State Department of Natural Resources or areas located within landslide hazard areas. 3 Washington Geological Survey, 2023, Washington State Landslide Inventory Database-GIS data, June 2023: Washington Geological Survey Digital Data Series 29, version 1.1. https://fortress.wa.gov/dnr/geologydata/publications/data download/ger portal landslide database.zip Page 16 Critical Areas Report Geologically Hazardous Areas Mathay-Bal linger Park Improvements 3 June 2024 ZipperGeo Geoprofessional Consultants The Site is not located within an area designated as having a "high" or "moderate to high" risk of liquefaction. However, per ECDC 23.80.020(C), portions of the Site do qualify as Landslide Hazard Areas and therefore also qualify as Seismic Hazard Areas. The approximate extent of Seismic Hazard areas at the Site is depicted in Figure 2, Site and Exploration Plan. Planned Site improvements do not overlap with mapped Seismic Hazard Areas and the risk that construction of the proposed Site improvements will have an adverse effect on the stability of nearby Seismic Hazard Areas is low. In our opinion, no mitigation appears necessary. Mitigation Sequencing Per ECDC 23.40.120(A), applicants shall demonstrate that all reasonable efforts have been examined with the intent to avoid and minimize impacts to critical areas. Geologically hazardous areas in the vicinity of the proposed park improvements include erosion hazard areas, landslide hazard areas, and seismic hazard areas. The extents of these critical areas are depicted on Figure 2, Site and Exploration Plan. Per ECDC 23.40.120(B), when an alteration to a critical area is proposed, such alteration shall be avoided, minimized, or compensated for in the following sequential order of preference: 1. Avoiding the impact altogether by not taking a certain action or parts of an action; — The proposed site improvements avoid geologically hazardous areas to the extent practicable. Site improvements overlap with limited portions of erosion hazard areas near the existing park area and on the slope leading up to the Interurban Trail to the north. 2. Minimizing impacts by limiting the degree or magnitude of the action and its implementation by using appropriate technology or by taking affirmative steps, such as project redesign, relocation, or timing, to avoid or reduce impacts; — The proposed site improvements will utilize existing grades to the extent practicable and will cross the northerly erosion hazard area at a nearly perpendicular angle to minimize the amount of disturbance. — Project plans avoid surcharge loads or other modifications to the landslide/seismic hazard areas. 3. Rectifying the impact to wetlands, frequently flooded areas, and fish and wildlife habitat conservation areas by repairing, rehabilitating, or restoring the affected environment to the historical conditions or the conditions existing at the time of the initiation of the project; — The site is an active city park and it is our understanding that no wetlands, frequently flooded areas, and fish and wildlife habitat conservation areas are present. Page 17 Critical Areas Report Geologically Hazardous Areas Mathay-Bal linger Park Improvements 3 June 2024 ZipperGeo Geoprofessional Consultants — Permanent grades will be configured according to Sheet C3.1, Grading and Drainage Plan of Mathay-Bal linger Park Site Improvements (plans), prepared by CG Engineering, dated 10 April 2024 4. Minimizing or eliminating the hazard by restoring or stabilizing the hazard area through engineering or other methods; — Project plans include appropriate stormwater control measures — Project plans include permanent erosion control measures in the form of revegetation of affected areas with appropriate ground cover or installation of erosion resistant surfacing. — Project plans include temporary erosion control measures during construction. — Clearing and grading will be conducted during the dry season (roughly May 1 to October 1 per ECDC 23.80.070(A)(6)). 