2024-11-26 Council PacketAgenda
Edmonds City Council
REGULAR MEETING
COUNCIL CHAMBERS
250 5TH AVE NORTH, EDMONDS, WA 98020
NOVEMBER 26, 2024, 7:00 PM
REGULAR COUNCIL MEETINGS BEGINNING AT 7:00 PM ARE STREAMED LIVE ON THE COUNCIL
MEETING WEBPAGE, COMCAST CHANNEL 21, AND ZIPLY CHANNEL 39.
TO ATTEND VIRTUALLY, CLICK ON OR PASTE THE FOLLOWING ZOOM MEETING LINK INTO A WEB
BROWSER USING A COMPUTER OR SMART PHONE:
HTTPS://ZOOM.US/J/95798484261 BY PHONE: +1 253 215 8782 WEBINAR ID: 957 9848 4261
CALL TO ORDER/FLAG SALUTE
2. LAND ACKNOWLEDGEMENT
WE ACKNOWLEDGE THE ORIGINAL INHABITANTS OF THIS PLACE, THE SDOHOBSH
(SNOHOMISH) PEOPLE AND THEIR SUCCESSORS THE TULALIP TRIBES, WHO SINCE TIME
IMMEMORIAL HAVE HUNTED, FISHED, GATHERED, AND TAKEN CARE OF THESE LANDS. WE
RESPECT THEIR SOVEREIGNTY, THEIR RIGHT TO SELF-DETERMINATION, AND WE HONOR THEIR
SACRED SPIRITUAL CONNECTION WITH THE LAND AND WATER.
3. ROLL CALL
4. PRESENTATIONS
1. Proclamation for Small Business Saturday (5 min)
2. Sister City Commission 2024 Report to Council (15 min)
3. Mayor's Finance Update (10 min)
S. APPROVAL OF THE AGENDA
6. AUDIENCE COMMENTS
THIS IS AN OPPORTUNITY TO COMMENT REGARDING ANY MATTER NOT LISTED ON THE
AGENDA AS CLOSED RECORD REVIEW OR AS A PUBLIC HEARING. SPEAKERS ARE LIMITED TO
THREE MINUTES. PLEASE STATE CLEARLY YOUR NAME AND CITY OF RESIDENCE. IF USING A
COMPUTER OR SMART PHONE, RAISE A VIRTUAL HAND TO BE RECOGNIZED. IF USING A DIAL -
UP PHONE, PRESS *9 TO RAISE A HAND. WHEN PROMPTED, PRESS *6 TO UNMUTE.
7. RECEIVED FOR FILING
1. Claim for Damages for filing (0 min)
Edmonds City Council Agenda
November 26, 2024
Page 1
2. Written Public Comments (0 min)
3. Lodging Tax Comments Received as of November 23, 2024 (0 min)
8. APPROVAL OF THE CONSENT AGENDA
1. Approval of Council Special Meeting Minutes November 2, 2024
2. Approval of Council Special Meeting Minutes November 4, 2024
3. Approval of Council Special Meeting Minutes November 4, 2024
4. Approval of claim checks and wire payments.
5. Approval of payroll and benefit checks, direct deposit and wire payments.
6. Social Worker Position
7. Confirmation of Diversity, Equity, Inclusion & Accessibility (DEIA) Commission Appointees Elaine
DuCharme & Joseph Tai Ademofe
8. Approval of an Interlocal Agreement with Snohomish County and Mountlake Terrace, to renew
an on -going water quality monitoring program for Lake Ballinger
9. Approve Subaward Safety Action Plan Agreement between Puget Sound Regional Council and
City of Edmonds
10. Approval of Professional Services Agreement Amendment for Phase 12 (2025) & 13 (2026)
Sewer Replacement
11. Permitting Program Manager Job Description
12. Code Amendment ECC 2.10.010
13. Confirm appointment of board/commission candidate
9. COUNCIL BUSINESS
1. Int'I District Banner Update (5 min)
2. Council 2025-26 Budget Deliberations, including possible voting on budget amendments
proposed by Councilmembers during meeting (120 min)
3. 2025-2030 Capital Facilities Plan (CFP) and Capital Improvement Program (CIP) (15 min)
10. COUNCIL COMMENTS
11. MAYOR'S COMMENTS
ADJOURNMENT 10:00 PM
Edmonds City Council Agenda
November 26, 2024
Page 2
4.1
City Council Agenda Item
Meeting Date: 11/26/2024
Proclamation for Small Business Saturday
Staff Lead: Carolyn LaFave
Department: Mayor's Office
Preparer: Carolyn LaFave
Background/History
Observed on the first Saturday after Thanksgiving, Small Business Saturday encourages holiday shoppers
to patronize brick and mortar businesses that are small and local.
Staff Recommendation
Information only
Narrative
This year Small Business Saturday falls on November 30. Since its inception, Small Business Saturday has
become the biggest sales day of the year for many small companies. Shopping small helps to promote a
more vibrant community. Every time you pick up a cup of coffee from your neighborhood cafe, or buy a
gift from a local artist, you're shopping small and making a difference.
Attachments:
Small Business Saturday 2024
Packet Pg. 3
4.1.a
PrIorriamat,1101"
City of Edmonds •Office of the Mayor
SHOP
SMALL SMALL BUSINESS SATURDAY 2024
Whereas, the city of Edmonds, Washington, celebrates our local small businesses and the contributions
they make to our local economy and community; and
Whereas, according to the United States Small Business Administration, there are 34.7 million small
businesses in the United States, small businesses represent 99.7% of firms with paid employees,
are responsible for 61.1% of net new jobs created since 1995, and employ 45.9% of the
employees in the private sector in the United States, and
Whereas, 68 cents of every dollar spent at a small business in the U.S. stays in the local community and
every dollar spent at small businesses creates an additional 48 cents in local business activity as a
result of employees and local businesses purchasing local goods and services; and
Whereas, 59% of U.S. consumers aware of Small Business Saturday shopped or ate at a small,
independently owned retailer or restaurant on Small Business Saturday 2023; and
Whereas, Edmonds, Washington supports our local businesses that create jobs, boost our local economy,
and preserve our communities; and
Whereas, advocacy groups, as well as public and private organizations, across the country have endorsed
the Saturday after Thanksgiving as Small Business Saturday.
Now, Therefore, I, Mike Rosen, Mayor of Edmonds, Washington do hereby proclaim, November 30, 2024, as
SMALL BUSINESS SA TURDA Y
And urge the residents of our community, and communities across the country, to support small businesses
and merchants on Small Business Saturday — celebrating its 15th year in 2024 — and Shop Small throughout
the year.
Mike Rosen, Mayor — November 26, 2024
Packet Pg. 4
4.2
City Council Agenda Item
Meeting Date: 11/26/2024
Sister City Commission 2024 Report to Council
Staff Lead: Carolyn LaFave
Department: Mayor's Office
Preparer: Carolyn LaFave
Background/History
The Edmonds Sister City Commission was established in 1988. In 2023 they celebrated the 35th
anniversary of their sister city relationship with Hekinan, Japan. The commission hosts annual student
student exchanges, with the exception of hosting an adult exchange every five years.
Staff Recommendation
Informational only
Narrative
Sister City Commissioner Karyn Heinekin will provide an overview of 2024 accomplishments, along with
a recap of the 2024 student exchange.
Attachments:
Council Report 2024
Packet Pg. 5
4.2.a
CITY OF EDMONDS MIKE ROSEN
MAYOR
OFFICE OF THE MAYOR / SISTER CITY COMMISSION
`11c. 10y
Edmonds Sister City Commission 2024 Report to Council
rnmmiccinnarc
Michele Fellows
Karyn Heinekin (Secretary)
Samantha Hopper
Anne Nadreau
Yuri Nishiyama
lyoko Okano
Karen Reid
Katy Renz (Chair)
Kiwa Tashiro
Colin Torretta
Mission
It is the mission of the Edmonds Sister City Commission to promote international communication and
understanding through exchanges of people, ideas, and culture.
2024 Highlights
2024 student exchange — summer 2024:
o Recruitment of students via media release, posting w/Edmonds school district, posting
on city website and Sister City Facebook page
o Conducted student interviews and five orientation meetings
o Planned and executed a ten-day itinerary for the Hekinan visit
Recruitment of two new commissioners in 2024
o Kiwa Tashiro in March
o Karen Reid in April
o There are currently 10 commissioners
Community Outreach @ the Museum Market
0 7/13/2024 focused on Commissioner recruitment; there was a high-level of interest, and
several commission applications were passed out
0 9/21/2024 focused on Commission familiarization; another day of high-level interest,
many brochures passed out, two previous student delegates stopped by and shared
what a positive impact the program had on their lives
Z Created a policy for recruitment and selection for the adult exchange program, which is included
in your agenda packet along with your directive
An opportunity was provided through Sister Cities International for students between the age of
19-27 to work at the USA Pavilion at the 2025 Osaka World Expo. We learned of this opportunity
Packet Pg. 6
4.2.a
through our relationship with the Consulate -General of Japan in Seattle and passed it along to
our list of past student exchange delegates. We are aware of one past student delegate who has
applied
2025 Gnals
:) Due to current budget constraints, the decision was made to cancel the 2025 student exchange
and concentrate on fundraising in 2025
In place of an in -person exchange we will plan a virtual meet -up, like the ones we did during
COVID
Further explore the Commission becoming a non-profit organization
To bring attention to the Commission and our work locally and regionally, we plan to arrange
speaking engagements, and participate in local markets, fairs, and cultural events
Presentation of 2024 Student Exchange with Hekinan, Japan
Packet Pg. 7
4.2.a
CITY OF EDMONDS MIKE ROSEN
MAYOR
OFFICE OF THE MAYOR / SISTER CITY COMMISSION
Inc. 10y
The Edmonds Sister City Commission was established by the Edmonds City Council and codified in ECC
10.60. The mission of the Edmonds Sister City Commission is to promote international communication
and understanding through exchanges of people, ideas, and culture. Edmonds and the city of Hekinan,
Japan established a relationship on April 5, 1988. The Sister City Commission hosts two exchange
programs: an annual reciprocal student exchange; and an adult anniversary exchange which happens
every five years. The Edmonds adult delegation visits Hekinan in early April with six months of planning
Application Policy for the Edmonds Sister City Commission adult exchange to Hekinan, Japan
Eligible delegates will be:
• Residents of City of Edmonds
• Over 18
• Comfortable and capable of representing our city, state, and country
Familiarity with Japanese language or culture is not a requirement.
Priority for appointments to the delegation will be:
• The Mayor and a guest of their choosing will lead the delegation and will not be required to
apply.
• Sister City Commissioners who have served at least one year will be offered a spot on the
delegation and will not be required to apply.
• City of Edmonds officials and staff will be invited to apply with the general public but will be
given priority in the selection process.
The Sister City Commission and the Hekinan Sister City Association will come to an agreement on the
feasibility and timing of an adult anniversary exchange by the fourth Monday in October of the year
prior to the exchange.
The Mayor and Commissioners will be informed of the dates and have until November 30 to reserve
spots.
In December, the opportunity to apply will be promoted through:
• The Edmonds Sister City Commission web page
• The Edmonds Sister City Commission Facebook page
• Alerts to local media: MyEdmondsNews, The Herald, The Edmonds Beacon
The deadline to apply will be the second Monday in January. All applicants will be invited to attend the
Sister City Commission meeting on the fourth Monday in January. At this meeting the Commissioners
Packet Pg. 8
4.2.a
will review the itinerary, costs, and expectations related to the trip with all applicants. Small group
interviews will be held before the Commission makes the final selections.
The approval of applicants for the delegation will be at the discretion of the Commission. 12 delegates
will be selected based on suitability, and the goal of sending a delegation representative of the Edmonds
community. The Commission reserves an option to increase the delegation to 15. There is no minimum
number of delegates.
Packet Pg. 9
4.2.a
8.9
City Council Agenda Item
Meeting Datt. 09/19/2023
Adult Exchange Application Process referred to Sister City Commission
Staff lead City Council
Department. City Council
Preparers Beckie Peterson
Background/History
The Sister City Commission is established by the City Council and codified in ECC 10.60 It is the mission
of the Edmonds Sister City Commission to promote international communication and understanding
through exchanges of people, ideas, and culture. Edmonds and the city of Hekman, Japan established a
relationship on April 5, 1988. The two cities celebrated their 35th anniversary this year
The Edmonds Sister City Commission hosts three exchange programs, two are reciprocal student
exchanges (students from Japan visit Edmonds, Edmonds students visit Japan) and an adult anniversary
exchange, every 5 years. The application process for the student exchange appears on the city website.
The next adult anniversary exchange trip is anticipated to be in 2028.
Council refers to the Sister City Commission the request to establish a process for the adult anniversary
exchange that will ensure ample public notification and a fair and equitable application process for
Edmonds residents.
This item was reviewed by the PSPHSP on September 12, and the committee agrees this work should be
referred to the commission Video for this committee discussion is available on the city website, if
finalized before the packet deadline, the PSPHHP minutes may be included in this agenda packet consent
agenda.
Recommendation
Approve the motion to refer the Adult Exchange Application Process to the Sister City Commission.
Narrative
In approving this consent agenda item, the Council is asking the Sister City Commission to propose policy
to Council for the 5-year adult anniversary exchange trip by the end of 2024 with the following
elements
1) Include public notice, application and interview process that is similar to notice required for
Boards and Commission vacancies (see ECC Chapter 10)
Since the contingency members act as ambassadors of our community, should references or other
background inquiry be part of the p(ocess?
2) Establish a definition of what constitutes "an adult" for the purpose of the adult trip
Packet Pg. 243
Packet Pg. 10
4.2.a
3) Establish contingency size to support a positwe experience for the contingency and our
counterparts in Hekinan (max total number of people and/or ratio of bilingual Japanese/English
speakers to non Japanese speakers)
4) Is there a desirable mix of the contingency such that a representation of residents from different
neighborhoods/geography of Edmonds, and categories (like Mayor, counulmembers, city staff, Srster
City commissioners, host families, etc) are represented / included?
Packet Pg. 244
Packet Pg. 11
4.3
City Council Agenda Item
Meeting Date: 11/26/2024
Mayor's Finance Update
Staff Lead: Carolyn LaFave
Department: Mayor's Office
Preparer: Carolyn LaFave
Background/History
On July 2, 2024 the council voted to have a Mayor Update as an ongoing item all regular meeting
agendas. This was in response to a recommendation from the Mayor's Blue Ribbon Panel.
Staff Recommendation
No action, informational
Narrative
The Mayor, or another member of the administration, will answer questions about City finances that
have been requested by council in advance and will also share actions related to the fiscal emergency
that have transpired since the last update.
When there is nothing new to report, this agenda item will be the opportunity to share that there is
nothing new to report.
Packet Pg. 12
7.1
City Council Agenda Item
Meeting Date: 11/26/2024
Claim for Damages for filing
Staff Lead: NA
Department: Administrative Services
Preparer: Marissa Cain
Background/History
N/A
Staff Recommendation
Acknowledge receipt of Claims for Damages for filing.
Narrative
Sae Park
21200 72nd Ave W
($549.56)
Attachments:
Claim for Damages - Park, Sae - for council
Packet Pg. 13
CITY OF EDMONDS
CLAIM FOR DAMAGES FORM
RECEIVE
NOV 14 2024
EDMONN CITY CIAc
Date Claim Form
Received by City
Please take note that �� �7Uvk who currently resides at _
mailing address _
home phone f. worts phone # and who resided at SA111Q QS A bow
at the time of the occurrence and whose date of birth is , is claiming damages
against in the sum of $ �� / arising out of the following circumstances listed below.
DATE OF OCCURRENCE: I I bm ^�11 11 �h j I �TIME: �j 3 :� () t% P rn
LOCATION OF OCCURRENCE: arwo �1<nC Hv4 Y'J , bA nos k I "1(�� � " so-'1I✓
DESCRIPTION:
1. Describq the conduct and circumstance that brought about the injury or damage? Also descri" the injury car damage.
0A
3.
4.
Provide a list of witnesses, if applicable, to the occurrence including names, addresses, and phone numbers.
Attach copies of all documentation relating to expenses, injuries, losses, and/or estimates for repair.
Have you submitted a claim for damages to your insurance company? Yes _
If so, please provide the name of the insurance company:
and the policy #:
INo
to
m
E
0
0
E
U
Fo= aev cd (W09,202] Page t of 2
Packet Pg. 14
7.1.a
This Claim form must be signed by the Claimant, a person holding a written power of attomey from the Claimant, by the
attomey in fact for the Claimant, by an attorney admitted to practice in Washington State on the Claimants behalf, or by a
court -approved guardian or guardian ad litem on behalf of the Claimant.
I declare under penalty of perjury under the laws of the state of Washington that the foregoing is true and correct.
�-
Si nature of Claimant Date and place (residential address, city and county)
Or
Signature of Representative Date and place (residential address, city and county)
Print Name of Representative Bar Number (if applicable)
Please present the completed claim form to
City Clerk's Office
City of Edmonds
121 5", Avenue North
Edmonds, WA, 98020
8:00 a.m. to 4:30 p.m.
y
d
a�
E
0
L
0
E
U
Form Rc,iwd 04/09/2021
Page 2 of
Packet Pg. 15
7.2
City Council Agenda Item
Meeting Date: 11/26/2024
Written Public Comments
Staff Lead: City Council
Department: City Council
Preparer: Beckie Peterson
Background/History
N/A
Staff Recommendation
Acknowledge receipt of written public comments.
Narrative
Public comments submitted to the web form for public comments
<https://www.edmondswa.gov/publiccomment>
between November 7, 2024 and November 20, 2024.
Attachments:
Public Comment November 26, 2024
Packet Pg. 16
7.2.a
Edmonds City Council Public Comments — November 26, 2024
Online Form 2024-11-10 10:15 AM (MST) was submitted by Guest on 11/10/2024 12:15:33 PM (GMT-
07:00) US/Arizona
FirstName N
LastName F
CityOfResidence Edmonds
AgendaTopic FAC Gymnastics Program
Comments To whom it may concern, Our family has been a part of the FAC Edmonds
Gymnastics program for two years now. Our child has no interest in any other sports or activities
apart from gymnastics. We are so happy and glad that she has found something that she enjoys
regularly and that it is in our hometown. Instructor Savannah is wonderful with all of the children
and we can't imagine not having the program be non-existent. We urge you to reconsider slashing
this amazing program due to budget restrictions. There is enough of that going around in our
education system where the ones who suffer most are our children. Thankyou for listening. Kindly,
Concerned parents of future gymnast
Online Form 2024-11-12 07:58 AM(MST) was submitted by Guest on 11/12/2024 9:58:14 AM (GMT-
07:00) US/Arizona
FirstName Mitch
LastName Stern
CityOfResidence edmonds
AgendaTopic Yost Pool
Comments Dear Edmonds City Council, I have recently been informed that possible closure of
Yost Pool and discontinuation of critical staff positions that support pool operations has been
mentioned in city of Edmonds budget negotiations. This is not a good idea and should be
immediately rejected as a potential consideration in the City of Edmonds ongoing budgetary
discussions. Yost Pool has been in operation for 52 years and is a vital part of the core fabric that
the Edmonds community relies upon. Nearly 100 years ago the Yost family donated the 40 acre
property, now known as Yost Park and Pool, to strengthen the portfolio of common City properties
for the benefit of the residents of Edmonds. Yost Pool is a true "gem" and should be held in the
highest priority of support in good times and in times of financial challenge. Respectfully
submitted, Dr. Mitchell A. Stern
Packet Pg. 17
7.2.a
Edmonds City Council Public Comments — November 26, 2024
Online Form 2024-11-13 11:30 PM (MST) was submitted by Guest on 11 /14/2024 1:30:30 AM (GMT-
07:00) US/Arizona
FirstName Nora
LastName L
CityOfResidence Edmonds
AgendaTopic Gymnastics
Comments I urge you to please not remove the gymnastics program. It does not make sense to
take away a program that brings in money to the city! Raise the prices if needed but please don't
take away the program.
Online Form 2024-11-18 09:15 AM(MST) was submitted by Guest on 11/18/2024 11:15:24 AM (GMT-
07:00) US/Arizona
FirstName Jonathan
LastName Milkey
CityOfResidence Edmonds
AgendaTopic RFA
Comments Good morning, We do not support fire/ems service costs at the assessed property
values. Please negotiate actual costs and be prepared to walk away if they will not negotiate in good
faith. Add additional Edmonds taxes/levies to get out of debt, the RFA, likely increase in County
taxes, school levies and likely assessment on highest and best property use after re -zoning will
result in extremely high taxes and displacing residents. Thank you!
Online Form 2024-11-18 11:11 AM(MST) was submitted by Guest on 11/18/2024 1:11:24 PM (GMT-
07:00) US/Arizona
FirstName Sarah
LastName Lemmon
CityOfResidence Edmonds
AgendaTopic Budget cuts affecting Tabatha Shoemake
Comments Hello Edmonds City Council, I am an Edmonds resident, a mother of two and a PSO
chair at Westgate Elementary School. I just heard about the possible elimination of Tabatha
Shoemake's position. I am contacting you today because I want to urge you to reconsider
eliminating this position. Tabatha is an integral part of the Edmonds community and it would be a
huge loss if her position is eliminated. I have had several interactions with Tabatha and wanted to
Packet Pg. 18
7.2.a
Edmonds City Council Public Comments — November 26, 2024
share the areas that she brings so much support to our community: -Tabatha does an amazing job
with the social media for Edmonds Police Department. Through those social sites she
communicates safety information, general awareness and communicates major wins in the police
department, showcasing teams within the police department in a way that is both transparent and
effective. I have seen multiple cases of worried parents on social media direct others to her posts to
help relieve worries about crime thanks to the wonderful work of the police department. I
contacted Tabatha last year to see if Edmonds had a gun buy back program. She told me there
wasn't one in place and reached out to other law enforcement bureaus to research and create one
for Edmonds. This took place last July and collected 75 unwanted guns from Edmonds residents. It
was so successful that they had to close it early because they ran out of gift cards for the gun
r
exchange! Last year I asked Tabatha if she could attend the Westgate Elementary Science Night.
And she managed a booth on behalf of the Edmonds Police Department, which reached more than
E
E
600 people, including more than 300 children. This was a night event and she did it with grace and a
C
U
whole lot of energy to meet our kids where they needed it. Our school is a wonderfully diverse
2
population and having a female woman of color who is in law enforcement was so impactful for
these children who saw a leader that looked like them. She is regularly at community events
=
handing out temporary tattoos and talking to the kids about the Police Department. Tabatha is
w
invested in this community now and laying positive groundwork for the future. I would be happy to
chat more, I'd start a GoFundMe to help save her position if it would help! Please reconsider the
elimination of this position, we need her! Thanks, Sarah Lemmon
o
Online Form 2024-11-18 03:35 PM(MST) was submitted by Guest on 11 /18/2024 5:35:47 PM (GMT-
07:00) US/Arizona
FirstName Ann
LastName Michel
CityOfResidence Shoreline
AgendaTopic Dangerous motocycle stunts during rally
Comments To City Council, Although we live in Shoreline, we come to Edmonds frequently. This
past July or August there was a motorcycle rally that drove down Edmonds Way, to the ferry, where
they were assisted by Edmonds Police to board the ferry. There seemed to be hundreds of bikers.
My husband and I were driving from Shoreline to the ferry terminal that day. We were completely
surrounded by the bikers, who would cut off our car, stand on the seats of their bikes, ride in the
same lane next to our small car, cross the median and even drive against traffic. We drove slower
and slower, and very carefully stayed in the center of our lane. We noticed other cars were doing the
same. We reported all this illegal and very unsafe driving to the Edmonds police at the ferry
terminal. We were told by more than one officer that their only job was to make sure the bikers got
on the ferry. We were told to contact Edmonds City Hall. I believe the rally was called the Pelican
Run. Please do not allow these very dangerous bikers to use Edmonds streets or the ferry in the
future. If they are allowed to return you need an officer every block or so along Edmonds Way, to
keep the bikers driving legally and safely. Thank you, Ann Michel
Packet Pg. 19
7.2.a
Edmonds City Council Public Comments — November 26, 2024
Online Form 2024-11-18 05:38 PM (MST) was submitted by Guest on 11 /18/2024 7:38:17 PM (GMT-
07:00) US/Arizona
FirstName Mary Jane
LastName Goss
CityOfResidence Edmonds
AgendaTopic RFA
Comments Mayor Rosen and City Councilmembers - I want reasonably priced Fire/Ems service
- either with Edmonds' own fire department, a contract with another city, or a contract with a
different fire district. Please take the next 13 months to evaluate and implement a service strategy
where we have more control over costs and levels of service. It seems that there needs to be some
more homework done, to understand how the number of new apartments in Edmonds up and down
the Aurora corridor bear in some of the cost of fire protection. New growth should be paying their
fair share for this service. I have no complaints with the first responders themselves. I do believe
the City needs to call out RFA management asking them to demonstrate that they if they had
managed Fire/Ems operations efficiently why the need for such an increase. If Edmonds still owns
its fire stations and has rights to buy back our fire engines from the RFA, there appear to beoptions
on who provides our service. Several service providers have been identified to the Mayor and City
Council. We believe those alternative providers will be able to provide equivalent Fire/Ems services
and control future cost increases better than the RFA.
Online Form 2024-11-20 11:14 AM(MST) was submitted by Guest on 11/20/2024 1:14:15 PM (GMT-
07:00) US/Arizona
FirstName Trina
LastName Loehndorf
CityOfResidence Edmonds
AgendaTopic Budget cuts
Comments I have been following this in My Edmonds News and do not envy you and the council
in the attempts to balance this budget. This is a monumental task for all of you. I do have a
comment on eliminating Tabitha Shoemake's position. When she was at Westgate Elementary for
their Science Night, I watched her as she talked with so many students and their parents spreading
goodwill as she did so. It was an evening event and probably out of her normal work schedule
hours. She was a hit with the crowd. Her involvement in getting the gun buyback program started
last year is huge feather in her cap and helped our residents realize that our city is trying to
eliminate guns and gun violence. That program was so successful as I recall they ran out of gift
cards and turned people away. Also, to me it is important for the students to see a woman as well
Packet Pg. 20
7.2.a
Edmonds City Council Public Comments — November 26, 2024
as a woman of color take such a leading role in our community. It would be a shame to lose her
since she has such a positive vibe in spread goodwill in the city. Thanks for reading this and to
consider my support for her.
Online Form 2024-11-20 07:39 PM(MST) was submitted by Guest on 11/20/2024 9:39:48 PM (GMT-
07:00) US/Arizona
Name Value
FirstName marjorie
LastName Fields
CityOfResidence Edmonds
AgendaTopic property tax increase
Comments We need this property tax increase to maintain our quality of life in Snohomish
County. The additional amount paid per household will not significantly affect their budgets, but the
cumulative effect of NOT paying will mean loss of significant services. Please do the responsible
thing and say yes to this needed tax.
Online Form 2024-11-21 09:49 AM(MST) was submitted by Guest on 11 /21/2024 11:49:39 AM (GMT-
07:00) US/Arizona
FirstName JAY
LastName MALONEY
CityOfResidence Edmonds
AgendaTopic December 3 Council meeting NO to RFA and/or NO TAX Levies.
Comments Please work to find cost cutting solution and share those with the community before
any new taxes or RFA annexation are considered. We should understand what impact cost cutting
will have on the community before any new taxes are considered. Thank you.
Packet Pg. 21
7.3
City Council Agenda Item
Meeting Date: 11/26/2024
Lodging Tax Comments Received as of November 23, 2024
Staff Lead: Todd Tatum
Department: Community Services
Preparer: Megan Luttrell
Background/History
As briefed during the Lodging Tax agenda item on November 12th, the Lodging Tax Advisory Committee
(LTAC) has a 45 day period to comment on any changes to their approved lodging tax budget. That
comment period ended on November 23rd. The Department received two comments from LTAC
members. They are included here for your awareness.
Staff Recommendation
Received for filing. This is for informational purposes only.
Narrative
Both comments indicate that they wish to preserve ending fund balance and wish to use additional
funds only in 2025. This is in keeping with the budget amendment - Staff Recommendation #9 - which
Council has already passed.
Attachments:
LTAC Comments to Council
Packet Pg. 22
7.3.a
Dear City Councilmembers:
As a member of the Lodging Tax Advisory Committee (LTAC) representing users of the
revenue, I am commenting on the proposed changes in the 120 Fund budget for
2025/2026. The Lodging Tax Advisory Committee (LTAC) funds play a vital role in providing
critical support not only for the City of Edmonds' tourism marketing, but for other Edmonds
organizations such as Edmonds Center for the Arts (ECA), which serves as a cornerstone of
our local culture and a catalyst for economic growth.
Nearly 70% of ECA's audiences arrive from outside of Edmonds. The marketing done
through ECA with LTAC funds supports and benefits Edmonds tourism activities and by
attracting visitors to Edmonds for performances, educational programs, and community
events, ECA drives tourism and generates significant revenue for local businesses,
including restaurants, the hotel, Airbnbs, and retailers, which meets the purpose of the
lodging tax funds. Redirecting LTAC funds into the General Fund beyond 2025 risks long-
term ramifications for the stability of the fund, which could lead to diminished marketing,
ultimately reducing the vibrancy and appeal of Edmonds as a tourism destination.
I respectfully urge the council to consider protecting future LTAC funding for initiatives that
directly contribute to the vitality and prosperity of our community and only supplement
the tourism marketing funds from the General Fund with LTAC funds in 2025.
Lori Meagher, MSA, SHRM-CP, Coach2 (she/her)
Associate Executive Director
Edmonds Centerfor the Arts / Edmonds Public Facilities District
Packet Pg. 23
7.3.a
Councilmembers,
Asa member of the Lodging Tax Advisory Committee (LTAC) representing users of the
revenue (arts organization Tourism Promotion Awards), I am commenting on the proposed
changes in the 120 Fund budget for 2025/2026.
The City role in promotion of our community through tourism marketing is crucial to the
health of our retail and cultural organizations. With this in mind I support the proposed use
of $49k ending cash in the 120 Fund to replace $49k from the General Fund for tourism
marketing through the Economic Development Division. The marketing done through the
Economic Development Division supports tourism activities and attractions, encouraging
both day and overnight visitors, and therefore meets the purpose of the lodging tax funds.
However, it is important to maintain the long-term stability of the fund with a level of
ending cash which has historically made it possible for the LTAC to both weather
downturns in the lodging industry and to support important tourist related projects such as
the downtown public restrooms which would not otherwise have been feasible. At this
time I do not support supplanting the tourism marketing funds from the General Fund in
2026 with LTAC funds, only for 2025.
Frances Chapin, City of Edmonds I Edmonds Arts Commission
Packet Pg. 24
8.1
City Council Agenda Item
Meeting Date: 11/26/2024
Approval of Council Special Meeting Minutes November 2, 2024
Staff Lead: Council
Department: City Clerk's Office
Preparer: Scott Passey
Background/History
N/A
Recommendation
Approval of Council Meeting minutes as part of the Consent Agenda.
Narrative
Council meeting minutes are attached.
Attachments:
2024-11-02 Council Special Minutes
Packet Pg. 25
8.1.a
EDMONDS CITY COUNCIL
ELECTED OFFICIALS PRESENT
Mike Rosen, Mayor
Vivian Olson, Council President
Chris Eck, Councilmember
Will Chen, Councilmember
Neil Tibbott, Councilmember
Michelle Dotsch, Councilmember
Susan Paine, Councilmember
Jenna Nand, Councilmember
1. CALL TO ORDER
SPECIAL MEETING
DRAFT MINUTES
November 2, 2024
STAFF PRESENT
Kim Dunscombe, Acting Finance Director
Beckie Peterson, Council Executive Assistant
Jeff Taraday, City Attorney
Scott Passey, City Clerk
The Edmonds City Council meeting was called to order at 9 am by Mayor Rosen in the Brackett Room,
121 5'a' Avenue North, Edmonds, and virtually.
2. ROLL CALL
City Clerk Scott Passey called the roll. All elected officials were present.
3. APPROVAL OF AGENDA
COUNCILMEMBER PAINE MOVED, SECONDED BY COUNCIL PRESIDENT OLSON, TO
APPROVE THE AGENDA IN CONTENT AND ORDER. MOTION CARRIED UNANIMOUSLY.
4. COUNCIL BUSINESS
2025-2026 REVENUE WORKSHOP OVERVIEW
Mayor Rosen reviewed the agenda, reminding no votes will be taken today, only consensus and if council
wants to take action, that could be done at Monday's council meeting. Before presenting the revenue ideas,
he wanted to present a series of seven what -if scenarios to give council a sense of how reliant the budget is
on certain decisions the council will make as well as decisions the community will make and potential gaps
to be filled. The intent of providing the seven what -if scenarios to council is background for the revenue
discussion. He recognized during the discussion it will be tempting to talk about other things so those will
be recorded in the "parking lot" for discussion during the budget workshop later on the agenda or at another
time. He advised there are current 53 revenue ideas on the list, up from 28 in the budget presentation.
Mayor Rosen continued, there aren't estimates for each revenue source; staff was faced with delaying the
discussion due to the significant effort to make estimates and assumptions. There may be things that are not
within the City's purview or ideas that are immediately off the table and preferences for items that rise to
Edmonds City Council Draft Minutes
November 2, 2024
Page 1
Packet Pg. 26
8.1.a
the top. Instead of giving equal value to all 53 ideas, there is value in reviewing the list. As the council
reviews the list of revenue ideas, he will answer questions, ask councilmembers for other revenues ideas,
eliminate ideas that are illegal or not within the City's authority, and then the council can prioritize the
ideas. The last hour of today's meeting, the budget workshop, is intended to be much less structured. The
council has received a great deal of information including the community survey, the scoring exercise,
council priorities, draft budget, presentations from each department, and approximately 70 queries from
councilmembers. The council has not had an opportunity to talk as a group, so the intent was to spend time
today with less structure.
Councilmember Paine asked if when the council discusses the options if there would be some estimates
regarding the timeline to implement any of the revenue ideas. Mayor Rosen anticipated that would be the
first action step. Councilmember Paine clarified she was interested in prioritizing the ideas and
implementation strategies. Mayor Rosen assured there would be a prioritization exercise as well as
identifying whose purview it falls under. For example, if it is something the City can do, action can be taken
immediately. If an idea takes council action, that needs to be incorporated into the process. If voter action
is required, obviously that would be a longer timeline. For revenue items that are prioritized, estimates can
be prepared. Some of the revenue ideas are short term and some are long term.
Acting Finance Director Kim Dunscombe reviewed:
YES TO RFA
2026
A
NO TO RFA
CONTRACT
DON'T KEEP
KEEPTHE
THE
DON'T KEEP
KEEPTHE
$6.500.000
KEEP THE
$6,500.000
THE
36,500.000
AND NO TO
$6.500.000
and NO TO
$6.500,000
AND NO TO
THE LEVY AND
and YES TO
THE LEVY LID
AND YES TO
LEVY LID LIFT
YES TO LEVY
NO TO LEVY
LOAN
LEVY LID LIFT
LIFT
LEVY LID LIFT
AND NO LOAN
LID LIFT
LID LIFT
BEGINNING FUND BALANCE
$757,457
$556,022
$556,022
$556.022
5556,022
$556,022
$556.022
$556.022
REVENUES
Other General Fund Revenue
$36.123,690
536,009.494
$36,009,494
$36,009,494
536.009.494
$36,009,494
$36,009,494
536.009.494
Regular Prop Tax Levy
$11,532.000
55,176.000
$5,176,000
$5,176,000
55.176.000
$5,176,000
$5,176,000
55.176.000
S6.5M of Reg Prop to Fire
56.500.000
$6,500.000
So
$0
$6.500,000
$6,500,000
56.500.000
EMS Prop Tax Levy
$4 404.000
SO
$0
So
$0
$0
54,450.000
$4 450.000
Transport Fees
$1.200.000
$O
$0
SO
$O
$0
$1,200.000
51.200.000
Internal Loan
$7.500,000
55,000.000
$0
$5.000,000
$0
$0
SO
$0
Levy Utl Lind RFA
$0
$10,879.500
$o
510.879,500
Levy Lid Lin if Contract
$241J19,664
$0
Adolf Levy Lid Lift if no to S6 million
So
56.500.000
$0
EXPENDITURES
Regional Fire contract
-$12.100,000
$0
$0
SO
$O
$0
-$19,000.000
519.000.000
Loan Repayment
$972,ODO
-51,620.471
$7.500,000
$1,620,471
57.500.000
.$1,620,471
-$7,500.000
S1.620.471
Budget Expenditures
$47,889,125
550,955,158
$50,955,158
$50,955,158
550.955.158
$50,955.158
$50,955.158
550,955.158
ENDING FUND BALANCE
$666.022
5665,887
$665AN
-0.11041118
5665.858
-$4,334,113
$556.022
-$17,684.113
Ms. Dunscombe explained the beginning fund balance for 2025 in the proposed budget is just over
$700,000. The spreadsheets breaks revenues into bigger pieces that have implications in 2026. In 2025, the
regular property tax levy is $11.5M, EMS is $4.4M, transport fees are $1.2M and there is an interfund loan
of $7.5M. The amount of $7.5M is up to council but there aren't many assumptions related to the regular
property tax, EMS tax and transport fees under the RFA contract. Expenditures include the regional fire
contract of $12.M, estimated loan repayment of $972,000; a commitment to repaying the loan, but other
decisions can be made regarding that. For the sake of the proposed budget, she wanted to include an amount
that showed the City would be paying back the loan from the utility funds. The remainder of the
expenditures shown in the spreadsheet are $47.8M which results in an ending fund balance just over
Edmonds City Council Draft Minutes
November 2, 2024
Page 2
Packet Pg. 27
U)
C%
G
lC
d
Q
to
C
O
U
N
O
4
N
O
N
d
E
t
�a
Q
8.1.a
$500,000 at the end of 2025. Clearly there are still some decisions that can be made in 2025, but many of
those are minute and not necessarily big -swing scenarios like there are in 2026.
Ms. Dunscombe explained 2026 is where the big scenarios play out Yes and No to RFA. She started with
Yes to RFA because that is what was included in the proposed budget. She reviewed scenarios under Yes
to the RFA, 1) Keep the $6.5M and no to the levy and the loan, 2) keep the $6.5M and yest to levy lid lift,
3) don't keep the $6.5M and no the levy lid lift, 4) don't keep the $6.5M and yes to levy lid lift, and 5) keep
the $6.5M and no to levy lid lift and no to loan. She acknowledged there may be other options but these
were determined to be the most important to describe. She reviewed the beginning fund balance at the end
of 2025 for each of the scenarios, how revenues affected each and the 2025 ending fund balance. She
pointed out these scenarios assume Yes to RFA so EMS property tax and transport fees are zero and the
expenditure for the Regional Fire Contract is also zero. She included a loan repayment in 2026 in each
scenario as the State Auditor's Office expects interfund loans to be paid back within three years.
