Loading...
REVIEWED RESUB 4 BLD2021-0116+GEO ENGINEER LETTER+2.22.2022_1.57.28_PM+2695753Irerracon February 22, 2022 CA Senior Living Holdings, LLC 130 E. Randolph St., Ste 2100 Chicago, IL 60601 Attn: Mr. Michael Duggan — Vice President of Development P: (312) 248-2091 E: mduggan@ca-ventures.com Re: Structural Plan Review - Permit No. BLD2021-0088 Anthology of Edmonds 21200 72nd Ave. W Edmonds, Washington Terracon Project No. 81185173 Dear Mr. Duggan: This letter serves as documentation that Terracon has reviewed the Anthology of Edmonds Structural Plans titled GMP/PERMIT SET, Revision 4 and dated January 3, 2022 that was prepared by KPFF. Additionally, Terracon had internal communication with KPFF in regards revision version titles Site Dev. Comments 2 (Rev. E). This request for geotechnical engineering review that was received on February 18, 2022 from Ankrom Moisan constitutes the first and only request for review by Terracon. Based on our review, we have suggested the following revisions: References to the geotechnical report addendums dated September 18 and December 6, 2019. (GEOTECHNICAL CRITERIA, S0.02) Only dense, native soils are valid for a 5,000 psf allowable bearing capacity and not structural fill. Lean mix concrete should be used where backfilling to restore grades is necessary below foundation elements. (GEOTECHNICAL CRITERIA, S0.02) Due to the variability and of the foundation subgrade elevations and likely method for excavating the foundations, we recommend continuous observation for the following: o Verify materials below footings are adequate to achieve the design bearing capacity o Verify excavations are extended to proper depth and have reached proper material Replace "CONTROLLED FILL MATERIALS" and "CONTROLLED FILL" with "APPROVED FILL MATERIALS" and "APPROVED FILL", respectively Add to the remarks: "ALL FILL MATERIALS MUST BE APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR TO USE" (TABLE 1 — REQUIRED GEOTECNIAL SPECIAL INSPECTIONS, S0.04) Replace: "FILL IN -PLACER DENSITY' with "PLACED APPROVED MATERIALS" Replace: "CONTROLLED FILL MATERIALS" with "APPROVED FILL MATERIALS" (TABLE 1 — REQUIRED GEOTECNIAL SPECIAL INSPECTIONS, S0.04) Terracon Consultants, Inc. 21905 64th Ave. W, Suite 100 Mountlake Terrace, WA 98043 P (425) 771 3304 F (425) 771 3549 www.terracon.com Structural Plan Review — Permit No. BLD2021-0088 Anthology of Edmonds Edmonds, Washington February 22, 2022 Terracon Project No. 81185173 Irerracon In follow up communications with KPFF and Ankrom Moisan, Terracon understands the suggested edits presented above have been incorporated into the February 22, 2022 structural plan set. Therefore, we anticipate that this will be our final request for review. With the exceptions noted above, this set of plans appears consistent with the recommendations provided in the geotechnical engineering report and associated addendum letters. We appreci ice to you on " `_ _.__:_ _� ,t .._.. _.-. - - -estions concerning ;r service, plez Sincerely, Terracon C �0 A4 Zachary L. Project Engii uui Responsive ■ Resourceful ■ Reliable 2