5. Reducing or eliminating the impact or hazard over time by preservation and maintenance operations during the life of the action; — Site improvements will be maintained in general accordance with City of Edmond Park Department Standards of Practice. 6. Compensating for the impact to wetlands, frequently flooded areas, and fish and wildlife habitat conservation areas by replacing, enhancing, or providing substitute resources or environments; and/or — Not applicable. 7. Monitoring the hazard or other required mitigation and taking remedial action when necessary. — Geotechnical construction monitoring will occur on an on -call basis during construction. These visits will include observations by a Certified Erosion & Sediment Control Lead (CESCL)-certified individual. Page 18 Critical Areas Report Geologically Hazardous Areas ZipperGeo Mathay-Bal linger Park Improvements GeoprofessionalGonsultants 3 June 2024 Cd010141ILIM[QLIPT_1►11111X4101LTA IAi140101_A1111[001.1 Portions of the Site and its vicinity qualify as Geologically Hazardous Areas per ECDC 23.80. These areas are depicted in Figure 2, Site and Exploration Plan. Based on our conceptual geologic model of the Site and our review of the preliminary civil plan set, it is our professional opinion that the risk that construction of the planned Site improvements will have an adverse effect on the stability of nearby Geologically Hazardous Areas is low. It is our opinion that conditions do not warrant a minimum setback from identified landslide or erosion hazard areas. Mitigating measures will include temporary erosion control during construction as outlined in Sheets C2.1 and C2.2 of the preliminary civil plan set. Based on our review, the proposed temporary erosion control measures appear sufficient. No further mitigation appears warranted in our opinion. RELIANCE AND LIMITATIONS This report is an instrument of service and has been prepared for the exclusive use of the City of Edmonds in accordance with generally accepted engineering geology practice for specific application to this project and site location. Our scope of services did not include a subsurface investigation. We assume that information provided by others is accurate and complete. No warranty, express or implied, is made. Technical Memorandum, Summary of Geotechnical Engineering Services, Mathay-Ballinger Park Project, Edmonds, Washington, prepared by Landau Associates, dated 27 December 2023. Critical Areas Determination, prepared by the City of Edmonds, dated 30 August 2024. DLD2023-1391, 24105 78th Place West, Fill/Grade — Mathay Ballinger Park, prepared by the City of Edmonds, dated 17 November 2023. City of Edmonds Community Development Code, revision dated 5 March 2024. Mathay-Bal linger Park Site Improvements (plans), prepared by CG Engineering, dated 10 April 2024. Geologic Map of the Edmonds East and Part of the Edmonds West Quadrangles, Washington, 1:24,000 scale, US Geological Survey Miscellaneous Field Studies Map MF-1541, prepared by Minard, J.P., dated 1983. Page 19 Critical Areas Report Geologically Hazardous Areas Mathay-Bal linger