REV2 REVIEWED BLD BLD2021-0088+REVISION LETTER+1.9.2023_9.38.14_AM+3303936BLD2021-0088 REVISION
AAA Jan 09 2023
Ankrom Moisan CITY OF EDMONDS
January 52023 DEVELOPMENT SERVICES
Y, DEPARTMENT
Leif Bjorback
City of Edmonds - Building Division
121 5th Avenue North
Edmonds, WA 98020-3145
Re: Anthology of Edmonds - BLD-2021-0088
Dear Mr. Bjorback,
ARCHITECTURE
INTERIORS
URBAN DESIGN
BRANDING
Ankrom Moisan Architects
PORTLAND
38 NW Davis Street
Suite 300
Portland, OR 97209
503.245.7100
SEATTLE
1505 5th Avenue
Suite 300
Seattle, WA 98101
206.576.1600
REVIEWED
BY
CITY OF EDMONDS
The following is a narrative of changes for your review and comment. Changes have been clouded
on the affected sheets under revisions CCD 003.
Permit Revision 02
CCD 003 - provides updates to the level 2 courtyard that expands the usable area of the courtyard
for building residents. A pop out along the south wall was added to include a second exit
for the courtyard. A steel canopy structure has been included, along with structural
calculations. Landscape architect added plantings and other design elements to the
courtyard.
• 1-1.01, 1-1.21, 1-1.22, 1-1.31, L2.01 - Added landscape sheets for updated courtyard design
• G2.01 -
Level 2 area updated under Building Area Calculations, Building Area Ratio
Calculations, and Level 2 - FLS BLD Area
• G2.21 -
Occupant load updated for Stair 01 and Stair 02
• G2.22
- Occupant load updated for the courtyard, second exit, and stair exiting
• A0.31 -
Assembly Q6.4 added with GA RC 2601
• A1.21 -
Sheet added with steel canopy plans and sections
• A2.02
- The courtyard usable space was expanded, a second exit was added on the
south wall, and a steel canopy was included.
• A2.03
- Courtyard canopy and exit roofs added.
• A3.13 -
Pop out for courtyard second exit shown on "Courtyard North Elevation"
• A6.03
- Additional second exit pop out plans and sections
• A7.21 -
Roof details added for second exit pop out
• A8.02
- Second exit pop out RCP added
• Al2.02
- Second exit door added to door schedule
• S2.02W - Added steel canopy, framing at second exit pop out, and framing at exit next
to the elevator.
• S2.03 - Added steel canopy and framing at second exit pop out.
• S6.02 - Added sheet for steel canopy details.
AAA
Ankrom Moisan
Affected sheets:
• LANDSCAPE SHEETS: 1-1.01, L1.21, 1-1.22. L1.31, L2.01
• LANDSCAPE PRODUCT SPECS: CCD 003 - LANDSCAPE PRODUCTS.PDF
• ARCH SHEETS: G2.01, G2.21, G2.22, A0.31, A1.21, A2.02, A2.03, A3.13, A6.03, A7.21,
A8.02, Al2.02
• STRUCTURAL SHEETS: S2.02W, S2.03, S6.02
• STRUCTURAL CALCULATIONS: STEEL CANOPY CALCS 1-3-23.PDF
Sincerely,
Ankrom Moisan Architects, Inc.
Mark Miller
Principal
ARCHITECTURE
INTERIORS
URBAN DESIGN
BRANDING
Anthology of Edmonds // 01.05.2023 2
ANKROM MOISAN