Ms. Dunscombe explained the council passed a resolution stating its intent keep the $6.5M in 2026. She
explained in the second scenario, keep the $6.5M and yes to levy lid lift, includes paying off the $7.5M
loan. To the question regarding interest, Ms. Dunscombe said she included 5.4%, the LGIP interest in
August when the proposed budget was developed. It is assumed rates will decrease in the future so that is
a worst case scenario.
Ms. Dunscombe explained in the second scenario, the budgeted expenditures stay the same as does the
ending fund balance. She reviewed scenario 3, don't keep the $6.5M and no the levy lid lift, which doesn't
work because the ending fund balance is-$5,834,113. She reviewed scenario 4 which includes a
$10,879,500 levy lid lift plus an additional levy lid lift if the $6.5M is not retained, noting having two levy
lid lifts would be challenging to explain to the public. Scenario 4 also assumes paying back the $7.5M
interfund loan, keeping proposed expenditures the same and the same ending fund balance. Scenario 5,
keep the $6.5M and no to levy lid lift and no to loan, includes a loan payment, and results in an ending fund
balance of-$4,334,113
Ms. Dunscombe reviewed scenarios under No to RFA — Contract, 6) yes to levy lid lift, and 7) no to levy
lid lift. In scenario 6, yes to levy lid lift, the City keeps the $6.4M property tax for fire, EMS property tax
levy and transport fees, and a $24,119,664 levy lid lift to cover the fire contract. This scenario includes a
$19M payment for the regional fire contract (increased from $12.M in 2025), paying back the $7.5M
interfund loan, budgeted expenditures remain the same and the ending fund balance is $556,022. Scenario
7, no to levy lid lift, includes a $19M payment for the regional fire contract, $1.6M payment on the interfund
loan, budgeted expenditures remain the same and the ending fund balance is-$17.6M.
Councilmembers asked for a copy of the scenarios. Ms. Dunscombe acknowledged there were a lot of
assumptions and options; these were the ones that they felt were high enough level to walk through. Mayor
Rosen commented this helped give a perspective on increasing revenues to not only reduce reliance on
property tax and sales tax and the volatility of those sources, and cover the gap. The City has emergent
needs along with other things that have been kicked down the road so there needs to be a path to much more
solvency and sustainability.
Mayor Rosen explained the process for reviewing revenue ideas will be to start with the 53 revenue ideas,
ask for other ideas, and during review of each of the revenue ideas, councilmembers will provide an instinct -
level choice by raising a green (good with it), red (deal breaker) or yellow (on the fence or need more
information) flag regarding each revenue idea.
Councilmember Dotsch said she always thinks backward and doesn't have an end point in mind. If the
council asks for a levy lid lift, other cities have done this such as Everett who asked for 44% and it failed.
This levy lid lift would be quite a bit more and she wondered about doing a lower levy lid lift. She needed
Edmonds City Council Draft Minutes
November 2, 2024
Page 3
Packet Pg. 28
8.1.a
an end point and felt it was still too vague. Mayor Rosen answered the council gets to decide what that is.
That vote will be informed by all the scenarios, the council could change the variables which would change
the asks. New revenue sources could change the ask. The assumption to pay back the interfund loan in one
year could be changed to paying it back over three years. Everything is negotiable. The council will also
consider if some of the things are done, would it allow some services to be restored or to reduce the ask.
The council could also reduce the ask by cutting more out of the budget now.
Councilmember Tibbott observed there are no numbers assigned to the 53 revenue sources. Mayor Rosen
acknowledged the only number is the $6.5M. Councilmember Tibbott observed these was just getting a
read on the council's affinity for any of the 53 revenue ideas and as they rise to the top, estimates could be
prepared. Mayor Rosen said the thought was let's do what we can as quickly as we can. Staff, the council
and the community have identified ideas.
Council President Olson commented when discussing revenues, it was related to the size of the levy ask.
Anything the council can identify that can be an offset and provide revenue in a different way means the
council is not going to the taxpayers for that amount in the levy ask. Mayor Rosen agreed, noting the other
variable is the council has not yet deliberated on savings. Some councilmembers may want to restore items
that were cut in the proposed budget and councilmembers may want to identify additional cuts; those would
both impact the size the levy. Council President Olson observed the proposed budget is borrowing $7.5M
so obviously there is a lot of road to make up, some way, somehow. Mayor Rosen relayed the proposed
budget assumes annexation would be on the ballot and the council would retain the $6.5M, but does not
assume a levy lid lift.
Council President Olson observed the council raising their flag is simply weighing in with an opinion. Some
councilmembers have very developed ideas regarding their opinion. Because the community will find out
what the council is supporting and not supporting, she suggested allowing councilmembers an opportunity
to be on the record regarding why they voted the way they did. Mayor Rosen suggested doing that after
there is consensus because if something is off the table, the council doesn't need to talk about it and for
items where there is more consensus and councilmembers have concerns, the council should hear those.
Council President Olson suggested it would be nice for councilmembers to voice why they voted one way
or another as it may be unpopular with some people but there might be a reason.
Councilmember Paine suggested starting with a target would help inform how to prioritize things. The
spreadsheet was very helpful. She hoped to have $12-15M in ongoing revenue ideas in 2025 and 2026. Ms.
Dunscombe asked if that was total or per year. Councilmember Paine observed some things would be short-
term. She suggested $12M for short term and a total including long term of $15M. Mayor Rosen observed
that could be a starting place.
Councilmember Eck commented these are all good points, but when doing a budget, there needs to be room
for an exchange of ideas. She understood there need to be price tags, but no one thing is going to save the
City. The council needs to change its behavior and while working on this, figure out their appetite for
making changes in addition. The council cannot let the lack of a price tag stimy them today.
City Attorney Jeff Taraday reminded cities have four primary revenue drivers; other things may move the
needle a little, but the big four are property tax, retail sales tax, utility tax and B&O tax; everything else is
a nice little adornment.
Councilmember Dotsch asked about goals, whether it was related to council goals established at the
beginning of the year, the mayor's priorities, public priorities, etc. In the comprehensive plan, the City is
supposed to expand services for the 13,000 more constituents that are coming. If the City is selling its assets,
that is not being done. She did not feel there were guardrails for this exercise to help the council identify
Edmonds City Council Draft Minutes
November 2, 2024
Page 4
Packet Pg. 29
8.1.a
their goals. Mayor Rosen commented she was welcome to recommend another process. Councilmember
Dotsch asked if councilmembers had other ideas.
Councilmember Chen suggested sticking with this process. Based on the seven scenarios Ms. Dunscombe
outlined, the council doesn't have its mind set on one scenario or a crystal ball to see whether the public
will be comfortable with approving a levy lid lift. He recommended sticking with this process and that goal
will come up.
Councilmember Nand asked if a councilmember could abstain from a vote if they didn't have enough
information. Mayor Rosen suggested raising a yellow flag which means either I don't have an opinion or
enough information. He suggested if a councilmember didn't raise a flag, it would be counted as yellow.
Mayor Rosen asked if there were any questions about the revenue ideas.
Council President Olson asked about franchise fees. Mr. Taraday answered due to a statute, franchise fees
are usually not a revenue tool in Washington. There are some unusual arrangements that some cities have
with utilities whereby the city agrees to forego competing with that utility and in exchange for that
noncompete, the utility provides some money to the city. For example, the City of Shoreline does this with
Seattle City Light; Shoreline said we're thinking about starting our own electric utility and Seattle City
Light said we'll pay you a bunch of money if you don't do that. Even though the statute says you can't
charge an electric utility for using rights -of -way, it doesn't prevent the city from receiving money from a
utility in exchange for a noncompete. Could Edmonds theoretically do that with PUD? Perhaps, but it would
require PUD's cooperation. Same with PSE, it would require PSE's cooperation. The City cannot do those
things unilaterally, it would require some kind of agreement to not compete and see what comes from that.
Council President Olson asked if that was on the radar due to the cable franchises. Mr. Taraday answered
the cable franchise fees are the one type of franchise fee that really are fairly significant revenue generators.
There are a couple interesting things going on with cable franchise fees right now, first, an audit found the
City has been underpaid on the cable television franchise fee and at some point something will have to be
done about that. The other big, interesting legal question is with so many people now watching television
using streaming services, the traditional cable franchise fee keeps shrinking every year. There is an
outstanding legal question as to whether the cable companies or the "Hulus of the world" should be
transferring franchise fees based on the revenue generated by the streaming services. It is the type of thing
that would require litigation and for the City to find partner cities to participate. There are several cities
looking at that.
Mayor Rosen asked for other revenue ideas.
Councilmember Chen suggested exploring the possibility of turning assets identified to be sold into revenue
generating rental assets. If the assets are sold, it is a one-time revenue. He suggested an in-house or
outsourced property manager.
Councilmember Dotsch suggested privatizing things the City does.
Mayor Rosen relayed a director suggested a Wastewater Treatment District.
Mr. Taraday advised an alcohol tax is preempted by state law. Cannabis is an undecided question. He
commented several of the ideas would require cooperation from a third party.
Councilmember Eck suggested additional red light cameras.
Edmonds City Council Draft Minutes
November 2, 2024
Page 5
Packet Pg. 30
8.1.a
Councilmember Paine asked about REIT. Ms. Peterson answered that is Real Estate Investment Trust.
Mayor Rosen explained it would be sell buildings and leasing them back. Mr. Taraday pointed out the City
doesn't currently pay property tax, but would if buildings were leased back.
Councilmember Nand referred to "Camera Fines from $130 to $145," relaying Judge Weiss indicated he
has discretion on the amount up to $130 and is impowered to fine people just $5 for their first infraction if
he wants to.
Mr. Taraday offered the following revenue ideas: wireless leases and franchise, charge utilities for ROW
permit fees, B&O tax, head tax for assisted living facilities, head tax for medical offices, City leasehold
excise tax, and collect full value of street vacations.
Councilmember Tibbott asked about a head tax. Mr. Taraday explained it is a form of a B&O tax. Under
B&O taxes, cities can do many different, creative business taxes. Mayor Rosen commented Seattle has a
head tax on businesses within the city. The reason he suggested assisted living facilities and medical offices,
is he knows they generate a lot of cost to the City in terms of EMS response.
Councilmember Paine asked how the head tax for assisted living facilities would be charged. Mr. Taraday
was certain it would be passed on to the consumer.
Councilmembers went through an exercise where they raised a green, yellow or red flag regarding the
following revenue ideas:
Revenue Idea
Green
Yellow
Red
Increase
1
Collect/Increase credit card fees
7
0
0
2
Increase sales tax
4
1
2
3
Property tax levy
7
0
0
4
Increase business license rate
5
1
1
5
Market/Higher rate for Museum lease
6
1
0
6
Market/higher rate for Wade James lease
5
2
0
7
Market/higher rate for old PW building lease
5
2
0
8
Market/higher rate for Boys & Girls Club lease
5
1
1
Wireless leases
7
0
0
9
Increase pet license fee
6
0
1
10
Increase our franchise fees PUD and PSE
7
0
0
11
Increase employee and resident parking pass
6
0
1
12
Camera fines from $130 to $145
3
2
2
13
Escalate fines for 2nd offense to $190 and 3rd offense to
$220
5
1
1
14
Increase Development Fees
5
1
1
15
Increase fees for services we provide at Special events
2
5
0
16
Increase Utility Tax
4
1
2
Increase the number of red light cameras
2
3
2
Increase street vacation fee
5
2
Introduce
17
Fire impact fee
2
5
18
Chare for police response to false alarms
3
3
1
19
Add an admission tax
4
2
1
20
Allowing gambling
4
1
2
21
Affordable Housing Sales tax
2
4
1
22
Commercial Parking tax
5
2
0
23
Parking Meters
3
2
2
24
Reduced fees we pay ourselves for utilities
6
2
0
Edmonds City Council Draft Minutes
November 2, 2024
Page 6
Packet Pg. 31
8.1.a
25
Parks entrance fees
2
0
5
26
Donation opportunities at Parks
6
0
1
27
Donation opportunities on utility bills
6
1
0
28
Traffic Impact Fees on tickets
2
2
3
29
Sugar Tax
3
0
4
3.0
n i E�
31
Cannabis Tax
6
0
1
32
Short Term Rental Tax
6
0
1
Chare utilities for ROW
7
0
0
B&O Tax
3
1
3
Head Tax ex. assisted living &/or medical fac.
0
2
5
Leasehold excise tax
7
0
0
Solid Waste Franchise Fee
4
3
1
Sell
33
Meadowdale Club House
5
0
2
34
Wade James property
1
3
3
35
Francis Anderson Center
0
4
3
36
City Hall
3
2
2
37
Ads on website
4
1
2
38
Sponsorships / naming rights on our assets
5
1
1
39
Additional police cars
2
3
2
40
Sell off Parks
1
1
5
Lease off Parks
2
3
2
Other
41
Join the RFA
42
If RFA annexation is approved retain tax revenue
43
Pursue Tax Increment Financing TIF
5
1
1
44
Create local improvement districts
5
2
0
Utilize PFDs Public Facilities District
7
0
0
45
Utilize Community renewal
5
2
0
46
Eliminate the MFTE(City currently has 2
5
1
1
47
Share costs/resources w/neighboring cities
5
2
0
48
Require business license for every unit in every apartment
house
0
3
3
49
Create a Park District
5
2
0
40
Digital advertising at ferry lane area
4
1
2
51
Eco and adventure tourism
4
3
0
52
Real Estate Investment Trusts REIT
1
6
0
53
Increase motor vehicle license fees from $40 to $50
4
2
1
Privative things we do
4
2
1
Create WWTP Tax District
2
4
1
Electric bike registration
3
3
1
Lime Bike Franchise
4
1
2
During the above exercise the following comments were made:
➢ Regarding increase sales tax, Council President Olson said she would support if the sales tax
increase proposed by the county does not pass. Regarding the market/higher rate for old PW
building lease, Council President Olson advised there is a short-term plan (2 years) to use the
building again.
➢ Councilmember Nand asked about wireless leases. Mr. Taraday advised there are leases for
wireless facilities on the City water towers leases and a couple wireless franchise on structures in
the City's right-of-way.
Edmonds City Council Draft Minutes
November 2, 2024
Page 7
Packet Pg. 32
➢ With regard to increasing red light camera fines, Mayor Rosen said if there was council consensus
to do this, there would need to be a vote so it could be included in the contract.
➢ Regarding increase fees for services we provide at special events, Mayor Rosen explained Public
Works closes the street, puts up barriers, cleans restrooms, etc. and all those costs are not
necessarily recovered. Councilmember Nand pointed out special events are usually annual
contracts so the City could charge the actual impact to the City the next couple years and then go
back to subsidizing via reduced rates. Councilmember Eck referred to Mayor Rosen's indication
the City isn't even covering its costs. Mayor Rosen pointed out during a recent event, staff was out
two extra hours, creating an overtime situation.
➢ Council President Olson asked if increasing fees for street vacation was related to the market value
of an easement being vacated. Mr. Taraday explained the current code says the City collects 50%
of the value but state allows collecting 100%.
➢ Councilmember Chen asked about charging a fire impact fee if the City annexed into the RFA. Mr.
Taraday it could exist via the ILA but would not benefit the General Fund, it would go into impact
fees which can only be used for fire capital projects such as fire engines, stations, etc.
Councilmember Paine suggested if the City still owned the fire stations, they could be updated
using those impact fees. Mr. Taraday agreed.
➢ Regarding Affordable Housing Sales tax, Ms. Dunscombe answered the City takes a credit against
the state's 6.5%, Fund 141, which has a balance of about $300,000 with annual revenue of about
$65,000. There hasn't been any expenditures from that fund. Mayor Rosen pointed out there may
be General Fund expenditures that could be offset by this fund.
➢ Regarding reduced fees we pay ourselves for utilities, Mayor Rosen explained the City currently
pays its own water bill at a retail level for parks, etc. Some cities charge themselves a government
rate. Ms. Dunscombe explained it would reduce the General Fund contribution to the utilities. For
example, the City of Bainbridge has a government rate so all schools, the library, etc. pay a
government rate for their utilities instead of what other customers pay.
➢ Donation opportunities at Parks, Mayor Rosen explained this would be a QR code on a sign to
make a donation to parks. Councilmember Paine commented funds collected as a donation can be
used for another higher priority.
➢ Traffic impact fee on tickets, Mayor Rosen advised the City can add an impact fee in addition to
the citation.
➢ Regarding the short term rental tax, Council President Olson asked if this was different than the
lodging tax, noting short term rentals should be subject to lodging tax and it should be collected.
Mr. Taraday answered they potentially could be different. The City could potentially do a B&O tax
on short term rentals instead of the lodging tax. The lodging tax is limited in its utility.
Councilmember Tibbott observed the state charges a B&O on short term rentals because it is a
business. Mr. Taraday assumed that was true.
➢ Regarding sell additional police cars, Council President Olson recalled when those were purchased,
it was a long term cost savings.
➢ Regarding utilize PFDs, Councilmember Chen commented Lynnwood PFD is expanding their
conference center. Mayor Rosen advised Edmonds Center for the Arts, Museum of Flight, and the
Lynnwood Conference Center are all PFDs. Council President Olson asked if the Museum could
shift to a PFD. Mayor Rosen suggested there was precedence with the Museum of Flight in Everett.
➢ Regarding eliminate the MFTE, Mr. Taraday explained the City is not collecting as much property
tax as it could be from properties that qualify for MFTE
➢ Regarding require business license for every unit in every apartment house, Mayor Rosen explained
each unit is a revenue stream for the owner of the apartment building.
Mayor Rosen declared a brief recess.
Mayor Rosen suggested identifying revenue ideas that have 5 or more green votes that do not impact the
General Fund. Mr. Taraday suggested identifying known costs at a ballpark level.
Edmonds City Council Draft Minutes
November 2, 2024
Page 8
Packet Pg. 33
8.1.a
• Revenue Ideas sorted by the most green votes:
Revenue Idea
Green
Yellow
Red
Potential Cost
to Implement
Non
General
Fund
Collect/Increase credit card fees
7
0
0
Property tax levy
7
0
0
Wireless leases
7
0
0Appraisal
not all
Increase our franchise fees (PUDand PSE)
7
0
0
Charge utilities for ROW
7
0
0
Leasehold excise tax
7
0
0
Utilize PFD's (public facility district)
7
0
0
newfund
Market/Higher rate for Museum lease
6
1
0
Reduced fees we pay ourselves for utilities
6
1
0
Donation opportunities on utility bills
6
11
0
Increase pet license fee
6
0
1
Increase employee and resident parking pass
6
0
1
GF / F121
Donation opportunities at Parks
6
0
1
Cannibis Tax
6
0
1
Short Term Rental Tax
6
0
1
MarkeUhigher rate for Wade lames lease
5
2
0
MarkeUhigher rate for old PW building lease
5
21
0
Increase fee for Street vacation 50%to 100%
5
2
0
Commercial Parking tax
5
2
0
Street Fund
Create local improvement districts
5
2
0
Other
Utilize Community renewal
5
2
0
Share costs/resourcesw/neighboring cities
5
2
0
Create a Park District
5
2
0
Increase business license rate
5
11
1
MarkeUhigher rate for Boys & Girls Club lease
5
1
1
Escalate fines for 2nd offense to $190 and 3rd offense to $220
5
1
1
Increase Development Fees
5
1
1
Sponsorships/namingrights on our assets
5
1
1
Pursue Tax Increment Financing (TIF)
1 5
1
11
Questionable
Eliminate the MFTE ( the city currently has 2)
5
1
1
Meadowdale Club House
5
0
2
Solid waste franchise fee
4
3
0
Eco and adventure tourism
4
3
0
Sell Hummingbird Park
4
3
0
Add an admission tax
4
2
1
Increase motor vehicle license fees from $40 to $50
4
2
1
Privatize things we do
4
2
1
Increase sales tax
4
1
2
Increase Utility Tax
4
1
2
Allowing gambling
4
1
2
Ads on website
4
1
2
Digital advertising at ferry lane area
4
1
2
Lime Bike Franchise
4
11
2
Charge for police response to false alarms
3
3
1
Electric Bike Registration
3
3
1
Camera fines from $130 to $145
3
2
2
Parking Meters
3
2
2
City Hall
3
2
2
B&O Tax
3
1
3
Sugar Tax
3
01
4
Increase fees for services we provide at Special events
2
5
0
Fire impact fee (no General Fund impact)
2
5
0
Affordable Housing Sales tax
2
4
1
Create WWTP Tax District
2
4
1
Increase the number Red light cameras
2
3
2
The additional police cars
2
3
2
Lease off Parks
2
31
2
Traffic Impact Fees on tickets
2
2
3
Parks entrance fees
2
0
5
REITs
1
6
0
Wade lames property
1
3
3
Sell off Parks
1
1
5
Edmonds City Council Draft Minutes
November 2, 2024
Page 9
Packet Pg. 34
8.1.a
Francis Anderson Center
1 01
4
3
Require business license for every unit in every apartmenthouse
1 01
31
3
Head tax ex. assisted Wing Wor medical fac.
01
21
5
The following comments were made with regard to the sorted list of revenue ideas:
➢ With regard to wireless leases, Mr. Taraday advised the City would have to get appraisals.
➢ With regard to increasing our franchise fees (PUD and PSE), Mr. Taraday reiterated the City would
need to move toward starting its own utilities to be able to collect those franchise fees and make
that tradeoff.
➢ Ms. Dunscombe pointed out the wireless franchise fee for wireless facilities on the water towers
would not come to the General Fund. Mr. Taraday agreed, noting most are in the right-of-way.
➢ Ms. Peterson asked if increased employee and resident parking pass would go to the parking fund.
Ms. Dunscombe answered resident parking passes go to the General Fund, employee parking goes
to Fund 121.
➢ Regarding Utilize PFDs, Mr. Taraday said that was not related to General Fund. Ms. Dunscombe
commented it would be a new fund.
➢ Ms. Dunscombe said a commercial parking tax would go into the street fund.
➢ Regarding create local improvement district, Mr. Taraday said it does not necessarily require
community initiation, but would definitely require community support.
➢ With regard to utilize community renewal Mr. Taraday was unsure that would be characterized as
a revenue tool.
➢ Mr. Taraday explained Tax Increment Financing is a vehicle for funding capital and trading off
property tax revenue which would not be a net gain to the General Fund. Councilmember Tibbott
commented unless it generate economic activity. Councilmember Nand expected it to be tied to a
specific property for capital projects.
Councilmember Paine suggested if MFTE is eliminated, she wanted to ensure it was large buildings with
commercial on the ground floor so that condominiumization for the commercial properties could be
incentivized. Having commercial on the ground floor will be very important to ensure there were amenities
for the community.
Council President Olson said she wanted to provide some additional information on one of the ideas that
did not get a lot of votes. Although she didn't support selling parks in general, but it matters where the
parks are because some areas are in a deficit and other areas have a lot. One of those areas includes Frances
Anderson Center, Civic Park, Yost Park and Edmonds Elementary. In the middle of all of those is
Hummingbird Park which she walks by regularly with her dog and there is rarely anyone in it. It is in a
residential neighborhood so there could be housing. Councilmember Paine anticipated that was a donation
so staff would have to ensure there weren't conditions. Council President Olson commented it would be
worth looking at since there are four parks within 'h mile.
With regard to the potential sale of the Meadowdale Clubhouse, Wade James property, Frances Anderson
Center, Councilmember Nand asked if those could be redeveloped with the original function on the ground
floor and market rate rental housing on the second and third floor. Mayor Rosen answered yes in general,
but maybe not the Meadowdale Clubhouse as it would be spot zoning in the middle of a residential area.
Councilmember Dotsch referred to the red light cameras, commenting the City created a new government
program that requires employees, funding, etc. Many of the revenue ideas are good ideas, but she was
concerned about creating new programs that the City then has to fund, provide staffing for, etc. Mayor
Rosen said the red light camera program can be looked at through the lens of safety, but looking at it through
the lens of revenue, if it is not generating revenue, it's not a good idea. Councilmember Dotsch commented
some of the other revenue ideas will require creating a government program and she wondered if that was
that the City wanted to be in the business of doing. She wanted to be cognizant of programs that require
oversight; for example, the City does not check for VRBOs because staff doesn't have time. Mayor Rosen
Edmonds City Council Draft Minutes
November 2, 2024
Page 10
Packet Pg. 35
8.1.a
agreed there was limited staff time; staff could spent time checking for VRBOs if the council believed that
was a revenue priority. Councilmember Dotsch said she was just raising the issue as part of the context.
Ms. Dunscome referred to column F, Potential Cost to Implement.
Councilmember Nand agreed with Councilmember Dotsch, the potential cost to implement is the council's
purview when looking at the optics for programs that will be cut or added. For example, if FTEs are added
to the courts related to more red light camera tickets, but the gymnastics program that serves a lot of young
families was cut, the optics of those decisions and how it appears to constituents need to be considered.
Councilmember Paine said some of the thing things that provide increased revenue like the red light cameras
and the school zone cameras also extend police services as there is not the cost of having officers there and
the police can work elsewhere.
Councilmember Eck commented these are all important factors and some revenue ideas will be more
important to some councilmembers than others. It is unlikely the council will agree 100%. She appreciated
the conversation although painful. There may be revenue ideas that require staff, but the revenue generated
still pencils out.
Council President Olson suggested taking a flag vote on divesting the City of Hummingbird Park (9t' &
Sprague):
Revenue Idea
Green
Yellow
Red
Sell Hummingbird Park
4
3
0
Councilmember Chen commented this is a good conversation to have, to identify revenue ideas that 7, 6
and 5 councilmembers support, but resources to pursue them may be limited. He suggested inviting citizens
to form an advisory committee to assist the finance committee or the administration with researching these
ideas. Mayor Rosen said staff will add a column to the spreadsheet that identifies who would have the
primary responsibility for each revenue ideas.
Councilmember Dotsch asked if the intent of the new revenue sources was to reduce the levy lid lift ask,
reduce borrowing or something else. Mayor Rosen said that is part of the conversation the council needs to
have because it is also related to the council's deliberation on the draft budget which hasn't begun yet. Cuts
the council makes in the budget could impact the levy lid lift amount or result in doing less and things that
are added to the budget could do the opposite. He pointed out most of the revenue ideas would take time to
implement. How the council uses the money for new revenues could be to add things back, ask for less, pay
off the loan sooner, etc.
Council President Olson commented it is also based on the timing of the revenue stream. If the council
borrowed less, that would be very prudent. Mayor Rosen explained that was part of the motivation for the
scenarios; even in the seven that were presented, changes could be made to the assumptions. Each of those
is a trigger, for example, annexation to the RFA and retaining the $6.5M, and the voters say no, the rest of
the assumptions are no longer valid and there has to be a course correct. The assumptions are scenarios that
can be adjusted and once the voters weigh in, that will force some course corrections.
Mayor Rosen declared a brief recess.
2. 2025-2026 BUDGET WORKSHOP OVERVIEW
Council President Olson explained the council had originally been told there would be an option to borrow
from private sources or the utilities or other funds and the preferred alternative was to borrow internally. It
has since been discovered that borrowing from private entities for operations and maintenance, which is
basically what the General Fund funds, is really not so available in the commercial market as they like to
Edmonds City Council Draft Minutes
November 2, 2024
Page 11
Packet Pg. 36
8.1.a
have collateral when making loans to entities. She referred to a conversation at the finance committee,
information that it was important the full council have regarding how the amount to be borrowed was
calculated. Acting Finance Director Kim Dunscombe recalled sharing with the finance committee
correspondence with the City's municipal advisor. Since the bond market is great, the market for spending
for general obligation without a capital project isn't really there and might be kind of expensive and
obviously it is cheaper to borrow internally.
Ms. Dunscombe continued, in analyzing what the utilities have available along with their upcoming capital
projects, the $7.5M and the $5M and even the $5M is on the edge of a little too risky for the utilities, but
that is the max. There is no capacity about $12.5M. She commented the $5M puts the Water Fund in a
tricky position at the end of 2026.
Council Executive Assistant Beckie Peterson reviewed the agenda for this discussion:
• Council -driven objectives
o What do we need to accomplish?
o What are our goals?
o Can we identify metrics we want to strive for?
• Council -directed approach
o How do we go about this?
o What do we agree will be helpful/productive?
o What do we agree we should avoid?
• Decision -making Information
• Amendments to Biennial Budget 2025-2026
• Timelines and Workplan
Councilmember Chen commented the biggest objective is to deliver a balanced biennial budget.
Councilmember Tibbott commented it needs to be balanced by the end of 2026.
Council President Olson asked how the council was feeling about the current proposed deadline of
approving the budget by Thanksgiving, knowing the future of fire service and comprehensive plan are still
topics to be considered. She was hopeful councilmembers were ready to work hard and fast on the budget
in the early weeks of November to meet the Thanksgiving deadline and then focus on those other topics.
Councilmember Eck said the council certainly doesn't want to rush and wants to be thoughtful, but doesn't
have time to waste and no one wants to prolong the conversation due to the need to discussion other
important topics. She concurred with the proposed schedule.
Councilmember Nand commented with the level of complexity with the first biennial budget and
contemplating dozens of layoffs, she anticipated the council may have to continue deliberations into
December to justify the hard, painful decision to the community and staff.
Councilmember Dotsch concurred with Councilmember Nand. There is a hard deadline for one and not
necessarily the other and both need very thoughtful consideration and effort. Looking ahead at this task,
she anticipated it would take into December.
Council President Olson added the timing of the layoffs is one of the factors that may play into the council's
decision because the City needs to provide the unions advance notice of any layoffs and it is just the right
thing to do regardless of whether it is required. Being done a little earlier helps with that component.
Councilmember Chen said November 26 is a good target, but December 31 is the actual deadline. With
regard to what are the council's goals, one of his goals was to deliver a balanced budget and at the same
time find ways to keep borrowing from the utility funds to a minimum to get through 2025/2026. The
Edmonds City Council Draft Minutes
November 2, 2024
Page 12
Packet Pg. 37
8.1.a
revenue ideas council identified are unlikely to meet the 2025/2026 timeline. There may be different
opportunities in the budget such as using the contingency funds to reduce borrowing. Advantages of using
the contingency fund include, 1) not paying interest, and 2) not jeopardizing the utility fund's position as
there are challenges with the wastewater treatment although that enterprise fund is almost like a separate
operation.
Councilmember Paine wanted to be a complete as possible and reduce the number of budget amendments
during the next couple of years to every six months. With regard to the biennial budget, she was curious
about the capacity for Finance, noting although the comprehensive plan does not affect Finance, but the
council will rely heavily on Finance with regard to the RFA vote and that universe. With regard to
budgeting, she anticipated council having real detailed questions and she wondered if Finance had enough
allocated capacity to respond to the deluge of questions. There have been 70 questions so far and more
come up at every meeting. She wondered if passing the budget by Thanksgiving was reasonable for staff.
The budget has to be approved by the end of the year and it has to be done responsibly.
Ms. Dunscombe said staff has been able to respond to queries and have also delegated to other departments
as necessary. Everyone is very aware that the budget has taken priority although the comprehensive plan is
a huge task for a number of staff. Going into 2026, whatever falls out from this process will probably require
a lot of financial staff, but the everyone in the City will need to jump in and play a different role, find
efficiencies, etc. which may actually break up some of the siloing issues. Councilmember Paine recognized
that is a cultural thing and she loved that idea because budgeting creates silos. Ms. Dunscombe assured
Mayor Rosen has been doing a great job getting everyone to work together.
Mayor Rosen shared he has been considering organizational structure on a fairly significant level. In an
ideal world, this all would have been done in parallel. He was hoping to be able to introduce a concept
before the end of the year; the motivation is to find efficiencies and more cost savings via restructuring.
Councilmember Paine asked when that would be happening. Mayor Rosen answered it would be early in
2025. Ms. Dunscombe answered the timing will work well with implementation. One of the reasons she
asked the mayor to put that aside was moving people around changes the chart of accounts and all the
numbers associated with where people are charged. In that a new chart of accounts will be created next
year, that is a good opportunity to put those things together.
Councilmember Paine asked if there were other initiatives that would happen in 2025 that the council hasn't
heard about yet. Mayor Rosen answered opportunities within the boards and commissions structure are
being investigated because that is a very big dollar time investment. For example, one of the smallest
departments, Community, Culture & Economic Development, supports seven boards and commissions
which is a huge time impact. Other things that have been talked about are a Parks District or Wastewater
District; those would have monster impacts. He did not know of anything else that was emerging other than
the reorganization.
Councilmember Eck said one of the concerns she is hearing is the council rushing and not considering staff.
A good point was just made that staff resources are being impacted the longer the budget discussion drags
out. She was not saying the council should rush, but it was also time for the council to use their business
acumen and be very disciplined and come to every meeting with their thoughts well organized so the council
can have meaningful and efficient conversations. If councilmembers come up with ideas to offset staff cuts,
that would be an ideal situation, urgent and high stakes. She was sure the council could do this based on
her experience in other realms.
Councilmember Nand agreed with Councilmember Chen that the council needed to deliver a balanced
budget for the City's first biennial budget that addresses the City's fiscal emergency. Her goal is that the
process used is very transparent, accountable to constituents, taxpayers and community members and City
Edmonds City Council Draft Minutes
November 2, 2024
Page 13
Packet Pg. 38
8.1.a
staff and that the council is able to justify each decision and demonstrate it was done in a thoughtful and
compassionate way. Both her parents were members of WEA and she was raised in a union household; the
school district lays off in the summer so if a family has to move for a new job, it is less impactful to children
than pulling them out of school in the middle of the school year. Laying people off around the holidays is
particularly heartless. Her personal goal was if layoffs were necessary, positions could be funded 3-7
months into 2025 to give people more certainty in their immediate future and show respect to staff members
who have dedicated their lives and efforts to making city government function and serving the community.
Councilmember Dotsch suggested what could help the council focus its energy is considering whether they
agree with the numbers in the proposed budget, whether the numbers take the City to insolvency, increase
taxes and ask the public to accept over 160% tax increase. The council needs to have a better idea of what
they are working from and make decisions such as whether to borrow, what amount should be borrowed,
etc.
Council President Olson said having the perspective of exactly where we are and what borrowing $7 million
in 2025 really means is the City is in a desperate situation. The things the council is doing are about keeping
the lights on and providing core services; the City has been spending beyond its means for a long time and
has to stop that before the City ends up bankrupt. Some residents who have looked closely at the budget
think the council shouldn't borrow more than $3M in 2025. At the same time she has looked at cuts in the
budget book, most of which she can support, but for example she was very concerned about losing the extra
support in the Finance Department when an ERP is being implemented and changes are happening to
accounts and budgeting by priorities in the biennial budget is still really new. She did not think the council
could do what it wanted on the revenue side if that department did not have the bandwidth. She
acknowledged retaining that position would require making a cut somewhere else.
With regard to what the council needs, Councilmember Tibbott said he needed a complete list of the jobs
that are proposed to be cut which he has received but not reviewed. To make budget decisions, although
the department presentations identified cuts to be made, there was no information regarding the savings
associated with those cuts. He requested the savings be provided in a list. Mayor Rosen said there are
different approaches, here's the money you have, what do you want to spend it on, versus what did I spend
last year versus what's in the budget book. He noted providing that information requires an investment in
time. The situation is the City doesn't have enough money to pay for what it has now.
Councilmember Tibbott said it would help him to know what more needed to be cut. For example, what
about the Police Chief? He asked if the plan was to hire another one, keep two assistant chiefs, or what is
the thought. Mayor Rosen answered there is a structure in the budget that exists until it doesn't.
Councilmember Tibbott observed the council could change the structure before the end of 2024. Mayor
Rosen agreed the council could, he will need to name an interim chief when Chief Bennett leaves at the end
of the year although what the council does with the budget could change that. He has been gathering
information via conversations with Chief Bennett and the assistant chiefs, the commanders, and the union
so he can provide a recommendation for the council to consider.
Councilmember Chen said clearly the proposed budget will not work because based on that budget, by 2027
the City will go bankrupt which cannot be allowed to happen. Out of the seven scenarios, he supported the
second scenario in 2026, Yes to the RFA, yes to levy lid lift, and pay off the 2025 utility fund loan as a
baseline. That scenario will provide a better outlook for future years instead of going bankrupt. The amount
of the levy lid lift, $10.8M, and paying off the $7.5M utility fund loan; he anticipated those numbers would
change based on the budget process. He agreed with Councilmember Dotsch, the council needed a target
or mindset to start from.
Mayor Rosen said he also liked that scenario. That scenario is optimistic that the community will support
the RFA and the levy lid lift. The community could say no. Councilmember Chen said then there will need
Edmonds City Council Draft Minutes
November 2, 2024
Page 14
Packet Pg. 39
8.1.a
to be an adjustment. Mayor Rosen suggested not waiting until election day to figure out what that means.
The council has to know ahead of time what it means if the community says no to either the RFA or the
levy lid lift. Councilmember Chen said in terms of delivering the 2025/2026 biennial budget, the council
has to pick one scenario and work toward it.
Councilmember Dotsch said she wanted to be realistic about the number the council was working toward,
whether those asks will be approved by the voters. Councilmember Chen answered the council doesn't
know until they ask the community. Councilmember Dotsch said the council can get an idea from
surrounding cities; Everett's 44% levy lid lift was rejected. She was concerned with the voters approving
annexation to the RFA and a levy lid lift.
Council President Olson anticipated the levy lid lift would be smaller than the numbers in the scenario due
to the council's efforts and possibly the City would borrow less from the utilities.
Councilmember Chen anticipated the amounts could be reduced by using the $2.2M contingency fund and
cutting costs could reduce the amount to $3.5M. Councilmember Paine pointed out the contingency fund
has to be reimbursed.
Council President Olson commented using the $2.2M would sacrifice the interest that earns and require
paying interest to use those funds. On paper there isn't a different outcome by using the contingency. She
asked via the budget queries to explain the impacts of one versus the other. Ms. Dunscombe said although
she has said assume the amount is $7.5M, only the amount needed will be borrowed. She will have an
ordinance or resolution prepared allowing that amount and ensuring the schedule and everything is prepared
to substantiate that ordinance, but she would only borrow as the General Fund needed so there is potential
that it would be less than $7.5M.
Councilmember Paine said to understand how this will flow out for the long term horizon such as 15 years,
she needs what bonds will come due, recalling a bar graph provided by bond counsel. That is good
information to have because dipping into contingency funds and the emergency contingency will affect the
City's bond rating and raise the cost of bonds. Ms. Dunscombe offered to provide the bond chart.
Ms. Peterson continued:
• Council -directed approach
o How do we go about this?
o What do we agree will be helpful/productive?
o What do we agree we should avoid?