Park Improvements 3 June 2024 ZipperGeo Geoprofessional Consultants Appendix A Figures Page 1 10 53 r a -1�s L r 1.6 it �, -.. -,&: APPROXIMATE PROJECT AREA 0 '' ► ice+ �� _ �� -s REFERENCE: 2022 AERIAL PHOTOGRAPH, ACQUIRED FROM SNOHOMISH COUNTY ONLINE PROPERTY INFORMATION PORTAL. CB RIM=339.44 - 10' / 30' M / 0EC 1 % M IE 12" RCP(SE)=336.39 / l / / /F 34' - - - �2? �/ 25' f� 0�� 28" x / /t. B 26• CB RIM=337.76 26• /12' F s• j / IE 12" RCI=335.86 / / / / I F F / M /// JDECI � IE �12' RCI (S 335.7s I ^ / / / _ // ! �• / / / 7) I CB RIM= 36.71 _ L _ / / 8 6• 14'x2 l \ 'M / IE 12" P(NW)=328.88 /F / 1/ IE ,11/' CPP SW=328.88 E / //// ///I M,/ // CB RIM=327.80 / / j / 4' /'f F II 26" I 91100000804 IE 12' CPP(NE)_324.68 ' 60 0 30 60 IE 12' PVC(SW)=324.68 + / // S� F 28' SCALE IN FEET*, n /j// ' I /.: �// / \ / \M ��F----------1 T P-4 / / / / \ / F F YF� 4 F / 5 AR ` ' ' 26• SHED P j / // BIKE / / / 95,481 SF /X F SHED / Y " 2704310040280Q/ SHED //'/ // / F 10, CB RIM=326.19 / I IE 12' C(NE =323.39 r0 • /i P(jS�/// / / IE 12" RCP(5;=323.39 �.% 1L"r / / / // F / / / / � I 0049 Xx SrAIRSS 26 / .'•. A, 8• / DEC � + 10, _ __ / TP-1 PIT-1 // axt OFFFENCE 0.3(N) \ \ j/// , / / / �' M �3 HmH F 9' 14' DEC DEC / CB RW=319.82 \ /7� P� Y�� ? OT 1 . IE 2' PWM=319.42 \ 20'/ BACK) 00J4100100 NEW 20'x30' SLAB FOR PICNIC AREA \ 0049110 / 26 �(��/ / cl 00491100000803 \ /42 /F / j` 014" 695 nI �i / / /� NEW RESTROOM I \ j / / / / F Q FFE: 322.0 I r \ m • 5'SETBACK C36" �329.05 / r RUCTURE SET�� I CO RIM=320.27 / 14' I I �- J �-- could Nor OPEN C M .6' / N as Os'02' E 135.78'(C) 1135.88'(P)EXISTING U. / / 7'-1 0.8, CB -r LANDSCAPING I I F .:': E 12" RCPSj 3I f72 IE 4' PIC(N)� 319.32 TO REMAIN LOT 4 E 12' PYC S)=318.70 IE 4' DIP(NW=319.32 I I Al 22 j l l 12' E 4' 1884 IE 12" DIP(W=319.32 I M / F g17f' / I I WARNER ADDITION 6 I LOT 2 I VOL. 15, PG. 76 N CB RIM=319.44 LAKE &ILLINGER I I I CB RIM=319.89 I IE 12' M(N)=317.79 HOMESM ADD. I L 0.8' GPM I IE 12 RCP(S)=3/7.04 VOL 14, PG. 99 7. �- �-31`n IE 12' RCP((S94 318.I �, �-------- - - - - - - - - - I I I REFERENCE: SHEET C1.1, PRELIMINARY SITE PLAN, CG ENGINEERING, APRIL 10, 2024. FIGURE 2, SITE AND EXPLORATION PLAN, LANDAU ASSOCIATES, SUMMARY OF GEOTECHNICAL ENGINEERING SERVICES, DECEMBER 27, 2023. LEGEND TP-1 APPROXIMATE LOCATION AND ID OF TEST PIT (LANDAU, 2023) SPIT-1 APPROXIMATE LOCATION AND ID OF PILOT INFILTRATION TEST (LANDAU, 2023) EROSION HAZARD AREA PER ECDC 23.80.020(A) r LANDSLIDE/SEISMIC HAZARD L - - J AREA PER ECDC 23.80.020(B/C) THIS FIGURE IS MEANT TO BE VIEWED IN COLOR. GRAYSCALE REPRODUCTION MAY LEAD TO INCORRECT INTERPRETATION. Critical Areas Report Geologically Hazardous Areas ZipperGeo Mathay-Bal linger Park Improvements GeoprofessionalGonsultants 3 June 2024 Appendix 6 Landau Associates Soil Classification Procedures, Test Pit Logs, and Grain Size Testing Results Page 1 11 MAJOR DIVISIONS Soil Classification System uscs GRAPHIC LETTER SYMBOL SYMBOL"' TYPICAL DESCRIPTIONS tz"3> GRAVEL AND CLEAN GRAVEL p:�.. j.:p: GW Well -graded gravel; gravel/sand mixture(s); little or no fines 0 @ w GRAVELLY SOIL (Little or no fines) Poorly graded gravel; gravel/sand mixture(s); little or no fines o: o. Q ,p ,o . GP 0 @� (More than Silty gravel; gravel/sand/siltmixture(s) GRAVEL WITH FINES GM w E'w coarse fraction retained (Appreciable amount of Qo N on No. 4 sieve) fines) GC Clayey gravel; gravelfsand/clay mixture(s) 0 LO z° SAND AND CLEAN SAND $W Well -graded sand; gravelly sand; little or no fines ui m c U) t r SANDY SOIL (Little or no fines) Poorly graded sand; gravelly