Loading...
Transmittal_RFI - 281 (Responded and Closed) (4)IN/i Ankrom Moisan Ankrom Moisan Architects, Inc. I United States PROJECT: Edmonds Senior Living 184470 SUBJECT: TYPE: PURPOSE: QUESTION: Elevator Shaft Sheathing Details RFI Answered RFI Transmittal DATE SENT: 5/2/2023 RFI ID: 281 TRANSMITTAL ID: 01269 VIA: Email View online Open In App To respond to this RFI simply reply to this email. Need help? Watch a short training video. New RFI #281 has been assigned to Lilla, Adriana (Ankrom Moisan) Miller, Mark (Ankrom Moisan) Grimes, Richard (Ankrom Moisan) by Alex Dent (Catalyst Construction Group) a 04/18/23. RFI Details This RFI is due on Tuesday, April 25, 2023. QUESTION 1 Asked By: Alex Dent (Catalyst Construction Group) Date: Tue Apr 18, 2023 at 05:54 pm CDT Question: per submittal 09 21 16 3-0 Catalyst Construction eh use 5/8's Dens Glass Gold on the backside of th Elevator Shaft Wall and between the following (Party Walls) 203, 303, 403, 503, & 603. This a: us to continue Rough -in and Close the Shear-w between these areas. Since the detail 6G on AO. refers you to GA File NO. WP 3825 and that de references "Proprietary Gypsum Board, Ameri Gypsum Company LLC....5/8's FireBloc Type Gypsum Board. Please provide an alternate detail allowing the substitution of The American Gypsum Compar allow the use 5/8's Dens Glass Gold instead of t current detail 6G on page AO.21 Page 1 of 3 SUGGESTION: ANSWER: FROM NAME Adriana Lilla TO NAME Kurt Sorensen Brenda Clark Alex Dent RFI Transmittal DATE: 5/2/2023 ID: 01269 Attachments: None ADDITIONAL DETAILS Project: Anthology of Edmonds Subject: Elevator Shaft Sheathing Details Date Initiated: 04/18/23 Created By: Alex Dent (Catalyst Construction Group) Assigned To: Lilla, Adriana (Ankrom Moisan) Miller, Mark (Ankrom Moisan) Grimes, Richard (Ankrom Moisan) Distribution List: Miller, Mark (Ankrom Moisan) Clark, Brenda (Catalyst Construction Group) Dent, Alex (Catalyst Construction Group) Grimes, Richard (Ankrom Moisan) Lilla, Adriana (Ankrom Moisan) Mendoza, Neftali (Catalyst Construction Group) Moore, Mike (Catalyst Construction Group) Mortenson, Eileen (Catalyst Construction Group) Roggeman, Mike (Anthology Senior Living) Sorensen, Kurt (Catalyst Construction Group) PDF For this location, disregard GA WP 3825 and reference UL U301 tested assembly. See attached UL U301 assembly information. DESCRIPTION OF CONTENTS COMPANY EMAIL PHONE Ankrom Moisan adrianal@ankrommoisa Architects, Inc. n.com 503.892.8363 COMPANY Catalyst Construction Catalyst Construction Catalyst Construction EMAIL PHONE KSorensen@catalystcon structiongrp.com bclark@catalystconstruc tiongrp.com adent@catalystconstruc 425.495.7506 tiongrp.com Page 2 of 3 RFI Transmittal DATE: 5/2/2023 ID: 01269 QTY DATED TITLE NUMBER SCALE SIZE RFI 281 - BXUV.U301 - 1 5/2/2023 Fire -resistance Ratings - ANSI_UL 263.pdf COPIES: Richard Grimes (Ankrom Moisan Architects, Inc.) Mark Miller (Ankrom Moisan Architects, Inc.) Page 3 of 3