Councilmember Chen said he wanted to inform the council about using the cash pool to subsidize the
negative General Fund balance. In September, the General Fund balance is-$300,000 and the cash pool is
used to fund operations. Ms. Dunscombe answered that was an idea to get through 2024; it is not
sustainable. As one looks at the cashflow on the last page of the finance report, the negative cash balance
is occurring more frequently and getting larger and is no longer an option. The goal was do that in 2024
although there were some struggles due to things popping up; that cannot continue in 2025 to the extent
that is occurring in 2024. Councilmember Chen said dipping into the cashflow is not the way to do it. Mayor
Rosen commented expenses do not go up at the same rate as revenue. It would be like if someone receives
a paycheck twice a year, their expenses occur all year. The City relies heavily on the receipt of property
taxes twice a year and the cashflow allows use of the pool during those times. Until the City can fix its
foundational problems, that option does not exist. Councilmember Chen said that has been done in the past,
but dipping into the cash pool should be once in a blue moon, not on a regular basis.
Councilmember Dotsch said the council needs to consider the priorities of government, what it has to do.
With regard to the council and community's goals, what part of City funds and staff are going toward that.
Edmonds City Council Draft Minutes
November 2, 2024
Page 15
Packet Pg. 40
8.1.a
The City has to be very intentional regarding what it is doing; Edmonds is only 8.9 square miles with very
limited revenue sources. She emphasized the council consider what they want to accomplish with Edmonds'
government. With regard to wants versus needs, because the City is nearly insolvent, the focus has to be on
needs. Being intentional now saves grief, unknowns and uncertainty for the staff team. The council needs
to be honest about what the City can provide and not promise things that aren't sustainable. The council
owes that to both the citizens and the staff team.
Council President Olson said it sounds like councilmembers are interested in looking at lower targets than
were established in the proposed budget. She recommended if a councilmember proposes an addition, they
find that much or more in cuts.
Councilmember Paine commented some of the things that were found last year still haven't been
accomplished this year. For example, the prisoner care budget which has been overspent. The
administration needs to figure that out between the City and the jail accounting staff such as what exactly
does the City get for the prisoner care budget. In discussions with labor groups, what structurally can be
done with reorganization and have that laid out first quarter next year so there is some stability.
Councilmember Tibbott agreed if a councilmember proposed an increase in spending, they have an
obligation to identify a reduction. Councilmember Eck agreed that was necessary to have a balanced budget
and was the responsible thing to do. If a councilmember wanted to put something back on the table, they
needed to identify an offsetting cut.
• Decision -making Information
o What information is needed?
o How best to obtain this information?
Council President Olson observed Mayor Rosen's reorganization is still in the works and departments'
presentation identified some changes. She suggested providing that information to council as soon as
possible so those could be incorporated. Ms. Dunscombe advised a list of staff s recommended changes has
begun. For example, the COLA was reduced from 3.8% to 3% for a handful of business units within the
City; overall it is about $200,000. Council President Olson suggested the administration provide that
information at any meetings that include budget deliberations. Ms. Dunscombe said a list of professional
services was prepared; some professional services cannot be reduced. For example last year the professional
services in the police department were reduced, but the police have a contract with Axon that cannot be
reduced further. She suggested having directors provide information regarding the professional services
such as whether something is in the work plan, something that has to be done, etc.
Councilmember Paine commented she was surprised to see the long list of cuts that were decided this past
year. If there are decisions that need to happen from the administrative side during the biennium, it would
be great to have that transparency to council. For example, relocating the police department was taken off
in 2024 and now is proposed again.
Councilmember Nand suggested some alignment between boards, commissions and committees and
professional services when looking at what to retain and what to cut. The City funds a lot of boards,
committees and commissions, but the tradeoff should be if those boards, commissions and committees
require staff support, they should be able to do work that other cities hire consultants to do. For example,
there is an ADA analysis of parks in the CFP/CIP; other cities might hire a consultant to audit the city's
parks and determine what needs to be done to make them more ADA accessible. That may be something
the DEIA Commission could be tasked with doing to provide an aggregated cost savings. She anticipated
eliminating boards, commissions and committees would mean hiring more consultants to do the work they
were doing on a volunteer basis.
Edmonds City Council Draft Minutes
November 2, 2024
Page 16
Packet Pg. 41
8.1.a
Councilmember Dotsch said since furloughs are a big piece of the budget and a reduction in staffing, staff
only has so much time to do what they need to get done. For example if furloughs result in 35% less time,
does there need to be a corresponding 35% cut in the things the City does? She wanted to be mindful and
realistic in what staff could do with less and not burden the team. Mayor Rosen said the intent of the
directors' presentations was to start that conversation. He recalled some were very specific about what
won't be provided when cuts are made. He agreed with managing expectations. He recalled a
councilmember asked the impact of closing city hall one day a week.
Council President Olson said she was interested in the impact to customer -facing city services if city hall
were open 3-4 days/week instead of 5. She suggested there may be an opportunity to ask the unions to make
concessions to save some positions.
Ms. Dunscombe reminded there is a structurally imbalanced budget. While she can plug furlough numbers
into 2025/2026, when she goes to the complete the rest of the strategic financial forecast, those numbers
will pop back up. One way to describe what work won't get done is to use the program as a way to
characterize what work won't get done. For finance staff, given the position proposed to be cut in the
budget, that really limits their work plan. Staff will do what's necessary for annual reporting, ensuring they
abide by financial policies, implement the new ERP system and prepare the budget; that will be their max.
Any of the new revenue ideas will be a challenge. Some of the ideas aren't just finance related, other
resources throughout the City can be utilized.
Mayor Rosen commented there are some things the City has to do, for example, there have to be seven
councilmembers and there are core services the City has to provide. Furloughs mean staff will be trying to
do the same thing with fewer hours. The way forward is to identify what the City doesn't need to do, not
doing a less good job on everything, but doing as good a job as we can on the critical few things. He
suggested looking at programs for ones the City could do without.
Councilmember Tibbott commented a lot of it comes down to the administration and things that are in the
administration's lane, not the council's. The council determines the budget and the administration
determines what things can be done this year and what things need to be delayed. Mayor Rosen expressed
appreciation for that, noting sometimes the council is pretty surgical in their decision making.
Councilmember Nand suggested if the administration got more data from City staff about how their time is
being used, it would allow the council a better understanding of each FTE's scope of work, how their time
is being used and what the council wants to/doesn't want to fund. She referred to her suggestion for project
number tracking that would provide information from a financial perspective and the administration can
have a better awareness of the scope of each FTE and how their time is being used. Mayor Rosen
commented there is a world he wants to live in and it includes that. Imagine a day where the council is
budgeting by proprieties and the community has identified the things that are important to them and the
City is able to play back the budget to them and say here are investments in every one of those priorities. If
it is quality of life, what does that mean and what are the metrics and what was the return on investment so
the City can be accountable to the public regarding how resources were invested in their priorities and the
metrics that were used. Someday the City will be able to do that and track efficiencies and effectiveness,
but that day is a ways away. The reality is the council lives at the policy level, not the level that determines
what each staff member does.
• Amendments to Biennial Budget 2025-2026
Edmonds City Council Draft Minutes
November 2, 2024
Page 17
Packet Pg. 42
8.1.a
Amendment Title: ADD SHORT TITLE
Amendment Number. Cd Cgstaffwepm xo Mednvmeer,
Councllmember
[CM Name[
I Date 5ubm fted:
[Date]
lo d
I [FUND, NUMBER]
Agenda Packet:
c..an.�.•r wd�n
Department'
DEPARTMENT
Deliberated:
ce1nO1°'H'"`�CO1�1e'
Program.
PROGRAM IF APPLICABLE
Outcome:
Bud et Year.
2025 or 2026 or both 2025/2026
Arrendrrent Motion
p make a nrotan to 7
m n
li [Narrative describng your amendrnentl
Amendment Purpose (intended outcomes)-
(Bullet L zt
Describe All Funding Souro
Describe funding — GO other?
Describe Future on Oraoine Costs enditure or Savi Reduction of benditure .
Describe ongoing cost; or saving;]
[Prgect Status or N/A[
FISCALOETAILS
ACCount/BARS
Notes:
Eupendltures
$—
$0
Revenues
I $D
Net Budget Impact
$0
Ms. Peterson reviewed the above template that is proposed to be used as a method of communication that
will be transparent, helpful and supportive to each other, staff and the community. She referred to the
Amendment Purpose (intended outcomes) section which is a direct parallel to what departments were asked
to provide, the intended outcomes of their programs. Providing a bulleted list of what a proposed
amendment will accomplish could allow for collaboration and cohesion between what other
councilmembers might think or what the department director thinks such as a different way to accomplish
the same thing in a similar way. She referred to the Amendment Motion section, challenging
councilmembers to go into this ready to make a motion, one sentence describing their proposed amendment.
The amendment form is available in Word and can be filled in with as much verbiage as a councilmember
wishes. The Amendment Description section can be used to provide justification or reasoning. She heard
today a desire for councilmembers offering an amendment that would increase expenditures to also offer a
counter to decrease expenditures. She suggested that could be mentioned on this form, but a companion
amendment would be required. Councilmember Paine suggested doing an Amendment A and B, A adding
an expenditure and B a reduction.
COUNCIL PRESIDENT OLSON MOVED, SECONDED BY COUNCILMEMBER CHEN, TO
EXTEND FOR 10 MINUTES. MOTION CARRIED (6-1).
Ms. Peterson suggested councilmembers fill out the amendment form in Word, save it as a file and send it
to her with an indication if assistance was needed with refining it, researching it, collaborating with directors
to get their input, etc. Amendments will be included in the agenda packet as well as posted to the website
to provide transparency to the public, staff and each other. Ms. Dunscombe and she plan to work on a
collaborative spreadsheet to keep track of all the proposed ideas that will include staff -proposed changes
with the impacts, outcome of deliberation, and total financial impact which will be updated weekly.
• Timelines and Workplan
o Council Meetings (Deliberation time):
■ November 4 (45 min + 45 min)
■ November 12 (90 minutes)
■ November 19 (90 minutes)
Edmonds City Council Draft Minutes
November 2, 2024
Page 18
Packet Pg. 43
8.1.a
■ November 21 (3 hours)
■ November 23 (3 hours)
■ November 25 (3 hours)
■ November 26* (60 minutes)
*target budget adoption date
Ms. Peterson said the above is the amount of time currently on the extended agenda for budget deliberation.
She suggested the earlier the council can begin considering amendments the better; for example, she did
not recommend putting off amendments until November 23. She suggested the bulk of the amendments be
formulated and included in the packet for the November 19 meeting which means they would need to be
submitted to her by November 13.
Council President Olson said in her experience, having been through the budget process before, whatever
day the council decides to be done is the week to 10 days that people will put the time in. So this is almost
exactly the right amount of time; it lets councilmembers know what they need to be doing this now.
Ms. Peterson commented if the council concludes its deliberations, some of the additional meetings such
as November 21, 23 and 25 could be eliminated.
Councilmember Dotsch asked for the dates that the council needs to decide on a levy lid lift. Ms. Peterson
answered a levy lid lift would go to the voters on a ballot so depending on the style of the levy, it would
likely be on the general or primary election. Mayor Rosen said consideration has been given to April 2025
for the annexation vote and November 2025 for the levy lid lift.
Council President Olson observed if council does not approve moving forward with annexation, the levy
vote could be moved up to April because funds will be needed for a contract.
Councilmember Dotsch commented if the council is going to ask the community for their support, there
needs to be time to tell them what is happening and why. Mayor Rosen said he is personally feeling a sense
of urgency regarding an annexation vote which would be in April.
Councilmember Nand asked if the administration has heard from the RFA regarding town halls to support
the annexation. Mayor Rosen relayed his understanding those would occur once council makes a decision
to put annexation on the ballot. Council President Olson remarked the process is already behind the ideal
timeline; it was hoped to have that discussion on November 12, but the pre -annexation plan and the contract
alternative need to be done first and that hasn't been accomplished yet.
ADJOURNMENT
With no further business, the Council meeting was adjourned at 12:04 pm.
Edmonds City Council Draft Minutes
November 2, 2024
Page 19
Packet Pg. 44
8.2
City Council Agenda Item
Meeting Date: 11/26/2024
Approval of Council Special Meeting Minutes November 4, 2024
Staff Lead: Council
Department: City Clerk's Office
Preparer: Scott Passey
Background/History
N/A
Recommendation
Approval of Council Meeting minutes as part of the Consent Agenda.
Narrative
Council meeting minutes are attached.
Attachments:
2024-11-04 Council Special Minutes
Packet Pg. 45
8.2.a
EDMONDS CITY COUNCIL
ELECTED OFFICIALS PRESENT
Mike Rosen, Mayor
Vivian Olson, Council President
Chris Eck, Councilmember
Will Chen, Councilmember
Neil Tibbott, Councilmember
Michelle Dotsch, Councilmember
Susan Paine, Councilmember
Jenna Nand, Councilmember
1. CALL TO ORDER
SPECIAL MEETING
DRAFT MINUTES
November 4, 2024
STAFF PRESENT
Kim Dunscombe, Acting Finance Director
Rob English, City Engineer
Bertrand Hauss, Transportation Engineer
Jeff Taraday, City Attorney
Scott Passey, City Clerk
Jerrie Bevington, Camera Operator
The Edmonds City Council meeting was called to order at 5:30 pm by Mayor Rosen in the Council
Chambers, 250 5' Avenue North, Edmonds, and virtually.
2. COUNCIL BUSINESS
1. 2025-26 BUDGET DELIBERATIONS
Council President Olson thanked the Council, City Clerk Scott Passey, Acting Finance Director Kim
Dunscombe and Mayor Rosen for attending the workshop last Saturday, relaying she thought it was very
fruitful and there was a lot of creative conversations regarding the revenue side of the ledger. Ms.
Dunscombe has prepared some questions to guide the council's conversation. She will ask Ms. Dunscombe
her opinion and pros and cons regarding items and councilmembers are also welcome to ask questions.
Once these questions are concluded, councilmembers can offer their thoughts, guiding principles for the
budget process, etc. With regard to the first question, council touched on this at Saturday's workshop and
she wanted to ensure there was a meeting of the minds. Is borrowing $7.5 million the appropriate amount
or could a smaller amount suffice given other budget reductions?
Council President Olson relayed she hoped greater cuts, such as $2-3 million, could be identified and a
smaller amount borrowed. Those cuts will be hard, but she has been broke before, she was unsure if anyone
else in the room can relate to that. When she went through that, the idea of what they were choosing not to
spend versus what they were literally financing to have the things they were bringing into their household
made the calculus different with regard to what they spent money on versus choosing to spend money that
literally is or isn't in your bank account. This is a different position because the loan has to be repaid. For
context, she compared it to counting on getting a good job in the future and maybe you are working toward
getting ready for that or getting a degree, but that good job isn't lined up yet. Similarly, the levy hasn't been
approved and the public hasn't agreed to RFA annexation yet. The less that can be borrowed, the less
unstable the City's footing is going forward until the council knows what it is dealing with in the future.
Edmonds City Council Draft Minutes
November 4, 2024
Page 1
Packet Pg. 46
COUNCILMEMBER NAND MOVED THAT COUNCIL AUTHORIZE THE ADMINISTRATION
TO INTERNALLY BORROW $7.5 MILLION THROUGH THE INTERFUND LOAN PROCESS.
MOTION DIED FOR LACK OF A SECOND.
Councilmember Chen recalled the loan was discussed during the revenue generation workshop, but he was
glad it had been brought up here for further consideration. In his personal view, the council needs to find
ways to reduce the amount it borrows because internal borrowing, although easier, the utility fund is an
enterprise fund and there are potential challenges and it is always good to have that enterprise fund reserved
for operations. There are other ways the council can find opportunities to make cuts. For example, the $2.2
million contingency reserve was established for this purpose and the council can use those funds. There are
other potential reorganizations, efficiencies in the administration's operations, that can restructure some
departments' operations where it makes sense and to generate some savings. He summarized he would like
to reduce the amount that is borrowed.
Councilmember Eck commented there are no great options and the City is in a crisis. On one hand cuts are
being considered that are quite painful and on the other hand, the council is continuing to look at all options.
Although she has not made up her mind, because of the drastic nature of the situation, she was inclined to
take the whole loan so no more staff had to be cut and then council realizes down the line that the cuts were
too stringent.
Councilmember Paine was glad the council was having this discussion at a somewhat regular council
meeting. She asked about the repayment schedule for utility borrowing versus borrowing from the
contingency reserve. Ms. Dunscombe answered what is proposed in the budget is a plan for paying back
the internal fund loans on a ten year basis. Although she assumed a ten year payback, the State Auditor's
Office (SAO), wants to see interfund loans paid back within three years. The amount included in the budget
as a potential principal and interest payment isn't what SAO would want to see, but she wanted to set aside
some funds in the budget to obligate repayment of that loan.
Ms. Dunscombe continued, using the contingency fund was one of the options she noted for how to start
this conversation during the deliberation process. If the council decides it wants to use the $2 million
contingency fund, a decision would need to be made whether it would offset the $7.5 million to reduce the
amount that is borrowed, whether to reduce the interfund loan and use the contingency, or other some other
option. She can describe all the options, but the option included in the budget was to leave the contingency
fund in full in the budget so there is still $2 million in the budget that is not appropriated in the proposed
budget. Obviously, council can make a different decision; she felt leaving that reserve alone signaled a
greater consideration to the amount the council wanted to borrow. She wanted to be more fiscally
conservative in leaving the $2 million to force everyone to think about service levels provided to the
community and priorities and leave that fund intact. Once it is spent, it is harder to figure out how to
replenish it back to normal reserve levels. That was the reason she left the $2 million contingency fund in
the budget.
Mayor Rosen commented the opportunity that might exist if annexation takes place and if a levy lid lift is
approved, depending on the level that the council approves and the voters approve it, potentially the internal
loan could be repaid in full in 2026. Councilmember Paine asked the risk to the City's bond rating if the
contingency reserve is spent. Ms. Dunscombe said if Councilmember Paine was seeking an exact answer
such as the rate the City can borrow at, she did not have that number. She knew it would be a consideration,
fund balance was always a consideration in the bond rating. She didn't know from a general government
standpoint if the City was looking at borrowing or issuing bonds in the near term; it hasn't been something
on her radar given the current CIP, the level of REET revenue the City is receiving and other revenue
sources that provide funding for capital projects, but it certainly should be a consideration.
Edmonds City Council Draft Minutes
November 4, 2024
Page 2
Packet Pg. 47
Councilmember Paine said she was also asking because if funds are borrowed from the utility funds, there
are some 20 year utility bonds coming up. She asked the risk to the City's ability to bond for long term
utility and enterprise fund bonds for transportation, stormwater, wastewater, road projects, or other things
that Public Works typically bonds for. She relayed her understanding $7.5 million was the absolute max
that could be borrowed without impacting the ability to do the work. Ms. Dunscombe explained the analysis
she did to determine if $7.5 million was doable for the utilities, she considered operating expenses and the
current financial policies regarding utility reserves. She considered the amount to be borrowed, the amount
in unreserved fund balance perspective. The budget book details fund balance for the utilities into four
different categories. While the unrestricted balance in the budget does not equate exactly to the working
capital which is prescribed in the financial policies, they are the most closely related. Using the unreserved
fund balance shown in the budget is more conservative than just using working capital which is in the
financial policies. She considered by fund and by year the amount required by the reserve policy plus the
year's capital expenditures. She wanted to consider by borrowing $7.5 million from a utility to assist the
General Fund, does that utility have enough to cover its reserves and enough to pay for the next year's
capital. By the end of 2026, she recalled the water fund was getting close to the borderline of paying for
2027 capital projects. That was the analysis she did to determine that the utility funds could afford to loan
the General Fund $7.5 million in 2025 and $5 million in 2026.
Ms. Dunscombe explained when the City went through the bonding process this past spring/summer for the
water and storm fund bond issuance, the City had a great rating considering the utilities alone; it did not
consider whether the General Fund was in a position to need borrowing or if the general government side
of the house was okay. It was strictly a great bond rating for the utility funds. Councilmember Paine
commented she was not particularly in favor of borrowing into the contingency reserve and would like to
find other funds in the budget through other mechanisms which will be important to long term stability, not
just one year at a time. Stability also means having knowledge, guarantees and estimates about what is
anticipated next year in terms of reorganizations and how that will affect operations. Consideration needs
to be given to continuing to become more efficient which will be difficult because the City is already one
of the lowest staffed cities for its size in the community. She was unsure staffing could get any tighter, there
already are 40 positions not funded. The council needs to sharpen its pencil to find ways to do this and do
it in ways that offer a lot of equity. She wanted to highlight and spotlight the need to focus on equity inside
this budget because it seems out of balance. She wanted to ensure whatever is done is done with equity
across all the positions and finding a good balance with the amount the council decides to borrow. She
summarized the council will need to consider all its options.
Councilmember Dotsch echoed Councilmember Chen's caution regarding the amount of borrowing,
commenting it was basically taking out a credit card and digging the hole deeper with interest over the next
two years without a defined source of revenue and going on a hope and a prayer. She asked if there was an
opportunity to not borrow from the utility funds and borrow from the equipment rental fund instead. Ms.
Dunscombe answered it is not recommended to borrow from the ER&R fund; the SAO is pretty strict on
making sure those funds are for a purpose. There are rules around that and it is restricted money. The council
could change the rate based on needs, but the council would need to focus on reducing needs for
replacement vehicles in the ER&R fund and less on the expense on the rate side to the General Fund to be
able to have the GF positively affected.
Councilmember Dotsch asked if there was an opportunity to borrow $3 million from that fund. Ms.
Dunscombe answered she did not think so. She knew there were a few items that had been raised for
discussion such as police vehicles. The administration hasn't totally committed to a take home vehicle
policy, but it's close. There are a lot of considerations related to that and it should definitely be a topic for
the council and administration to discuss more formally, but that won't be $3 million.
Councilmember Dotsch said she was very cautious about borrowing from the utility funds, their purpose is
community health and safety and if there is a default on the loans, that is a big issue. The community will
Edmonds City Council Draft Minutes
November 4, 2024
Page 3
Packet Pg. 48
8.2.a
be paying the interest on the loan as part of their taxes so it is another burden and not just gaining money
from that account. She was hopeful the council could identify ways to reduce the amount borrowed from
the utility funds.
Councilmember Tibbott emphasized borrowing is something to resist as much as possible. He appreciated
the prudence demonstrated by borrowing internally rather than outside. He echoed what other
councilmembers have said about not using the contingency reserve. He preferred to maintain a reserve for
true emergencies that are urgent and unexpected expenses. For example, there are times when an unusual
amount of snow or even potentially a toxic spill when the City would need reserves readily available. He
recalled from the Saturday workshop Ms. Dunscombe saying the loan would only be drawn upon as needed.
He asked if she anticipated that draw would happen monthly or quarterly, via an amendment brought to
council, or something else. Ms. Dunscombe answered she probably would draw on it monthly if needed
given the ordinance is written in such a way that it allows the General Fund to borrow up to $7.5 million or
whatever that number ends up being through the budget process. Given the 2024 experience, that doesn't
have to be every single month. The General Fund was in a negative cash position the first couple months
of the year; property tax comes in April and a couple months into the future the cashflow returned to a
negative position. She anticipated borrowing on a monthly basis and ensuring an analysis is done so the
cash is above zero through 2025.
Councilmember Tibbott suggested the council would be interested in knowing when those draws happen
as part of the monthly budget reports. Ms. Dunscombe anticipated it would be part of the monthly financial
report in 2025. Councilmember Tibbott reminded everyone that the budget cuts presented by City staff are
for services, programs and employees. There are cuts proposed across the spectrum of the City and when
that happens, the expectation will be that service times will be longer such as obtaining a permit, or when
a program is eliminated, citizens may have to look for other activities the City provides or utilize programs
in other cities. With regard to staff, it is regrettable that some positions will go away, but the council wants
to be prudent about bringing back positions that absolutely allow the City to fulfill essential services. He
summarized cuts have been made across the board, not in one particular area.
Councilmember Chen said he valued this discussion tremendously, but in terms of how much to borrow
and how much levy lid lift to ask the citizens to approve, it is too early in the process to determine those
amounts. By the end of the budget deliberation when all the budget amendments are voted on, the council
will have a better understanding of how much the loan needs to be.
Councilmember Nand commented when she looks at the date on the calendar, 11/4/24, she doesn't know
how the community and hardworking City staff can be left in limbo. There are career public servants facing
a pink slip after devoting decades in some cases of their lives toward bettering the community including
staff in the police department and public works who actually risk their lives to serve the community. She
felt the council owed it to them to follow the finance department's recommendation and authorize a $7.5
million internal loan. She acknowledged there was a structural budget gap that the council spent its way
into over the last four years, but wanted to buy time for hardworking staff to figure that out in 2025. There
are reserves and if she was a City employee, she would find it odd to hear the council didn't value them
enough to tap into reserves to retain them. She strongly encouraged councilmembers to retain the City's
talent.
Councilmember Eck expressed her appreciation for the points being made by councilmembers. She did not
support using reserves or the contingency fund as she did not think that was a smart idea. She agreed with
Councilmember Tibbott, recalling she tried to make the point last week that it cannot be communicated
enough to the community the impact on response times and services; citizens will feel a difference. In
considering whether to borrow $7.5 million from the utilities in an internal loan, she wondered why the
council wouldn't take everything they possibly can. The council is making cuts that are really severe for
Edmonds City Council Draft Minutes
November 4, 2024
Page 4
Packet Pg. 49
8.2.a
the community. It is not just to save jobs, it is what the community will experience. She summarized nothing
in this situation was ideal.
Councilmember Dotsch asked if anyone had looked into working with Verdant. They are involved with
health and safety, maybe they could help support an embedded social worker. She knew they give out a lot
of grants and taxpayers in Edmonds continue to fund Verdant. Ms. Dunscombe responded the City has
received Verdant grants in the past. In asking Deputy Parks, Recreation & Human Services Director
Shannon Burley whether the City would benefit from any Verdant grants in the 2025/2026 biennium, she
indicated Verdant is moving away from things that the City has benefitted from in the past and whether
they would be doing other things that the City could benefit from in the future hasn't been explored yet. It
was decided not to include anything in the 2025/202 budget. That doesn't mean funds won't be available
in the future, but she wasn't confident enough to include funds in the 2025/2026 budget. She tends to be
fiscally reserved when budgeting revenues and she felt the grant agreement was close to being done so she
didn't include it in the budget. She likes the revenue forecast to be solid before including it in budget; with
regard to Verdant in the next biennium, the answer was it wasn't available for the purposes the City has
used them in the past.
Mayor Rosen relayed he meets with Verdant on a pretty regular basis. The City has benefitted directly from
Verdant, they support the community paramedic outreach program, partnering on social services in the
community and reducing call levels. The intent of that program is to help people before they need to go to
the emergency room, reduce police calls, etc. Verdant significantly changed their donating profile last year;
they used to give a much broader number of grants and recently focused on a very critical few.
Councilmember Dotsch commented it would seem a social worker would be right up their alley. She
recalled when she attended the Edmonds Police Awards Ceremony, there was mention of the number of
calls they respond to at the hospital, Edmonds Police responding to assist people from other communities
who are at the hospital. She wondered if there was a way to ask for more help, anticipating more call volume
when the hotel on Highway 99, which is a county facility, opens next year. It is Edmonds' burden because
the hospital is located within the City and she wondered if other jurisdictions were supporting Edmonds
police responding to calls at the hospital.
Council President Olson referred to an earlier comment about operating reserves, pointing out operating
reserves are very slim at this point. The operating reserve at yearend is forecast to be $800,000. She asked
Ms. Dunscombe to confirm that amount. Ms. Dunscombe said she did not consider fund balance a reserve
at all, but that was the forecast amount. Council President Olson observed that was fund balance not
operating reserves. She asked if there were any operating reserves besides the emergency contingency. Ms.
Dunscombe shook her head and Council President Olson confirmed there were no operating reserves. To
the question of why not take all we can, Council President Olson said it is because it has to be repaid and
at some point it is a struggle to make the loan payments and when the loan payments can't be made, that's
called bankruptcy. She summarized that is why the council doesn't want to borrow any more than they have
to in order to get by in the interim until the revenue side of things is addressed. As hard as this is, it is the
council's responsibility.
Council President Olson offered the following amendment, noting it is a not a huge move from the amount
in the budget, but if the council could commit to finding another $1 million to reduce the amount to be
borrowed, that would be a good place the start, acknowledging the council is working hard on revenues and
hopefully will be able to have budget amendments during the year to bring the borrowing amount down
further. She suggested a $6.5 million loan as the target for balancing the budget instead of $7.5 million.
COUNCIL PRESIDENT OLSON MOVED TO BORROW $6.5 MILLION IN THIS BUDGET
RATHER THAN $7.5 MILLION AND LEAVING THE EMERGENCY RESERVES INTACT.
MOTION DIED FOR LACK OF A SECOND.
Edmonds City Council Draft Minutes
November 4, 2024
Page 5
Packet Pg. 50
Mayor Rosen asked how the council would find the $1 million in cuts. Council President Olson answered
in collaboration with the administration.
Council President Olson took the lack of a second to her motion to mean the council was not ready to
commit to a loan amount tonight.
Councilmember Nand reiterated she was disappointed the council was unwilling to make a commitment
tonight to follow Ms. Dunscombe and her staff s recommendation to authorize an interfund loan of $7.5
million. The council needs to build as much certainty into the 2025/2026 budget as possible, especially
when non -represented employees are already being asked to furlough for the next year, do 100% of the
work they are doing this year on 13% less income. She was considering fairness to City staff and retention
of talent, commenting the City can keep training great people and they can go to other cities once Edmonds
has invested the time and effort in training them or Edmonds can be a hospitable environment to work in
and retain its civil servants for decades which she felt should be the goal of City government.
Councilmember Chen asked how the council will be reviewing the budget, whether it will be account by
account, line item by line item or pick and choose which items to vote on. He pointed out borrowing was
one of the numerous items included in the budget book. Mayor Rosen recalled on Saturday the council
agreed to a process of using an amendment form to make amendments and councilmembers were
encouraged to look at them programmatically instead of line by line. The deadline for submitting those is
November 13. Councilmember Chen commented the budget amendments will impact the amount that needs
to be borrowed. If the loan amount is determined now, that is working backwards.
Ms. Dunscombe thanked the council for allowing her to participate via Zoom. Her thought process for the
council's first budget deliberation process was to agree on whether $7.5 million was the right amount given
the positions that will remain vacant and are proposed to be laid off. Agreeing on whether $7.5 million was
the right starting place was the first question. It appears there are four councilmembers who do not agree
the $7.5 million loan is the right amount. If council decides $7.5 million is not the right amount, the next
question is whether to use contingency reserves to reduce the loan amount. There are also some
councilmembers who do not want to use reserves to reduce the loan amount. Once decisions are made on
whether to leave the contingency reserve intact or not and if $7.5 million is not the correct number, the
council needs to look at programs in the budget book and evaluate how they contribute to community
priorities in the community survey, and using the scoring to determine what programs are essential, what
can the City not reduce, what is non-negotiable, what needs to be fully funded? Once the ones that are off
the table and need to be fully funded are identified, the consideration can be given to what programs can be
considered for reduction or reduced schedule or delayed to the next biennium. She reiterated the first
question to be answered was whether $7.5 million was the right amount.
Councilmember Paine commented it is clear to her that $7.5 million is the right amount. To councilmembers
who have mentioned the importance of staff, she totally agrees and the council needs to find a way to ensure
as many staff members as possible are retained. She was hopeful amendments will be provided early enough
so councilmembers have time to consider what they will support. Ms. Dunscombe commented if the council
decides $7.5 million is the right number, there is no fund balance to borrow from. So every time an
amendment is made, as was said on Saturday, there will need to be an offset. Mayor Rosen recalled council
agreed to that at Saturday's meeting.
Councilmember Eck sensed it was important to give Ms. Dunscombe an answer tonight regarding the
internal loan amount so things aren't held up. She did not think the council should be hasty but felt providing
her an answer tonight was reasonable. Mayor Rosen responded it is possible the council could make
amendments that would lower the amount. During deliberations, the council can continue to make cuts or
identify revenue opportunities so the motion could be no more than $7.5 million. Councilmember Eck
Edmonds City Council Draft Minutes
November 4, 2024
Page 6
Packet Pg. 51
8.2.a
recalled Ms. Dunscombe saying amounts would be transferred a little at a time so even if the council
approved a $7.5 million loan to give leeway, chances are not all of it will be needed.
Ms. Dunscombe answered it sends a good signal to the community regarding what services the council
feels are non-negotiable, required and identified as priorities by the community and the level they should
be delivered. By agreeing to the $7.5 million in the proposed budget, that is the starting point and there will
be amendments during the deliberation process. If the $7.5 million is correct and that level of service is
what the council wants to provide to the community based on the survey and the scoring exercises,
consideration should be given to 2026 to figure out if the proposed $5 million internal fund loan is the right
number.
COUNCILMEMBER ECK MOVED, SECONDED BY COUNCILMEMBER PAINE, TO APPROVE
THE $7.5 MILLION AMOUNT TO GIVE TO STAFF SO THEY HAVE THAT AMOUNT AS A
STARTING POINT.
Councilmember Dotsch recalled Ms. Dunscombe explained the way the $7.5 million amount was
determined was that was the amount that did not fully rob the utility funds and impact their work. The $7.5
million is not a set amount, it is the maximum that can be borrowed and not harm the work the utilities do
in the community. She recalled the $5 million in 2026 was based on the same calculation. She did not have
a sense of what the correct number was and she was concerned repaying that amount was a risk for the City.
The budget currently shows the City going insolvent in 2027. She preferred the council do more moving
around through the budget, noting the Saturday revenue workshop was very helpful. If the council plans to
ask taxpayers for more money, the council needs to look at all options to avoid spending beyond its means.
Edmonds only has so much revenue and the businesses it has; there is potential for more revenue in the
longer term and some options for short term. Mayor Rosen reminded the motion was to approve the amount
in the budget.
Councilmember Tibbott expressed support for the motion, commenting the idea of up to $7.5 million was
embedded into the motion, but not more than $7.5 million. To the extent this facilitates the budget
conversation, it is worthy to approve it tonight to allow council to continue its deliberations. He hoped the
council will be able to identify additional cuts to reduce the $7.5 million amount.
MOTION CARRIED (4-3), COUNCILMEMBERS CHEN AND DOTSCH AND COUNCIL
PRESIDENT OLSON VOTING NO.
Council President Olson recalled Ms. Dunscombe saying the approach that will work best is for
councilmembers to identify programs that can be cut versus line items or staff positions. For example, she
traveled this year she saw the difference in the way parks are maintained in Rome and Florence; Florence
maintained their parks much like Edmonds and they were beautiful and perfect. She thanked Parks for the
amazing job they do maintaining Edmonds parks, but it is an option to mow once a month instead of once
a week which is absolutely what she saw in Rome. She didn't love it as much, but it was okay, people were
still enjoying the parks. There could be a carve out or exceptions for the ballfields, but the rest of the park
mowed just once a month.
2. TRANSPORTATION PRIORITIES AS PART OF THE 2024 TRANSPORTATION PLAN
City Engineer Rob English introduced Transportation Engineer Bertrand Hauss who commented the title
of this item was misleading as the intent was to review a Proposed Multi -Use Paths Revision (as part of
Transportation Plan Update)
• Background:
o —100 Transportation Projects were listed in preliminary project list (preliminary estimate >
$550 million)
Edmonds City Council Draft Minutes
November 4, 2024
Page 7
Packet Pg. 52
8.2.a
o Multi -use paths (MUP) projects were identified on State Routes (based on WSDOT Complete
Streets Policy)
0 14 MUP Projects were identified on arterial and collector streets (=>preliminary estimate of
—$125 million/covering total distance of — 10 miles)
Non-MMLOS Project Map
A00333J
wrr n.imq
�09 NU YIiM
, ronl6 Moot-iwOE
rY.M.oN =
M.bp ieMV W M •
_ � .pnU yXJ eManN3
�I
9
a
�' 1
• MMLOS Project Ma
LEGENn
A
P-J-TyP
BRe Lena
N
= 54ewM
_ Lanos
= T.,
wm..y
.
•INn�xse.im Pro�eci
EamomsCM Lume
�..,..._
I
Proposed Revision
o Due to the high cost of non-MMLOS MUP's projects and low probability of securing grants to
build them, removal of MUP projects on all arterials and collectors except ones on MMLOS
Project Map:
■ Olympic View Dr. from 76' Ave. to City Limits (MUP-01);
■ 228t1i St. SW from 95d' Pl. W to Highway 99 (MUP-13);
■ 220th St. SW from 76th Ave. W to Highway 99 (MUP-21);
■ 212t1i St. SW from 72nd Ave. W to Highway 99 (MUP-22); AND
o Total number of projects
Edmonds City Council Draft Minutes
November 4, 2024
Page 8
Packet Pg. 53
8.2.a
■ Reduction from 100 projects to 90 projects
o Preliminary estimate of all projects
■ Reduction from —$550 million to —$455 million
o Reduction of MUP distance on collector and arterial streets
■ Reduction from 10 miles to 2 miles
Roadway & Intersection Projects
_LGEND ' A
• InhrSetlian Pmod N
= awUray PrgM '
Eam 1 CO I,—
L._
d
0
Active Trans ortation Projects
LEGEND
PrW +TYw
= 9Yu Law.
= saw.0
= T. ut
R-e..., a 1'
P,
EEmonO.0 yLmm.
rd�
Recommendation
o Staff recommends keeping MUPs on State Routes and removing from collector/arterial streets
except for the following stretches:
■ Olympic View Dr. from 76' Ave. to City Limits (MUP-01)
■ 228th St. SW from 95d' Pl. W to Highway 99 (MUP-13)
■ 220th St. SW from 76th Ave. W to Highway 99 (MUP-21)
■ 212th St. SW from 72°d Ave. W to Highway 99 (MUP-22)
o Transportation Committee and North Sound Bicycle Advocacy Group support this
recommendation.
Edmonds City Council Draft Minutes
November 4, 2024
Page 9
Packet Pg. 54
U)
C�
C
co,,i.AAl.
O
U
0
4
N
0
N
d
E
t
to
Q
8.2.a
Mayor Rosen asked if staff was seeking a decision from council tonight. Mr. Hauss answered yes, the
Transportation Plan process is looking at prioritization of cost estimates; no further work would be done on
the cost estimates for the projects to be removed.
Councilmember Chen asked for confirmation with this proposal MUPs on Highway 99, SR-104 and SR-
524 would remain and MUPs on the smaller arterials would be removed. Mr. Hauss answered that was
correct.
COUNCILMEMBER CHEN MOVED, SECONDED BY COUNCILMEMBER ECK, TO APPROVE
THE REMOVAL OF MULTI -USE PATH PROJECTS ALONG MINOR ARTERIAL STREETS AS
PROPOSED.
Councilmember Tibbott expressed support for the motion, asking for confirmation that connectivity to new
transit options will be prioritized. Mr. Hauss answered that was correct. Councilmember Tibbott
commented this proposal would focus efforts on projects that have the highest possibility of getting grant
funding. Mr. Hauss answered that is somewhat considered in the priority.