sand; little or no fines SP Q oo O0 (More than 50%of fraction Silty sand; sand/siltmixture(s) SAND WITH FINES SM coarse passed (Appreciable amount of $C through No. 4 sieve) fines) Clayey sand; sand/clay mixture(s) ML Inorganic silt and very fine sand; rock flour; silty or clayey fine p r SILT AND CLAY sand or clayey silt withlow plasticity CL U) o - N Inorganic clay of low to medium plasticity; gravelly clay; sandy ov'v m (Liquid limit less than 50) clay; silty clay; lean clay OL Z @ w o Organic silt; organic, silty clay of low plasticity MH Inorganic silt; micaceous or diatomaceous fine sand; elastic silt a N o'er SILT AND CLAY uJ �,z° CH Inorganic clay of high plasticity; fat clay Z E LL (Liquid limit greater than 50) Organic clay of medium to high plasticity; organic silt OH HIGHLY ORGANIC SOIL PT Peat; humus; swamp soil with high organic content GRAPHIC LETTER OTHER MATERIALS SYMBOL SYMBOL TYPICAL DESCRIPTIONS PAVEMENT • :. AC Or PC Asphalt concrete pavement or Portland cement pavement ROCK RK Rock (See Rock Classification) WOOD WD Wood, lumber, wood chips DEBRIS O O O DB Construction debris, garbage Notes: 1. USCS letter symbols correspond to symbols used by the Unified Soil Classification System and ASTM classification methods. Dual letter symbols (e.g., SP-SM for sand or gravel) indicate soil with an estimated 5-15% fines. Multiple letter symbols (e.g., MUCL) indicate borderline or multiple soil classifications. 2. Soil descriptions are based on the general approach presented in the Standard Practice for Description and Identification of Soils (Visual -Manual Procedure), outlined in ASTM D 2488. Where laboratory index testing has been conducted, soil classifications are based on the Standard Test Method for Classification of Soils for Engineering Purposes, as outlined in ASTM D 2487. 3. Soil description terminology is based on visual estimates (in the absence of laboratory test data) of the percentages of each soil type and is defined as follows: Primary Constituent: > 50% - "GRAVEL," "SAND," "SILT," "CLAY," etc. Secondary Constituents: > 30% and < 50% -'very gravelly," 'very sandy," 'very silty," etc. > 15% and < 30% - "gravelly," "sandy," "silty," etc. Additional Constituents: > 5% and <_ 15% - "with gravel," "with sand," "with silt," etc. < 5% - "with trace gravel," "with trace sand," "with trace silt," etc., or not noted. 4. Soil density or consistency descriptions are based on judgement using a combination of sampler penetration blow counts, drilling or excavating conditions, field tests, and laboratory tests, as appropriate. Drilling and Sampling Key SAMPLER TYPE & METHOD SAMPLE NUMBER & INTERVAL Field and Lab Test Data Code WOR Description Weight of Rod Graphic Code Description Sample Identification Number ® a 3.25-in OD, 2.42-in ID Split Spoon WOH Weight of Hammer ® b 2.00-in OD, 1.50-in ID Split Spoon Sampler Graphic (variable) PP = 1.0 Pocket Penetrometer, tsf m c Thin -Wall Sampler (aka Shelby Tube) TV = 0.5 Torvane, tsf ® d Grab Sample Recovery Depth Interval PID = 100 Photoionization Detector VOC screening, ppm 0 e Single -Tube Core Barrel W = 10 to Moisture Content, El f Double -Tube Core Barrel 1 1� Sample Depth Interval D = 120 Dry Density, ® g 2.50-in OD, 2.00-in ID WSDOT Jpcf ® h 3.00-in OD, 2.37-in ID Mod. Calif. Portion of Sample Retained -200 = 60 Material smaller than No. 200 sieve, % ® i Other - See text if applicable for Archive or Analysis GS Grain Size - See separate figure for data 1 300-lb Hammer, 30-inch Drop Groundwater AL Atterberg Limits - See separate