Transmittal_RFI - 281 (Responded and Closed) (4)IN/i
Ankrom Moisan
Ankrom Moisan Architects, Inc. I United States
PROJECT: Edmonds Senior Living
184470
SUBJECT:
TYPE:
PURPOSE:
QUESTION:
Elevator Shaft Sheathing Details
RFI
Answered
RFI Transmittal
DATE SENT: 5/2/2023
RFI ID: 281
TRANSMITTAL ID: 01269
VIA: Email
View online Open In App
To respond to this RFI simply reply to this email. Need help? Watch a short training video.
New RFI #281 has been assigned to Lilla, Adriana (Ankrom Moisan)
Miller, Mark (Ankrom Moisan)
Grimes, Richard (Ankrom Moisan) by Alex Dent (Catalyst Construction Group) a
04/18/23.
RFI Details
This RFI is due on Tuesday, April 25, 2023.
QUESTION 1
Asked By: Alex Dent (Catalyst Construction Group)
Date: Tue Apr 18, 2023 at 05:54 pm CDT
Question: per submittal 09 21 16 3-0 Catalyst Construction eh
use 5/8's Dens Glass Gold on the backside of th
Elevator Shaft Wall and between the following
(Party Walls) 203, 303, 403, 503, & 603. This a:
us to continue Rough -in and Close the Shear-w
between these areas. Since the detail 6G on AO.
refers you to GA File NO. WP 3825 and that de
references "Proprietary Gypsum Board, Ameri
Gypsum Company LLC....5/8's FireBloc Type
Gypsum Board.
Please provide an alternate detail allowing the
substitution of The American Gypsum Compar
allow the use 5/8's Dens Glass Gold instead of t
current detail 6G on page AO.21
Page 1 of 3
SUGGESTION:
ANSWER:
FROM
NAME
Adriana Lilla
TO
NAME
Kurt Sorensen
Brenda Clark
Alex Dent
RFI Transmittal
DATE: 5/2/2023
ID: 01269
Attachments: None
ADDITIONAL DETAILS
Project:
Anthology of Edmonds
Subject:
Elevator Shaft Sheathing Details
Date Initiated:
04/18/23
Created By:
Alex Dent (Catalyst Construction Group)
Assigned To:
Lilla, Adriana (Ankrom Moisan)
Miller, Mark (Ankrom Moisan)
Grimes, Richard (Ankrom Moisan)
Distribution List:
Miller, Mark (Ankrom Moisan)
Clark, Brenda (Catalyst Construction Group)
Dent, Alex (Catalyst Construction Group)
Grimes, Richard (Ankrom Moisan)
Lilla, Adriana (Ankrom Moisan)
Mendoza, Neftali (Catalyst Construction Group)
Moore, Mike (Catalyst Construction Group)
Mortenson, Eileen (Catalyst Construction Group)
Roggeman, Mike (Anthology Senior Living)
Sorensen, Kurt (Catalyst Construction Group)
PDF
For this location, disregard GA WP 3825 and reference UL U301 tested
assembly. See attached UL U301 assembly information.
DESCRIPTION OF CONTENTS
COMPANY EMAIL PHONE
Ankrom Moisan adrianal@ankrommoisa
Architects, Inc. n.com 503.892.8363
COMPANY
Catalyst
Construction
Catalyst
Construction
Catalyst
Construction
EMAIL PHONE
KSorensen@catalystcon
structiongrp.com
bclark@catalystconstruc
tiongrp.com
adent@catalystconstruc 425.495.7506
tiongrp.com
Page 2 of 3
RFI Transmittal
DATE: 5/2/2023
ID: 01269
QTY DATED TITLE NUMBER SCALE SIZE
RFI 281 - BXUV.U301 -
1 5/2/2023 Fire -resistance Ratings -
ANSI_UL 263.pdf
COPIES:
Richard Grimes (Ankrom Moisan Architects, Inc.)
Mark Miller (Ankrom Moisan Architects, Inc.)
Page 3 of 3