Councilmember Paine commented one of the emails the Transportation Committee received pointed out
multimodal levels of service can also be funded through impact fees. She asked if these projects would be
eligible for impact fees if they were not on the list. Mr. Hauss answered if they are not shown in the plan at
all, that indicates they are not a priority for the City over the next 20 years. Councilmember Paine
commented impact fees are another funding opportunity in addition to grants. Mr. Hauss commented on
average 10 projects would cost $100 million so $10 million each; impact fees would not provide that level
of funding. The City was unlikely to secure grants for those because they would not fare well with other
projects and most would require a local match.
Councilmember Dotsch observed 196' narrows as it goes east and asked where the additional right-of-way
would come from to accommodate the addition of a 10-foot wide sidewalk. Mr. Hauss answered the path
is identified in the planning document, but further study would be required. He acknowledged there would
be a significant right-of-way take. On the segment east of Olympic View Drive to 88th, grade differences
on both sides would make that challenging and that has been identified as needs further study. In some
areas where the 2-way left turn lane is pretty wide, there may be an opportunity to reduce the lane width.
These have not been studied in great detail, this is just identifying preliminary cost estimates but a lot more
work would need to be done. Councilmember Dotsch commented some days she turns there, it is backed
up from 76t1i to the top of the hill almost to the fire station. She did not see a need for a MUP on 196th
because no one walks on 196' because there is nothing to walk to other than housing and one church. She
suggested 200th instead.
COUNCILMEMBER DOTSCH MOVED TO AMEND THE MOTION TO REMOVE THE 196TH
MULTI -USE PATH FROM THIS AND APPROVE THE REST. MOTION FAILED FOR LACK OF
A SECOND.
Mayor Rosen restated the motion:
TO APPROVAL THE REMOVAL OF MULTI -USE PATH PROJECTS ALONG MINOR
ARTERIAL STREETS WITH THE EXCEPTION OF THOSE FOUR NOTED, OLYMPIC VIEW
DR. FROM 76TH AVE. TO CITY LIMITS, 228TH ST. SW FROM 95TH PL. W TO HIGHWAY 99,
220TH ST. SW FROM 76TH AVE. W TO HIGHWAY 99 AND 212T11 ST. SW FROM 72ND AVE. W TO
HIGHWAY 99
MOTION CARRIED UNANIMOUSLY.
Edmonds City Council Draft Minutes
November 4, 2024
Page 10
Packet Pg. 55
8.2.a
Mayor Rosen pointed out at the upcoming regular meeting, there was 45 minutes scheduled for budget
deliberations. With the discussion that just occurred, he suggested council consider whether they wanted to
continue that discussion.
Council President Olson commented it was her sense there may not be content for continued budget
deliberations at the regular meeting. Obviously she wanted to have deliberations if there were things that
councilmembers wanted to talk about. She suggested during approval of the agenda the agenda item related
to Council 2025-26 Budget Deliberations be removed.
ADJOURNMENT
With no further business, the Council meeting was adjourned at 6:38 pm.
Edmonds City Council Draft Minutes
November 4, 2024
Page 11
Packet Pg. 56
8.3
City Council Agenda Item
Meeting Date: 11/26/2024
Approval of Council Special Meeting Minutes November 4, 2024
Staff Lead: Council
Department: City Clerk's Office
Preparer: Scott Passey
Background/History
N/A
Recommendation
Approval of Council Meeting minutes as part of the Consent Agenda.
Narrative
Council meeting minutes are attached.
Attachments:
2024-11-04 Council Special Minutes 2
Packet Pg. 57
8.3.a
EDMONDS CITY COUNCIL
SPECIAL MEETING
DRAFT MINUTES
November 4, 2024
ELECTED OFFICIALS PRESENT
Mike Rosen, Mayor
Vivian Olson, Council President
Chris Eck, Councilmember
Will Chen, Councilmember
Neil Tibbott, Councilmember
Michelle Dotsch, Councilmember
Susan Paine, Councilmember
Jenna Nand, Councilmember
1. CALL TO ORDER/FLAG SALUTE
STAFF PRESENT
Shane Hope, Acting Planning & Dev. Dir.
Rob English, City Engineer
Jeanie McConnell, Engineering Program Manager
Navyusha Pentakota, Urban Planner
Jeff Taraday, City Attorney
Scott Passey, City Clerk
Jerrie Bevington, Camera Operator
The Edmonds City Council meeting was called to order at 7 pm by Mayor Rosen in the Council Chambers,
250 5t' Avenue North, Edmonds, and virtually. The meeting was opened with the flag salute.
2. LAND ACKNOWLEDGEMENT
Council President Olson read the City Council Land Acknowledgement Statement: "We acknowledge the
original inhabitants of this place, the Sdohobsh (Snohomish) people and their successors the Tulalip Tribes,
who since time immemorial have hunted, fished, gathered, and taken care of these lands. We respect their
sovereignty, their right to self-determination, and we honor their sacred spiritual connection with the land
and water."
3. ROLL CALL
City Clerk Scott Passey called the roll. All elected officials were present.
4. PRESENTATIONS
1. NATIONAL NATIVE AMERICAN HERITAGE MONTH PROCLAMATION
Mayor Rosen invited Diana White to join him at the podium as he read the proclamation. He explained Ms.
White is on the Hazel Miller Foundation Board, an enrolled member of the Prairie Band Potawatomi Tribe,
a member of the Blue Heron Canoe Family, a trustee for the Seattle Foundation, past Edmonds School
Board Director, past Edmonds Center for the Arts Board Member, and a darn fine person.
Mayor Rosen read a proclamation proclaiming November as National Native American Heritage Month in
the City of Edmonds and encouraging our community to actively seek knowledge about the original
Edmonds City Council Draft Minutes
November 4, 2024
Page 1
Packet Pg. 58
8.3.a
inhabitants of North America and commit to preserving Native American heritage and traditions for
generations to come.
Ms. White explained when she moved to Edmonds 23 years ago, one of the things she would tell her family
was there's nothing native in Edmonds, something that went on for a quite a few years. Now, she is proud
to say there is a lot of native art in Edmonds including at the Waterfront Center and across the street. She
was proud of the role she has had in helping to educate people on native causes. She was happy to say this
next year she will be working on a project with other native persons to create a booklet called the Indigenous
Walking Tour of Edmonds that will highlight native art, native murals and anything they can find in the
community and also tell the story about what the art means and who the artists are. She thanked the council
for the proclamation, migw6ch in Potawatomi.
2. MAYOR'S FINANCE UPDATE
Mayor Rosen relayed the council spent time together Saturday and a good deal of the earlier meeting talking
about finances.
5. APPROVAL OF AGENDA
COUNCILMEMBER PAINE MOVED, SECONDED BY COUNCIL PRESIDENT OLSON, TO
APPROVE THE AGENDA IN CONTENT AND ORDER.
COUNCIL PRESIDENT OLSON MOVED, SECONDED BY COUNCILMEMBER TIBBOTT, TO
DELETE COUNCIL BUSINESS ITEM 10.3, COUNCIL 2025-26 BUDGET DELIBERATIONS,
WHICH WAS COVERED IN THE EARLIER MEETING. AMENDMENT CARRIED
UNANIMOUSLY.
COUNCIL PRESIDENT OLSON MOVED, SECONDED BY COUNCILMEMBER TIBBOTT, TO
CHANGE THE EXPECTED DURATION OF 13, EXECUTIVE SESSIONS, FROM 30 TO 45
MINUTES. AMENDMENT CARRIED UNANIMOUSLY.
MAIN MOTION AS AMENDED CARRIED UNANIMOUSLY.
6. AUDIENCE COMMENTS
Arlene Williams, Edmonds, representing herself and 13 other residents on 2271 Place SW and 228t" Place
SW who are asking for a small transition zone in the proposed alternatives for the Westgate Center. They
want reduced building heights for 22805 and 22811 100' Avenue West to create a buffer for the adjacent
single family homes on 227t' Place SW which are at the same elevation as these two commercial lots. There
is already a subarea on the southern border of the proposed Westgate map and there is no reason not to
include one on the northern border. The lot at 22805 100t'' Avenue West is currently restricted to two stories
with no incentive for an extra floor. Proposed Alternative A would add three floors to that lot for a total of
five floors which is unacceptable. They are proposing three stories without incentive for these two lots as a
transition between Westgate Center and the single family homes. She believed the current momentum
behind Westgate Center Alternative A is based on a mistaken assumption that the city code currently allows
four stories everywhere in Westgate; instead as shown on pages 3-5 of the materials she provided, only the
southwest corner allows four stories. A majority of lots are three stories with some two story around the
boundaries where low rise single family homes are at the same elevation as the commercial lots. These two
lots also contain protective slopes above the 340 elevation mark (see pages 6 and 7) where existing trees
and vegetation shall be retained and no development activity like grading or construction can occur. These
two commercial lots have stormwater and drainage issues as well which she explained in her written
comments on pages 1-2. Currently there is excess capacity in the combined preferred alternatives to allow
the council to make this change. The surplus capacity for Edmonds is a whopping 1,800 units above the
Edmonds City Council Draft Minutes
November 4, 2024
Page 2
Packet Pg. 59
8.3.a
2,400 units the City needs to find which is 175% of what is needed. The planning board is recommending
restricting the whole Five Corners Center to three stories with no incentive. It is only fair to treat these two
Westgate lots the same and spare residents on 227' Place SW. She urged the council to make this change
at the comprehensive plan level and not leave it for later zoning. She provided written material.
Ken Reidy, Edmonds, suggested one way the city can increase revenue is to lease or sell surplus items
that the city owns. For example, land, property or equipment acquired in the past for public utility purposes
can be leased or sold under RCW 35.94.040. This RCW was not complied with when public ownership of
stormwater facilities at 22901 Edmonds Way was conveyed to a private party under Ordinance 4061. He
questioned how this happened and if there was ever any accountability. During last year's budget process,
a presentation involving red light camera revenue was made even though city council had not adopted
legislation allowing red light cameras. On June 25, 2024, council voted to adopt Ordinance 4361 related to
red light cameras; the ordinance claims it was adopted pursuant to RCW 46.63.170 which is not possible
as RCW 46.63.170 was repealed prior to June 25, 2024. He urged the council not to rely on red light camera
revenue before they have confirmed that Ordinance 4361 was adopted pursuant to existing state law.
Next, Mr. Reidy said he has informed the city that there are signs posted in Civic Park that are not consistent
with city law. The signs have not been removed. He recommended looking at ECDC 20.60.075 to see if a
policy needs to be added requiring the mayor or a director to verify that all wording on governmental signs
is consistent with city code before city staff purchases and installs signs. As the council adopts the budget
for 2025-2026 in the weeks ahead, he urged council to consider what should happen if the budget is not
executed. For example, the code rewrite has been budgeted on multiple occasions, yet it has never been
executed. Finally, he has asked questions about the hearing examiner for years. For example, what should
happen if city staff and the city attorney choose not to provide a hearing examiner all relevant code sections
for a hearing. On March 29, 2023, he informed city council that the hearing examiner term was set to expire
at the end of 2023 and that he was hopeful Edmonds city government would not overlook that expiration
for the third time. He asked that all his questions be considered by city council prior to confirming the
mayor's appointment of a four year term starting January 1, 2024. His questions were never answered and
no appointment or reappointment to the office of hearing examiner for a new four year term was ever made.
He questioned how that happened.
7. RECEIVED FOR FILING
1. WRITTEN PUBLIC COMMENTS
2. BUDGET QUERIES 3.0 - COUNCIL BUDGET QUESTIONS AND
ADMINISTRATION/STAFF RESPONSES
8. APPROVAL OF CONSENT AGENDA ITEMS
COUNCIL PRESIDENT OLSON MOVED, SECONDED BY COUNCILMEMBER TIBBOTT, TO
APPROVE THE CONSENT AGENDA. MOTION CARRIED UNANIMOUSLY. The agenda items
approved are as follows:
ADOPTION OF CODE AMENDMENTS FOR PERMIT PROCESSING TIMELINES AND
PUBLIC NOTICE TO ACHIEVE COMPLIANCE WITH MANDATES IN SB 5290 AND HB
1105 (FILE AMD2024-0002)
9. PUBLIC HEARING
PUBLIC HEARING ON DISPOSITION OF SEWER EASEMENT — ANTHOLOGY
SENIOR LIVING
City Engineer Rob English reviewed:
Edmonds City Council Draft Minutes
November 4, 2024
Page 3
Packet Pg. 60
8.3.a
• Project Location
A�
A
3 �
P
• _(YWNWOOD 4-f EDMONDS 206TH ST SW
-A�
W Z
a �I TH ST SW
^ �NNP OO�pFP�E
t
r! OJta
3
=-.RQANNOS 220THSTSW
• Survey of Sewer Easement
o Originally easement recorded in 1977 as a 10-foot wide sewer easement with the bulk of the
easement on Lot 3 to the northwest and crossed into Lot 4 where the Anthology development
is occurring
o Easement encumbers a portion of the south side of property — 216 sf Easement Area on Lot 4
o Prior building was served by a sewer pipe line connected to that building
o When building was demolished for development of Anthology, the sewer was capped and
service was no longer provided
EXHIBIT C
DEPICTION OF PORTION OF EASEMENT FOR REUNQUISHNENT
c 212TH ST SW
l") (PUBUC RIGHT OF WAY)
GRAPHIC SCALI
30'
a zs sI
L -50'
LOT G
TPN: oD5BO1o00oo4Dl
I
EASEMENT
6
EASEMENT TO BE
RWNOUISHED PANT OF Q�
NM'59'21'E COMMENCENENT g
10.00'� N50L0'39'W BE COR LOT 4 v
2T.BJ'
ROEr OF BE9xNN9 30' � a
A, N8952'W'W 128.08' 1
N50vo,39'W 10' SANITARY SE-
15.85' , EA9EN11 REG N0.
17
------------- Rse7r
LOT 3
EMOET PLAT E.77 „ T
REc. NO. 7706710Y
PARK 212 APT LLC -
- EXHIBR NOTE — q '83c2
THI5 EXHIBIT HAS BEEN PREPARED TO ASSIST IN 4 D 9_S8R�5
THE INTERPRETATION OF THE ACCONP—NO �aNAt LeA
IEGAL DESCRIPTION- E' THERE 5 A CONFLCT --��
BETWEEN THE W—EN LEGAL DESCRIPTON ANO
THIS SKETCH, THE LEGAL DESCRIPTON SHALL NW 1/4, NW 114. SEC. 29, Tw P. 211.,-F.+_.. 11.
Engineering Program Manager Jeanie McConnell reviewed:
• Proposed development — Anthology Senior Living
Edmonds City Council Draft Minutes
November 4, 2024
Page 4
Packet Pg. 61
V
N
0)
C�
C
^)^
CL
N
C
O
V
Iq
O
4
N
0
N
C
E
t
C�
R
w
Q
8.3.a
0 127 senior living units
o Located in CG zone which has different frontage improvements than existed prior to
construction of this development
o Future development will include
■ Landscape buffer between the street and sidewalk
■ New wider sidewalk
■ Sidewalk encroaches onto private property for which pedestrian easements were retained
Proposed Development
o Subject sewer easement only serves subject property
o Existing public sewer abandoned with project
o New sewer connection direct to 212th St SW
o Public pedestrian easement
o Public water vault easement
21M STREET SW !{ I
PROPOSED 5--SENIOR
LMNG FPCILITY MiX BEVEL
UNDERGROUND PM
NING
Mr. English continued:
• Disposition of Easement
o RCW 35.94.040
■ By resolution and pursuant to a public hearing, City Council may release or otherwise sell,
the surplus lands or property at its fair market value or rent or other consideration to be
paid
o Resolution 1560 approved by City Council 10/22/2024
o Appraisal — Fair Market Value $8,700
o Other Consideration
■ City ownership & maintenance responsibilities eliminated
■ Public pedestrian & water vault easements granted
■ Frontage improvements constructed — 212th St SW & 72nd Ave W
Edmonds City Council Draft Minutes
November 4, 2024
Page 5
Packet Pg. 62
8.3.a
o Easement Comparison
■ Pedestrian & water vault easements to be granted - approx. 1823 sf
■ Sewer easement proposed to be released — 216 sf
Staff Recommendation
o Approve release of sewer easement
o No monetary compensation in consideration for the improvements being built and the
easements granted to the city
o Acceptance of public pedestrian and water vault easements
■ (Approved by City Council February 15, 2022)
Mayor Rosen opened the public testimony portion of the hearing.
Ken Reidy, Edmonds, commented a much different item was presented to the PPW Committee at its
March 8, 2022 meeting. The committee was told the city wanted to release a utility easement. Somebody
had taken the time and spent public resources to prepare a final draft of a release of a utility document and
there was no mention of the need for a public hearing in the committee agenda packet. He emailed the
committee on March 5, 2022 and informed the committee of the following: "The City of Edmonds does not
release or relinquish a public easement. The City of Edmonds vacates public easements. ECDC 20.70.060.G
states that an appraisal that not required if a utility easement only is proposed to be vacated. Please requires
Mayor Mike Nelson request the City of Edmonds to comply with Chapter 20.70 during this process. This
is Mayor Nelson's duty per ECC 2.01.010. It is not my duty as a citizen to make sure all laws and ordinances
are faithfully enforced and that law and order is maintained in the City. Why should any citizen ever feel a
need to write an email such as this. Sadly I fear that if I do not write this email, our laws and ordinances
will not be faithfully enforced. ECDC 20.70.000 states this chapter establishes the procedure and criteria
that the city will use to decide upon vacations of streets, alleys and public easements. Ordinance 2933,
adopted January 1993. For one example of us doing this in the past, please refer to Ordinance 3289 which
vacated a portion of a utility easement. ECDC 20.70.110 states the city council shall hold a public hearing
on each requested vacation. Again, please request Mayor Mike Nelson require the City of Edmonds to
comply with Chapter 20.70 during this process. This is Mayor Nelson's duty per ECC 2.01.010."
Mr. Reidy continued, despite his efforts in March 2022, here we are over 2'/2 years later and council is
conducting a different type of public hearing under RCW 35.94. 040. RCW 35.94 says nothing about the
disposition of a sewer easement. Chapter 35.94 RCW deals with the sale or lease of surplus land, property
or equipment acquired in the past for public utility purposes. Utility easements are not real property. He
urged the council to respect the city code and comply with ECDC 20.70 and vote to refund the cost of the
appraisal found on packet pages 66-138 to the property owner.
With no further public comment, Mayor Rosen closed the public hearing.
COUNCILMEMBER ECK MOVED, SECONDED BY COUNCILMEMBER TIBBOTT, TO
APPROVE RELEASE OF THE SEWER EASEMENT.
Councilmember Dotsch asked if the property is there and it is an easement for an underground pipe, who is
paying the property tax on that, and whether it was the property owner. Mr. English answered it is fee title
so they own that and would be paying the taxes. Councilmember Dotsch asked whether they use it or not,
property tax is still paid by the current owner. Mr. English answered that was correct. Councilmember
Dotsch said she was still trying to understand how it is a physical thing to release versus vacating since the
City is vacating what is under the ground, not the property above it. City Attorney Jeff Taraday relayed his
understanding of the way property taxes work is the assessor assesses based on an appraisal of the value of
the property. The more a property is encumbered by easement drives the value of the property down, so
theoretically the property is paying less tax on something that is burdened than something that wasn't
burdened. With regard to Councilmember Dotsch second question, he explained an easement is a form of
Edmonds City Council Draft Minutes
November 4, 2024
Page 6
Packet Pg. 63
8.3.a
real property. There are lots of different types of real property, an easement is a permanent right to use
someone else's real property and is considered a real property interest.
To the question of why not use the street vacation process, Mr. Taraday explained state law provides two
separate processes for different types of easements; there is a street vacation process in RCW 35.79 which
is a different process than the process set forth in RCW 35.94. The state legislature distinguishes between
utility interests, property or in this case easements, and directs the city to follow RCW 35.94 for utility
related things. It is a similar process, but not identical. For vacations, there is a process under RCW 35.79.
There are different considerations at play; the main issue with vacation and how to know whether the
process is a vacation is all the things that can be vacated are basically related to public travel and access
such as a street, alley, a public pedestrian easement. For example, if the city were ever to get rid of the
public pedestrian easement, the street vacation process in Chapter 20.70 would be followed. In determining
the process, staff looks to the underlying purpose of the utility easement to determine if it is related to public
travel; if it is, the street vacation process is used. If it is for a utility, then the RCW 35.94 process is used.
Councilmember Dotsch commented part of it goes under the building and the City doesn't own under their
building, the City can't just go under their building because the easement exists. Mr. Taraday answered it
depends on whether there is an easement or not. If the City has a right to the underneath of someone's
building, the City can go under it. That is how easements work; a utility easement often gives someone the
right to go in, tear the property up, make repairs, replace what's there and put it back together.
Councilmember Dotsch commented it's access; like going to a movie theater, this is the ticket to get in that
the City is monetizing. Mr. Taraday answered the sewer easement is worth something. If the City needed
to extend a sewer over someone else's property the City couldn't just do it. The City would have to go to
the property owner and say the City would like to extend a sewer across your property and the property
owner would ask how much are you going to pay me and the City would pay fair market value or just
compensation. That is how that sewer easement would be acquired. This is just the undoing of that where
money flows in the opposite direction. In this case it is not a money flow, it is a right of property flow but
it is basically undoing what would be done if a sewer line was being extended.
Councilmember Dotsch said with that logic of putting something across someone's property, it devalues
their property. She asked if that was what the City would be paying for. Mr. Taraday agreed that was how
it worked. Anytime an easement is acquired, whether it is for a water main, sewer main, pedestrian
easement, etc., all those burden property and devalue it. The reason they devalue property is because if a
property owner gives the City permission to use their property, the property owner has less ability to do
things on their property. Because of that, the City has to pay when it acquires easements because easements
have real value. That is why condemnation exists; sometimes the parties can't agree on what to pay and the
imminent domain process is used to acquire those easements and let the court decide what just compensation
is. The City is basically doing the opposite of condemnation.
Councilmember Dotsch recalled the development is providing a pedestrian easement on the front and side
and because of that, staff s recommendation is no monetary compensation. Mr. Taraday commented if the
City wasn't getting any easement in return, the City would be acquiring cash. Because the City is getting
easements, it does not need to acquire cash to be justly compensated. Using the opposite of condemnation
example, the City feels it is being justly compensated by receiving these easements in exchange versus
taking cash.
Councilmember Nand said under normal circumstances she wouldn't question the staff recommendation to
release the easement without seeking compensation, but the City is in such a desperate financial status this
year. She asked for a ballpark estimate for how much the City is receiving in permit revenue from the
Anthology development. Mr. English answered knew they paid a substantial traffic impact fee, a building
Edmonds City Council Draft Minutes
November 4, 2024
Page 7
Packet Pg. 64
8.3.a
permit fee, and general facility charges for water, sewer and storm connections. He did not have the amounts
with him but they were sizeable because of the size of the development.
Councilmember Nand said it was her sense this type of relinquishment without compensation was standard
practice for the City. She asked if was worthwhile to ask for the $8,700 appraised value. Mr. English
answered staff s evaluation of what the project is providing offsets that $8,700 payment.
MOTION CARRIED UNANIMOUSLY.
10. COUNCIL BUSINESS
1. 2024 OCTOBER BUDGET AMENDMENT ORDINANCE
Acting Finance Director Kim Dunscombe reviewed budget amendments beginning on packet page 155:
• HR - increase spending authority by $12,729 with corresponding, offsetting revenue. Total effect
to General Fund is -$800 (packet page 155)
• Police Department — most of increased spending authority offset is by revenues, totally budget
neutral and results in zero dollar effect to 2024
• Request to increase General Fund spending authority by $550,000. The most controversial and an
item the council may want to discuss. Required to keep budget appropriation in line with forecast
spending authority and what spending authority at the end of 2024 will actually be. This keeps the
City from having a finding in the audit and other more substantial ramifications (packet page 158)
• Community, Culture & Economic Development — request to increase spending authority to
accommodate grants and other spending. Spending across 2024 and 2025 does not require more
General Fund spending, just an increase in spending to allow some of grants and donations to be
spent (packet page 159).
• Grants using ARPA funds provided in previous years that were unable to be spent and entity will
send the funds back to the City. City has until December 31, 2024 to spend the money. Request is
to apply the funds to the fire contract.
• Related to utility bond fund issuance earlier this year. True up the bond issue and refinancing related
to 2013 refunding and bring spending and repayment of 2013 bond issuance and increase spending
authority to accommodate that.
• Offset to above and put the 2024 bond issuance into the budget.
o To the question of why this was not included in the 2024 budget, it was unknown at that time
if this would be approved. Now that the refunding is complete, need to have spending authority
to accommodate payback of refunding of 2013 bonds, bond issuance and payment that will
occur in December for the bonds issued in 2024.
• Increase spending authority for Fund 511, ER&R Fund to accommodate carryover missed from
2023 into 2024 to accommodate outfitting police vehicles purchased in 2023.
Mayor Rosen relayed staff was seeking council action tonight to approve an ordinance to amend the budget.
Ms. Dunscombe agreed.
Councilmember Nand asked for clarification that the administration was proposing to sweep funds in 018
Edmonds Homeless Response Fund with these amendments or have those funds already been swept. Ms.
Dunscombe answered that was a request made in the July amendments which was declined and is not part
of this amendment. Councilmember Nand referred to Exhibits B and C which indicate the funds had been
swept. She would not be resistant to sweeping if those funds could be allocated toward preserving direct
human services staffing, equipment resources, etc. Ms. Dunscombe responded Exhibit A Fund 018, the
Edmonds Homeless Response Fund, shows the unaudited beginning fund balance is $200,000. She was
certain that would be the result after the audit and $200,000 is shown as the 2024 ending fund balance.
Edmonds City Council Draft Minutes
November 4, 2024
Page 8
Packet Pg. 65
8.3.a
Since council denied the request during the previous budget amendment process, she was not proposing to
spend any of that fund in 2024. However, as part of the 2025 proposed budget, there is a proposal to spend
$130,000 of that $200,000 to fund the social worker position in the police department.
A MOTION WAS MADE BY COUNCILMEMBER PAINE AND SECONDED TO APPROVE THE
ORDINANCE AS ATTACHED TO THE PACKET AMENDING THE 2024 BUDGET.
Councilmember Paine commented it will be good to tidy up all the loose ends going into the budget season.
COUNCILMEMBER CHEN MOVED, SECONDED BY COUNCILMEMBER NAND, TO REMOVE
THE BUDGET AMENDMENT ON PAGE 158 TO INCREASE GENERAL FUND SPENDING BY
$550,000.
Councilmember Chen observed the description states the 2024 budget originally budgeted $3.2 million as
savings supposed to be realized by projected staff vacancies which has been discovered is difficult to
realize. In addition, to spending the $3.2 million, that spending authority is expanded even further, another
$550,000 which was heading in the wrong direction given the City's current financial situation. This
$550,000 was based on cashflow estimates that that amount would be spent by year end. He cautioned the
spending limits are heading in the wrong direction. He understood there was an audit concern, but if it was
truly needed by the end of the year, a yearend budget amendment could be approved. At this time, he was
hesitant to approve that amendment.
Councilmember Nand recalled Ms. Dunscombe and Finance Committee Chair Councilmember Chen had
a robust discussion about lifting the spending limit by $550,000 during the Finance Committee meeting.
She seconded Councilmember Chen's motion for discussion to raise this issue for the council and the public
to show the council is paying assiduous attention to every dollar in the budget book. She was comfortable
with raising the spending authority by $550,000 but wanted to provide an opportunity for Councilmember
Chen to explain his concerns.
AMENDMENT FAILED (2-5), COUNCILMEMBERS CHEN AND DOTSCH VOTING YES.
MOTION CARRIED UNANIMOUSLY.
2. PLANNING BOARD PREFERRED GROWTH ALTERNATIVE AND FLUM
DISCUSSION
Acting Planning & Development Director Shane Hope explained tonight is aimed at selecting a preferred
alternative for further growth. She reviewed:
• Task at Hand
o Selection tonight of Preferred Alternative to guide growth
■ Council's November 4 selection critical because Draft Comp Plan must be revised to reflect
the selection and other information; this will take 2-3 weeks;
■ Delay in selecting Preferred Alternative would make it nearly impossible to complete the
Comprehensive Plan update before the end of 2024 (when it is due to the State).
■ About the only way the Comprehensive Plan can be completed by the end of 2024 is if
nothing else changes and the council holds an additional meeting between Christmas Eve
and New Year's Eve.
• Recap of Proposed Alternatives
Edmonds City Council Draft Minutes
November 4, 2024
Page 9
Packet Pg. 66
8.3.a
Step 1: Growth Target City needs to plan for Step 2: Counting the existing capacity
County adopted housing units
target (includes existing capacity
including H-99)
Edmonds currently has capacity for 5148
units, but only 4,948 units can be counted
towards growth targets.
• 4862 units that are mufti family, senior
apartments Le low rise or mid rise
• 84 units that must are middle housing
• Capacity for ADUs has not previously been
evaluated
• 201 units that are single family (Not
Counted as they do not satisfy HB 1220)
4,946
Existing
Ca ac'
Per BLR
11
9,069 — 4,946 = 4,123
Required Typology for the total 4,123
• 1952 - low-rise or mid -rise multi-
family apartment category.
• 2129 ADUs or low-rise or mid -
rise multi -family apartment category.
• 42 units that are middle housing low-
rise or mid -rise multi -family
apartment category
Step 3: Capacity we need to plan for after
considering existing plus capacity achieved
by the enabling house bills
HB1110-HB1337
Achieved Capacity
4,946
2,019
Existing
Ca aci
Per BLR
1
•
300 units approx.
Loss of unro in UNOCAL
2,400 units
City to find potential growth locations feasible to
accommodate this additional housing
Growth Alternatives A and B
o To accommodate needed capacity for housing and jobs
■ Both alternatives include capacity on Hwy 99 and along SR 104.
■ Each alternative varies in where and how much future development would occur
ticllDS Alternative
ED Focused Growth .-. •.vw Baer,... --
Neighborhood Residential
(Housing Bills Compliance)
Middle housing: Duplexes, Triplexes, ADUs, townhomes,
quedplexes(only withone alTcd,bI unit), stocked flats,
cottage style and --yard apartmerrts t
Neighborhood Center l i
Mid —le mixd : Apartments or contlos with retail/ ocid/o4' Floors
ffices on grwntl floor in seleR locations
Neighborhood Hub
Low -stele mized-use: Apartments or con dos with retail/ wmVM camp... ! !•
commercial/offices on ground floor in select locations 3Floors
aTransit Oriented Housing
Total Capacity Enabled in ALT A -
3,860
---------------------------------------------
Note_ Cap dly meMrs shown arc approximate values
Neighborhood Residential
(Housng Bills Compliance)
Middle housing: Duplexes, Triplexes, ADUs. townhomes,
quadplexes (only with one affordable unit), stacked flats.
cottage style and courtyard apartments
Neighborhood Center
Mld-scale mixed -use: Apartments or condos with retall/
commercial/ofces on grwntl floor In select locations 3' Floors
•Neighborhood Hub
Low -scale mixed -use: Apartments or contlos with retail/
coma"" 'I/ offices on ground floor in select locations 3- Floors
LTransit Oriented Housing
`Maplewood Hub: Cannot count towards GMA Capacity
Total Capacity Enabled In ALT B
4,285
---------------------------------------------
Note_ Capacity melocs shown are approximate values
Edmonds City Council Draft Minutes
November 4, 2024
Page 10
Packet Pg. 67
Alternative A: Alternative 13:
Focused Growth Distributed Growth
Total Capacity Enabled in Total Capacity Enabled in
ALTA - 3,860 L7 ALT B - 4,285
Westgate Wa ttTMaa Way
PorInNlk 40 Nt—
MEN
Urban Planner Navyusha Pentakota reviewed the Planning Board Recommendation for Preferred Growth
Alternative:
0 Draft Area Details of Planning Board's Recommendation (with capacity achieved)
o PB Preference: Westgate
■ Growth Area Extent: Alt A as proposed
■ Heights — Alt A as proposed
Neighborhood Commercial
Existing Multi -Family (3 floors)
Up to 4 floors (5 with incentive)
Up to 4 floors
1800 units
o Future Land Use Changes: Westgate
Conipmhenstya Plan 2020
Community Commercial 45' max
Single Family Urban 1 25'
Mind Use 5 Up to 4 floors is with
incentive)
Mixed Uw 4 Up to 4 flOOM
Low density Residential 1
Edmonds City Council Draft Minutes
November 4, 2024
Page 11
Packet Pg. 68
V
8.3.a
o PB Preference: Five Corners
■ Growth Area Extent: Alt A as proposed
■ Heights: Max height of 3 stories (no bonus)
Existing Multi -Family (3 floors)
Up to 3 floors
420 UNITS
r
•a.
!two
o Future Land Use Changes: Five Corners
Comprehensive Plan 2020 Comprehensive Plan 2024
Neighborhood Commercial 25' % Mixed Use 3 Up to 3 Roars
Single Family Urban 1 25'
low Density Residential 1
Multi Family Medium Density 25'-30'
- MOd¢ra[¢ Density
Residential
o PB Preference: Medical District
■ Growth Area Extent: Alt B as proposed
■ Heights: Mix of what's proposed in Alt A, Alt B
- Parcels on either side of 212th - Heights same as proposed in Alt A - Up to 4 floors
(5 with incentives)
- Rest of the parcels (E of 76th, west and south of Woodway High School) - 3 Floors
max (No incentives)
Existing Multi -Family (3 floors)
Up to 4 floors (5 with incentive)
iiiiiiiii Up to 4 floors
Up to 3 floors
7Cn I IKIITC
o Future Land Use Changes: Medical District Expansion
Edmonds City Council Draft Minutes
November 4, 2024
Page 12
Packet Pg. 69
8.3.a
Medical/Hwy
99 Activity
nteroa
_--
r
f
v/ 0,
Comprehensive Plan 2020
Mixed Use Commercial 25'-75'
Single Family Urban 1 25'
Multi Family Medium Density 25-30'
- Mixed Use 5(Medical) Up to 4 floors(5
with incentive)
Mixed Use 4 Up to 4 Floors
WA Mixed Use 3 Up to 3 Floors
Low Density Residential t
Moderate Density residential
o PB Preference: Firdale (Hub & Center)
■ Firdale Center
- Same as proposed
- Alt A and B are exactly the same
■ Firdale Hub
- Growth Area Extent: Alt A as proposed
- Heights: Alt A - as proposed
Existing Multi -Family (3 floors)
Up to 4 floors (5 with incentive)
Up to 3 floors
1
1 ■
-30 units JIM
I
F.
�290 units
o Future Land Use Changes: Firdale
Comprehensive Plan 2020
Neighborhood Commercial FVMU - Up to 52'
BN- 25'
- Single Family Urban 1 25'
Multi Family High Density 25-30'
o PB Preference: North Bowl
Comprehensive Plan 2024
Mixed Use 5 Up to 4 floors (5
with incentive)
Mixed Use 3 Up to 3 floors
- Low Density Residential 1
Moderate Density
Residential
Edmonds City Council Draft Minutes
November 4, 2024
Page 13
Packet Pg. 70
V
N
0)
r.+
7
_
R
a)
a
rn
0
v
v
0
4
N
CD
N
C
E
t
ci
R
a
8.3.a
■ Growth Area Extent: Alt B as proposed
■ Heights: Alt B as proposed
Existing Multi -Family (3 floors)
Up to 3 floors (4 with incentive)
Up to 3 floors
—200 units
a
o Future Land Use Changes: North Bowl
Comprehensive Plan 2020
Comprehensive Plan 2024
Neighborhood Commercial 25 IIIVA� Mixed Use 3 Up to 3 Floors
Single Family Urban 3 25 Mixed Use 4 Up to 3 Floors (4
with incentive)
Low Density Residential 2
o PB Preference: Perrinville
■ Growth Area Extent: Alt B as proposed
■ Heights: Alt B as proposed
Existing Multi -Family (3 floors)
Up to 3 floors (4 with incentive)
o Future Land Use Changes: Perrinville
Edmonds City Council Draft Minutes
November 4, 2024
Page 14
Packet Pg. 71
8.3.a
Comprehensive Plan 2020 Comprehensive Plan 2024
Neighborhood Commercial 25 Mixed Use 4 Up to 3 floors (4 with
incentive)
Single Family Urban 1 25
Low Density Residential 1
Single Family Urban 3 25 Low Density Residential 2
_ Multi Family Medium Density 25-30 Moderate Density
Residential
o PB Preference: East Seaview
■ Growth Area Extent: Modified Alt B. Removed few parcels north of 196t'
■ Heights: Alt B as proposed
Existing Multi -Family (3 floors)
iiiiiiiiiiis Up to 3 floors
ID i I
A
4PNeNVOOP
o Future Land Use Changes: East Seaview
Comprehensive Plan 2020
Single Family Urban 1 25
Multi Family Medium Density 25-30
Multi Family High Density 25-30
J
Comprehensive Plan 2024
WFA
Mixed Use 3
Up to 3 floors
Mixed Use 4
Up to 3 floors (4
with incentive)
Low Density Residential 1
Moderate Density
Residential
o PB Preference: South Lake Ballinger
■ Growth Area Extent: Alt B as proposed
■ Heights: Alt B as proposed
Edmonds City Council Draft Minutes
November 4, 2024
Page 15
Packet Pg. 72
8.3.a
Up to 3 floors
E 70 units
i ` J�po a
'Il
Loire
BaOhrper
INE 10Sth St.
o Future Land Use Changes: South Lake Ballinger
I
Comprehensive Plan 2020 Comprehensive Plan 2024
Single Family Urban 1 25 &A' Mixed Use 3 Up to 3
floors
Single Family Urban 1 25
Law Density Residential 1
® Corridor Development 25-30
o PB Preference: West Edmonds Way
■ Growth Area Extent: Alt B as proposed
■ Heights: Alt B as proposed
Up to 3 floors
i units
o Future Land Use Chances: W Edmonds Wav
Comprehensive Plan 2020 Comprehensive Plan 2024
Planned Neighborhood 25.30 / Mixed Use3 Up to
floors
o PB Preference: Maplewood
■ Growth Area Extent: Alt B as proposed
Edmonds City Council Draft Minutes
November 4, 2024
Page 16
Packet Pg. 73
V
N
N
r.+
7
C
R
4)
Q
I;n
C
0
V
0
r
4
N
O
N
c
t
0
tQ
Q
8.3.a
■ Heights: 3 stories (no height incentive)
Up to 3 floors
20 units
o Future Land Use Changes: Maplewood
isere sr ww
SR 524 y+
J
Comprehensive Plan 2020
Single Family Urban 1 25
Multi Family Medium Density 25.30
Single Family Urban 3 25
o Planning Board Recommendation
Alt A as proposed
Alt A area extents
Mix of Alt A+Alt B
Alt A as proposed
• : • Alt B as proposed
• Alt A as proposed
East Seaview Modified Alt B
Perrinville Alt B as proposed
EdmondsWest Alt B as proposed
Alt B as proposed
••• Alt
o Planning Board Recommendation
Comprehensive Plan 2024
Mixed Use 3 Up to 3
floors
Low Density Residential 1
Moderate Density
Residential
4 Floors, Bonus Floor height incentive
allowed
3 Floors
3, 4 Floors,
Bonus Floor height incentive allowed on
some parcels.
