REV1 APPROVED TCP 212TH UTILITY WORK 3.29.2022_4.11.23_PM+276880921200 72ND AV W PHASE 1 UTILITIES TRAFFIC CONTROL PLAN --
® CATALYST -
CONTRACTOR: CONSTRUCTION
CONTACT: Hardik Patel, Vice Preside^+ Pro_(�nne+n it+inn
Catalyst, 847-687-4909,
HPatel@catalystconstructiongrp.com
PREPARED BY: Julian Morales, Elite Traffic Solutions LLC,
elitetrafficsolutions@gmail.com, 206-922-9205, TCS # 12813,
Expires 4/30/2025
Legend
BE Arrowboard (Chevron)
Bus Stop
Cone
Project Site
i Sign Stand
Traffic Light
Work Area
12TH ST SW 30MP
ROAD
WORK
W20-1
. L.
L-L7
fJ I
WORK
W20-1
IM
72ND AV W 25MPHIJ
I
CLOSED
�' AHEAD
W20-5
7215 212TH ST SW CATALYST SHALL COMMUNICATE
WITH 2O20 SOLUTIONS EDMONDS
DATES & HOURS OF CONSTRUCTION
CLOSING DRIVEWAY. X
f 12} 2
i1CCr
ROAD L
CLOSED
5' L 11- R4-8
� �12p p 7
11'
General Notes:
1. All signs and spacing shall conform to The MUTCD and WAC.
2. Priority passage through the work area for emergency
vehicles vehicles shall be provided at all times.
3. Alert Community Transit 5 days in advance
4. Protective vehicle recommended may be a work vehicle.
5. Devices should not encroach into adjacent lanes.
6. All signs min. 48 x 48 B/O unless otherwise specified.
7. Channelization devices are 28" reflective cones
8. All sign spacing may be adjusted to accommodate at -grade
intersections and/or driveways.
9. Maintain Minimum 11' lane.
71
WHEN STEEL PLATES ARE USED,
SIGNS NEED TO BE SET IN ADVANCE
WARNING SEQUENCE ATALL TIMES.
1 2 3
ROAD oroacvc�es STEEL
WORK use PLATES
AHEAD CAUTION AHEAD
W20-1 W8-24
www.invarion.com
UTILITIES IMPACTS - 212TH ST SW
START DATE: 03/18/22 - 04/21/2022
DURATION: 25 DAYS
:B TRAVEL LANE - 45' X 12' = 540SF
w- -
-0 down
n .
® OR I RIGHT LANE ROAD
cLoseD WORK
AHEAD AHEAD
W4-119L W4-2 W20-5 W20-1
p Il D 1 1 a X x--4—X-4—
d.
ALL LANES REOPENED DURING NIGHT TIME HOURS
CHANNELIZING DEVICE SPACING (FEET)
�►Ls•�s'r
MPH TAPER TANGENT
50170 40 80 N
4V
35145 30 60
25130 20 ao MNOT TO SCALE
03.29.2022 by:
al►.,�J������
Ai�►�I�Je���������
Elite Traffic Solutions
253.886.3057
MINIMUM TAPER LENGTH (L) IN FEET
; ►��
�'� — ���O�AJ►J����s�s���
`ti gas ov s awa��d
X
..n t Julian Morales
Lane Posted Speed (mph)
Width
♦O�s•d ►4s•s•�s�
PROJECT SITE +aaaas aasa�
TCS # 012813
Feet 25 30 35 40 45 50 55 60 65 70
•���� �� s s•''►s•s s �.,
i� ♦�������N�����
�•��s 21200 72NDAV W►����������.����i����
a�- s�a�a�a�a�������«
Jude.a.a Moratts
10 105 15o z05 zss aso soo sso
9-1;
Yes s s s s s ss����J�JJ��J�J�Ji��J�J�J�J�J�J�J�J�J�J��o�z� �V�� ��s•�ArFw���������'
.'
