Loading...
REV1 REVIEWED BLD2021-0088+Revision description+7.8.2022_10.38.05_AM+2977188AAA BLD2021-0088 REVISION Ankrom Moisan Jul 08 2022 July 7, 2022 CITY OF EDMONDS DEVELOPMENT SERVICES Leif Bjorback DEPARTMENT REVIEWED City of Edmonds - Building Division BY 121 5th Avenue North CITY OF EDMONDS Edmonds, WA 98020-3145 Re: Anthology of Edmonds - BLD-2021-0088 Dear Mr. Bjorback, The following is a narrative of changes for your review and comment. Changes have been clouded on the affected sheets under revisions ASI 01 and ASI 02. ASI 001 - provides updates to the main electrical room, resizing to fit both MDP panels, removing the CMU wall. Entry was revised from 2 doors down to 1 door and centered in room. MDF (level P1) and IDF (level 1) have been resized. GC priced OTIS elevators; ASI 001 updates the shaft openings to work with the new elevator design. • A2.01P: revised openings at elevators a. Removed CMU wall to double the size of the main electrical room #0002 b. Resized MDF room #0003 c. Revised Main electrical room to 1 opening. Note that outside of this permit revision, the design team has coordinated the door opening to ensure that a minimum of 42" clear is maintained from any electrical equipment. • A2.01 , A5.11, A5.12: Revised openings at elevators a. Revised size of IDF room #1018 b. Revised location of receiving room door #1017B. This was done in order for the opening to stack with the P1 opening below, simplifying the structural loading in the area. • A6.21: Revised openings at elevator to meet revised manufacturer's requirements. • A6.51: Added elevator door jamb detail. • A10.01: Revised openings at elevator • Al2.01: Updated main electrical room door, omitting the second door as it was confirmed that it was not required due to new layout of room. ARCHITECTURE INTERIORS Affected sheets: URBAN DESIGN • ARCH SHEETS: A2.01D, A2.01, A5.11, A5.12, A6.21, A6.51, A10.01, A10.04, Al2.02 • STRUCTURAL SHEETS: S3.01, S3.02, S3.03, S5.31, S5.32 BRANDING • STRUCTURAL CALCULATIONS: _CombinedCalcPackage_ASI01-Core Revisions.PDF Ankrom Moisan Architects ASI 002 - provides updates for the crane openings in the PT slab and a revision to the generator room access. The crane required updated drawings to show the openings in the PT slab, PORTLAND along with updated structural calculations. The generator room was updated to include a pad for the generator and a curb for the interior CMU to sit on. The generator door moved 38 NW Davis Street from the exterior wall to the wall adjacent to the drive aisle. Suite 300 • G2.21: Generator door rating updated; door shifted locations. Portland, OR 97209 . A2.01 & A3.11: Updates to the generator room. 503.245.7100 AS2.01: Updates to the slab at the generator room. • A3.13: Added elevation of generator room. SEATTLE 1505 5th Avenue Suite 300 Seattle, WA 98101 206.576.1600 Alt Ankrom Moisan • Al2.01: Updated generator room door size & fire rating. • Al2.02: Updated generator room door to show sloped bottom panel. • S2.01: Added opening/infill slab for tower crane. Updated generator room for curb, pad and relocated door opening. • S2.01P: Added opening/infill slab for tower crane. • S2.01R: Added opening/infill slab for tower crane. • S2.02: Added opening/infill slab for tower crane. • S2.02P: Added opening/infill slab for tower crane. • S2.02R: Added opening/infill slab for tower crane. • S5.12: Details 12 to 14 added for crane opening and infill slab. Detail 15 added for Generator Room curb and pad. Affected sheets: • ARCH SHEETS: G2.21, A2.01, AS2.01, A3.11, A3.13, Al2.01, Al2.02 • STRUCTURAL SHEETS: S2.01, S2.01P, S2.01R, S2.02, S2.02P, S2.02R, S5.12 • STRUCTURAL CALCULATIONS: Edmonds Tower Crane Opening Calcs-07062022 Sincerely, Ankrom Moisan Architects, Inc. L �t Mark Miller Principal ARCHITECTURE INTERIORS URBAN DESIGN BRANDING Anthology of Edmonds // 07.07.2022 2 ANKROM MOISAN Alt Ankrom Moisan ARCHITECTURE INTERIORS URBAN DESIGN BRANDING Anthology of Edmonds // 07.07.2022 ANKROM MOISAN