4 Floors, Bonus Floor height incentive
allowed
3 Floors
Bonus Floor height incentive for few parcels
3 Floors
3 Floors
Bonus Floor height incentive for few parcels
3 Floors,
Bonus Floor height incentive
3 Floors
3 Floors
3 Floors
Edmonds City Council Draft Minutes
November 4, 2024
Page 17
Packet Pg. 74
V
rn
d
3
C
m
a
c
3
0
U
Iq
0
4
N
O
N
c
m
E
t
0
c�
r
r
Q
8.3.a
750
1,800
420
290
200
30
250
100
35
70
20
3,965 dM
H�C.,.,,.,aa.R..,.
Note: Capacity metrics shown
are approximate values
Downtown/
waren,o t
west enmoncs way
MedicaID t t
Fspans
Frve C.,—
W., ,
Y
E
F rtlniw Nonb � 1
Frtlale Village
WON
o Total Capacity Available per Planning Board Recommendation
42
Middle Housing
4,947
3,965
1,977
42
Earl s--.
subarea
$O.1M1 Eakc
r ealknge,
10,93ANO
qqW
City's Growth Target
-1,8�=
■ Existing ■ Centers & Hubs ■ ADUs ■ MU
o
Future Land Use Map Based on Planning Board Recommendation
PlanMng Board Recommended f
Preterted Growth Altemehve Iyyy `
�.r
m�
r,i
E3 --
o.�1r7.
Z,
Edmonds City Council Draft Minutes
November 4, 2024
Page 18
Packet Pg. 75
V
to
N
7
C
R
4)
Q
7
O
V
O
4
N
CD
04
C
E
t
ci
R
r+
a+
Q
8.3.a
Ms. Hope reviewed:
• Next Steps
o Tonight: Council selection of Preferred Alternative (critical step)
o Revision of Draft Comp Plan, including for transportation projects & other information: 2 -3
weeks
o Continuation of Planning Board & City Council review of other Draft Comp Plan elements
o Revised Draft Plan to be ready for Council's Initial Review — December 3
o Public hearing on revised Plan -- Dec. 10
o City Council adoption of revised Plan, with any changes — Dec. 17
NOTE: Due date to State is December 31, 2024; Then begins Code Updates to implement Comp
Plan, due July 31, 2025 + Critical Area Code updates due by Dec. 31, 2025.
Planning Board Chair Jeremy Mitchell requested an opportunity to add context since the Planning Board's
recommendation was communicated quickly and this is a sensitive discussion for the community. He
referred to the old saying that every person who moves to a small, quiet town wants to be the last person.
Here especially, given the sensitivities with heights and growth, he acknowledged at the same time the City
needs to plan from a long range perspective. This is a culmination of the last year; he recalled the
introduction to the comprehensive plan from the Planning Board's perspective kicked off last November,
but the Planning Board did not get into the meat and potatoes until this February. A lot of it was condensed
to the point where the Planning Board has been meeting every Wednesday for the past month and a half in
order to get to this point. He wanted the community to know the Planning Board does not take this lightly
as it involves drastic zoning changes that in a sense are a departure from how the City used to deal with
growth. He was happy to provide any contextual background to any of the Planning Board's decisions.
Mayor Rosen thanked Chair Mitchell for those additional comments and the amazing amount of time and
wisdom the Planning Board has invested.
With regard to consideration, and format for council action, Councilmember Nand asked if it would be
possible for council to consider and make motions for each hub as the council works toward establishing a
preferred alternative. Ms. Hope answered that would absolutely be possible and recalled that was what the
Planning Board did as well. The Planning Board wanted to look at what made sense for each hub and
neighborhood center and didn't count capacity as they did that. The Planning Board considered each
neighborhood, the form, and the conditions and made their preferred selection and added it all up.
Councilmember Paine commented she had watched several of the most recent Planning Board meetings.
With regard to the Planning Board recommendation, she asked about their discussion regarding incentives
and why there were no incentives at Five Corners. Chair Mitchell answered to preface that question requires
understanding the intent to plan the City in a way that creates places. An opportunity for placemaking is
essential for all the centers and hubs and is the premise around which the Planning Board was originally
planning. Ultimately it comes down to size and area of each hub and center. What made sense from the
Planning Board's perspective with existing topography, land area, and that some centers over others could
accommodate additional incentives for bonus height.
Councilmember Paine referred to Maplewood and asked why it was not included in the GMA capacity
count, only 20 versus the uncounted capacity of 200. Ms. Pentakota answered when Alternative B was
initially proposed, that contributed around 200 units. After the Planning Board decision was made, the
height was limited to only three floors which reduced the number of units achieved to 20. There is one
church parcel and the capacity achieved from that parcel is not counted toward the target. The rest of the
parcels can be counted toward the target which is the 20 housing capacity. Ms. Hope answered sometimes
when looking at what's feasible for development, it is not simply clipping off in theory different floors,
Edmonds City Council Draft Minutes
November 4, 2024
Page 19
Packet Pg. 76
etc., it is if a floor is added or taken away, does that change the feasibility of development. If it changes on
paper but it doesn't really change the feasibility of development, that is where it doesn't count.
Councilmember Paine referred to Westgate, recalling a person during Audience Comments requested
consideration for building heights on two parcels adjacent to where taller building incentives are proposed.
She understood that information was also provided to the Planning Board and asked about the Planning
Board's discussion regarding reducing the incentive on those two parcels. Chair Mitchell said it was not a
reduction in the incentive per se, it was a discussion regarding the next exercise after the council selects a
preferred alternative which will be diving into these more granularly and looking at where transition zones
could be. He pointed out there are already transition zones via building stepbacks in existing ordinance.
There are also critical area ordinances for mitigation. He summarized some of the concerns are covered by
the existing building code.
Councilmember Paine observed the council would be able to look at transitions in the next round. Ms. Hope
agreed, recognizing geographic characteristics of that area and the fact that in some cases the Planning
Board discussed slopes that help provide transition. There are also steep slopes that can't be built on or that
would required serious alteration to meet all the geotechnical requirements and construction techniques so
may not be able to accomplish as much as planned. It would be considered on a site by site basis.
Councilmember Dotsch clarified the Planning Board did not go through the DEIS. Chair Mitchell answered
not in a meeting; the Planning Board was provided the DEIS as supplemental reading before a meeting.
Councilmember Dotsch said in working through some of the numbers at a high level, the population target
between now and 2044 is 13,113. The City will go from a 2020 population of 42,853 to a target of 55,966
or 6,288 people per square mile for the City's 8.9 square miles. The Planning Board preferred option
includes the additional 1,862 units to 10,931. With Alternative A or B, there are also surpluses, greater than
1,800 on one and 2,181 on the other. She found it interesting in looking at the history of Edmonds, the City
has been around 2.1-2.2 capacity, consistently above 2.0 for decades. The City was tasked with planning
for 1.44 capacity for the next 20 years which created the population number and minimum units. Adding
the Planning Board's additional capacity beyond what is required, the capacity per unit goes down to 1.19.
In Planning Board Alternative A with excess, the capacity is 1.2 per unit and down to 1.16 in Alternative
B. Lynnwood is planning for 1.7 capacity per unit. She was trying to figure out what Edmonds is actually
planning for through this process, whether it is for Edmonds to become a single person per unit type
development when Edmonds is a very family friendly suburb at this time and not highly urbanized with
very limited roads. She understood the need for some flex, but feared the alternatives took the City in a
highly urbanized direction, even more so than Lynnwood which has light rail. She wanted the council to be
mindful of these numbers during their consideration and understand as more is added, especially to certain
areas, the density is out of sorts for Edmonds.
Councilmember Dotsch asked whether the ADU count looked at existing housing sizes and considered
internal ADU options such as over a certain square footage of a house. Ms. Pentakota answered yes.
Councilmember Dotsch said Mukilteo did that and she hadn't seen it in Edmonds' calculations.
Next, Councilmember Dotsch referred to the medical district expansion. She attended nearly all the public
hearings and public meetings over the past year; the extent of the land grab in this alternative was never
described to the neighborhood. No information was provided, yet the Planning Board recommendation puts
some of the highest capacity in this area. She acknowledged there was capacity to reduce that, but this area
was not informed of the plans for it to absorb some of the highest density changes of any neighborhood.
She wanted to ensure the council understood that, noting it is a heavily treed area with limited ability to get
in and out, with a lot of schools, which raises safety concerns. She relayed concern the medical district got
ballooned out, noting down to 220' was never on the original map which had the circle at 212t'', not down
at 220t'.
Edmonds City Council Draft Minutes
November 4, 2024
Page 20
Packet Pg. 77
8.3.a
Ms. Hope responded she was not here for that part and suggested Ms. Pentakota speak to how that came
about. Ms. Pentakota explained initially when the neighborhood meetings were held, there was a separate
meeting for Highway 99 which included discussions of three districts. As part of the medical district
conversation, there were a few things people wanted and the potential was identified based on that. There
were discussions around temporary residential units for people visiting people in the hospital or for medical
purposes. Due to the location and its proximity to the corridor and transit, it is identified as one of the
biggest opportunities when identifying locations for centers and hubs. It was considered based on multiple
factors and there were conversations in general with the community. There was no separate meeting after
centers and hubs were determined for each location. There was initially a plan for that, but it was not done
due to the tight timeline. These were the discussions that occurred at the time and questions asked at the
time of the open house as well as multiple comments from the community in the process.
In response to Councilmember Dotsch's comment about excess capacity, Ms. Hope acknowledged there is
excess capacity as calculated partly to ensure choices can be made and to provide flexibility for some
reductions. At the same time there is a need to recognize that critical areas, trees and other things may
further limit development or areas with special issues where the growth capacity that was identified won't
be possible. The excess capacity was intended to leave some room for decisions either at the comprehensive
plan stage or development code stage.
Councilmember Eck recognized the work done by Staff and the Planning Board over the past year,
recognizing everyone took this very seriously and trying to amplify voices of community members as
conversations have occurred. The Planning Board recommendation fundamentally keeps true to the fact of
spreading equitability while also taking into account certain sensitivities based on different areas, hubs, and
centers. The Planning Board's analysis has been thoughtful and she supported their recommendation.
Council President Olson commented in addition to planning for additional housing units, there was a
requirement to look at certain levels of affordability. It is important for the community to know that was
part of the task, and the City could not just add more single family houses. She asked how much of a
consideration the question of infrastructure upgrades was for the Planning Board and Planning Staff. She
recognized each neighborhood would love to have an extra space, a third place. She commented on the
neighborhood by Edmonds Elementary that has Portofino, which although it is a small commercial hub, it
is someplace to go with neighbors or to walk to. She liked the idea of neighborhood hubs for that reason.
In view of the financial struggles the City is having and the need to bring sidewalks up to code, etc., she
asked whether consideration had been given to whether hubs are supportable and practical from an
infrastructure standpoint, whether it was a good choice in that way.
Ms. Hope responded the concept of neighborhoods and having vibrancy, mixed use opportunities, coffee
shops, etc., was definitely part of the reason for looking at neighborhood centers and hubs. The idea of
having more places that are walkable or accessible to people in the neighborhood without driving was part
of that consideration, making those more livable. In considering the infrastructure needs for each of those,
there are probably a few things that would be changed in the transportation projects to reflect which
neighborhoods are focused on, but to some extent there are assumptions there will not be wholesale changes
in infrastructure; things will be added incrementally as they have in Edmonds for years. This is a 20 year
plan and things will not change overnight or even in five years, this is a long term process. Those things
have been thought about. There could be some transportation projects in specific areas where there is a high
need, but in general the EIS shows there will need to be some improvements over time, but none of them
are immediate, big ticket items.
Council President Olson observed there were three Planning Board Members in the room. She recognized
they had received thanks and kudos, but there has never been a year when the Planning Board has worked
Edmonds City Council Draft Minutes
November 4, 2024
Page 21
Packet Pg. 78
8.3.a
as hard as they have this year. She offered her thanks to the entire Planning Board. To the extent things
came fast and furiously to the Planning Board, she asked if there was anything they agreed to in Planning
Board meetings that they have had second thoughts about that and wanted to put on the council's radar.
Chair Mitchell answered there was a lot of emphasis on relooking at Highway 99 from a capacity standpoint
and figuring out how to best make the hubs and centers approach work there as well while looking at areas
beyond the centers and hubs to shoulder some of the growth that Highway 99 is currently shouldering.
Planning Board Member Judi Gladstone agreed with Chair Mitchell's comment, noting that was very
important to her because she viewed it as a error in the subarea plan, that the Highway 99 area would bear
the brunt of so much growth and this update needs to take an integrated look, not just here's Highway 99
and then the rest of the City, so there are clear hubs and centers and there no longer saying there's a two
mile stretch of development because that does not support placemaking. She hoped some of that could be
addressed during the next stage, the development code. In the same way, the Planning Board heard the
public's concerns with the Westgate area and the public's concerns that allowing this level going forward
those concerns can be addressed via development standards. As long as that is tracked and the intent is
known, it is okay to think that way, being thoughtful at that stage knowing what some of those concerns
are.
Board Member Gladstone continued, on Highway 99 there was discussion about 55 story buildings in
between hubs and centers so there was clear definition of where the hubs and centers are. The Planning
Board was told that can happen during the design standards phase. She wanted to ensure those things were
kept in mind and carried forward so there is flexibility because where the City says growth can occur is not
necessarily where developers will go. Having those higher numbers will be helpful to accommodate where
developers want to go, but it is up to the Planning Board and the Council to define those development
standards so the end result looks like what was envisioned.
With regard to infrastructure, Chair Mitchell said it was brought up early on in the process and throughout
when the Planning Board was reviewing hubs and centers that PSRC policy goals want cities to place
growth were infrastructure currently exists. Staff is waiting on the council to adopt a growth alternative so
they can form their CFP/CIP projects around that.
Council President Olson suggested a little more focus on the transition zones, if a couple properties change
things for a neighborhood and apparently they do because the council received a petition saying they do. If
there is excess capacity, maybe that would make sense. If the Highway 99 Subarea was left as a whole, she
was hopeful the comprehensive plan would achieve somewhat of a transition zone. Ms. Hope answered one
of the things that having excess capacity allows for is making some reductions where it makes sense. For
example, if the intent is full capacity, but some transition zones reduce that capacity, it either doesn't add
up to the total because it's not needed or its traded off with something else. Looking at the zoning code
updates that will be needed, not only will some things need to be done related to housing overall in the City
per state legislation, in each of the neighborhood centers, there needs to be careful consideration regarding
how the zoning codes, the design standards, amenities, etc. are laid out to make a real different to those
being livable, great places to be. Council President Olson summarized she thought the Planning Board
recommendation was quite good.
Councilmember Tibbott reflected on how much he would have liked to have been on the Planning Board
doing this work. The ability to have time to do a deep dive in all these neighborhoods is a great luxury and
he thanked the Planning Board for giving the council their views on how to handle the hubs. In general he
appreciated the adaptations the Planning Board made to Option B which he was finding a lot of affinity for.
In addition to transition zones such as height adjustments between taller and shorter buildings, there are
also transitional uses in many of the areas. There are some areas where buildings are 60-70 years old and
the transitional uses are moving to higher and better uses. That is one of the reasons why hubs are so
Edmonds City Council Draft Minutes
November 4, 2024
Page 22
Packet Pg. 79
8.3.a
effective for the City, it gives a chance to upgrade all around the hubs, something he wanted to lean into
for many of the reasons that have already been stated.
Councilmember Tibbott continued, recalling at the open house all of the hubs already have higher density
and multifamily uses so it's not like something completely new is being introduced, only creating potential
or upgrading what's already there. For example, one story apartments to 2-3 stories which would serve the
neighborhood better. He applauded the work that had been done there. With regard to excess capacity, he
asked at what point in the process an adjustment would be made. For example, if the council approves the
Alternative B, would reductions be made before the comprehensive plan is adopted. He was unsure where
or if any reductions would be made. Ms. Hope answered there are different options; one is to make those
adjustments during council's deliberations today. Another time to make adjustments would be before the
final comprehensive plan is adopted. Setting the future land use does not necessarily lock the City into using
the full capacity as the code is updated as long as the overall targets are met. Another time an amendment
could be considered is during next year's comprehensive plan amendment process.
Councilmember Tibbott said he would like to see a bigger map. The map is shown on a small screen and
he would like to see it printed in color on larger paper. It also seems the discussion is floors instead of
heights and he was concerned what that means. He recalled Ms. Pentakota said 25 feet is 2 floors and asked
if 36 feet was 3 floors. Ms. Hope referred to her email to council, explaining specific numbers of feet were
not included because that will depend on the zoning code. For example, the council could choose 22, 24 or
28 feet for 2 stories. The same could be decided for 3 stories, conceivable 3 stories can be achieved in 30
feet or maybe slightly more depending on the height of the first floor. That is a zoning code decision.
Councilmember Tibbott asked when the council will have input on the zoning. Ms. Hope answered the first
six months of 2025. Councilmember Tibbott summarized the council was agreeing to 1, 2, 3, 4 floors and
then will accomplish clarification of the heights during the zoning process next year. Ms. Hope agreed that
would occur early 2025.
Councilmember Tibbott asked if the Planning Board Members had any thoughts relative to floors and
heights. Mr. Mitchell answered it was difficult because a lot of people think floors are 10 feet, but it really
depends on the proposal. For example, there is a project in Seattle, Mosler Lofts, that was advertised as a
10-story building but in reality it is 18, but the unit are lofts so they count one loft as a single story. As Ms.
Hope said regarding stories and heights, it is development centric related to what the developer wants to
do. Ms. Hope said in areas with mixed use which may be a good place for a taller first floor, that is one
decision; if it is purely residential, that is a different decision regarding the number of feet.
Board Member Gladstone said from a layperson's standpoint, people can relate to floors better than feet.
Floors give Edmonds' residents a feel for what it will look like, not necessarily the actual dimensions.
Councilmember Tibbott referred to green building incentives, if there is a 2 foot space between the first
floor and 2nd floor, that automatically adds height to a building. If for example, one of the areas has a 3 floor
standard at 35 feet and they get a green building incentive, the height goes up to 40 feet. Ms. Hope answered
it could. Councilmember Tibbott observed that would be addressed during the zoning discussions. Ms.
Hope advised the green building incentives had not yet been approved.
Councilmember Tibbott said he would have difficulty approving this tonight without having a bigger map
to look at versus the tiny little map on the screen. He looked forward to having that before the council
makes a decision. Mayor Rosen reminded staff was hoping to get a decision tonight and without one,
everything backs up into potentially needing a meeting between the holidays or not being able to meet the
state deadline.
Edmonds City Council Draft Minutes
November 4, 2024
Page 23
Packet Pg. 80
8.3.a
Councilmember Chen echoed his appreciation for the hours of hard work. He was glad the blanket upzone
on Highway 99 was being reconsidered as well as the opportunity for third places. He liked Alternative B
over Alternative A because it spreads the love and lowers building heights which is more suitable for
Edmonds and maintaining Edmonds' charm while meeting the state's requirements. With regard to
spreading the love, he noticed most of the hubs and centers are in central and south Edmonds and not in
north Edmonds. He asked if there was a specific reason for that. Ms. Hope asked if he was thinking of the
Highway 99 area when he refers to north. Councilmember Chen said like Meadowdale neighborhoods. Ms.
Hope answered that was probably because there is no existing commercial in that area. The intent was to
stick to areas where there was existing commercial or multifamily development. Those were the bookends
that were selected early on, focus on those areas instead of areas developed exclusively with single family
residences, and that have a lot of infrastructure and critical area issues.
Councilmember Chen reiterated Alternative B with the inclusion of SR-104 and 76t' area has good
potential. He preferred Alternative B. Ms. Hope relayed in her observation, the majority of the Planning
Board's recommendations aligned with Alternative B other than a few exceptions where they added
Alternative A as a preferred option. Councilmember Chen echoed Councilmember Tibbott's comment that
at the appropriate time the council would nail down and right -size ethe number of units to meet the state
requirements. Ms. Hope commented the first six months of 2025 will be busy trying to accomplish that.
As the council questioned individual board members, Councilmember Dotsch reminded the Planning Board
as a body made the recommendations and not all members are present tonight. She expressed concern
Alternative B for Five Corners extends behind the water tower into the Yost area on the hillside. She was
concerned because the DEIS was not used and the final EIS has not been issued, she knows that area is
getting closer and closer to becoming a Perrinville issue. She recommended avoiding any development on
the northwest side on Bowdoin beyond the existing capacity. The other area she found interesting was when
the Co -Chair picked Maplewood, she saw a roundabout going in on 196' & 88t''. In the new plan, it looks
like right -turn only due to safety. That is an extremely dangerous area; coming out of 88t' and looking down
the hill, it is the shadows due to trees on Puget Drive and unless a car has its lights on, a driver cannot see
a car coming up the hill. People try to cross there to get to Seaview which is also very dangerous. The new
plan to create safety via right turns in an area that will only provide 20 units on a very dangerous corner
and the total 200 does not count toward the GMA, she believed from a safety standpoint and now the
transportation change for that intersection it was not necessary to retain those few properties in this plan.
Council President Olson commented the Planning Board has spent a lot of time vetting this and deciding
which hubs to leave out. She was very concerned about choosing the hubs version without going through
another workshop for the council to learn about why the Planning Board left them out because she did not
watch all the meetings. She felt very good, better than she thought she would, about the Planning Board's
proposal and felt the feedback and lack of feedback from residents was also a positive sign that they feel
they were listened to and this plan represents something they can live with. There will be an opportunity to
address the number of units in the future.
Main Motion
COUNCIL PRESIDENT OLSON MOVED, SECONDED BY COUNCILMEMBER PAINE, TO
ADOPT THE PLANNING BOARD RECOMMENDATION.
For those who wanted to see a larger map, Council President Olson suggested taking a five minute break
before beginning deliberations on the motion.
Mayor Rosen declared a brief recess.
Mayor Rosen suggested councilmembers offer amendments which would be discussed one at a time.
Edmonds City Council Draft Minutes
November 4, 2024
Page 24
Packet Pg. 81
8.3.a
Councilmember Dotsch did not support going directly to the Planning Board recommendation, recalling at
the beginning there was an indication that the council would discuss each area. She did not support the
motion, preferring to do as was originally intended.
Amendment 1
COUNCILMEMBER TIBBOTT MOVED, SECONDED BY COUNCIL PRESIDENT OLSON,
THAT THE PLANNING BOARD RECOMMENDATION FOR WESTGATE BE CAPPED AT 4
FLOORS AND REMOVE THE INCENTIVE FOR A 5TH FLOOR.
Council President Olson requested Staff and/or the Planning Board weigh in on the amendment. Board
Member Gladstone explained Alternative B is up to 3 floors with the 41 floor incentive. She asked for
clarification if the intent was 4 stories or 3 with a 4' floor incentive. Councilmember Tibbott recommended
Alternative B.
Mayor Rosen advised the amendment had been revised with approval of the second.
Councilmember Nand spoke in favor of Alternative B. She thanked the community member who presented
the petition. She was hopeful the City can continue to engage with the neighborhood during the zoning
process to address their concerns with transitions. Currently the council is at the policy stage and not
adopting zoning.
Councilmember Dotsch asked for clarification regarding the motion. Mayor Rosen clarified it was to adopt
Alternative B in the Westgate area. Councilmember Dotsch asked if that removed 5 floors with an incentive
as the Planning Board did. Ms. Hope answered that was correct. Mayor Rosen advised Alternative B was
on packet page 223. Councilmember Dotsch clarified the motion was Alternative A removing five floors
with incentive.
Councilmember Tibbott clarified his amendment:
AMEND THE PLANNING BOARD RECOMMENDATION FROM ALTERNATIVE A AT
WESTGATE TO ALTERNATIVE B AT WESTGATE WHICH IS UP TO 4 FLOORS WITH AN
INCENTIVE.
Amendment 1A
AN AMENDMENT WAS MADE BY COUNCILMEMBER PAINE AND SECONDED, TO AMEND
TO HAVE THE EXTENT OF ALTERNATIVE A INCLUDED, NOT JUST THE BUILDING
HEIGHTS, BUT A LARGER LAND AREA, NOT THE SMALLER ONE IN ALTERNATE B.
Councilmember Paine said when considering distributed growth, one would expect a bit more space. More
space would offer additional units as well as greater potential for transition zoning in the Westgate
neighborhood which is one of the biggest hubs. She was supportive of the height limit in Alternative B with
the incentive, but wanted to have the extent of the map in Alternative A. When Councilmember Tibbott
first suggested this, she thought he would keep Alternative A and remove the height incentive.
Councilmember Tibbott referred to page 189 and the additional parcel in Alternative A. He asked about the
additional parcel in Alternative A, recalling there was a church on that corner. Chair Mitchell agreed it was
a church.
Action on Amendment IA
AMENDMENT CARRIED (6-1), COUNCILMEMBER DOTSCH VOTING NO.
Amendment 1B
COUNCILMEMBER DOTSCH MOVED, SECONDED BY COUNCILMEMBER TIBBOTT, TO
AMEND TO HAVE THE SOUTHEAST CORNER STAY AT 3 FLOORS.
Edmonds City Council Draft Minutes
November 4, 2024
Page 25
Packet Pg. 82
8.3.a
Councilmember Dotsch recalled a neighbor saying there was a steep slope behind and houses at the end of
the street and going up to four stories would mean looking into their houses on the bluff. The other three
sides do not have that same issue. With development backing up to the steep slope behind it, that is the one
corner that would literally allow an apartment to look into the houses on the bluff.
Council President Olson asked about parcel numbers and whether this would be executed during the
development code phase. Ms. Hope answered it can be done at the development code phase or that call here
made by accepting the amendment to the amendment. Council President Olson commented there are other
parcels on the council's radar such as the ones that were the basis of today's comment and the council
intends to circle back on those. She asked staff s recommendation. Ms. Hope answered that would be
circling back at the zoning code stage. Council President Olson asked if that would be appropriate and an
option for the other one as well. Ms. Hope answered yes. Council President Olson said in light of that
answer, she was inclined to wait for that stage.
Action on Amendment 1B
AMENDMENT FAILED (3-4), COUNCILMEMBERS CHEN, TIBBOTT AND DOTSCH VOTING
YES.
Action on Amendment 1 as amended
AMENDMENT CARRIED UNANIMOUSLY.
Amendment 2
COUNCILMEMBER DOTSCH MOVED TO AMEND TO REMOVE THE MAPLEWOOD 20
UNITS COUNTED FROM THE PLANNING BOARD RECOMMENDATION.
Action on Amendment 2
AMENDMENT DIED FOR LACK OF A SECOND.
Amendment 3
COUNCILMEMBER DOTSCH MOVED TO AMEND MEDICAL DISTRICT TO REMOVE UP TO
4 FLOORS (5 WITH INCENTIVE) AND THREE FLOORS ON 80Tn AND 220Tn TO MATCH.
Action on Amendment 3
AMENDMENT FAILED FOR LACK OF A SECOND.
Amendment 4
COUNCILMEMBER DOTSCH MOVED, SECONDED BY COUNCIL PRESIDENT OLSON, TO
AMEND TO REMOVE THE 30 UNITS IN THE FIRDALE NORTH SECTION OVER THE CARA.
Councilmember Dotsch commented in addition to being a crazy intersection, when this came out and the
state did their buildable lands report, the CARA had not been identified.
Councilmember Nand was unable to support the amendment, preferring to wait for the Department of
Ecology to provide further guidance on how to alter zoning around CARAs to ensure it is protected as a
critical area before singling out or burdening these parcels.
With regard to Councilmember Nand's comments, Council President Olson pointed out the critical area
code still applies and it is possible development could not occur there as a result. It is such a small number
of units and an easy protection to put in place and could be added later if it was determined that it was easy
to carefully develop there.
Action on Amendment 4
Edmonds City Council Draft Minutes
November 4, 2024
Page 26
Packet Pg. 83
8.3.a
AMENDMENT CARRIED (4-3), COUNCILMEMBERS ECK, PAINE AND NAND VOTING NO.
AmpndmPnt 5
COUNCILMEMBER DOTSCH MOVED, SECONDED BY COUNCILMEMBER TIBBOTT, TO
REMOVE FROM NORTH BOWL ALTERNATIVE B THE L-SHAPED SINGLE FAMILY
NEIGHBORHOOD ON THE NORTH.
Councilmember Dotsch said this is a cul-de-sac on a very small street and changing it to multifamily from
single family disturbs that small road. The Planning Board removed a similar single family cul-de-sac in
the east Seaview neighborhood.
Councilmember Paine was unable to support the amendment. She was very familiar with this area; there
are some good sized apartments and condominiums developments in this area. Adding this capacity in the
area offers more diversity of housing options at all levels. Bulldozers are not arriving tomorrow; there are
some single family buildings being used for other purposes that could stand to be refreshed. This would be
a great opportunity for some of the homeowners. Redevelopment won't happen tomorrow or even in the
next four years, but this provides great potential for that neighborhood.
Councilmember Tibbott recalled there are single family homes in that L-shaped area. This would provide
incentive to develop it from single family to multifamily and he wondered about the impact of 3 stories to
development to the north as there is no transition zone. He asked how many units that L-shaped section
represented. Ms. Pentakota answered she could not provide that right now and would need to check with
the consultant to provide the number.
As the numbers were not available, Councilmember Tibbott asked if that could be added later during
consideration of the zoning for that area. Ms. Pentakota answered it could. Councilmember Tibbott
expressed concern with allowing 3 stories in that location on top of a single family block of homes. Ms.
Pentakota answered it is existing Multifamily Medium Density. In the proposed maps, there are two shades
of purple, Mixed -Use 3 and Mixed -Use 4, but the existing comprehensive plan maps that as Multifamily
Medium Density which already allows up to 30 feet height. Councilmember Tibbott said he was only
talking about the L-shaped section. Ms. Pentakota reiterated it is Multifamily Medium Density in the
existing comprehensive plan, not single family. Councilmember Tibbott asked if the transition zone could
be adjusted between the higher and lower density during the zoning discussion. Ms. Pentakota answered
yes. Councilmember Tibbott said he could accept that.
Councilmember Nand said unfortunately she was unable to support this amendment. She noted for the
public, under the GMA, the City is obligated to plan for additional residential units, but those don't
necessarily get built. If she recalled correctly, there were 4300 banked units allocated to Highway 99 that
have never been built. Just because the City was saying to developers if they want to invest in the
community and bring something that some might think is better and others might think is worse, this is
where they can do it. It doesn't mean the market will support that or even that the property owners will
want to sell their properties for that vision. A lot of people prefer to sell to young families who they know
will keep the property as a single family home no matter what the zone capacity is. She has known people
who have made that decision and turned down higher bids from developers because they want their property
to remain a single family property. She recognized anxiety in Edmonds about building heights, density,
etc., but this is still at the policy level.
Councilmember Eck agreed the discussion was at the policy level. She appreciated these well-rounded,
necessary conversations, but was concerned whittling away at the areas was reducing the buffer units and
the zoning effort will reveal areas that cannot be developed. She was also concerned with equitability and
spreading this in gentle, modest ways throughout the City.
Edmonds City Council Draft Minutes
November 4, 2024
Page 27
Packet Pg. 84
8.3.a
Council President Olson emphasized the development code is where transition zones and stepbacks will be
addressed. She supported having a nice transition, anticipating it would be terrible to be living in a single
family home and have a large building built next door. There need to be plans for that in the development
code and she will be vigilant to ensure that occurs at that point.
Action on Amendment 5
AMENDMENT FAILED (1-6), COUNCILMEMBER DOTSCH VOTING YES.
Councilmember Dotsch said East Seaview Alternative B originally included the parcel north of 196t'', also
a cul-de-sac and was removed. She wondered why that was singled out versus the others. Chair Mitchell
answered that was removed because it goes deep into a low density residential zone. Councilmember
Dotsch pointed out it is in the same block as multifamily to the east. Chair Mitchell agreed. Councilmember
Dotsch asked why that was singled out and not other areas. Ms. Hope answered it may have been related
to the existing zoning on that other property. Councilmember Dotsch was curious why this area was singled
out when it is not being done in other areas.
Councilmember Dotsch referred to the Planning Board preference for East Seaview on packet page 208,
commenting it was all 3 stories with no incentives. Chair Mitchell agreed. Councilmember Dotsch said
Lynnwood is keeping that area commercial. She expressed support for the Planning Board's preference.
Councilmember Dotsch referred to South Lake Ballinger (packet page 210), pointing out 76' and 205' is
high capacity transit to the light rail and other areas such as the Medical went up to 4 stories.
Amendment 6
AN AMENDMENT WAS MADE BY COUNCILMEMBER DOTSCH AND SECONDED TO
AMEND DISTRIBUTED GROWTH TO ADD THE ONE BONUS FLOOR TO LAKE BALLINGER.
Councilmember Dotsch said because it is high capacity and seems like a prime area for people who use
light rail to live and across the street is a very big bus area and most of it is in a ravine so it's very low with
nothing behind it, it's a good opportunity to add the one floor incentive.
Councilmember Nand said she definitely did not support this motion. She grew up in a house just down the
street and remembered the last time a developer in the 1990s wanted to build a big development, the entire
neighborhood mobilized very fast. Three stories is comfortable for this area and attempting to add a fourth
story from the dais, completely bypassing the public process and the Planning Board effort and work and
tell the neighborhood they are getting an extra story of height based on a whim from the dais when every
other part of the comprehensive plan has been so carefully handled would be insulting to the neighborhoods.
Councilmember Chen did not support the amendment. There is no infrastructure to accommodate a fourth
floor. It is very close to the Interurban Trail but there is not enough lighting. Adding an additional floor is
not respectful to the Planning Board who put in so many hours studying and holding numerous meetings.
Council President Olson said the reason for considering it was a good one. The points made about the
process and ensuring something was fully vetted were also valid. She won't support it now, but it may be
something to look at more closely in future updates.
Action on Amendment 6
AMENDMENT FAILED (1-6), COUNCILMEMBER DOTSCH VOTING YES.
Amendment 7
COUNCILMEMBER DOTSCH MOVED TO AMEND THE PERRINVILLE RECOMMENDATION
TO REMAIN AT 3 FLOORS.
Edmonds City Council Draft Minutes
November 4, 2024
Page 28
Packet Pg. 85
8.3.a
Action on Amendment 7
AMENDMENT FAILED FOR LACK OF A SECOND.
Action on Main Motion as amended
MOTION CARRIED UNANIMOUSLY.
3. COUNCIL 2025-26 BUDGET DELIBERATIONS
This item was removed from the agenda via action taken under Agenda Item 4.2.
11. COUNCIL COMMENTS
Councilmember Nand reminded it is a great time to engage in democracy.
Councilmember Dotsch thanked everyone who has emailed and participated over the past two years. She
wished the Medical District had had better representation because she anticipated that will be a surprise for
a lot of people. She thanked the Planning Board and Ms. Hope for their work. She also thanked Ms.
Dunscombe for preparing information for Saturday's workshop and tonight's budget discussion.
Council President Olson reminded there is an election tomorrow and encouraged everyone to vote, assuring
every voice matters.
Councilmember Tibbott reported on a Creative District Advisory Committee meeting that included
representatives from arts and creative organizations across the city, from theater to ballet, to restaurants.
One of the common themes was how robust each of those creative enterprises is and the arts and
entertainment and activities that will be going on the in City for many decades. Whether the City's budget
is up or down, the Creative District is still planning ways to offer creative expression in the City. There is
so much for residents and visitors to take advantage of. He reminded there are tremendous opportunities in
Edmonds despite budget challenges the City is facing.
Councilmember Chen reminded those who are not registered to vote can register in person up until 8 pm.
He urged the public to vote.
Councilmember Eck gave a shout out to the Multicultural Association of Edmonds who put together a
celebration of Dia de Muertos last Friday night. She heard it was divine; she was unable to attend due to
illness in her household. She urged the public to exercise their fundamental right to vote.
12. MAYOR'S COMMENTS
Mayor Rosen had no comments.
A MOTION WAS MADE BY COUNCIL PRESIDENT OLSON AND SECONDED TO EXTEND
THE MEETING TO 10:45 PM. MOTION CARRIED UNANIMOUSLY.
13. EXECUTIVE SESSION: PENDING OR POTENTIAL LITIGATION, RCW 42.30.110(1)(I)
At 9:45 pm, the Council convened in executive session to discuss pending or potential litigation per RCW
42.30.110(1)(i) for a period of 45 minutes.
Meeting Extension
At 10:30 pm, Mayor Rosen announced that the executive session would be extended to 10:45 pm.
Edmonds City Council Draft Minutes
November 4, 2024
Page 29
Packet Pg. 86
8.3.a
COUNCIL PRESIDENT OLSON MOVED, SECONDED BY COUNCILMEMBER DOTSCH, TO
EXTEND THE MEETING TO 11:15 PM. MOTION CARRIED UNANIMOUSLY (Councilmembers
Eck, Paine and Tibbott were not present for the vote).
WITH ALL COUNCILMEMBERS PRESENT, A MOTION WAS MADE BY COUNCIL
PRESIDENT OLSON AND SECONDED, TO EXTEND THE MEETING TO 11:15 PM. MOTION
CARRIED (6-1), COUNCILMEMBER TIBBOTT VOTING NO.
At 10:45 pm, Mayor Rosen announced that the executive session would be extended to 11 pm.
At 11 pm, Mayor Rosen announced the executive session would be extended to 11:10 pm.
14. RECONVENE IN OPEN SESSION
The meeting reconvened at 11:10 pm.
ADJOURNMENT
With no further business, the council meeting was adjourned at 11:10 pm.
Edmonds City Council Draft Minutes
November 4, 2024
Page 30
Packet Pg. 87
8.4
City Council Agenda Item
Meeting Date: 11/26/2024
Approval of claim checks and wire payments.
Staff Lead: Kimberly Dunscombe
Department: Administrative Services
Preparer: Nori Jacobson
Background/History
Approval of claim checks #265019 through #265114 dated November 13, 2024 for $1,277,754.95 (re-
issued check #265114 $1,800.00), claim checks #265115 through #265187 dated November 20, 2024 for
$345,670.27 and wire payments of $4,609.72, $3,806.54, $91.76 & $28,011.78.
Staff Recommendation
Approval of claim checks and wire payments.
Narrative
The Council President shall be designated as the auditing committee for the city council. The council
president shall review the documentation supporting claims paid and review for approval by the city
council at its next regular public meeting all checks or warrants issued in payment of any claim, demand
or voucher. A list of each claim, demand or voucher approved and each check or warrant issued
indicating the check or warrant number, the amount paid and the vendor or payee shall be filed in the
city council office for review by individual councilmembers prior to each regularly scheduled public
meeting.