11 115 165 225 295 495 550 605 660
SHALL MAINTAIN EMERGENCYACCESS AT ALL TIMES
.+.Vaasa}a�a*aaaaaaaaaaaaaaaaaaaaa4t� ►«�.aa.�:�:�:e
12 tzs 16o zas 32o sao soo sso 7zo 760 6ao
�i.Ia l t y���0 •- -9s•� ►�s•r ! I�����������
a ►� Oaaaa4 ♦aaaaaw : ♦aaaaaaaaaal
RIGHT LANE
SIGN SPACING=X FEET 1
(FEET) ( )
BUFFER DATA
►AWAA��'. Js•s•s•s•a'S�a I�e��s•�O���s•
Cad Aaaaaaa4 raaaaaaadaaaaaaa ►aaa�
♦♦ ��������_e����������s•�s•♦<��O♦
♦( laaaaaar�aaaaaaaaaaaaaaaJaaal
CLOSED
AHEAD
FREEWAYS & EXPRESSWAYS 55/70MPH 1500±(ORAS
BUFFER SPACE=B
�� �s•s•s•s•s•s•e y�������������s•Wm
� �as•�r
PER MUTCD )
SPEED(MPH) 25 30 35 40 45 50 55 60 65 0
- � � i �� �♦s••s••s••s••s••s•♦�t♦`♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�♦�.�♦�.�.
r.
RURAL HIGHWAYS
�73.
9a�a�a�aaa�a�a�� .`VAA-ss-ssssssssss�s�s�s�s�s�s�s�������l�s�s�s��
�������������������������������������������������R�Sp�,��
W 20 - 5
60/65 MPH 800'±
LENGTH (FT) 155 200 250 305 360 425 495 570 645
S9t�a� Ak- 2 j ��>►�J�� �i� ; �w7q���J���������������������������J��������������, oAt�.�! >w1
RURAL ROADS 45/55 MPH 500'±
PROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCE
va0a01 J"`J•'. gaaaaaaaaaaaaaaaaaaaaaat►aPc�i4
►�V►��������+�N�v�swi�Mt��N,� ���,►���sJsJss���ss���sJsJssJsJs�s�s���sJ��s���4Js���i�JJ�!
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350'±
1
v
^
RURAL ROADS, URBAN ARTERIALS
RESIDENTIAL& BUSINESS DISTRICTS 25130 MPH ZDD'±(2)
TYPICAL PROTECTIVE VEHICLE STATIONARY OPERATION
TYPICAL PROTECTIVE VEHICLE WITH TMA) LOADED WEIGHT (feet)
MA (
TYPE WITHH TMA
20'
22'
URBAN STREETS 25 MPH OR LESS 100'±(2)
(Les)
ALL SIGNS ARE 48" X 48" BLACK ON ORANGE UNLESS OTHERWISE
MINIMUM WEIGHT 15,000 LES
DESIGNATED.
4YARD DUMP TRUCK (MAXIMUM WEIGHT SHALL BE IN
SERVICETRUCK ACCORDANCE WITH 30 MIN
1 All spacing may be adjusted to accommodate interchange ramps,
() p 9 Y 1 9 P
FAT BED, ETC. MANUFACTURER
RECOMMENDATIONS
=
RonD
at -grade intersections, and driveways.
WORK
ROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT
-
AHEAD
2 This spacing may be reduced In urban areas to fit roadway
( ) P g Y y
' A PROTECTIVE VEHICLE IS RECOMMENDED REGARDLESS IF A TMA IS AVAILABLE, IF NO TMA IS
USED, THE PROTECTIVE VEHICLE SHALL BE STRATEGICALLY LOCATED IN THE FIELD TO SHIELD
conditions.
WORKERS AND NO ROLL AHEAD DISTANCE IS SPECIFIED.
W20-1
All Signs & Spacing to conform to the MUTCD & The City of Edmonds Standards -
reference WSDOT "Work Zone Traffic Control Guidelines M54-44.08 January 2021 " and WAC
21200 72ND AV W PHASE 2 UTILITIES TRAFFIC CONTROL PLAN - -
® CATALYST -
CONTRACTOR: CONSTRUCTION
CONTACT:Ari Sen, Project Engineer, Catalyst, 708-733-4262, inn
ASen@catalystconstructiongrp.com
PREPARED BY: Julian Morales, Elite Traffic Solutions LLC, Aft
elitetrafficsolutions@gmail.com, 206-922-9205, TCS # 12813, `
Expires 4/30/2025
Legend
03.29.2022 by:
Elite Traffic Solutions
253.886.3057
IIIArrowboard Chevron
Julian Morales
TCS # 012813
BUS Stop
Juti.a.a. Morales
Cone
Project Site
i Sign Stand
Traffic Light
Work Area
I�
12TH ST SW 30MP
ROAD
WORK
W20-1
7215 212TH ST SW
1 :!Ilk A,
►n XWW"I'M
Ak
PROJECT SITE
21200 72ND AV W EiMV:
WORK
W20-1
M
7AV W 25MPH
C2ND
E
W20-5
f 12' 12
KEEP
PG
CLOSED
AHEAD
W20-5
ROAD
WORK
General Notes:
1. All signs and spacing shall conform to The MUTCD and WAC.
2. Priority passage through the work area for emergency
vehicles vehicles shall be provided at all times.
