REV1 REAPPROVED ENG +ENG2022-0038+Site_Plan+6.13.2024_2.44.11_PM+4321395RFI 484 - backup
Existing 18" concrete
sewer force main
service the City of
Lynnwood
8" water main
•
r000
000
Existing concrete
fiber ductbank
212T'ri SIRE
Wi
I ko-21
18-
�':'
SURFACE ELEVATION =
13 - - - -
TOP OF TELECOM ELEVATION =
I
BTM OF TELECOM ELEVATION =
3 RISER
TELCOM WIDTH =
^ I ROOM 5
-
TOP OF WATER MAIN ELEVATION =
BTM OF WATER MAIN ELEVATION =
TOP OF SEWER FORCEMAIN ELEVATION =
BTM OF SEWER FORCEMAIN ELEVATION =
SURFACE ELEVATION =
TOP OF TELECOM ELEVATION =
BTM OF TELECOM ELEVATION =
TELCOM WIDTH =
ALL POTHOLE INFORMATION SHALL BE
PROVIDED IN PROJECT SURVEY
COORDINATES/DATUM.
NAVIX REQUIRES POINTS AND LOCATIONS OF
EXISTING UTILITIES (POTHOLE INFORMAITON)
IN CAD FORMAT.
TOP OF WATER MAIN ELEVATION =
BTM OF WATER MAIN ELEVATION =
TOP OF SEWER FORCEMAIN ELEVATION =
BTM OF SEWER FORCEMAIN ELEVATION =
CONTRACTOR TO LOCATE GAS MAIN
SURFACE ELEVATION =
TOP OF GAS ELEVATION =
BTM OF GAS ELEVATION =
ng 6" fire
,n,t supply
SURFACE ELEVATION =
'OP OF TELECOM ELEVATION =
STM OF TELECOM ELEVATION =
'ELCOM WIDTH =
'OP OF WATER MAIN ELEVATION =
STM OF WATER MAIN ELEVATION =
-OP OF SEWER FORCEMAIN ELEVATION =
STM OF SEWER FORCEMAIN ELEVATION = 1
SURFACE ELEVATION =
TOP OF HYDRANT LATERAL ELEVATION =
BTM OF HYDRANT LATERAL ELEVATION =
SURFACE ELEVATION =
TOP OF TELECOM ELEVATION =
BTM OF TELECOM ELEVATION =
TELCOM WIDTH =
TOP OF WATER MAIN ELEVATION =
BTM OF WATER MAIN ELEVATION =
TOP OF SEWER FORCEMAIN ELEVATION =
BTM OF SEWER FORCEMAIN ELEVATION =
CONTRACTOR TO LOCATE GAS MAIN
SURFACE ELEVATION =
TOP OF GAS ELEVATION =
BTM OF GAS ELEVATION =
RFI 484 - backup
Existing 18" concrete 8" water main
sewer force main
service the City of
Lynnwood
r0000000
Existing concrete
fiber ductbank
21 STREET SW
III
I j ! 16 Existing 6" fire
hydrant supply
I 17
--, s I I
�--------------- -- ------- -----------II
41
18" S F M
{
A
/ concrete ductbank
ems• - ;, w
4