figure for data 2 140-lb Hammer, 30-inch Drop UU Triaxial Unconsolidated Undrained (UU) Strength 3 Direct Push V Approximate water level at time of Cu Triaxial Consolidated Undrained (CU) Strength 4 Vibrocore - drilling (ATD) Consol 1-D Consolidation Test 5 Other - See text if applicable Approximate water level at time after Perm Permeability Test 6 Piston Extraction - drilling/excavation/well CA Chemical Analysis I LANDAU Mathay-Ballinger Park Soil Classification Figure Edmonds, Washington System and Key 3 A S S O C I A T E S z s a 0 14 PIT-1 SAMPLE DATA SOIL PROFILE � Excavation Method: Tracked Excavator o z ca a cn 9 E Ground Elevation (ft): Not Measured .m -am Q o U) Excavated By: NW Excavating and Trucking, Inc. w in a 12 65 Logged By: SC rn 0s c� SP- Brown, fine to coarse, SAND with gravel, silt, SM and root organics (loose, damp) SM (TOPSOIL) Light brown, silty SAND with gravel and root S-1 = d W = 30 organics (loose, damp) (RECESSIONAL OUTWASH) S-2 = d WGS 1 ML -T Brown -gray, SILT with gravel, trace cobbles, and mottling (medium stiff, damp) Infiltration test depth S-3 = I d S-4 JW I d I FFFFS-M Gray, silty, very gravelly, SAND with cobbles (medium dense, damp) Test Pit Completed 05/24/23 Total Depth of Test Pit = 10.5 ft. GROUNDWATER Groundwater Not Observed Notes: 1. Stratigraphic contacts are based on field interpretations and are approximate. q 2. Reference to the text of this report is necessary for a proper understanding of subsurface conditions. 3. Refer to "Soil Classification System and Key" figure for explanation of graphics and symbols. N 7 n Figure LALANDAU Mathay-Ballinger Park Log of Test Pit PIT-1 Edmonds, Washington 9 4 A S S O C I A T E S z s a 0 12 TP-1 SAMPLE DATA SOIL PROFILE GROUNDWATER � Excavation Method: Tracked Excavator o z ca a cn 9 E Ground Elevation (ft): Not Measured .m -am Q o U) Excavated By: NW Excavating and Trucking, Inc. w in a 12 65 Logged By: SC rn 0s c� SP- Brown, fine to coarse, SAND with gravel, silt, SM f and root organics (loose, damp) SM (TOPSOIL) Brown, silty SAND with gravel, and root organics (loose, damp) (RECESSIONAL OUTWASH) S-1 = d W = 21 ML Browmgray, SILT with gravel, trace cobbles, Groundwater Not Observed and mottling (medium stiff, damp) S-2 = d W = 10 GS S-3 = d S-4 = d Test Pit Completed 05/24/23 Total Depth of Test Pit = 9.5 ft. --------------------- Light brown, gravelly, very silty, SAND with cobbles (medium dense, damp) -grades to gray, silty, and very gravelly Notes: 1. Stratigraphic contacts are based on field interpretations and are approximate. 0 2. Reference to the text of this report is necessary for a proper understanding of subsurface conditions. 3. Refer to "Soil Classification System and Key" figure for explanation of graphics and symbols. N 7 n Figure LALANDAU Mathay-Ballinger Park Log of Test Pit TP-1 Edmonds, Washington 9 A S S O C I A T E S N 14 TP-2 SAMPLE DATA SOIL PROFILE Excavation Method: Tracked Excavator z m a @ to -0 �, Ground Elevation (ft): Not Measured Q Q o r U) Excavated By: NW Excavating and Trucking, Inc. m e m iv CL m U) Logged By: SC w cn 05 cn 1-- (0 D SP- Brown, fine to coarse, SAND with gravel, silt, SM and root organics (loose, damp) (TOPSOIL) SM Brown, silty SAND with trace gravel, root organics, and mottling (loose, damp) S-1 I d = W 21 (RECESSIONAL OLITWASH) S-2= d ML Brown -gray, SILT with gravel, trace cobbles, and mottling (medium stiff, damp) ----------------------- S-3 = d SM Gray, silty SAND with gravel and cobbles (medium dense, moist) S-4 = d GS4 -grades to very gravelly, with trace cobbles, mottling, and medium dense to dense Test Pit Completed 05/24/23 Total Depth of Test Pit = 9.0 ft. GROUNDWATER Groundwater Not Observed Notes: 1. Stratigraphic contacts are based on field interpretations and are approximate. 