Attachments:
Claim cks 11-13-24 Agenda copy
claim ck lighthouse law 11-13-24
Claim check 265114 Agenda copy
Claim cks 11-20-24 Agenda copy
Packet Pg. 88
8.4.a
apPosPay Positive Pay Listing Page: 1
11/13/2024 10:43:07AM City of Edmonds
Document group: jacobson
Vendor Code & Name Check # Check Date Amount
061029
ABSOLUTE GRAPHIX
265019
11/13/2024
71.82
077610
ALBA PAINTING & COATINGS
265020
11/13/2024
4,972.50
079745
AMAZING MAPLES LLC
265021
11/13/2024
822.00
079537
AMERICAN TRAFFIC SOLUTIONS INC
265022
11/13/2024
23,750.00
064341
AT&T MOBILITY
265023
11/13/2024
1,749.36
070305
AUTOMATIC FUNDS TRANSFER
265024
11/13/2024
5,627.95
077387
AVEDISYAN, RUBEN
265025
11/13/2024
130.00
073041
BECK & ASSOCIATES PLLC
265026
11/13/2024
560.00
075941
BELL, LAURIE
265027
11/13/2024
82.50
079747
BLUE COAST ENGINEERING LLC
265028
11/13/2024
12,440.37
072005
BROCKMANN, KERRY
265029
11/13/2024
760.50
071816
CARLSON, JESSICA
265030
11/13/2024
110.00
003510
CENTRAL WELDING SUPPLY
265031
11/13/2024
381.35
035160
CITY OF SEATTLE
265032
11/13/2024
31.38
073135
COGENT COMMUNICATIONS INC
265033
11/13/2024
661.59
062975
COLLISION CLINIC INC
265034
11/13/2024
7,274.31
070323
COMCAST BUSINESS
265035
11/13/2024
356.10
068815
CORRECT EQUIPMENT
265036
11/13/2024
10,517.56
070415
CRESSY DOOR CO INC
265037
11/13/2024
1,277.38
074444
DATAQUEST LLC
265038
11/13/2024
150.00
073823
DAVID EVANS & ASSOC INC
265039
11/13/2024
15,770.86
007253
DUNN LUMBER
265040
11/13/2024
97.40
065065
EDMONDS DAYBREAKERS FOUNDATION
265041
11/13/2024
4,200.00
076610
EDMONDS HERO HARDWARE
265042
11/13/2024
94.91
038500
EDMONDS SENIOR CENTER
265043
11/13/2024
300.00
075200
EDUARDO ZALDIBAR
265044
11/13/2024
260.00
068803
EJ USA INC
265045
11/13/2024
3,166.80
008812
ELECTRONIC BUSINESS MACHINES
265046
11/13/2024
597.16
065789
ESTES, KEN
265047
11/13/2024
611.71
009350
EVERETT DAILY HERALD
265048
11/13/2024
98.04
079755
FLOCK GROUP INC
265049
11/13/2024
131,881.75
071562
FORMA
265050
11/13/2024
8,400.00
075538
GAMEZ, OMAR
265051
11/13/2024
136.00
074358
GEO-TEST SERVICES
265052
11/13/2024
1,302.00
076436
GRANITE CONSTRUCTION CO
265053
11/13/2024
605,667.99
076333
HASA INC
265054
11/13/2024
10,571.74
079717
HEALING ENERGY & MASSAGE PLLC
265055
11/13/2024
24.00
079287
HERITAGE PROF PRODUCTS GROUP
265056
11/13/2024
594.05
072647
HERRERA ENVIRONMENTAL
265057
11/13/2024
3,313.07
013500
HINGSON, ROBERT
265058
11/13/2024
3,567.67
067862
HOME DEPOT CREDIT SERVICES
265059
11/13/2024
3,045.34
061013
HONEY BUCKET
265060
11/13/2024
290.95
066265
INDUSTRIAL SCIENTIFIC CORP
265061
11/13/2024
1,240.38
065306
INSTITUTE OF TRANSP ENGINEERS
265062
11/13/2024
337.00
014940
INTERSTATE BATTERY SYSTEMS
265063
11/13/2024
1,171.19
079573
JUVVAL TECH LLC
265064
11/13/2024
200.00
079524
KIMLEY-HORN & ASSOCIATES INC
265065
11/13/2024
23,674.45
079069
KISHA POST
265066
11/13/2024
1,295.00
078360
LANGUAGE LINE SOLUTIONS
265067
11/13/2024
5.92
075746
MCMURRAY, LAURA
265068
11/13/2024
136.80
076895
MOREHEAD, LOUISE
265069
11/13/2024
260.00
064570
NATIONAL SAFETY INC
265070
11/13/2024
262.99
024302
NELSON-REISNER
265071
11/13/2024
144.48
Page: 1
Packet Pg. 89
apPosPay Positive Pay Listing
11/13/2024 10:43:07AM City of Edmonds
Document group: jacobson
Vendor Code & Name Check # Check Date Amount
026200
OLYMPIC VIEW WATER DISTRICT
265072
11/13/2024
693.95
075735
PACIFIC SECURITY
265073
11/13/2024
5,016.11
027060
PACIFIC TOPSOILS
265074
11/13/2024
1,443.00
071488
PARENTMAP
265075
11/13/2024
2,310.00
028860
PLATT ELECTRIC SUPPLY
265076
11/13/2024
2,934.65
079020
PRECISION LANGUAGE SERVICES
265077
11/13/2024
520.00
075769
QUADIENT LEASING USA INC
265078
11/13/2024
808.58
062657
REGIONAL DISPOSAL COMPANY
265079
11/13/2024
3,698.80
075737
ROBINSON, HUA
265080
11/13/2024
130.00
064769
ROMAINE ELECTRIC
265081
11/13/2024
336.54
079607
ROMERO, STACEY F
265082
11/13/2024
260.00
079019
ROOT AND LIMB YOGA
265083
11/13/2024
396.60
067076
SEATTLE PUMP AND EQUIPMENT CO
265084
11/13/2024
762.40
070495
SEPULVEDA, PABLO
265085
11/13/2024
260.00
075590
SMARSH INC
265086
11/13/2024
136.49
037801
SNO CO HUMAN SERVICE DEPT
265087
11/13/2024
3,192.76
075543
SNO CO PUBLIC DEFENDER ASSOC
265088
11/13/2024
88,684.00
037375
SNO CO PUD NO 1
265089
11/13/2024
22,184.85
079132
SNOHOMISH CO CONSERVATION &
265090
11/13/2024
2,993.00
072776
SNOHOMISH CONSERVATION DIST
265091
11/13/2024
10,519.69
076433
SNOHOMISH COUNTY 911
265092
11/13/2024
82,827.93
075700
SONESSA, MERGIA
265093
11/13/2024
130.00
038300
SOUND DISPOSAL CO
265094
11/13/2024
5,055.92
079704
SPECTRUM ENTERPRISES
265095
11/13/2024
260.00
079753
SUTTON PSYCHOLEGAL SERVICES
265096
11/13/2024
4,575.00
027269
THE PART WORKS INC
265097
11/13/2024
995.09
066056
THE SEATTLE TIMES
265098
11/13/2024
1,500.00
079359
THE WALLS LAW FIRM INC
265099
11/13/2024
25,000.00
072649
THE WIDE FORMAT COMPANY
265100
11/13/2024
232.05
038315
TK ELEVATOR CORPORATION
265101
11/13/2024
5,468.67
077963
TWIST YOGA
265102
11/13/2024
1,800.00
079567
URBAN FORESTRY SERVICES
265103
11/13/2024
6,061.30
044960
UTILITIES UNDERGROUND LOC CTR
265104
11/13/2024
316.80
069751
VESTIS
265105
11/13/2024
175.47
067216
VIKING AUTOMATIC SPRINKLER CO
265106
11/13/2024
501.74
067195
WASHINGTON TREE EXPERTS
265107
11/13/2024
994.50
075635
WCP SOLUTIONS
265108
11/13/2024
4,457.16
079752
WEISS, NEIL
265109
11/13/2024
100.90
078389
ZENNER USA
265110
11/13/2024
7,909.45
079733
ZHELEZNYAK, MICHAEL
265111
11/13/2024
130.00
011900
ZIPLY FIBER
265112
11/13/2024
136.33
G ran dTotal :
1,190,356.05
Total count:
94
Page: 2
Packet Pg. 90
8.4.b
vchlist
11 /13/2024 11:43:57AM
Bank code : usbank
Voucher Date Vendor
265113 11/13/2024 073603 LIGHTHOUSE LAW GROUP PLLC
1 Vouchers for bank code : usbank
1 Vouchers in this report
Voucher List
City of Edmonds
Invoice PO # Description/Account
20705 10-2024 LEGALS FEES
10-2024 Legal fees
001.000.36.515.41.41.00
10-2024 expense Police public record
001.000.36.515.41.41.00
Total
Bank total
Total vouchers
Page:
vi
c
m
E
Amoun
a
d
L
�3
87,343.9( c
M
55.0( v
87,398.9(
87,398.9( E
87,398.9(
O
O
L
CL
Q
Q
N
CM
R
d
N
7
O
t
r
t
a1
Y
C.1
E
v
r-�
C
N
E
t
V
O
r
Page: 1
Packet Pg. 91
Q
apPosPay
11/13/2024 3:57:25PM
Document group: jacobson
Vendor Code & Name
079757 MITCHELL, JENNIFER
Positive Pay Listing
City of Edmonds
8.4.c
Page: 1
Check # Check Date Amount
265114 11 /13/2024 1,800.00
GrandTotal: 1,800.00
Total count: 1
vi
c
d
E
0
0_
a�
L
�3
c
as
M
U
4-
0
E
0
L
Q
Q
Q
Q
0
ci
M
Q
r
r
LO
N
Y
V
d
t
C.1
U
c
d
E
t
0
Q
Page: 1
Packet Pg. 92
8.4.d
apPosPay Positive Pay Listing Page: 1
11/20/2024 11:36:54AM City of Edmonds
Document group: jacobson
Vendor Code & Name Check # Check Date Amount
079758
A NATURAL DESIGN STUDIO LLC
265115
11/20/2024
75.00
070322
A&A LANGUAGE SERVICES INC
265116
11/20/2024
170.00
079313
ABELLA, COLENDRINO ANGELO
265117
11/20/2024
130.00
061029
ABSOLUTE GRAPHIX
265118
11/20/2024
105.81
078469
AGUIRRE, RAUL
265119
11/20/2024
260.00
077610
ALBA PAINTING & COATINGS
265120
11/20/2024
4,353.70
000850
ALDERWOOD WATER DISTRICT
265121
11/20/2024
160,768.53
078237
ARIAS, ADRIAN
265122
11/20/2024
390.00
075523
ART WALK EDMONDS
265123
11/20/2024
2,700.00
079030
BAGAN, RICK
265124
11/20/2024
123.01
075217
BASLER, ANTHONY C
265125
11/20/2024
520.00
075342
BORUCHOWITZ, ROBERT
265126
11/20/2024
3,410.00
073029
CANON FINANCIAL SERVICES
265127
11/20/2024
572.56
071816
CARLSON, JESSICA
265128
11/20/2024
531.30
003510
CENTRAL WELDING SUPPLY
265129
11/20/2024
169.95
073737
CITY OF SEATTLE
265130
11/20/2024
1,900.00
074559
CLARK, PATRICK
265131
11/20/2024
46.00
079679
CUSIMANO, JINA
265132
11/20/2024
116.98
006626
DEPT OF ECOLOGY
265133
11/20/2024
125.00
064531
DINES, J EAN N I E
265134
11/20/2024
1,440.00
079614
DRY BOX INC
265135
11/20/2024
165.75
068292
EDGE ANALYTICAL
265136
11/20/2024
1,478.00
076610
EDMONDS HERO HARDWARE
265137
11/20/2024
34.04
008705
EDMONDS WATER DIVISION
265138
11/20/2024
22,854.27
075200
EDUARDO ZALDIBAR
265139
11/20/2024
130.00
008812
ELECTRONIC BUSINESS MACHINES
265140
11/20/2024
825.03
009350
EVERETT DAILY HERALD
265141
11/20/2024
32.68
072493
FIRSTLINE COMMUNICATIONS INC
265142
11/20/2024
1,127.11
075654
FLORIAN, ADRIAN
265143
11/20/2024
130.00
079184
FORMA CONSTRUCTION COMPANY
265144
11/20/2024
16,671.73
077248
FRIDAY HARBOR JOLLY TROLLEY
265145
11/20/2024
260.00
074722
GUARDIAN SECURITY SYSTEMS
265146
11/20/2024
69.53
079012
HARLOWE & FALK LLP
265147
11/20/2024
80.00
066575
HERC RENTALS INC
265148
11/20/2024
1,328.61
061013
HONEY BUCKET
265149
11/20/2024
167.42
075966
HULBERT, CARRIE
265150
11/20/2024
3,641.63
072528
INTERCOM LANGUAGE SERVICES
265151
11/20/2024
260.00
075259
KOENIG, KIMBERLY
265152
11/20/2024
252.93
075716
MALLORY PAINT STORE INC
265153
11/20/2024
70.65
079736
MOLNAR, JOSE LUIS
265154
11/20/2024
130.00
079734
MONICA SANGHEE KANG-AHN
265155
11/20/2024
130.00
075520
NOBLE, LINDA
265156
11/20/2024
130.00
074866
NORTHWEST PLAYGROUND EQUIPMENT
265157
11/20/2024
20,561.29
079255
PACIFIC COAST SURVEYS INC
265158
11/20/2024
1,375.00
079464
PERKINS EASTMAN ARCHITECTS DPC
265159
11/20/2024
25,200.00
064167
POLLARD WATER
265160
11/20/2024
165.75
029117
PORT OF EDMONDS
265161
11/20/2024
4,567.65
073988
PRECISION CONCRETE CUTTING
265162
11/20/2024
9,307.03
079020
PRECISION LANGUAGE SERVICES
265163
11/20/2024
390.00
061540
REPUBLIC SERVICES #197
265164
11/20/2024
1,857.04
079565
RIGOR, ROGELIO N
265165
11/20/2024
260.00
079175
RING, KIM
265166
11/20/2024
47.17
075737
ROBINSON, HUA
265167
11/20/2024
130.00
Page: 1
Packet Pg. 93
apPosPay Positive Pay Listing
11/20/2024 11:36:54AM City of Edmonds
Document group: jacobson
Vendor Code & Name Check # Check Date Amount
079607
ROMERO, STACEY F
265168
11/20/2024
130.00
079760
ROOHI, MAHZAD
265169
11/20/2024
96.00
066918
SEDOR, NORMAN
265170
11/20/2024
7,000.00
079492
SKYCORP LTD
265171
11/20/2024
16,025.65
037375
SNO CO PUD NO 1
265172
11/20/2024
8,586.01
072776
SNOHOMISH CONSERVATION DIST
265173
11/20/2024
4,459.55
006630
SNOHOMISH COUNTY
265174
11/20/2024
710.00
075700
SONESSA, MERGIA
265175
11/20/2024
130.00
039775
STATE AUDITOR'S OFFICE
265176
11/20/2024
10,502.05
074800
TURNSTYLE INC
265177
11/20/2024
900.00
079707
VAN DUKER, YELYZAVETA
265178
11/20/2024
260.00
067865
VERIZON WIRELESS
265179
11/20/2024
27.63
069751
VESTIS
265180
11/20/2024
260.87
067195
WASHINGTON TREE EXPERTS
265181
11/20/2024
1,740.38
075635
WCP SOLUTIONS
265182
11/20/2024
22.37
075068
WEDA
265183
11/20/2024
400.00
079759
WESTON, SCOTT
265184
11/20/2024
136.00
079743
WONG, EMILY
265185
11/20/2024
189.00
078389
ZENNER USA
265186
11/20/2024
1,496.68
011900
ZIPLY FIBER
265187
11/20/2024
859.93
GrandTotal:
345,670.27
Total count:
73
N
c
m
E
ca
a
d
�3
c
c�
N
v
d
s
E
0
0
L
Q
Q
Q
Q
0
0
w
d
CD
Q
N
CD
N
C1
E
M
U
r
c
d
E
s
0
ca
Q
Page: 2
Packet Pg. 94
8.5
City Council Agenda Item
Meeting Date: 11/26/2024
Approval of payroll and benefit checks, direct deposit and wire payments.
Staff Lead: Kimberly Dunscombe
Department: Administrative Services
Preparer: Lori Palmer
Background/History
Approval of Kelly Day Buy Back direct deposit for $122,378.50, dated November 20, 2024, payroll checks
#66122 through #66125 dated November 20, 2024 for $10,248.67, direct deposit for $853,541.55,
benefit checks #66126 through #66133 and wire payments for $872,291.95 for the pay period of
November 1, 2024 through November 15, 2024.
Staff Recommendation
Approval of payroll and benefit checks, direct deposit and wire payments.
Narrative
In accordance with the State statutes, City payments must be approved by the City Council. Ordinance
#2896 delegates this approval to the Council President who reviews and recommends either approval or
non -approval of payments.
Attachments:
11-15-2024 kelly day buy back earnings summary
11-01-2024 to 11-15-2024 payroll earnings summary
11-01-2024 to 11-15-2024 benefit checks summary
Packet Pg. 95
Hour Type Hour Class
153 HOLIDAY
Payroll Earnings Summary Report
City of Edmonds
Pay Period: 1,225 (11/14/2024 to 11/15/2024)
Description
HOLIDAY BUY BACK
Hours
2,504.25
2,504.25
Total Net Pay:
Amount
167,820.39
$167,820.39
$122,378.50
8.5.a
11 /19/2024
Packet Pg. 96
Payroll Earnings Summary Report
City of Edmonds
Pay Period: 1,160 (11/01/2024 to 11/15/2024) ,
Hour Type Hour Class Description Hours Amount
112
ABSENT
NO PAY NON HIRED
106.00
0.00
121
SICK
SICK LEAVE
598.25
31,195.15
122
VACATION
VACATION
1,175.75
65,509.72
123
HOLIDAY
HOLIDAY HOURS
59.00
2,569.42
124
HOLIDAY
FLOATER HOLIDAY
42.00
2,228.87
125
COMP HOURS
COMPENSATORY TIME
201.25
11,272.45
128
HOLIDAY
Holiday Bank WWTP
103.00
5,250.86
131
MILITARY
MILITARY LEAVE
60.00
2,936.57
134
MILITARY
MILITARY LEAVE -UNPAID
88.00
0.00
135
SICK
WASHINGTON STATE SICK LEAVE
1.00
39.27
141
BEREAVEMENT
BEREAVEMENT
60.00
2,805.49
150
REGULAR HOURS
Kelly Day Used
204.00
10,627.50
154
HOLIDAY
FLOATER HOLIDAY BUY BACK
10.00
464.03
155
COMP HOURS
COMPTIME AUTO PAY
24.13
1,452.09
157
SICK
SICK LEAVE PAYOFF
160.70
7,456.96
158
VACATION
VACATION PAYOFF
172.16
7,988.74
160
VACATION
MANAGEMENT LEAVE
104.00
8,977.27
161
VACATION
VACATION PREMIUM PAYOFF
11.40
528.99
190
REGULAR HOURS
REGULAR HOURS
17,143.50
935,939.41
194
SICK
Emerqency Sick Leave
75.50
3,256.80
210
OVERTIME HOURS
OVERTIME -STRAIGHT
172.00
10,254.13
215
OVERTIME HOURS
WATER WATCH STANDBY
48.00
3,236.05
216
MISCELLANEOUS
STANDBY TREATMENT PLANT
4.00
505.97
220
OVERTIME HOURS
OVERTIME 1.5
300.50
28,583.85
225
OVERTIME HOURS
OVERTIME -DOUBLE
71.50
7,405.85
400
MISCELLANEOUS
MISC PAY
0.00
100.00
404
MISCELLANEOUS
Medical Opt Out
0.00
600.00
410
MISCELLANEOUS
WORKING OUT OF CLASS
0.00
756.04
411
SHIFT DIFFERENTIAL
SHIFT DIFFERENTIAL
0.00
2,575.90
600
RETROACTIVE PAY
RETROACTIVE PAY
0.00
64.81
602
COMP HOURS
ACCRUED COMP 1.0
60.50
0.00
604
COMP HOURS
ACCRUED COMP TIME 1.5
51.50
0.00
606
COMP HOURS
ACCRUED COMP 2.0
3.00
0.00
609
COMP HOURS
Commander Standy Accrual
12.00
0.00
11/19/2024 Packet Pg. 97
Payroll Earnings Summary Report
City of Edmonds
Pay Period: 1,160 (11/01/2024 to 11/15/2024)
Hour Type Hour Class Description Hours Amount
902
MISCELLANEOUS
BOOT ALLOWANCE
0.00
193.38
acc
MISCELLANEOUS
ACCREDITATION PAY
0.00
322.98
acs
MISCELLANEOUS
ACCRED/POLICE SUPPORT
0.00
261.56
anc
REGULAR HOURS
Ancilary Duty Pay
0.00
264.19
anc2
REGULAR HOURS
Ancilary Duty Pay
0.00
1,494.73
anc3
REGULAR HOURS
Ancilary Duty Pay
0.00
1,774.84
boc
MISCELLANEOUS
BOC II Certification
0.00
237.66
cpl
MISCELLANEOUS
TRAINING CORPORAL
0.00
226.78
crt
MISCELLANEOUS
CERTIFICATION III PAY
0.00
118.83
det4
MISCELLANEOUS
Detective 4%
0.00
1,301.62
ed1
EDUCATION PAY
EDUCATION PAY 2%
0.00
928.36
ed2
EDUCATION PAY
EDUCATION PAY 4%
0.00
849.10
ed3
EDUCATION PAY
EDUCATION PAY 6%
0.00
12,125.26
fmla
ABSENT
FAMILY MEDICAL/NON PAID
16.00
0.00
hol
HOLIDAY
HOLIDAY
1,368.26
72,970.15
k9
MISCELLANEOUS
K-9 Assiqnment
0.00
414.20
Ian
MISCELLANEOUS
LANGUAGE PAY
0.00
450.00
Iq1
LONGEVITY
LONGEVITY PAY 2%
0.00
1,347.39
Ig11
LONGEVITY
LONGEVITY PAY 2.5%
0.00
923.44
Ig12
LONGEVITY
Lonqevity 9%
0.00
3,750.14
Ig13
LONGEVITY
Lonqevity 7%
0.00
1,210.41
Ig14
LONGEVITY
Lonqevity 5%
0.00
1,158.46
Iq2
LONGEVITY PAY
LONGEVITY PAY 4%
0.00
166.92
Iq3
LONGEVITY PAY
LONGEVITY 6%
0.00
289.83
Iq4
LONGEVITY
Lonqevity 1%
0.00
1,157.87
Iq5
LONGEVITY
Lonqevity 3%
0.00
3,749.63
Iq6
LONGEVITY
Lonqevity .5%
0.00
28.35
Iq7
LONGEVITY
Lonqevity 1.5%
0.00
503.50
mels
SICK
Medical Leave Sick
13.00
714.77
pfmh
HOLIDAY
Paid Family Medical Holiday
24.00
1,174.62
pfmp
ABSENT
Paid Family Medical Unpaid/Sup
389.25
0.00
pfms
SICK
Paid FAMILY MEDICAL/SICK
67.50
3,727.11
pfmv
VACATION
Paid Family Medical Vacation
59.25
3,182.16
phy
MISCELLANEOUS
PHYSICAL FITNESS PAY
0.00
2,834.08
11/19/2024 Packet Pg. 98
Hour Type Hour Class
slw
SICK
str
MISCELLANEOUS
tac
MISCELLANEOUS
to
MISCELLANEOUS
traf
MISCELLANEOUS
vap
VACATION
Payroll Earnings Summary Report
City of Edmonds
Pay Period: 1,160 (11/01/2024 to 11/15/2024)
Description
SICK LEAVE ADD BACK
PSET Serqeant
TAC Officer
Traininq Officer
Traffic Officer - Car
Vacation Premium
Hours Amount
74.11
0.00
0.00
0.00
0.00
2.50
23,136.51
Total Net Pay
0.00
246.44
207.10
207.10
414.20
130.41
$1,275,639.76
$863,790.22
8.5.b
P
11/19/2024 Packet Pg. 99
8.5.c
Benefit Checks Summary Report
City of Edmonds
Pay Period: 1,160 - 11/01/2024 to 11/15/2024
Bank: usbank - US Bank
Check #
Date
Payee #
Name
Check Amt
Direct Deposit
66126
11/20/2024
bpas
BPAS
11,568.56
0.00
66127
11/20/2024
epoa2
EPOA-POLICE
8,730.00
0.00
66128
11/20/2024
epoa3
EPOA-POLICE SUPPORT
2,250.00
0.00
66129
11/20/2024
icma
MISSIONSQUARE PLAN SERVICES
8,087.01
0.00
66130
11/20/2024
flex
NAVIA BENEFIT SOLUTIONS
5,265.59
0.00
66131
11/20/2024
teams
TEAMSTERS LOCAL 763
7,073.00
0.00
66132
11/20/2024
teamcom
TEAMSTERS LOCAL 763
615.00
0.00
66133
11/20/2024
tx
TEXAS CHILD SUPPORT SDU
166.50
0.00
43,755.66 0.00
Bank: wire - US BANK
Check #
Date
Payee #
Name
Check Amt
Direct Deposit
3754
11/20/2024
awc
AWC
432,607.76
0.00
3760
11/20/2024
us
US BANK
195,994.97
0.00
3762
11/20/2024
mebt
WTRISC FBO #N3177B1
149,429.52
0.00
3763
11/20/2024
pb
NATIONWIDE RETIREMENT SOLUTION
9,360.86
0.00
3764
11/20/2024
wadc
WASHINGTON STATE TREASURER
40,378.18
0.00
3766
11/20/2024
oe
OFFICE OF SUPPORT ENFORCEMENT
765.00
0.00
828, 536.29
0.00
Grand Totals: 872,291.95
0.00
11/19/2024 Packet Pg. 100
8.6
City Council Agenda Item
Meeting Date: 11/26/2024
Social Worker Position
Staff Lead: Assistant Chief Loi Dawkins
Department: Police Services
Preparer: Alexandra Ehlert
Background/History
The Social Worker position was originally approved as a temporary employee through December 13,
2024. We are requesting the position be extended through to 12/31/24 using grant funds. In 2025 the
position is being transitioned to a Limited Term employee and is included in the 2025 proposed budget
under fund 018. We are requesting the position be approved as a Limited Term position through
12/31/2025
The attached job description reflects a pay grade change from the Hourly Pay Schedule to the Non -
Represented Pay Schedule. This is due to the transition from Temporary to Limited Term. NR grade 23 is
comparable with Hourly grade 16.
Staff Recommendation
Staff is asking for the Social Worker position to be extended through 2024 using grant funds and the
position to be approved for 2025 as Limited Term with the attached job description and salary schedule
on the consent agenda.
The funding is already included in the 2025 proposed budget. If council chooses to not approve the 2025
proposed budget listing this position as limited term and funding it under fund 018, then the social
worker position will not extend past what grant funds allow in early 2025.
Narrative
<Type or insert text here>
Attachments:
Community Social Worker Revision 24-11
Packet Pg. 101
8.6.a
City of
EDMONDS
Washington
Community Social Worker
" . j b,
Department: Police Pay Grade: NR-32 ld--1-6
Bargaining Unit: Non Represented FLSA Status: Exempt
Revised Date: 6/10/2024 Reports To:
POSITION PURPOSE
Under the supervision of Edmonds Police and an Everett -based Social Worker (MSW), respond to individuals with
mental health, substance use, behavioral, housing, financial and other social service needs. The duties include
considerable public contact and are intended to provide resource coordination and support to individuals
contacted by law enforcement and/or emergency medical response and the social service needs of people within
this population.
ESSENTIAL FUNCTIONS AND RESPONSIBILITIES:
The following duties ARE NOT intended to serve as a comprehensive list of all duties performed by all employees
in this classification, only a representative summary of the primary duties and responsibilities. Incumbent(s) may
not be required to perform all duties listed and may be required to perform additional, position -specific duties.
• Directly contact or accompany emergency medical responders and/or law enforcement to assist
individuals belonging to the target population in accessing mental health, substance use, housing,
financial, or other social services.
• Deliver services that are recovery -focused and include but are not limited to case management, crisis
intervention, treatment planning, resource identification and assistance with follow through, and
identification and development of natural supports and other providers.
• Assessing client immediate and long-term needs and partnering with the clients to develop an individually
tailored plan designed to promote stability and recovery, lessening the individual's dependence on law
enforcement and/or emergency medical responders.
• Cultivate contacts and establish and maintain positive, effective, collaborative working relationships with
Edmonds Police Department personnel, other law enforcement agencies, other emergency medical
response agencies, Courts, Snohomish County Human Services, area community service and faith -
based organizations, staff of state and local hospitals, shelters, and health providers in an effort to care
for and assist chronic utilizers and other citizens in need of social services.
• Develop a network of working relationships with the Triage Center, voluntary outreach teams, Involuntary
Treatment Act (ITA) teams, Snohomish County Jail, detox and treatment providers, emergency housing
providers and other social service providers.
• Routinely assess for risk issues including danger to self or others and develop plans with client to mitigate
those risks.
0
0
a
L
Y
L
0
Ta
0
U)
Community Social Worker
Last Reviewed: 11/21/
Last Revi Packet Pg. 102
8.6.a
2 of 5
JOB DESCRIPTION
Community Social Worker
• Coordinate services with community agencies (e.g., DSHS, Courts, etc.) and work in context of a crisis
team as needed and appropriate.
• Promote best practices in treatment approaches, support systems and interventions. Meet with and
interview contacts, families, and other care providers to assess needs and eligibility of services.
Advocate needs of contacts within and outside system; liaise between contact, caregivers, and service
providers. Provide client -level and system -wide troubleshooting and advocacy.
• Provide information, consultation and referral to community members who inquire about social services
for themselves or on behalf of others. Respond to requests for information about available mental health,
substance use, housing, financial, and other social services. Make referrals to appropriate service
providers and coordinate service delivery.
• Make appropriate referrals for auxiliary services such as drug and alcohol services when clinically
indicated.
• Coordinate care with primary care and collaborating professionals from other systems as well as natural
supports as appropriate.
• Assist the target population served with obtaining basic resources such as shelter, food, medical services,
and other social and human services.
• Provide outreach, engagement and liaison support to those individuals who are seen on a reoccurring
basis which may require short term intensive case management. Facilitate services for high -need
individuals across all involved systems of care.
• Monitor contact behaviors and progress, provide assistance to contacts toward attaining self -identified
goals, schedule contacts appointments, visit and observe residences.
• Follow-up with identified individuals in an effort to bridge gaps between police and/or emergency medical
contacts and social services.
• Consult with other agency professionals on difficult cases.
• Make appropriate referrals and reports to APS and CPS, based on knowledge, observations, and
interactions with persons served.
• Develop and recommend procedures for identifying and screening people with social service needs.
• Develop and maintain an ongoing list of housing resources.
• Study and analyze program participation. Prepare recommendations for improvement of existing and
development of new programs. Collect and prepare data for daily status reports and weekly/monthly
outcome summaries.
• Prepare memos, correspondence, records, and reports related to social services activities.
• Develop, recommend, plan, initiate and organize programs, policies, procedures, and projects that will
assist in efficiently addressing the human and social service needs of the target population served within
the Edmonds community.
• Provide training to officers on social service resources.
• Manage limited resources to maximize efficiencies and effectiveness of services provided.
• Facilitate the transport of person(s) in need of assistance to appropriate facilities.
• May attend and testify at court hearings and other legal proceedings.
• Perform related work and special projects as assigned within the scope of this position classification
• Exercise individual initiative and apply considerable independent judgment.
Community Social Worker
Last Reviewed: 11/21/
Last Revi Packet Pg. 103
8.6.a
3 of 5
JOB DESCRIPTION
Community Social Worker
Required Knowledge of:
• The philosophy and objectives of social services and community service programs.
• Symptoms, common behavioral and social characteristics, and other manifestations of the disabilities
affecting the population served.
• Presentation of mental illness related behaviors and appropriate clinical interventions.
• Safety practices, policies and applicable federal, state and local laws, ordinances, codes, regulations,
policies and procedures.
• Motivational interviewing and appropriate interpersonal communication techniques.
• Medicaid, Medicare and Social Security Disability Income (SSDI) guidelines.
• Local, state, and regional social service resources and programs.
• Community systems and resources including residential housing for the population served.
• Human development and behavior.
• Trauma informed care and practices.
• Addiction process and chemical dependency (CD) treatment approaches and expected outcomes.
• Conflict resolution principles, and de-escalation techniques.
• Judicial procedures, sentencing implications, and the corrections environment.
• Related state and federal mandates including those related to privacy and confidentiality.
Required Skill in:
• Excellent communication skills, written and verbal.
• Ability to communicate effectively with diverse populations.
• Ability to maintain a positive, solution -focused demeanor when responding to conflicts or problems.
• Effective public speaker in the areas of presentations, facilitation, and conflict resolution.
• Excellent interpersonal skills for establishing and maintaining effective working relationships with
employees, other departments and city staff, city officials and the public.
• General computer proficiency, including Microsoft Word and Excel. Ability to effectively utilize
spreadsheets and databases.
Ability to:
• Effectively interview clients and natural supports and/or families.
• Establish and maintain rapport with the population served.
• Establish and maintain effective working relationships with federal, state, regional and local agencies,
Snohomish County Human Services, Police Department employees, Fire Department employees, staff of
state and local hospitals, community organizations and leaders, providers, and the general public.
• Work effectively in team environments.
• Recognize personal signs of secondary trauma and prioritize self -care.
• Observe, evaluate, and interpret behavior.
• Express ideas and recommendations clearly and effectively both orally and in writing.
• Gather, review, and evaluate complex data and make appropriate recommendations.
Community Social Worker
Last Reviewed: 11/21/
Last Revi Packet Pg. 104
8.6.a
4 of 5
JOB DESCRIPTION
Community Social Worker
• View and address the total spectrum of service needs.
• Exercise a high degree of initiative and independent judgment, problem solving and decision making
within the scope of assigned authority.
• Effectively identify and resolve conflict in a professional manner.
• Be discreet and maintain confidentiality of information.
• Follow oral and written instructions.
• Read, interpret, and apply work -related laws, rules, and other regulations.
• Maintain detailed records and prepare clear concise written reports.
• Analyze programs, policies, procedures, and operational needs and make appropriate recommendations. o
w
• Maintain a work environment free of discrimination, harassment, and retaliation. o
• Support diversity and multi -cultural understanding in the workplace and the community. a
d
• Work safely and in compliance with federal and state laws, departmental and City policies and standards. Y
0
MINIMUM QUALIFICATIONS:
0
U)
Education and Experience
• Bachelor's degree in social work, psychology, or related field; and four (4) years' experience in the direct It
treatment of acutely and severely mentally ill, homeless and/or chemically dependent individuals. o
OR
m
• Master's degree in social work, psychology, or related field; and two (2) years' experience in the direct
treatment of acutely and severely mentally ill, homeless and/or chemically dependent individuals.19
Required Licenses or Certifications
Desirable but not required: One of the following licenses issued by the State of Washington:
• A valid independent Clinical Social Worker License (LISCW), or
• A valid Advanced Social Worker License (LASW)
Other Requirements
• Successful completion of the Criminal Justice Information Services (CJIS) Online Security Awareness
Training
• A Valid WA State Driver's License and a five-year driving abstract acceptable to the City's insurance
requirements is required for any position that will drive for City business.
• A criminal background check is required following a verbal offer of employment. Criminal history is not an
automatic employment disqualifier. Results are reviewed on a case -by -case basis.
• This position requires an FBI fingerprint background check. The Edmonds Police Department may require
other supplementary background screenings in order to authorize the incumbent's unescorted access to
the Police Department.
• A pre -employment drug screening is required following a conditional job offer.
• Bilingual communications skills desirable.
Community Social Worker
Last Reviewed: 11/21/
Last Revi Packet Pg. 105
8.6.a
5 of 5
JOB DESCRIPTION
Community Social Worker
WORKING CONDITIONS:
Environment:
Work within a law enforcement or an emergency medical response environment, which includes exposure
to high stress, rapidly evolving incidents, public safety responder culture and norms.
Physical Abilities:
Use computers and various software programs and other computer applications, including word
processing, data management, and spreadsheets. _
0
w
The employee will be working primarily out of the police station and will provide outreach to community
.y
M
settings as needed, which could include client homes, hospitals, medical facilities, schools, jails,
Y
community organizations, etc. While performing the duties of this job, the employee must occasionally lift
c
and/or move up to 20 pounds and is regularly required to sit, stand, walk, talk, and use close vision. The
3:
noise level in the work environment is usually moderate.
The physical demands described here are representative of those that must be met by an employee to
vo)
successfully perform the essential functions of this job in the work environment. Reasonable
accommodations may be made to enable individuals with disabilities to perform the essential functions.
Incumbent Signature:
Department Head:
Date:
Date:
Community Social Worker
Last Reviewed: 11/21/
Last Revi Packet Pg. 106
8.7
City Council Agenda Item
Meeting Date: 11/26/2024
Confirmation of Diversity, Equity, Inclusion & Accessibility (DEIA) Commission Appointees Elaine
DuCharme & Joseph Tai Ademofe
Staff Lead: Todd Tatum
Department: Community Services
Preparer: Megan Luttrell
Background/History
The nine Edmonds Diversity, Equity, Inclusion, Accessibility Commission members were originally
appointed on October 27, 2015 for staggered 1-, 2- and 3-year terms. As of June 26, 2024 Position 5
became available for the remainder of the term that runs until December 31, 2026. As of January 1,
2025 Position 7, will become available for a term that runs until December 31, 2027. Position 5's vacancy
was advertised in July 2024 but no applications were received. Both openings were advertised in
October 2024 via local media, and two applications were received; those two applicants were
interviewed by the Commission at the November 5, 2024. The Commission chose to appoint Elaine
DuCharme to Position 5 and Joseph Tai Ademofe, to Position 7. Pursuant to ECC 10.65.020(B), new
appointments to the DEIA Commission shall be made by the seated Commissioners, subject to
confirmation by the City Council.
Staff Recommendation
Confirm appointments of Elaine DuCharme to Position 5 for a partial term expiring on 12/31/26 and
Joseph Tai Ademofe to Position 7 for a term expiring on 12/31/27.
Narrative
Two applications were received by the City for consideration to fill the open positions, both applicants
were interviewed by the DEIA Commissioners. The Commission voted to appoint Elaine DuCharme to fill
the partial term for Position 5, expiring on 12/31/26 and Joseph Tai Ademofe to Position 7 for a term
scheduled to expire 12/31/27, subject to City Council confirmation. Both applications are attached.