3. Alert Community Transit 5 days in advance
4. Protective vehicle recommended may be a work vehicle.
5. Devices should not encroach into adjacent lanes.
6. All signs min. 48 x 48 B/O unless otherwise specified.
7. Channelization devices are 28" reflective cones
8. All sign spacing may be adjusted to accommodate at -grade
intersections and/or driveways.
9. Maintain Minimum 11' lane.
WHEN STEEL PLATES ARE USED,
SIGNS NEED TO BE SET IN ADVANCE
WARNING SEQUENCE ATALL TIMES.
1 2 3
ROAD OTORCVCLES STEEL
WORK use PLATES
EXTREME
AHEAD CAUTION AHEAD
W20-1 W8-24
11
UTILITIES IMPACTS - 212TH " n.com
START DATE: 03/18/22 - 04/21 /2022
DURATION: 25 DAYS
EB TRAVEL LANE - 45' X 11' = 495SF
.
r
< > <11
�1>
LEFT LANE ROAD
OpRR CLOSED WORK
AHEAD AHEAD
W4-119R W4-2 W2 -5 W20-1
X—-4—X-4—
CHANNELIZING DEVICE SPACING (FEET)
MPH
TAPER
TANGENT
-
50170
40
80
4NV
35145
30
60
25130
20
ao
NOT TO SCALE
LL MAINTAIN EMERGENCYACCESS AT ALL
MINIMUM TAPER LENGTH (L) IN FEET
Lane Posted Speed (mph)
Width
Feet 25 30 35 40 45 50 55 60 65 70
10 105 (80
205 265 450 500 550
11 115 225 295 495 550 605 660
12 195 1 245 320 540 600 660 720 780 8417
SIGN SPACING=X (FEET) (1) BUFFER DATA
FREEWAYS & EXPRESSWAYS 55170 MPH 1500±(OR AS BUFFER SPACE = B
PER MUTCD) SPEED(MPH) 25 30 35 40 45 so ss 60
RURAL HIGHWAYS 60/65 MPH 8001±
LENGTH (FT) 155 200 250 305 360 1425 1495 1570
RURAL ROADS 45/55 MPH 500'± PROTECTIVE VEHICLE WITH TMA ROLLAHEAD DISTANCE
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350'±
RURAL ROADS, URBAN ARTERIALS 25/30 MPH 2001(2)
RESIDENTIAL& BUSINESS DISTRICTS
TYPICAL PROTECTIVE VEHICLE
TYPE WITH TMA
TYPICAL PROTECTIVE VEHICLE
(WITH TMA) LOADED WEIGHT
(Les)
STATIONARY OPERATION
(feet)
URBAN STREETS 25 MPH OR LESS 100'±(2)
ALL SIGNS ARE 48" X 48" BLACK ON ORANGE UNLESS OTHERWISE
MINIMUM WEIGHT 15,000 LBS
DESIGNATED.
4YARD DUMP TRUCK
SERVICETRUCK
(MAXIMUM WEIGHT SHALL BE IN
ACCORDANCE WITH
30 MIN
(/1 All spacing may be adjusted to accommodate interchange ramps
1) P g Y 1 9 P
FLAT BED, ETC.
MANUFACTURER
RECOMMENDATIONS
at -grade intersections, and driveways.
ROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT
2 This spacing may be reduced In Urban areas t0 fit roadway
( ) P g Y y
A PROTECTIVE VEHICLE IS RECOMMENDED REGARDLESS IF A TMA IS AVAILABLE, IF NO TMA IS
USED, THE PROTECTIVE VEHICLE SHALL BE STRATEGICALLY LOCATED IN THE FIELD TO SHIELD
conditions.
WORKERS AND NO ROLL AHEAD DISTANCE IS SPECIFIED.
Eir—
w20-1 All Signs & Spacing to conform to the MUTCD & The City of Edmonds Standards -
reference WSDOT "Work Zone Traffic Control Guidelines M54-44.08 January 2021 " and WAC
L-L7
21200 72ND AV W PHASE 3-UTILITIES- TRAFFIC CONTROL PLAN SHEET 1
® CATALYST
CONTRACTOR: CONSTRUCTION
CONTACT: Hardik Patel, Vice President, Pre -Construction,
Catalyst, 847-687-4909,
H Patel@catalystconstructiongrp.com
PREPARED BY: Julian Morales, Elite Traffic Solutions LLC,
41, elitetrafficsolutions@gmail.com, 206-922-9205, TCS # 12813,
Expires 4/30/2025
General Notes:
1. All signs and spacing shall conform to The MUTCD and WAC.
2. Priority passage through the work area for emergency
vehicles vehicles shall be provided at all times.