0 2. Reference to the text of this report is necessary for a proper understanding of subsurface conditions. 3. Refer to "Soil Classification System and Key" figure for explanation of graphics and symbols. N athay 7 r Figure LALANDAU M Edmonds, Ballinger Park Log of Test Pit TP-2 Edmonds, Washington A S S O C I A T E S N SAMPLE DATA _ � m E C- z m � 0 o Z aD > E c E m w (n 05 in S-1I d S-2 I d W = 24 GS _' 10 S-3 T I d a Test Pit Completed 05/24/23 0 Total Depth of Test Pit = 10.3 ft. 0 0 12 TP-3 SOIL PROFILE o Tracked Excavator Excavation Method: E (o -0 >, Ground Elevation (ft): Not Measured r (Un Excavated By: NW Excavating and Trucking, Inc. 12 U) Logged By: SC (2 SP- SM Brown, fine to coarse, SAND with gravel, silt, and root organics (loose, damp) SM (TOPSOIL) Brown, silty SAND with gravel, organics, and mottling (loose, damp) (RECESSIONAL OUTWASH) --------------------- Light gray, sandy SILT with mottling (medium stiff, damp) -grades to gray and moist GROUNDWATER Groundwater Not Observed Notes: 1. Stratigraphic contacts are based on field interpretations and are approximate. 0 2. Reference to the text of this report is necessary for a proper understanding of subsurface conditions. 3. Refer to "Soil Classification System and Key" figure for explanation of graphics and symbols. N 7 athay r Figure LALANDAU M Edmonds, Ballinger Park Log of Test Pit TP-3 Edmonds, Washington / A S S O C I A T E S N TP-4 SAMPLE DATA SOIL PROFILE Excavation Method: Tracked Excavator z m a @ to -0 �, Ground Elevation (ft): Not Measured Q Q o r U) Excavated By: NW Excavating and Trucking, Inc. M c m iv CL m U) Logged By: SC w cn 05 cn 1-- (0 D SP- Brown, fine to coarse, SAND with gravel, silt, SM and root organics (loose, damp) SM (TOPSOIL) Light brown, silty SAND with gravel, tree roots, and trace cobbles (loose, damp) S-1I d = W 16 (RECESSIONAL OUTWASH) S-2I d ML Brown -gray, SILT with gravel, trace cobbles, and mottling (medium stiff, damp) S-3 = d SM Gray, silty, very gravelly, SAND with trace cobbles (medium dense, damp) Test Pit Completed 05/24/23 Total Depth of Test Pit = 10.0 ft. Notes: 1. Stratigraphic contacts are based on field interpretations and are approximate. 2. Reference to the text of this report is necessary for a proper understanding of subsurface conditions. 3. Refer to "Soil Classification System and Key" figure for explanation of graphics and symbols. GROUNDWATER Groundwater Not Observed � Figure LALANDAU M Edmonds, Ballinger Park Log of Test Pit TP-4 Q Edmonds, Washington v A S S O C I A T E S 74217.01 6/23/23 P:\074\217.010\T\GINT\074217.010.011 MATHAY BALLINGER PARK.GPJ GRAIN SIZE FIGURE 100 U.S. Sieve Opening in Inches 6 4 3 2 1.5 1 1/2 3/8 3 j U.S. Sieve Numbers 6 810 1416 20 30 40 5060 100 140 200 Hydrometer 90 80 70 L m a 60 c ii 50 c a 40 30 20 10 0 100 10 1 0.1 0.01 0.001 Grain Size in Millimeters LANDAUEdmonds, A S S O C I A T E S MathaLAy-Bal linger Park Washington Grain Size Distribution Figure Q J Cobbles Gravel Sand Silt or Clay Coarse Fine Coarse Medium Fine Symbol Exploration Number Sample Number Depth (ft) Natural0 Moisture (/o) Soil Description Unified Soil Classification • PIT-1 S-2 2.3 31 SILT ML m TP-1 S-2 3.8 10 Gravelly, very silty, fine to coarse SAND SM A TP-2 S-4 8.3 4 Silty, very gravelly, fine to coarse SAND SM * TP-3 S-2 3.4 24 Sandy, SILT ML