Attachments:
Elaine DuCharme Application
Joseph Tai Ademofe Application
Packet Pg. 107
City ofEdmonds
Citizen Board and Commission Application
(PLEASE PRINT OR TYPE) NOTE: This form is a public record and maybe subject to disclosure upon request
DEIA
(Board or Commission)
Name: Elaine DuCharme
Address:
Edmonds, WA 98020
Date:October 13,2024
Day Phone:
Evening Phone:
Cell
E-mail:
l)Af
o
Occupational status and background: Retired attorney, extensive board experience over the last 30 years
GSBA (12 years), Pioneer Human Services (10 plus years), former North Seattle Youth Services (4years)
organizational affiliations: none currently. moved to Olympia from Shoreline and resigned board positior
and local memberships (GSBA) and King County Bar Association and WSBA.
Why are you seeking this appointment? For 30+ years I volunteered for numerous organizations
and committees (GSBA, PHS, WSBA, my church). I was unable to continue my involvement when I moved to Olympia
four years ago. I am ready to re-engage and I believe in the mission of the DEIA commission.
What skills and knowledge do you have to meetthe selection criteria? Addressed legal issues relating to
LGBTQ issues both in private practice and as a presenter at over 30+ Continuing Legal Education Seminars.
fRr:XXNC_ ��Mt—.>A I .an S5 �`' 1 C����of a�-}�JtL 5w-\1
Please list any other Board, Commission, Committee, or official positions you currently hold with the City of Edmond:
None
Additional comments: As a lesbian I bring a personal perspective along with extensive board experience,
knowledge and experience relating to minorities and the societal and legal issues they face
Please return this completed form to:
Edmonds City Hall
121 5�h Avenue North
Edmonds, WA 98020
carolyn.lafave@edmondswa.gov
Phone: 425.771.0247 1 Fax:425.771.0252
Signature
Revised 41301
_
0
Q
CL
Q
as
E
M
U
0
d
_
w
c
a�
E
Q
Packet Pg. 108
I 8.7.b I
City o f Edmonds
Citizen Board and Commission Application
(PLEASE PRINT OR TYPE) NOTE: This form is a public record and maybe subject to disclosure upon request
Diversity Equity Inclusion & Accessibility Commission
(Board or Commission)
Name: Joseph Tai Ademofe Date: 10/07/2024
Address: Day Phone:
Edmonds, WA 98026 Evening Phone:
Cell:
E-mail:
Joseph Ademofe graduated with a Master's Degree in International Studies at the University of Washington Seattle.
Occupational status and background:
As a Soccer Head Coach, Ademofe recruited student athletes from diverse communities and awarded them with scholarships to support their
education_ Ademofe also currently works at the University of Washington as a Public Safety Officer, which ensures the safety of everyone regardless of their backgrounds_
Organizational affiliations: None
Why are you seeking this appointment? I am seeking this appointment because I firmly believe that an entity that endorses
diversity. equity. and inclusion tend to be more flourished and productive. As an immigrant ,vho has had the privilege
to live in different continents and interact with diverse populations, I am convinced I v✓ill be a great asset to the commission.
What skills and knowledge do you have to meet the selection criteria? I will utilize the skills and knowledge I have gained professionally
and personally in working with diverse groups and cultures to contribute effectively to the mission and purpose of this commission_
Please list any other Board, Commission, Committee, or official positions you currently hold with the City of Edmonds:.
None
Additional comments: I am looking forward to hearing from you and discussing my qualifications further.
Please return this completed form to:
Edmonds City Hall
121 5th Avenue North Joseph Ademofe
Edmonds, WA 98020
carolyn.Iafave@edmondswa.gov Signature
Phone: 425.771.0247 1 Fax: 425.771.0252
Revised 4/30/14
c
O
w
U
Cl.
a
Q
a�
O
E
a)
a
CL
in
O
w
m
E
U
Q
Packet Pg. 109
8.8
City Council Agenda Item
Meeting Date: 11/26/2024
Approval of an Interlocal Agreement with Snohomish County and Mountlake Terrace, to renew an on-
going water quality monitoring program for Lake Ballinger
Staff Lead: Rob English
Department: Engineering
Preparer: Emiko Rodarte
Background/History
On June 11, 2019, staff presented this item to the Parks & Public Works committee and it was forwarded
to the June 18th consent agenda for City Council approval.
On June 18, 2018 City Council approved this item on the consent agenda.
On November 19, 2024 staff presented this item to the Parks & Public Works Committee and it was
forwarded to the November 26th consent agenda for City Council Approval.
Staff Recommendation
Approve the interlocal agreement.
Narrative
This is a renewal of an existing ILA that will expire on December 31, 2024.
Through staff work with the City of Mountlake Terrace, Snohomish County, and Lake Ballinger residents,
a desire for continuous and on -going monitoring of the water quality health within Lake Ballinger was
identified by both residents and staff. Employees and residents have worked to identify the most
appropriate method of establishing a long-term program and have reached the conclusion again that a
volunteer -based monitoring program which is overseen by trained technical staff from Snohomish
County would be the most appropriate mechanism to monitor lake water quality.
The 'Lakewise Program' administered through Snohomish County, manages several lakes throughout
the County and has staff who are technically trained in lake water quality data gathering and reporting.
The proposed program utilizes the County's technical staff to properly train lake residents in methods of
gathering samples and following required chain of custody for date validation. Snohomish County staff
will review the water quality data and provide a full report annually, along with a quick summary'water
quality report card' for the lake. The information and data will also be publicly available on the County
water quality database webpage.
Through the previous iteration of the ILA, volunteer residents have been identified, trained, and have
filled their designated role of Water Quality Monitors. These volunteers will continue in their role as the
Packet Pg. 110
8.8
Lake Ballinger Water Quality Monitors. Staff hopes to also add more volunteers as the program
continues.
The City of Edmonds will share all costs of the program equally with the City of Mountlake Terrace.
Edmonds direct costs for 2025 are limited to $3,012.50, which is covered by the annual stormwater
budget for Lake Ballinger related work that is part of our NPDES permit. Future years will require the
County to provide cost estimates for written City approval prior to commencing work. At the same time,
by the agreement, it also includes a 'max cost' clause so that the program cannot cost more than
$50,000, with the City's share being $25,000 before its expiration on December 31, 2029. These costs
are within currently projected annual budget amounts in the stormwater utility fund and would not
require additional funding to support. At the end of this ILA, on December 31, 2029, the City can
consider the option to continue the program or allow it to expire.
In addition, the agreement does include several potential additional services which are currently outside
of staff technical abilities, and which the City can request in writing when needed. The ability to tap into
those services, gives staff and residents better flexibility to respond to concerns, algae blooms, or other
issues which could arise quickly as lake conditions change.
Attachments:
Attachment 1 - ILA
Packet Pg. 111
8.8.a
INTERGOVERNMENTAL SERVICES AGREEMENT
FOR LAKE MANAGEMENT AND WATER QUALITY SERVICES
This AGREEMENT FOR LAKE MANAGEMENT AND WATER QUALITY
SERVICES (this "Agreement") is made and entered by and between the CITY OF
EDMONDS, a Washington municipal corporation, the CITY OF MOUNTLAKE
TERRACE, a Washington municipal corporation, (together the "Cities"), and
SNOHOMISH COUNTY, a political subdivision of the State of Washington (the "County").
RECITALS
A. Lake Ballinger lies within the boundaries of the City of Edmonds and the City
of Mountlake Terrace.
B. Lake Ballinger is an important water resource for both the City of Edmonds and
the City of Mountlake Terrace which provides opportunities for swimming, boating, fishing
and aesthetic enjoyment.
C. The Cities and the County recognize the importance of performing certain water
quality monitoring services at Lake Ballinger.
D. The Cities do not have the staff or resources to monitor water quality at Lake
Ballinger.
E. The Cities desire to retain the services of the County to perform certain water
quality monitoring at Lake Ballinger and the County has the staff and resources to perform
said services, all under the terms and conditions described in this Agreement.
AGREEMENT
NOW, THEREFORE, in consideration of the respective agreements set forth below
and for other good and valuable consideration, the receipt and sufficiency of which are hereby
acknowledged, the Cities and the County agree as follows:
1. TERM a
J
The term of this Agreement (the "Term") shall commence upon execution (the r
"Commencement Date") and shall expire on December 31, 2029 (the "Expiration Date");
provided, however, that both the Cities and the County's obligations after December 31, 2024, E
are contingent upon local legislative appropriation of the necessary funds for this specific
purpose in accordance with applicable law. Q
2. CATEGORIES OF SERVICES PERFORMED BY COUNTY AND RIGHT OF
ENTRY
During the Term of this Agreement, the County shall perform for the Cities the
following services (collectively, the "Services"): (i) lake monitoring services, as more fully
described in Section 3 below (the "Lake Monitoring Services"); and (ii) any additional services
related to water quality or quantity issues that may be mutually agreed upon in writing by the
AGREEMENT FOR LAKE MANAGEMENT pg. I
AND WATER QUALITY SERVICES
Packet Pg. 112
8.8.a
Cities and the County pursuant to Section 4 below (the "Additional Services"). The Services
shall be performed in a good and professional manner, consistent with accepted industry
standards and in accordance with both the substantive and procedural requirements specified
in this Agreement.
The Cities shall provide the County with reasonable access to any location where
Services are to be provided. If the Cities are unable to provide such access, the County shall
have no obligation to perform any Services under this Agreement unless and until the Cities
provides reasonable access.
3. LAKE MONITORING SERVICES
3.1. Lake Water Quality Monitoring
Beginning in 2025, the County, through the assistance of trained citizen volunteers,
will perform basic water quality monitoring of Lake Ballinger two times per month from May
through October of each contract year depending on volunteer availability. Basic monitoring
will be conducted in the deepest portion of the lake and will consist of measurements of water
clarity (Secchi depth) and near -surface water temperature, as well as observations of water
color and algae abundance.
Water column profiles for temperature and dissolved oxygen will also be taken as a
part of basic monitoring per availability of a dissolved oxygen/temperature meter (meter). If
the Cities provide a meter, the profiles will be included every year as part of basic monitoring.
The County will provide basic maintenance of a Cities -provided meter, but will not be
responsible for repairs. If the Cities do not provide a meter, then Lake Ballinger volunteers will
be provided with a County meter at least every third year. The County will be responsible for
all maintenance and repairs of County -provided instruments.
The County will also provide more detailed monitoring of Lake Ballinger from June
through September of each contract year including in months when a volunteer is not available.
The detailed monitoring will be conducted in the deepest portion of the lake and will include
water samples for laboratory analysis. The sampling depths and associated parameters to be
analyzed are as follows:
Parameter
1 meter
5 meter
15 meter
Total Phosphorus TP
X
X
X
Soluble reactive phosphorus
SRP
X
X
X
Total Persulfate Nitrogen TPN
X
Chlorophyll a
X
All monitoring will be conducted in accordance with the "Quality Assurance
Monitoring Plan for the Snohomish County Lake Management Program" as updated. Citizen
volunteers will be trained by the County in proper monitoring techniques and will be
supervised by County staff. Water samples will be analyzed by a Washington State Department
AGREEMENT FOR LAKE MANAGEMENT pg. 2
AND WATER QUALITY SERVICES
Packet Pg. 113
8.8.a
of Ecology -accredited laboratory. The laboratory results are sent to the County in electronic
format. The cost for all such services shall be as set forth in Section 5 below.
3.2. Reporting of Water Quality Data
All data collected from Lake Ballinger will be summarized annually in two written
reports that will be made available to the Cities and the general public. The first is a water
quality report card, a short summary for the public of lake health. The second report is a more
detailed report with a summary of all data collected through the monitoring program. The
reports for a given calendar year shall be delivered to the Cities on or before March 15 after
the close of the calendar year at issue. The reports will also be made available on Snohomish
County's website unless otherwise directed by the Cities. The raw water quality data shall be
available on the County's online water quality database following completion of quality
assurance checks. Copies of the raw data shall also be provided to the Cities upon request.
If requested by the Cities, County staff will also provide one annual public presentation
on the condition of water quality in Lake Ballinger. The County will also provide comments
on documents, reports, or grant proposals related to lake water quality that may be developed
by the Cities for the management of Lake Ballinger.
3.3. Technical Assistance
County staff will be available to respond to questions from the public and the Cities
about the water quality conditions in Lake Ballinger via email or phone. The County will also
provide plant identification services as requested. The County will refer all other inquiries,
including those regarding lake management actions, to the Cities.
4. ADDITIONAL SERVICES
4.1. Desire for Additional Services
The County and the Cities anticipate that, during the Term of this Agreement, the Cities a
may desire for the County to provide additional water quality monitoring or related services
a
(the "Additional Services") to the Cities, and the County may be willing to provide some or all a
of such Additional Services. By way of example, and not by way of limitation, the parties
anticipate Additional Services could involve any one or more of the following: (i) sampling r
one or more water quality monitoring sites for additional or different water quality parameters
at Lake Ballinger and/or its tributaries; (ii) monitoring of blooms of potentially toxic algae; E
(iii) commencement of other activities as requested or as mutually agreed that enhance the
Cities' water quality program. Q
4.2. Request for Additional Services
Subject to the total cost limitation described in Section 5.4 below, at any time and from
time to time during the Term of this Agreement, the Cities may request that the County perform
one or more Additional Services. The Cities may request that such Additional Services be
performed a specific number of times, or on an ongoing basis, for a single calendar year, or for
multiple calendar years. The County may, but need not, agree to perform some or all of the
AGREEMENT FOR LAKE MANAGEMENT pg. 3
AND WATER QUALITY SERVICES
Packet Pg. 114
8.8.a
requested Additional Services under terms and conditions acceptable to both parties. Any
agreement to add Additional Services must be memorialized in writing and signed by the City
Manager of Mountlake Terrace or the Mayor of Edmonds and the County's Director (as those
terms are defined in Section 4.3 below).
4.3. Authority to Request and Approve Additional Services
Subject to the total cost limitation described in Section 5.4 below, the City Manager of
Mountlake Terrace and the Mayor of Edmonds shall have the authority to request, authorize
and memorialize Additional Services on behalf of the Cities without the need to obtain
additional approvals from the City Council of Edmonds or the Mayor of Mountlake Terrace.
Subject to the total cost limitation described in Section 5.4 below, the Director of the County's
Department of Conservation and Natural Resources (the "County's Director") shall have the
authority to agree to perform and memorialize Additional Services on behalf of the County
without the need to obtain additional approvals from the County Executive.
5. COMPENSATION
5.1. Cost of Lake Monitoring Services in 2025
The Cities shall pay the County $6,025 in 2025 for the cost of Lake Monitoring
Services. The City of Edmonds shall pay 50% of the costs ($3,012.50 in 2025). The City of
Mountlake Terrace shall pay 50% of the costs ($3,012.50 in 2025). The Cities will be notified
of costs for subsequent years as noted in Section 5.3 below.
5.2. Cost of Additional Services
Unless specifically otherwise provided herein, the County shall be compensated for all is
Additional Services on a time and materials basis. The County's time shall be calculated based c
on the base hourly rate of each of the individual County Personnel (as that term is defined in c
Section 6 below) performing the Services. The actual reasonable cost of benefits shall be added a
to the base hourly rate of all County Personnel. The time billed to the Cities shall consist only a
of personnel time that is actually spent and is reasonably required to perform the Services. The a
Cities shall reimburse the County for all reasonable costs actually incurred by the County in J
connection with performing the Services, including, but not limited to, laboratory fees. The r
Cities shall reimburse the County for the reasonable costs of materials and/or equipment the
County uses in connection with performing any one or more of the Additional Services. E
Reimbursement for Additional Services will be split between the Cities, with each bearing
responsibility for 50% of the costs incurred. a
5.3. Cost of Services in Following Years
Beginning in 2025, on or before October 1 st of each year, the County shall provide the
Cities with a written estimate for the total cost of performing the Services for the following
calendar year. The Cities must provide written acceptance of the cost estimate to the County
on or before November 1 of the year that the County's cost estimate is provided. This
AGREEMENT FOR LAKE MANAGEMENT pg. 4
AND WATER QUALITY SERVICES
Packet Pg. 115
8.8.a
Agreement shall terminate on December 31 st of the year that the County's cost estimate is
provided to the Cities if either: (1) one or both of the Cities do not provide written acceptance
of the County's cost estimate; or (2) one or both of the Cities rejects the County's cost estimate.
5.4. Total Services Not to Exceed $50,000 Maximum Cost
Notwithstanding anything to the contrary contained elsewhere in this Agreement, the
total cumulative cost of all Services performed by the County under this Agreement shall not
exceed Fifty Thousand Dollars ($50,000.00) (the "Maximum Cost"). Accordingly, if any
proposal to add one or more Additional Services to this Agreement would cause the total cost
of Services to exceed the Maximum Cost, the Cities shall not submit a request for such
Additional Services to the County. Should the County receive a request for Additional Services
that would cause the total cost of all Services to exceed the Maximum Cost, the County shall
reject said request.
5.5. Invoicing and Payment
The County shall submit one invoice to the Cities by October 1 st of each year itemizing
the cost of providing the Lake Monitoring Services for the current calendar year. The County
shall also submit one or more invoices each year to the Cities for any Additional Services
agreed to by the County and the Cities. Invoices for Additional Services shall describe in
reasonable detail the cost of time and materials spent by the County on Additional Services
during the period at issue. The Cities shall pay each invoice within thirty (30) days of receiving
same. Invoices shall be emailed to the following addresses:
City of Edmonds City of Mountlake Terrace
Attn: Patrick Johnson Attn: Laura Reed
121 5th Avenue N 6100 219th Street SW, Suite 200
Edmonds, WA 98020 Mountlake Terrace, WA 98043
Pat.Johnson@edmondswa.gov LReed@mltwa.gov
6. INDEPENDENT CONTRACTOR
All work performed by the County pursuant to this Agreement shall be performed by
the County as an independent contractor and not as an agent or employee of the Cities. The
County shall furnish, employ, and have exclusive control of all persons (including, but not
limited to volunteers) to be engaged in performing the County's obligations under this
Agreement (collectively, the "County Personnel") and shall prescribe and control the means
and methods of performing such obligations by providing adequate and proper supervision.
The County Personnel shall for all purposes be solely the employees, agents or volunteers of
the County and shall not be deemed to be employees or agents of the Cities for any purpose
whatsoever. With respect to the County Personnel, the County shall be solely responsible for
compliance with all rules, laws, and regulations relating to employment of labor, hours of
labor, working conditions, payment of wages and payment of taxes, such as employment,
Social Security, and other payroll taxes including applicable contributions from the County
Personnel when required by law.
AGREEMENT FOR LAKE MANAGEMENT pg. 5
AND WATER QUALITY SERVICES
Q
J
Packet Pg. 116
8.8.a
7. TERMINATION FOR CONVENIENCE
This Agreement may be terminated by either party for any reason or for no reason, by
giving thirty (30) days advance written notice of termination to the other parties. Any
termination notice delivered pursuant to this Section 7 shall specify the date on which the
Agreement will terminate. If this Agreement is terminated pursuant to this Section 7, the
County shall continue performing Services through the date of termination. The Cities shall
compensate the County for all Services performed by the County through the date of
termination on a pro -rated basis. The Cities' obligation to make such final payment to the
County shall survive the termination of this Agreement.
8. COMPLIANCE WITH LAWS
The Cities and the County shall at all times exercise their rights and perform their
respective obligations under this Agreement in full compliance with all applicable laws,
ordinances, rules and regulations of any public authority having jurisdiction.
9. INDEMNIFICATION
Each party to this Agreement shall indemnify, defend and hold the other party and its
agents, employees and contractors harmless from and against any and all costs, liabilities, suits,
losses, damages, claims, expenses, penalties or charges, including, without limitation,
reasonable attorneys' fees and disbursements, that the other party may incur or pay out by
reason of. (i) any accidents, damages or injuries to persons or property occurring during the
Term of this Agreement, but only to the extent the same are caused by any negligent or
wrongful act of the indemnifying party; or (ii) any breach or Default (as such term is defined
in Section 10 below) of the indemnifying party under this Agreement. The provisions of this
Section 9 shall survive the expiration or earlier termination of this Agreement.
10. DEFAULT AND REMEDIES
If either party to this Agreement fails to perform any act or obligation required to be o
performed by it hereunder, the parry to whom such performance was due shall deliver written n
notice of such failure to the non -performing party. The non -performing party shall have thirty a
(30) days after its receipt of such notice in which to correct its failure to perform the act or J
obligation at issue, after which time it shall be in default ("Default") under this Agreement;
provided, however, that if the non-performance is of a type that could not reasonably be cured
within said thirty (30) day period, then the non -performing party shall not be in Default if it
commences cure within said thirty (30) day period and thereafter diligently pursues cure to
completion. In the event of a parry's Default under this Agreement, then after giving notice
and an opportunity to cure, the party to whom the performance was due shall have the right to a
exercise any or all rights and remedies available to it at law or in equity.
11. PUBLIC DISCLOSURE LAWS
The Cities and the County each acknowledge, agree and understand that the other
parties are public agencies subject to certain disclosure laws, including, but not limited to
Washington's Public Records Act, chapter 42.56 RCW. Each party understands that records
AGREEMENT FOR LAKE MANAGEMENT pg. 6
AND WATER QUALITY SERVICES
Packet Pg. 117
8.8.a
related to this Agreement and the County's performance of Services under this Agreement may
be subject to disclosure pursuant to the Public Records Act or other similar law. Neither the
Cities nor the County anticipate that the performance of any party's obligations under this
Agreement will involve any confidential or proprietary information.
12. NOTICES
Each notice, demand, request, consent, approval, disapproval, designation or other
communication that is permitted or required to be given by one parry to the other parry under
this Agreement shall be in writing and shall be given or made or communicated by: (i) United
States registered or certified mail, postage prepaid, return receipt requested; (ii) any nationally
recognized overnight carrier or express mail service (such as FedEx or DHL) that provides
receipts to indicate delivery; (iii) by personal delivery; or (iv) by facsimile (with proof of
successful transmission); (v) or by email (with a request for and receipt of proof of successful
transmission). All such communications shall be addressed to the appropriate Administrator of
this Agreement (or their designee) as follows:
To the City of Edmonds:
ATTN: Patrick Johnson
121 5t' Avenue N
Edmonds, WA 98020
Telephone: 425-771-0220 x1322
Email: patJohnsonkedmondswa.gov
To the County:
Snohomish County
ATTN: Surface Water Management
3000 Rockefeller Avenue M/S 303
Everett, Washington 98201
Telephone: (425) 388-3204
Email: Marisa Burghdoff
To the City of Mountlake Terrace.
ATTN: Laura Reed
6100 219t1i Street SW, Suite 200
Mountlake Terrace, WA 98043
Telephone: 425-744-6226
Email: lreedkci.mlt.wa.us
All notices shall be deemed given on the day each such notice is personally delivered,
transmitted by facsimile (with evidence of receipt), or delivered by overnight courier service,
or on the third business day following the day such notice is mailed if mailed in accordance
with this Section.
13. MISCELLANEOUS
13.1. Entire Agreement
This Agreement constitutes the entire agreement between the parties regarding the
subject matter hereof and supersedes any and all prior oral or written agreements between the
parties regarding the subject matter contained herein. This Agreement may not be modified or
amended in any manner except by a written document signed by the party against whom such
modification is sought to be enforced.
AGREEMENT FOR LAKE MANAGEMENT pg. 7
AND WATER QUALITY SERVICES
a
J
Packet Pg. 118
8.8.a
13.2. Interpretation
This Agreement shall be governed by and enforced in accordance with the laws of the
State of Washington. This Agreement and each of the terms and provisions of it are deemed to
have been explicitly negotiated by the parties, and the language in all parts of this Agreement
shall, in all cases, be construed according to its fair meaning and not strictly for or against
either of the parties hereto. The captions and headings in this Agreement are used only for
convenience and are not intended to affect the interpretation of the provisions of this
Agreement. This Agreement shall be construed so that wherever applicable the use of the
singular number shall include the plural number, and vice versa, and the use of any gender
shall be applicable to all genders.
13.3. Severability
If any provision of this Agreement or the application thereof to any person or
circumstance shall, for any reason and to any extent, be found invalid or unenforceable, the
remainder of this Agreement and the application of that provision to other persons or
circumstances shall not be affected thereby, but shall instead continue in full force and effect,
to the extent permitted by law.
13.4. No Waiver
A parry's forbearance or delay in exercising any right or remedy with respect to a
Default by another party under this Agreement shall not constitute a waiver of the Default at
issue. Nor shall a waiver by a party of any particular Default constitute a waiver of any other
Default or any similar future Default.
13.5. Assignment
This Agreement shall not be assigned, either in whole or in part, by the parties hereto.
Any attempt to assign this Agreement in violation of the preceding sentence shall be null and
void and shall constitute a Default under this Agreement.
13.6. Warranty of Authority
a
J
Each of the signatories hereto warrants and represents that he or she is competent and
authorized to enter into this Agreement on behalf of the party for whom he or she purports to
sign this Agreement.
13.7. No Joint Venture
Nothing contained in this Agreement shall be construed as creating any type or manner
of partnership, joint venture or other joint enterprise between the parties.
AGREEMENT FOR LAKE MANAGEMENT Po. 8
AND WATER QUALITY SERVICES
Packet Pg. 119
8.8.a
13.8. No Third Party Beneficiaries
This Agreement is made and entered into for the sole benefit of the Cities and the
County. No third party shall be deemed to have any rights under this Agreement; there are no
third parry beneficiaries to this Agreement.
13.9. Execution in Counterparts
This Agreement may be executed in two or more counterparts, each of which shall
constitute an original and all of which shall constitute one and the same agreement.
IN WITNESS WHEREOF, the Cities and the County have executed this Agreement as of the
date of the last party to sign.
CITY OF EDMONDS:
CITY OF MOUNTLAKE TERRACE:
City of Edmonds, a Washington Municipal City of Mountlake Terrace, a Washington
Corporation municipal corporation
Mike Rosen, Mayor
Date:
Attest/Authenticate:
Scott Passey, City Clerk
Approved as to Form:
Office of the City Attorney
SNOHOMISH COUNTY:
Snohomish County, a political subdivision of
the State of Washington
County Executive
Date:
Approved as to Form:
Deputy Prosecuting Attorney
Name, Title:
Date:
Approved as to Form:
City Attorney
AGREEMENT FOR LAKE MANAGEMENT Po. 9
AND WATER QUALITY SERVICES
Packet Pg. 120
8.9
City Council Agenda Item
Meeting Date: 11/26/2024
Approve Subaward Safety Action Plan Agreement between Puget Sound Regional Council and City of
Edmonds
Staff Lead: Rob English
Department: Engineering
Preparer: Emiko Rodarte
Background/History
On June 18, 2024, staff presented this item to the Parks & Public Works committee. The Committee
recommendation was a presentation to the City Council with clarification on the funding source.
On November 19, 2024, staff presented this item to the Parks & Public Works Committee. The item was
forwarded to the consent agenda for City Council approval.
Staff Recommendation
Approve agreement.
Narrative
In late 2023, the City of Edmonds secured a $300,000 federal grant through the U.S. Department of
Transportation's Safe Streets and Roads for All (SS4A) Grant Program. This program is focused on the
development of local roadway safety action plans by developing well-defined strategies to prevent
roadway fatalities and serious injuries. It will also identify and prioritize future projects to help address
roadway safety issues. The scope of work will include data collection, speed studies, accident history
and analysis of the City's transportation network, review and update of existing policies, develop a
Vision Zero Policy, identify and prioritize transportation projects to improve safety and document
findings in a Comprehensive Safety Action Plan.
This item was presented at the June PPW committee with the recommendation to have the 112 Fund
provide the 20% local match and not REET funds as outlined in the agenda memo. There were
discussions about the availability of 112 funding and staff capacity to manage this project. The item was
placed on -hold until: 1) Staff could complete a review of the 112 Fund after development of the
proposed 2025-2026 Budget; 2) More progress was made on the Transportation Plan update; and 3)
Staff capacity to manage the project.
The proposed budget includes $375k in 2025 to complete the study. The study will be funded with an
80% grant reimbursement and a 20% local match from the 112 Fund. Staff will have the ability to
manage the study once the Transportation Comprehensive Plan update is complete and approved by
the City Council.
Background:
Packet Pg. 121
8.9
The City partnered with ten other agencies, including Puget Sound Regional Council (PSRC), on a $2.87
million grant application. PSRC is the Metropolitan Planning Organization for the Seattle metropolitan
area. The City will be working closely with the agency to support the goal of reducing fatalities and
serious injuries on roadways in the Puget Sound region. As part of this project, a subaward agreement is
required between PSRC and City of Edmonds.
Attachments:
Attachment 1 - Agreement
Packet Pg. 122
8.9.a
�O�
fo '
Puget Sound Regional COuncil
Subaward Agreement Between
Puget Sound Regional Council
.,.
City of Edmonds for
"Safety Action Plan"
Date Entered into Agreement:
Subaward Agreement M 2024-09
Packet Pg. 123
8.9.a
Pass -through Entity (PTE): Puget Sound
Subrecipient: City of Edmonds
Regional Council
Subaward Period of Performance:
Start: January 1, 2025
Amount Funded:
Subaward Agreement #:
End: December 31, 2025
$300,000
2024-09
Federal Awarding Agency: U.S Department of
FAIN: 693JJ32440280
Transportation
Federal Award Issue Date: April 17, 2024
Total Amount of Matching Funds: $75,000
ALN No. and Name: 20.939, Safe Streets and Roads for All
Project Title: Safety Action Plan
R & D Award ❑ Yes ® No
Unique Entity ID #NF1AQNT457R7
This SUBAWARD (hereinafter the "Award"), is made and entered into as of signing by and between the
Pass -through Entity, Puget Sound Regional Council, (hereinafter "PSRC") and Subrecipient, City of
Edmonds (hereinafter "City of Edmonds"), and supports the work described in the approved final scope of
work, which is incorporated by reference into this Award and attached in Exhibit A. All work on this
project should be consistent with the Authorized Scope of Work unless modified by the appropriate
authority as described in 4.2 below.
PSRC is a Metropolitan Planning Organization under federal law (23 USC 134) and a Regional Planning
Transportation Planning Organization under state law (RCW 47.80) and has all powers necessary for the
performance of the work and obligations of this Agreement, and has the authority to contract with member
and non-member agencies for special services; and
City of Edmonds is a US Local Government under state law (RCW 43.21CA20) and has all powers
necessary for the performance of the work and obligations of this Agreement;
The U.S. Department of Transportation (hereinafter the "USDOT"), has expressly consented to this
Award; and
NOW, THEREFORE, in consideration of the covenants, assurances and mutual promises herein the
Parties agree as follows:
To ensure effective intergovernmental cooperation and efficiencies, the Parties each designate a
representative (the "Designated Representative") who shall be responsible for coordination of
communications between the Parties and shall act as a central point of contact for each Party. The
aEi
Designated Representatives shall each be responsible for the administration and performance of the
P
Scope of Work of this Award, as well as ensuring that schedule, budget, and funding limitations of this
a'
Q
Agreement are satisfied. Each Designated Representative is also responsible for coordinating the input
and work of its respective governmental agency or department staff, consultants and contractors as it
r
relates to the scope of this Agreement.
A Party may change its Designated Representative by written notice to the other Party. Each Party's
Designated Representative is named below with the individual's contact information.
PSRC Designated Representative. The Designated Representative for PSRC is Gary Simonson. They
may designate other staff as the principal contact for daily work coordination. All official correspondence
concerning this Agreement shall be directed to the Designated Representative at the following address:
Packet Pg. 124
8.9.a
Puget Sound Regional Council Phone: 206-971-3276
Attn: Gary Simonson, Senior Planner
1201 3rd Avenue, Suite 500 Email: gsimonson@psrc.org
Seattle, WA 98101
City of Edmonds Designated Representative. The Designated Representative for City of Edmonds is Mr.
Bertrand Hauss. They may designate other staff as the principal contact for daily work coordination. All
official correspondence concerning this Agreement shall be directed to the Designated Representative at
the following address:
City of Edmonds Phone: 425-754-5325
Attn: Bertrand Hauss
Title: Transportation Engineer
121 5th Ave. N Email: bertrand.hauss@edmondswa.gov
Edmonds, WA 98020
3.1. In its performance of this Subaward Agreement, City of Edmonds shall be an independent entity and
not an employee or agent of PSRC.
3.2. City of Edmonds must obtain the prior written approval of PSRC whenever any programmatic
changes are anticipated, including but not limited to the following:
a) Any revision of the Scope of Work or objectives of the project (regardless of whether there is an
associated budget revision requiring prior approval).
b) Changes in key persons in cases where specified in an application or a grant award. In research
projects, a change in the project director or principal investigator shall always require approval
unless waived by the USDOT.
C) Under non -construction projects, contracting out, subgranting (if authorized by law) or otherwise
obtaining the services of a third party to perform activities, which are central to the purposes of
the award.
d) Transfer of budgeted amounts.
e) No -cost extensions.
3.3. Governmentwide Debarment and Suspension -a
City of Edmonds shall comply with the provisions of 2 C.F.R. Part 200, Appendix II, "Contract Provisions 3
for Non -Federal Entity Contracts Under Federal Award", Section I, (published in the Federal Register on c�
December 26, 2013, 78 FIR 78608), which generally prohibit entities that have been debarred,
suspended, or voluntarily excluded from participating in Federal non -procurement transactions either
through primary or lower tier covered transactions, and which sets forth the responsibilities of recipients of =
Federal financial assistance regarding transactions with other persons, including subrecipients and
contractors. Q
a�
City of Edmonds (and all subcontractors, if any) must maintain current registration in the System for Q
Award Management (www.sam.gov) at all times during which they have active federal awards or
subawards, including for this Agreement.
3.4. Indemnification
To the extent permitted by law, each Party to this Agreement shall indemnify the other Party and its
officers, officials, employees, and agents, while acting within the scope of their employment, from any and
all costs, claims, demands, judgments, damages, or liability of any kind including injuries to persons or
damages to property, which arise out of, or in any way result from, due to, any acts or omissions of the
indemnifying Party in the implementation of this Agreement or any agreement between City of Edmonds
and its subcontractor(s).
No Party shall be required to indemnify the other Party if the claim, suit, or action for injuries, death, or
damages is caused by the sole negligence of the Party seeking indemnification.
Packet Pg. 125
8.9.a
Where such claims, suits, or actions result from concurrent negligence of the Parties, the indemnity
provisions provided herein shall be valid and enforceable only to the extent of the Party's own negligence
Each Party by mutual negotiation, hereby waives, with respect to the other Party only, any immunity that
would otherwise be available against such claims under the industrial insurance provisions of Title 51
RCW.
This indemnification shall survive the termination of this Agreement.
3.5. Compliance with Federal Award Obligations. The Award is subject to, and City of Edmonds shall
comply with, the terms and conditions of the Award and the Department of Transportation General Terms
and Conditions (February 8, 2023) (see attachments 1 and 2), including all applicable statutes,
regulations, executive orders (E.O.$), Office of Management and Budget (OMB) circulars, provisions of
the OMB Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal
Awards (codified at 2 C.F.R. Part 200) (OMB Uniform Guidance), and approved applications.
City of Edmonds is also a party to the award, and the parties want City of Edmonds to carry out certain
Project components with PSRC's assistance, financial management, internal controls, and oversight as
described in Article 17 of this agreement. PSRC, as a pass -through entity, shall monitor the activities of
City of Edmonds in compliance with 2 C.F.R 200 332(d) with respect to a subrecipient's performance of
work under a subaward of this SS4A Grant.
4.1. Budget
The estimated budget to accomplish the tasks described in the Scope of Work for this project is
incorporated in Exhibit B of this Agreement. This budget reflects the Parties' best estimates of the
amounts that may be required to accomplish the total work under this Agreement. Actual amounts
reimbursable shall be based on actual work performed. In the event it is determined that the Scope of
Work has been accomplished by City of Edmonds for a lesser amount, PSRC shall only pay
reimbursements for documented costs. In no event shall City of Edmonds be paid for costs that are not
documented pursuant to the requirements of this Agreement.
4.2. Payments/Invoices
PSRC shall reimburse City of Edmonds not more often than monthly for costs incurred in the performance 3
of this Award, which are determined to be allowable, allocable, & reasonable in accordance with 2 CFR
Part 200. All invoices shall be submitted using City of Edmonds' standard invoice, but at a minimum shall
include current and cumulative costs, subaward number, and certification (Exhibit C), as required in 2
CFR 200.415 (a). PSRC shall not transfer nor be obligated to transfer any funds in advance of its
approval of such requests. E
a�
d
Documentation of all expenses eligible for reimbursement shall be maintained by City of Edmonds and Q
shall, upon request by PSRC, be provided prior to reimbursement as required by this Award. All invoices ,
presented for payment shall include a reasonable description of the tasks performed that correspond to
the amounts invoiced. c
To assure payment processing in a timely manner, City of Edmonds shall submit all invoices, required
reports, and documentation to the attention of:
PSRC
Attn: Finance
1201 3rd Avenue, Suite 500
Seattle, WA 98101
206-464-7090
Finance(cDpsrc.org
Packet Pg. 126
8.9.a
PSRC shall review and pay reimbursable amounts within 45 days of receipt of the invoice.
PSRC reserves the right to withhold payments pending timely delivery and proper completion of the
reports or documents as may be reasonably required under this Agreement.
4.3. Prohibited Use of Funds
City of Edmonds may not use funds for the following ineligible activities:
(a) Ineligible costs under 2 C.F.R Part 200, Uniform Administrative Requirements, Cost Principles,
and Audit Requirements for Federal Awards;
(b) Any activities prohibited under the Grant between USDOT and PSRC dated April 17, 2024
4.4. Final Payment
Final payment will be made to City of Edmonds upon final completion of the work and upon written
acceptance by PSRC's Designated Representative. Any required adjustments shall be reflected in the
final invoice.
4.5. Use of Consultants/Contractors
For all proposals and contracts where costs are expected to exceed $100,000, the scope of work and the
costs of such must be submitted to and approved by USDOT prior to employment of such consultants or
contractors. City of Edmonds will ensure that any consultant or contractor paid from funds provided under
this Award is bound by all applicable award terms and conditions. USDOT shall not be liable hereunder to
a third party nor to any party other than PSRC.
In addition, all procurements shall adhere to PSRC's Procurement Policies and Procedures as updated
March 2023.
$10,000 or under Micro purchase: No competition required.
$10,001-$250,000* Small purchase: Competition required with documentation of an adequate
number of price/rate quotes.
Over $250,000* Competitive proposal: Competition required with documentation of at least
two formal, written bids, proposals or qualifications, as well as an
independent cost estimate.