3. Alert Community Transit 5 days in advance
4. Protective vehicle recommended may be a work vehicle.
5. Devices should not encroach into adjacent lanes.
6. All signs min. 48 x 48 B/O unless otherwise specified.
7. Channelization devices are 28" reflective cones
8. All sign spacing may be adjusted to accommodate at -grade
intersections and/or driveways.
O NAainfnin rAini—i 11' Irmo
�-�r _► I_I. ALL LANES REOPENED DURING NIGHT TIME HOURS
4
i
T
:.
DETOUR
i M4-9b
t-qNJ-'7"m9T
_-;:.
NOT TO SCALE
SIGN SPACING=X (FEET) (1)
FREEWAYS & EXPRESSWAYS 55/70 MPH
1500±(OR AS
PER MUTCD)
RURAL HIGHWAYS 60/65 MPH
800'±
RURAL ROADS 45/55 MPH
500'4-
RURAL ROADS & URBAN ARTERIALS 35140 MPH
3504
RURAL ROADS, URBAN ARTERIALS 25130 MPH
200'±(2)
RESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS
100'±(2)
ALL SIGNS ARE 48" X 48" BLACK ON ORANGE UNLESS OTHERWISE
DESIGNATED.
(1) All spacing may be adjusted to accommodate interchange ramps
at -grade intersections, and driveways.
(2) This spacing may be reduced in urban areas to fit
roadway
conditions
'ok
All Signs & Spacing to conform to the MUTCD & The City of Edmonds Standards -
SHALL MAINTAIN EMERGENCY ACCESS AT ALL TIMES reference WSDOT "Work Zone Traffic Control Guidelines M54-44.08 January 2021 " and WAC
www.invarion.com
UTILITIES IMPACTS - 212TH ST SW
START DATE: 03/18/22 - 04/21/2022
DURATION: 25 DAYS
=B TRAVEL LANE - 80 X 10' = 800SF
74TH
AV W 25MPH
�..��
RIGHT LANE
CLOSED
AHEAD
W20-5
X
< >
ti
W4-2
� X NANO
OR
W4-119L
21200 72ND AV W PHASE 3 UTILITIES TRAFFIC CONTROL PLAN SHEET 2
® CATALYST
CONTRACTOR: CONSTRUCTION
CONTACT: Hardik Patel, Vice President, Pre -Construction,
Catalyst, 847-687-4909,
HPatel@catalystconstructiongrp.com
PREPARED BY: Julian Morales, Elite Traffic Solutions LLC,
elitetrafficsolutions@gmail.com, 206-922-9205, TCS # 12813,
Expires 4/30/2025
V 1ICICII IVVMC .
1. All signs and spacing shall conform to The MUTCD and WAC.
2. Priority passage through the work area for emergency
vehicles vehicles shall be provided at all times.
3. Alert Community Transit 5 days in advance
4. Protective vehicle recommended may be a work vehicle.
5. Devices should not encroach into adjacent lanes.
6. All signs min. 48 x 48 B/O unless otherwise specified.
7. Channelization devices are 28" reflective cones
8. All sign spacing may be adjusted to accommodate at -grade
intersections and/or driveways.
9. Maintain Minimum 11' lane.
�r ALL LANES REOPENED DURING NIGHT TIME HOURS
N '1
7215 212TH ST SW
CONTACT COMMUNITY TRANSIT
CONSTRUCTION COORDINATOR AT:
425-353-7433
SIDEWALK
CLOSED
R9-9
R3-2
WHEN STEEL PLATES ARE USED,
SIGNS NEED TO BE SET IN ADVANCE
WARNING SEQUENCE ATALL TIMES.
ROAD 2 3
< > <
OTORCVCLES STEEL
WORK .ae PLATES
AHEAD CAUTION AHEAD
W 20-1 W8-24
SIGN SPACING=X (FEET) (1)
FREEWAYS & EXPRESSWAYS
55170 MPH
1500±(OR AS
PER MUTCD)
RURAL HIGHWAYS
60/65 MPH
8001±
RURAL ROADS
45155 MPH
5001±
RURAL ROADS & URBAN ARTERIALS
35/40 MPH
350'±
RURAL ROADS, URBAN ARTERIALS
RESIDENTIAL & BUSINESS DISTRICTS
25/30 MPH
2001(2)
URBAN STREETS
25 MPH OR LESS
100'±(2)
ALL SIGNS ARE 48" X 48" BLACK ON ORANGE UNLESS OTHERWISE
(1) All spacing may be adjusted to accommodate interchange ramps
at -grade intersections, and driveways.
(2) This spacing may be reduced in urban areas to fit roadway
conditions.
SHALL MAINTAIN EMERGENCYACCESS AT ALL
72ND AV W 25MP
f 12'}1
DETOUR
F.
www.invarl
UTILITIES IMPACTS - 212TH ST SW
START DATE: 03/18/22 - 04121 /2022
DURATION: 25 DAYS
=B TRAVEL LANE - 80 X 10' = 800SF
WORK
W20-1 , -**:. -
.owl
9
2TH ST SW 30MPH�
75' 11'
16' 10'
SIDEWALK CLOSED C14ANNELIZING DEVICE SPACING (FEET)
.•s����o�N�4�����M� SIDEWALK clxoss HERE _ MPH TAPER TANGENT -
/~♦��A'�� 7•P������� CLOSED
�,00,��,►+o►�y�� � R9-11 a (R) sono ao ao 4NV
' R9-9 35145 30 605
.�•.v r �'.►a goo+�'�i 25130 zo ao NOT TO SCALE
ii j AO�� ����\�t4► a xw1*1���� MINIMUM TAPER LENGTH (L) IN FEET
�r054.�j�j�j�
A Lane Posted Speed (mph)
(��x t A �s� �'o� t�*>�� (w►i0����������4 Width
( � 03.29.2022 by: 25 30 35 40 45 50 55 60 65 70
Feet
I•��._ _ e w� �c►t���� Elite Traffic Solutions
�!��� -� i���►��►����������� X 253.886.3057 10 105 150 205 265 450 500 550
ti • ^►O���Q Julian Morales
PROJECT SITE ; 0000♦ 11 115 1s5 225 295 ass sso soy sso
TCS#012813
r��'�'�:�r� ���5�
21200 72ND AV W �i�o�o�o�o�o�� s0000000e a A, M�Tat�s 12 125 160 zas 320 Sao soa sso 7zo Tao aao
BUFFER DATA
.�. ►..�0000 Legend BUFFER SPACE
♦7'� -rv- v. .�.� so,00es�
►,+���, _.�.��� >� � �%,���`� V�9•NW�O�� ���������A���'S�,6�1�a�♦�� ROAD
►�� I %r_s ����`. ��'���� ►����ee'''�'®'�o� SPEED(MPH) 25 �h.� 35 40 45 50 5565�7301
_�ioioioioioisiooiioioi+iioAHEAD ®Arrowboard (Chevron)����LENGTH(FT) 155 250 305 360 425 495 570 fi45
►��������O��y��� j����BUS Stop PROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCE
���������s������������������������������������������
►�������� •000000000000000000000s000��; w20-1
��0000eo♦ ♦o��o���o���0000��000000s�o♦
>A000000�..\. ,0000000000000000000000•�oo�os � Cone
►-1�����O�A � ������������������������'���` TYPICAL PROTECTIVE VEHICLE STATIONARY OPERATION
♦ t. ��♦♦♦♦..♦♦♦♦♦�♦�♦�♦�♦�♦�♦�.�♦�♦�♦�♦���♦o��' TYPICAL PROTECTIVE VEHICLE �
TYPE WITH TMA ( WITH TMA) LOADED WEIGHT (feet)
- _ Pedestrian Detour (LBB)
Project Site MINIMUM WEIGHT 15,000 LBS
201►�-22' 4 YARD DUMP TRUCK (MAXIMUM WEIGHT SHALL BE IN
SERVICE TRUCK ACCORDANCE WITH 30 MIN
EL Sign Stand
FLAT BED, ETC. MANUFACTURER
RECOMMENDATIONS
Traffic Light ROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT
_ "A PROTECTIVE VEHICLE IS RECOMMENDED REGARDLESS IF A TMA IS AVAILABLE, IF NO TMA IS
USED, THE PROTECTIVE VEHICLE SHALL BE STRATEGICALLY LOCATED IN THE FIELD TO SHIELD
Work Area
I WORKERS AND NO ROLL AHEAD DISTANCE IS SPECIFIED.
t ,rr
All Signs & Spacing to conform to the MUTCD & The City of Edmonds Standards -
reference WSDOT "Work Zone Traffic Control Guidelines M54-44.08 January 2021 " and WA