Pre -approval required Noncompetitive proposal: Only when competitive method is infeasible and
certain situations apply. Un
*In addition, all contracts over $100,000 shall include applicable lobbying certifications as stated in
section 10.15. E
a�
d
REPORTINGRECORDS
Q
5.1. Reports and Documentation
Project Progress Reports: City of Edmonds agrees to assist PSRC with Project Progress Reports on a
quarterly basis for the period(s) ending March 2025, or any portion thereof. City of Edmonds will supply
report content, e.g. summaries of work completed, to PSRC no later than 10 days following the end of the
period. Reports are due no later than 30 days following the end of the period.
Performance Progress Reports submitted to USDOT by PSRC should include the following:
i. Provide a clear, concise overview of the activities undertaken during the Project Period;
ii. Document accomplishments, benefits, and impacts that the Project and Activities are having.
Recipients should note specific outcomes where activities have led to job creation/retention,
Packet Pg. 127
8.9.a
private investment, increased regional collaboration, engagement with historically excluded
groups or regions, enhanced regional capacity, and other positive economic benefits;
iii. Highlight any upcoming or potential press events or opportunities for collaborative press events to
highlight benefits of the USDOT investment;
iv. Compare progress with the project timeline, explaining any departures from the targeted
schedule, identifying how these departures are going to be remedied, and projecting the course
of work for the next period;
V. Outline challenges that currently impact or could impact progress on the grant over the next
reporting period and identify ways to mitigate this risk; and
vi. Outline any areas where USDOT assistance is needed to support the project or any other key
information that would be helpful for your USDOT Project Officer to know.
Final Project Reports may be posted on USDOT's website, used for promotional materials or policy
reviews, or may be otherwise shared. Recipients should not include any copyrighted or other sensitive
business information in these reports. There is no specific page limit for Final Project Reports; however,
such reports should concisely communicate key project information, and should:
i. Outline the specific regional need that the project was designed to address and update on
progress made during the reporting period that will mitigate need and advance economic
development;
ii. Provide a high-level overview of the activities undertaken;
iii. Detail lessons learned during the project period that may be of assistance to USDOT or other
communities undertaking similar efforts;
iv. Outline the expected and actual economic benefits of the project as the time that the report is
written; and
V. Any other key information from the relevant project period
5.2. Availability of Records
All project records in support of all costs and actual expenditures incurred by City of Edmonds and its
Sub-Contractor(s) under this Agreement shall be maintained by City of Edmonds and its Sub-
Contractor(s) and open to inspection by PSRC (or its federal funding agency) during normal business
hours, and shall be retained and made available for such inspection for the duration of the State and
Federal records retention requirements from final payment of funds under this Agreement to PSRC.
Copies of said records shall be furnished to PSRC and/or its federal funding agency upon request. This
requirement shall be included in all subcontracts related to the work entered into by City of Edmonds to
fulfill the terms of this Agreement.
By signing the Subaward Agreement, the Authorized Official of Subrecipient certifies, to the best of
his/her knowledge and belief, that:
E
Certification Regarding Lobbying
Q
1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the Subrecipient,
to any person for influencing or attempting to influence an officer or employee of any agency, a
Q
Member of Congress, an officer or employee of Congress, or an employee of a Member of
Congress in connection with the awarding of any Federal contract, the making of any Federal
c
grant, the making of any Federal loan, the entering into of any cooperative agreement, and the
E
extension, continuation, renewal, amendment, or modification of any Federal contract, grant,
s
loan, or cooperative agreement.
2) If any funds other than Federal appropriated funds have been paid or will be paid to any person
Q
for influencing or intending to influence an officer or employee of any agency, a Member of
Congress, an officer or employee of Congress, or an employee of a Member of Congress in
connection with this Federal contract, grant, loan, or cooperative agreement, the Subrecipient
s
shall complete and submit Standard Form -LLL, "Disclosure Form to Report Lobbying," to the
Pass -through Entity.
a
3) The Subrecipient shall require that the language of this certification be included in the award
documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under
Packet Pg. 128
8.9.a
grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose
accordingly.
This certification is a material representation of fact upon which reliance was placed when this transaction
was made or entered into. Submission of this certification is a prerequisite for making or entering into this
transaction imposed by section 1352, title 31, U. S. Code. Any person who fails to file the required
certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for
each such failure.
Debarment, Suspension, and Other Responsibility Matters
Subrecipient certifies by signing this Subaward Agreement that neither it nor its principals are presently
debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from
participation in this transaction by any federal department or agency.
Audit and Access to Records
Subrecipient certifies by signing this Subaward Agreement that it complies with the Uniform Guidance, will
provide notice of the completion of required audits and any adverse findings which impact this subaward
as required by 2 C.F.R. parts 200.501 and 200.521, and will provide access to records as required by
parts 200.336, 200.337, and 200.201 as applicable.
Right to Audit and Disallow and Recover Funds
The Federal government reserves the right to seek recovery of any funds that were not expended in
accordance with the requirements or conditions of this Agreement based upon USDOT review, the final
audit, or any other special audits or reviews undertaken. USDOT has the right to order a special audit,
even if PSRC's auditor or a cognizant agency has already conducted one.
City of Edmonds shall be solely responsible for the administration of and the completion and quality of
work performed under any contracts executed by City of Edmonds. In no event shall any contract
executed by City of Edmonds be construed as obligating PSRC. Any claims arising out of the separate
contracts of City of Edmonds for work under this Agreement are the sole responsibility of City of
Edmonds. All contracts shall comply with all applicable public works and procurement laws and
regulations, including, but not limited to, applicable bonding, prevailing wage, nondiscrimination,
retainage, insurance, and workers compensation requirements.
7.1. Direct Supervision
Nothing in PSRC's exercise of the right to inspect or accept the work performed by City of Edmonds shall
reduce City of Edmonds' responsibility for the proper execution of the work or relieve City of Edmonds
from its responsibility for direct supervision of the work. When PSRC exercises its right to inspect or
accept the work performed by City of Edmonds, it shall not be deemed or construed to be in control of the
work under this Agreement.
E
Q
d
7.2. Sub -recipient Monitoring
Q
PSRC reserves the right to monitor and manage subrecipients, including lower tier subrecipients. At a
minimum, monitoring of City of Edmonds will include: c
i. Review of financial and programmatic reports;
ii. Following -up and ensuring that City of Edmonds takes timely and appropriate action on all
deficiencies pertaining to the Federal award provided to City of Edmonds from PSRC detected
through audits, on -site reviews, and other means; and
iii. If applicable, issuing a management decision for audit findings pertaining to the Federal award
provided to City of Edmonds from PSRC as required by 2 C.F.R. § 200.521 (Management
decision).
Packet Pg. 129
8.9.a
PSRC requires all subrecipients, including lower tier subrecipients, under the Award to comply with the
provisions of the Award, including applicable provisions of the OMB Uniform Guidance (2 C.F.R. Part
200) and all associated terms and conditions.
City of Edmonds will maintain at all times during the term of this Agreement, satisfactory limits of
insurance and/or self-insurance to protect against claims arising out of this Agreement. Such insurance or
self-insurance shall include General Liability, Business Automobile Liability, and Workers' Compensation
in accordance with statutory requirements under Title 51 RCW.
Each Party will require and cause its respective subcontractors of all tiers to maintain such insurance as
described above in sufficient amounts to protect the interest of the Parties. Such insurance shall be
confirmed by a Certificate of Insurance prior to commencement of the work.
The Parties hereby agree to require their respective insurers and their respective subcontractors of all
tiers, to waive subrogation rights against the other Party and such other Party's insurers.
It is understood and agreed that insurance and/or self-insurance provided by the Parties under this
Agreement is not intended to and shall not in any manner limit or qualify the liabilities and obligations
assumed by the Parties or their Contractors of any tier under their respective contracts or imposed by
applicable laws or regulations.
9.1. Termination for Default
Either Party may terminate this Agreement, in whole or in part, if the other Party substantially fails to fulfill
any or all of its obligations under this Agreement through no fault of the other Party, provided that insofar
as practicable, the Party terminating the Agreement will give:
a. Notice of intent to terminate at least thirty (30) calendar days prior to the date of termination stating
the manner in which the other Party has failed to perform the obligations under this Agreement; and
b. An opportunity for the other Party to cure the default. If City of Edmonds is the party in default,
PSRC shall provide an opportunity for City of Edmonds to cure the default as provided in Section
14.2. If PSRC is the party in default, City of Edmonds shall give PSRC a Notice of Termination
stating the time period in which cure is permitted and any other appropriate conditions.
c. Provided however, that if PSRC's funding agency terminates financial support for the project at any
time, either party shall have the right to immediately terminate this Agreement by giving written
notice thereof.
If the other Party fails to remedy the default or the breach to the satisfaction of the other Party within the
time period established in the Notice of Termination or any extension thereof granted by the Party not at E
fault, the other Party may terminate this Agreement. However, any terms of this Agreement relevant to a
dispute that is unresolved at the time of termination shall survive until the dispute is finally resolved. Q
9.2. Termination for Convenience
Either Party may terminate this Agreement, in whole or in part, for its convenience provided that the
terminating Party shall provide the other Party with an advance notice of at least thirty (30) calendar days.
9.3. Notice of Termination
Notice of termination shall be given by the Party terminating this Agreement to the other Party in writing
The notice shall specify the effective date of termination, which shall not be sooner than the non -
terminating Party's receipt of the notice.
Packet Pg. 130
8.9.a
9.4. Rights and Duties of Parties Upon Termination
A termination by any Party shall not extinguish or release either Party from liability, claims, or obligations
to third parties existing as of the time of termination. Any costs incurred prior to the effective date of
termination will be borne by the Parties in accordance with the terms of this Agreement and this Section.
The record keeping requirements, payment, release and indemnification provisions set forth in this
Agreement and all remedial provisions shall survive termination of this Agreement.
Upon termination of this Agreement by expiration of the term or upon termination for the convenience of
the Parties, the Parties agree to work together cooperatively to develop a coordinated plan for terminating
the scope of work rendered up until the time of termination and determining reasonable contract close-out
costs for termination for convenience or as a result of PSRC's default or breach. In the event of
termination by default or breach, PSRC shall only be obligated to compensate City of Edmonds for the
portion of work that has been satisfactorily rendered to the date of termination according to the terms of
this Agreement.
10.1. Rights and Remedies
The rights and remedies of the Parties to this Agreement are in addition to any other rights and remedies
provided by law, except as otherwise provided in this Agreement.
10.2. No Agency
No joint venture or partnership is formed as a result of this Agreement. No employees, agents or
subcontractors of one Party shall be deemed, or represent themselves to be, employees of any other
Party.
10.3. Third Party Rights
It is understood and agreed that this Agreement is solely for the benefit of the Parties hereto and USDOT,
and gives no right to any other entity. Nothing in this Agreement, whether express or implied, is intended
to confer any rights or remedies under or by reason of this Agreement on any persons other than the
Parties and USDOT.
10.4. Assignment/Successors
No Party shall assign any interest, obligation, or benefit in this Agreement or transfer any interest in the -a
same, whether by assignment or novation, without prior written consent by the other Party. This limitation 3
does not, however, prevent City of Edmonds from selecting subcontractors or consultants to perform the
work authorized by this Agreement. All of the terms, provisions, and conditions of this Agreement will be
binding upon and inure to the benefit of the Parties hereto and their respective successors, permitted
assigns, and legal representatives.
E
10.5. Compliance with Laws
Q
P
City of Edmonds shall comply, and to the best of its ability shall ensure, that its employees, agents,
Q
consultants, and representatives comply with all federal, state, and local laws, regulations, and
ordinances applicable to the work to be performed. The work performed by City of Edmonds under this
r
Agreement shall comply with all applicable public works and procurement laws and regulations, including,
but not limited to, bonding, prevailing wage, nondiscrimination, retainage, insurance, and workers
E
s
compensation requirements.
10.6. Governing Law and Venue
This Agreement will be governed by, and construed and enforced in accordance with, the laws of the
State of Washington. Any legal action resulting from this Agreement shall be brought in the Superior
Court of King County.
Packet Pg. 131
8.9.a
10.7. Notice
All notices or requests required or permitted under this Agreement shall be in writing, shall be personally
delivered or sent by certified mail, return receipt requested, postage prepaid, or by facsimile transmission
and shall be deemed received three (3) business days following the date when mailed or on the date
when delivered or faxed (provided the fax machine has issued a printed confirmation of receipt). All
notices or requests shall be sent to PSRC and City of Edmonds addressed as shown in Section 3.0.
10.8. Waiver of Default
Waiver of any default shall not be deemed to be a waiver of any subsequent default. Waiver of breach of
a provision of this Agreement, including failure to require full and timely performance of any provision,
shall not be deemed to be a waiver of any other or subsequent breach and shall not be construed to be a
modification of the terms of this Agreement unless stated to be such in writing, signed by authorized
parties, and attached to the original Agreement.
10.9. Severability
If any of the terms and conditions of this Agreement are determined to be invalid or unenforceable by a
court of competent jurisdiction, the remaining terms and conditions unaffected thereby shall remain in full
force and effect. The Parties agree to negotiate in good faith to reform the Agreement to replace any
invalid or unenforceable term and/or condition with a valid and enforceable term and/or condition that
comes as close as possible to the intention of the stricken term and/or condition.
10.10. Warranty of Right to Enter into Agreement
The Parties each warrant that they have the authority to enter into this Agreement and that the persons
signing this Agreement have the authority to bind such person's respective entity.
10.11. Publicity
The Parties to this Agreement shall not make any formal press releases, news conferences or similar
public statements concerning this Agreement without prior consultation with the other Party.
10.12. Future Support
PSRC makes no commitment of future support and assumes no obligation for future support of the
activity contracted herein except as set forth in this Agreement.
10.13. Exhibits
All exhibits referenced in and attached to this Agreement are incorporated herein, except to the extent
otherwise provided herein.
E
10.14. Limitation on Payments to Influence Certain Federal Transactions
Q
P
a�
Q
Section 1352 of Title 31 of the U.S. Code provides in part that no appropriated funds may be expended
by the recipient of a Federal contract, grant, loan, or cooperative agreement to pay any person for
r
influencing or attempting to influence an officer or employee of any agency, a Member of Congress, and
officer or employee of Congress, or an employee of Member of Congress in connection with any of the
E
following covered Federal actions: the awarding of any Federal contract, the making of any Federal grant,
the making of any Federal loan, the entering into of any cooperative agreement, and the extension,
Q
continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative
agreement.
Packet Pg. 132
8.9.a
10.15. Lobbying Restrictions
Statutory Provisions
1. Non -Federal entities shall comply with 2 C.F.R. § 200.450 ("Lobbying"), which incorporates the
provisions of 31 U.S.C. § 1352; the "New Restrictions on Lobbying" published at 55 FR 6736
(February 26, 1990); and OMB guidance and notices on lobbying restrictions. In addition, non -Federal
entities must comply with the DOC regulations published at 15 C.F.R. Part 28, which implement the
"New Restrictions on Lobbying". These provisions prohibit the use of Federal funds for lobbying the
executive or legislative branches of the Federal Government in connection with the award, and
require the disclosure of the use of non -Federal funds for lobbying. Lobbying includes attempting to
improperly influence, meaning any influence that induces or tends to induce a Federal employee or
officer to give consideration or to act regarding a Federal award or regulatory matter on any basis
other than the merits of the matter, either directly or indirectly. Costs incurred on to improperly
influence are unallowable. See 2 C.F.R. § 200.450(b) and (c).
2. Disclosure of Lobbying Activities
Any non -Federal entity that receives more than $100,000 in Federal funding shall submit a completed
Form SF-LLL, "Disclosure of Lobbying Activities," regarding the use of non -Federal funds for
lobbying. The Form SF-LLL shall be submitted within 30 days following the end of the calendar
quarter in which there occurs any event that requires disclosure or that materially affects 22 1
December 26, 2014 the accuracy of the information contained in any disclosure form previously filed.
The non -Federal entity must submit any required Forms SF-LLL, including those received from
subrecipients, contractors, and subcontractors, to the Grants Officer.
10.16. Confidentiality
The Parties acknowledge that the prohibitions against disclosure of information or records described in
this Section 10.16 is limited by and not applicable where any law, rule, regulation or court proceeding
requires or allows disclosure of information and documents, and neither Party is required to notify the
other or any program beneficiary regarding such allowed or required disclosure.
City of Edmonds and any subgrantees, subcontractors or vendors must maintain confidential files on
individual program beneficiaries served associated with this Agreement. Recipient staff must keep paper
files in a locked filing cabinet and protect all electronic files related to individual beneficiaries with a
personal password.
The service providers shall maintain primary access to individual beneficiary files. Other project WIF
management staff may have access to these files only if they contain a "release of information" consent
form signed by the individual beneficiary. A release of information form must clearly indicate which
parties may have access to an individual beneficiary's file. Such parties might include the management
staff and USDOT staff. City of Edmonds may only share individual beneficiary files with those parties c
listed on the signed form. If an individual beneficiary has not signed the consent form the parties listed
may not read that individual beneficiary's file.
E
a)
These categories serve as guidelines to City of Edmonds staff and management staff. City of Edmonds
must determine if the individual beneficiary's confidential information will significantly affect the safety and a'
Q
security of that individual or City of Edmonds itself.
10.17. Entire Agreement
This Agreement, including its Recitals and Exhibits, embodies the Parties entire Agreement on the
matters covered by it, except as supplemented by subsequent amendments to this Agreement. All prior
negotiations and draft written agreements are merged into and superseded by this Agreement.
If City of Edmonds contracts or subawards funds under this Agreement with a person or entity to perform
work under this Award, City of Edmonds shall include in the contract or subaward agreement such
provisions as may be necessary to ensure that all contractors and subgrantees comply with the
Packet Pg. 133
8.9.a
requirements of the grant and reporting provisions as set forth in these terms and conditions or as
established by USDOT and the Office of Management and Budget (OMB).
All subgrantees are required to obtain a Unique Entity ID (or update its existing record), in the System for
Award Management prior to award.
IN WITNESS WHEREOF, the parties hereby agree to the terms and conditions of this Agreement as of
the date written below.
City of Edmonds:
121 5t" Ave. N
Edmonds, WA 98020
PSRC:
Puget Sound Regional Council
1201 V Avenue, Suite 500
Seattle, Washington 98101
By: By:
Mike Rosen Josh Brown, Executive Director
Mayor, City of Edmonds Puget Sound Regional Council
Date: Date:
Approved as to form:
Bv:
Office of the City Attorney
City of Edmonds
bi
Packet Pg. 134
8.9.a
Exhibit A
Scope of Work for City of Edmonds' Safety Action Plan
City of Edmonds Tasks and Timeline-
Objective/Task
Date/Period of Completion
1.
Project Management
Winter 2025 to Fall 2025
• Project initiation and management
• Prepare for and participate in team meetings
• Monitor scope of work and budget
• Review invoices and prepare grant bills
2.
Data Collection and Analysis
Winter 2025
• Counts
• Speed Studies
• Crash Analysis
3.
Existing Policy Review and Documentation
Spring 2025
• Comprehensive Plan
• Complete Street Ordinance
• Transportation Improvement Plan
4.
Outreach and Community Engagement
Summer 2025
5.
Policy Development
Summer 2025
• Vision Zero Framework
• Review of Street Standard Details
• Traffic Calming Program
• Complete Streets Checklist
6.
Scoping and Development of Prioritized Safety
Projects
Summer 2025
• High Risk Corridor / Network Projects
• Pedestrian Safety Projects
• Bicycle Safety Projects
• Intersection & Spot Safety Improvements
7.
Final Report
Fall 2025
• Vision Zero Policy
• Crash Data Analysis and Evaluation
• Proposed Actions including countermeasures and
transportation projects
w
Packet Pg. 135
8.9.a
Exhibit B
Project Budget
Amounts Based on $300,000 Grant Award, $75,000 Match
Item
Grant Share
Match
Personnel
$42,400
$10,600
Fringe Benefits
$17,600
$4,400
Travel
Equipment
Supplies
Contractual
Construction
Other Consultant
$240,000
$60,000
Total Direct Charges
$300,000
$75,000
Indirect Charges
Total Charges
$300,000
$75,000
a)
E
L
R
Packet Pg. 136
8.9.a
To: Puget Sound Regional Council
Attn: Accounts Payable
1201 3rd Avenue, Suite 500
Seattle, Washington 98101
Project Title: City of Edmonds
Project Agreement Number: 2024-09
Invoice Period: From to
Exhibit C
Requisition for Payment
and Reporting Template
From: City of Edmonds
121 5t" Ave. N
Edmonds, WA 98020
Budget Table
Line Item
Current Expense
Total Expense
to Date
Contract Budget
Personnel
$
$
$
Fringe Benefits
$
$
$
Travel
$
$
$
Equipment
$
$
$
Supplies
$
$
$
Contractual
$
$
$
Other (Consultant)
$
$
$
Total Direct Charges
$
$
$
Indirect Charges
$
$
$
Total Requisition this Period
$
$
$
I certify that the expenses listed above have been properly incurred in the accomplishment of the services
of this Agreement.
Name, Title
Date
R
Packet Pg. 137
8.10
City Council Agenda Item
Meeting Date: 11/26/2024
Approval of Professional Services Agreement Amendment for Phase 12 (2025) & 13 (2026) Sewer
Replacement
Staff Lead: Rob English
Department: Engineering
Preparer: Emiko Rodarte
Background/History
On March 12, 2024, staff presented the PSA for design services to the Parks and Public Works
Committee and it was forwarded to the consent agenda.
On March 19, 2024, City Council approved the PSA on the consent agenda.
On November 19, 2024, staff presented the PSA amendment for design services to the Parks and Public
Works Committee and it was forwarded to the consent agenda.
Staff Recommendation
Approve amendment.
Narrative
This contract is intended to be a supplement to complete the design, bidding, construction support, and
related engineering services for the Phase 12 Sewerline Replacement and Rehabilitation Project. This
phase will rehabilitate, via mainly trenchless methods, select sewer pipe segments throughout the City
of Edmonds sewer collection system. Additional work will involve preparation of more detailed cost
estimates for sewer segments planned for the future Phase 13 design, which will be scoped separately in
2025 to ensure that the project costs don't exceed the currently allotted budget.
The City has negotiated a consultant fee of $199,954 for the additional scope of work covered by this
supplement agreement. There is $95,794.54 in remaining unspent budget from the initial agreement
that will be moved to this next segment of work and will reduce the supplement agreement amount to
$104,159. These project costs are being funded by the sewer utility fund.
In total, the Phase 12 Sewer Replacement Project will rehabilitate/replace approximately 9,000 linear
feet of the City's sewer pipe network and associated appurtenances at various locations within the City.
In addition, various sewer lateral repairs, within City Rights of Way, will be included as part of the
project due to significant and constant root intrusion issues. These locations are experiencing root
intrusion that requires maintenance staff to perform pipe cleaning and root cutting multiple times per
year to ensure that these systems do no experience backups.
Packet Pg. 138
8.10
Selection of the sites were determined using the data supplied in the 2013 Comprehensive Sewer
System Plan dated August 2013, coordinating with upcoming road, water, and storm drain projects, and
input from Public Works maintenance. Projects for Phase 12 will focus on lining pipe segments and
replacement/rehabilitation of pipes that our Public Works maintenance department staff needs to root
cut clean and unclog pipes multiple times a year to ensure that these pipes do not get fully clogged and
would cause sewer backups/overflows in Edmonds residences and business.
Attachments:
Attachment 1 - Agreement
Attachment 2 - Sites Map
Packet Pg. 139
of ED,V 8.10.a
CITY OF EDMONDS MIKE ROSEN
121 5T" AVENUE NORTH - EDMONDS, WA 98020 - 425-771-0220 - WWW.EDMONDSWA.GOV MAYOR
r
C
1-6a° PUBLIC WORKS DEPARTMENT I ENGINEERING DIVISION
AMENDMENT NO. 1 TO
PROFESSIONAL SERVICES AGREEMENT
WHEREAS, the City of Edmonds, Washington, hereinafter referred to as the "City", and
David Evans and Associates, Inc., hereinafter referred to as the "Consultant", entered into an
underlying agreement for design, engineering and consulting services with respect to a project
known as Phase 12 and Phase 13 Sewer Replacement and Rehabilitation project, dated April
4, 2024 ("Underlying Agreement"); and
WHEREAS, Section 12 of the Underlying Agreement authorizes revisions to its terms
only upon a written amendment approved by both parties; and
WHEREAS, additional tasks to the original Scope of Work have been identified with
regard to providing Phase 12 Final Design, Bidding, and Construction Support;
NOW THEREFORE, in consideration of the mutual benefits accruing, it is agreed by and
between the parties thereto as follows:
1. The Underlying Agreement of April 4, 2024 between the parties, incorporated by
this reference as fully as if herein set forth, is amended in, but only in, the following respects:
1.1 Scope of Work. The Scope of Work set forth in Section 1 and Exhibit A to
the Underlying Agreement is hereby amended to include the additional services and material
necessary to accomplish the stated objectives as outlined in the attached Exhibit A, incorporated
by this reference as fully as if herein set forth.
1.2 Pam. The $237,624.00 amount set forth in Section 2.A of the
Underlying Agreement and stated as an amount which shall not be exceeded, is hereby amended
to include an additional not to exceed amount of $104,159.00 for the additional scope of work
identified in Exhibit A to this Amendment No. 1. As a result of this Amendment No. 1, the total
contract amount is increased to a new total not -to -exceed amount of $341,783.00 ($237,624.00
plus $104,159.00).
1.3 Fee Schedule. Exhibit B to the Underlying Agreement consisting of the rate
and cost reimbursement schedule is hereby amended to include the form set forth on the attached
Exhibit B, incorporated by this reference as fully as if herein set forth.
1
Packet Pg. 140
8.10.a
2. In all other respects, the Underlying Agreement between the parties shall remain in
full force and effect, amended as set forth in this Amendment No. 1 but only as set forth herein.
DONE this day of , 2024.
CITY OF EDMONDS DAVID EVANS AND ASSOCIATES, INC.
Mike Rosen, Mayor Craig Christensen, Associate
ATTEST/AUTHENTICATE:
Scott Passey, City Clerk
APPROVED AS TO FORM:
Office of the City Attorney
R
2
Packet Pg. 141
8.10.a
STATE OF WASHINGTON )
)ss
COUNTY OF KING )
On this day of , 2024, before me, the under -signed, a Notary
Public in and for the State of Washington, duly commissioned and sworn, personally appeared
Craig Christensen, to me known to bean Associate of David Evans and Associates, Inc., the
corporation that executed the foregoing instrument, and acknowledged the said instrument to be
the free and voluntary act and deed of said corporation, for the uses and purposes therein
mentioned, and on oath stated that he/she was authorized to execute said instrument and that the
seal affixed is the corporate seal of said corporation.
WITNESS my hand and official seal hereto affixed the day and year first above written
NOTARY PUBLIC
My commission expires:
R
Packet Pg. 142
8.10.a
EXHIBIT A
SCOPE OF WORK AND SCHEDULE
Phase 12 and 13 Sewer Replacement and Rehabilitation — Assessment, Design,
Bidding, and Construction Engineering Services
City of Edmonds
October 29, 2024
This scope of work is the second of three proposals anticipated for this project as
described below:
• Phase 12 and 13 Assessment and 30% Design (previous scope)
• Phase 12 Final Design, Bidding, and Construction Support (this scope)
• Phase 13 Final Design, Bidding, and Construction Support
This second scope of work (Phase 12 Final Design, Bidding, and Construction Support)
describes the final design, bidding, and construction support, and related engineering
services to be provided in support of the proposed Phase 12 replacement and
rehabilitation of select sewer segments throughout the City of Edmonds sewer collection
system. The Phase 12 project will focus primarily on the trenchless rehabilitation of
sewer mains with only open -cut replacement as necessary. The primary goal of this
project is to address the identified structural and hydraulic capacity deficiencies that
result in service and maintenance problems for the City.
The anticipated work elements for Phase 12 are 26 sewer sites totaling approximately
446 feet of 6-inch, approximately 6,365 feet of 8-inch, approximately 333 feet of 12-inch,
and approximately 193 feet of 18-inch pipe including 2 individual side sewer
tees/laterals.
DEA understands that the City continuously evaluates its collection system and that the
preliminary information used to prepare this estimate may be supplemented by new
information for pipes with a higher priority for rehabilitation and repair via the use of the
Management Reserve. DEA understands that although priorities may change, the goal
is to design this Phase 12 work on approximately the number of work elements
identified, presuming similar site constraints and design considerations.
The final design activities include additional site visits (if necessary) as well as the final
review of CCTV video inspection records and easement, as -built, and GIS information.
The site visits and information review will be used to confirm the type of repair(s)
selected to address the existing deficiencies at each of the different sites. DEA will also
request from the respective purveyor, maps showing the location of all franchise and
City -owned utilities (water, sewer, storm, gas, power, communications, internet, fiber,
TV, etc) and continue to update the base maps from that information. DEA will complete
90% plans, specifications, and cost estimate (PSE) and send them to the City for review
and approval by the end of February 2025 with the goal of bidding the project by the
end of March 2025. The estimated duration of construction of the project is 6 months.
PAC\C0ED00001716\0100PM\Phase 12 - Design\archive\COED00001716-Ph 12 Sewer Design & Construction Support -Scope of
Work1.docx 1
Packet Pg. 143
8.10.a
DEA will also support the City in bidding and construction as indicated in the Scope of
Work.
In addition to the above -listed work on Phase 12, DEA will also complete more detailed
cost estimates (including survey, design, permitting, geotechnical, and construction
costs) for the eleven Phase 13 sites identified during the DEA and City 30% review
meeting. These cost estimates will be completed and sent to the City for review by the
end of December 2024.
Once the Phase 12 design has been completed, a separate scope of work will be
prepared for the final design, bidding, and construction support of Phase 13.
SCOPE OF WORK
The scope of engineering services is as follows:
1. Project Management
1.1. Planning, Scoping, and Coordination
1.2. Monitoring and Control
1.2.1. Submit monthly invoices with status reports if requested. The status
report shall summarize activities completed for each task during the
billing period and anticipated deliverables for the next month. DEA
shall also summarize problems encountered and actions taken for their
resolution, potential future delays, and issues requiring City direction.
Any element that may impact the schedule and design fee shall be
included in the report.
1.3. Closeout
2. Assessment (Work completed under the previous scope)
3. 30% Design (Work completed under the previous scope)
4. Final Assessment
4.1. Additional Existing Information
4.1.1. Review additional easements, as-builts, and GIS sewer data
4.1.2. Confirm repairs by reviewing CCTV video inspection logs and videos
4.2. Additional Site Visits
4.2.1. Review of site information and available City sewer easements,
generally confirm space available for access and construction staging
4.3. City -Identified Phase 13 Site Cost Estimates
4.3.1. Including survey, design, permitting, geotechnical (by HWA), and
construction
5. Final Design
5.1. Prepare plans using City GIS layers (30 sheets estimated)
5.1.1. Cover sheet, notes, legend, vicinity map, sheet index (2 sheets)
5.1.2. All sites — civil plan (1 site per sheet, 26 sheets total)
PAC\C0ED00001716\0100PM\Phase 12 - Design\archive\COED00001716-Ph 12 Sewer Design & Construction Support -Scope of
Work1.docx 2
Packet Pg. 144
8.10.a
5.1.3. Details (1 sheet)
5.1.4. TESC plan & details (1 sheet — general notes and details)
5.2. Prepare contract documents/specifications (COE/WSDOT format)
5.2.1. Bidding & contract documents with special provisions (COE standard)
5.2.2. Special provisions — civil
5.2.2.1. CIPP (full length, spot repair, tee/lateral, etc) liner and open
cut (full length, spot repair, tee/lateral, etc) replacement for main
rehabilitation and replacement
5.2.2.2. Bypass/continual operation
5.3. Prepare quantity take -off
5.3.1. Prepare and report final quantity take -off broken down per plan sheet
5.4. Prepare construction cost estimate
5.4.1. Final engineer's construction cost estimate in accordance with the
City's Estimating Policy
5.5. Submittals
5.5.1. QAQC-confirmed plans, quantity take -off, specs, and estimate at 95%
5.5.2. QAQC-confirmed final plans, quantity take -off, specs, and estimate
ready for bidding
6. Bidding and Construction Support
6.1. Answer RFIs (assume 2)
6.2. Prepare addendum (assume 1)
6.3. Review material submittals (assume 4)
6.4. Review and complete as-builts
7. Manaaement Reserve
7.1. Tasks not included in the scope but that may be authorized in writing by the
City Project Manager on a time and expense basis
The City shall provide the following to complete the corresponding work for this project:
• Available record drawings and sewer easements
• GIS data
• Access to CCTV videos
• Payment for permit fees and costs of advertising as required for permits or other
governmental approvals E
• Advertisement and publishing documents for bidding
• Management/Inspection of construction project a
Other Significant Assumptions:
• Civil sheets will include plan view only — no profile.
• Project is presumed to be completed without the need for significant excavation
or modification of existing buried utilities. Plans will be prepared without
the benefit of utility locates or a field survey of existing improvements. Utility
locates will be requested and other non -exploratory site research will be
conducted when excavation within the right of way, such as for sewer main spot
PAC\C0ED00001716\0100PM\Phase 12 - Design\archive\COED00001716-Ph 12 Sewer Design & Construction Support -Scope of
Work1.docx 3
Packet Pg. 145
8.10.a
repairs, manhole installation/repair, or other similar scales of excavation, are
required for the project.
• Existing sewer is presumed to be in existing right of way or sewer easement.
Work to correct right of way deficiencies or to secure additional access rights or
easements for this work is presently not part of the scope of work.
• SEPA review is not required due to the rehabilitation nature of the project.
• The City will secure all necessary permits.
• The consultant will not charge for additional addenda if they are needed to
correct or clarify errors or omissions in the bid documents.
• The consultant will not charge for RFls if they are needed to correct or clarify
errors or omissions in the bid documents.
SCHEDULE
Presuming approval by the City in late November 2024, the following is the proposed
schedule. The timing of bidding and construction will be at the discretion of the City.
2024
2025
Task
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
AugSep
Oct
Ph 13 Cost Estimates
Final Assessment
Final Design
90% PSE Submittal
City Review
Bid -Set PSE Submittal
Bidding Support
Construction Support
BUDGET
Due to remaining budget in several tasks from the previous scope and per discussion
with City staff, DEA proposes moving the remaining $95,794.54 in unspent budget (as
of 10/16/24 invoice) as detailed in the attached project fee estimate.
E
L
R
P:\C\COED00001716\0100PM\Phase 12 - Design\archive\COED00001716-Ph 12 Sewer Design & Construction Support -Scope of
Work1.docx 4
Packet Pg. 146
8.10.a
Fee Estimate
Project Number COED00001716
David Evans and Phase 12 and 13 Sewer Replacement and Rehabilitation - Phase 12 Final Design, Bidding, and Construction Support Date 10/29/2024
Associates, Inc. I CITY OF EDMONDS
Prepared By CFCH
Estimated DEA Labor - Civil Engineering Services
Task/Subtask
Personnel Positions and Approximate Hourly Billing Rates
DEA Labor
Total - w/
Expenses and
Subs.
Project
Manager
QAQC
Project
Engineer
Designer
Survey
Manager
Survey Crew
CAD/GIS
Technician
Admin.
Assistant
Total
Hours
Additional
Estimated Fee
$244.80
$278.40
$261.60
$131.20
$233.60
$268.80
$169.60
$118.40
1
Project Management
88
$16,185
$16,185
1.1
Planning, Scoping, and Coordination
24
4
24
52
$13,267
1.2
Monitoring and Control
18
12
30
$5,827
1.3
Closeout
2
2
2
6
$1,250
Minus Unspent Project Management Budget
($4,159)
4
Final Assessment
240
$25,197
$52,661
4.1
Additional Existing Information
16
32
16
64
$14,387
4.2
Additional Site Visits
16
16
16
48
$10,202
4.3
City -Identified Phase 13 Site Cost Estimates
24
12
40
40
12
128
$27,731
4.4
Minus Unspent Assessment Budget
($27,122.54)
5
Final Design
274
$12,471
$12,619
5.1
Plans
16
2
16
16
64
114
$21,613
5.2
Specifications
161
2
32
321
82
$17,043
5.3
Quantity Take -off
4
2
12
12
30
$6,250
5.4
Construction Cost Estimate
4
2
12
12
30
$6,250
5.5
Submittals
2
8
4
4
18
$4,288
5.6
Minus Unspent30% Design Budget
($42,972)
6
Bidding and Construction Support
110
$22,694
$22,694
6.1
RFIs (2)
2
1
4
4
11
$2,339
6.2
Addendum (1)
2
1
4
4
11
$2,339
6.3
1 Material Submittals (4)
16
16
16
48
$10,202
6.4
As-builts
8
81
81
1
16
40
$7,814
7
Management Reserve
$0
$0
7.1
Management Reserve
$21,541
7.2
Minus Unspent Management Reserve Budget
($21,541)
Total
170
34
222
180
12
01
801
141
712
1 $76,548
1 $104,159
Estimated Direct Expenses
Mileage & Other Expenses
$590
Subconsultants
$27,022
Total Expenses
1 $27,611
Notes and Assumptions:
(1) See detailed Scope of Work dated 10/29/2024.
(2) The City must approve all transfers of available budget between tasks prior to exceeding the estimated budget for an individual task.
Project Fee Estimate Summary and Total
Total Estimated Labor
$76,548
Total Estimated Ex enses
$27,611
Total Fee Estimate
$104,159
(3) Client shall be responsible for direct payment of all permit, agency review, advertisement, service or other project expenses not expressly included in the Project Fee Estimate and/or Scope of Work.
David Evans and Associates, Inc. 14432 SE Eastgate Way, Suite 400, Bellevue, WA 98007 425.519.6500 www.deainc.com
1 Of Packet Pg. 147
MEAD
Sv �
ST c
Sl 4
JI ovv Q
c6
d
Ln
N
r�
d
t
L U
f6
I
Q
F a
� r
C
d
II U
1
-T�
F
A
a6TH
PIS SW = Q
228TH STSW
MOUNTLAKE
TERRA
m�
235TH PL SW
0
�Z
m
99
LAKE
BALLINGER WAY 244TH STSW
8.11
City Council Agenda Item
Meeting Date: 11/26/2024
Permitting Program Manager Job Description
Staff Lead: Emily Wagener
Department: Human Resources
Preparer: Emily Wagener
Background/History
The Permitting Program Manger Job Description was previously approved on the 7/23/2024 consent
agenda. This position replaced the Permitting Supervisor as it was determined that the level of work was
not needed in the department. The Permitting Program Manager is an AFSCME covered position.
The Permitting Program Manager position initially remained on the Non Represented pay scale and it
was communicated to Council at the 7/16/2024 PSPHSP Committee that the position would be placed
on the AFSCME pay scale during contract negotiations. Because a contract extension was negotiated
with AFSCME, this position's pay was not able to be placed onto the AFSCME pay scale as intended.
This was reviewed by the PSPHSP Committee on 11/19/2024 and was recommended for placement on
Council's Consent Agenda.
Staff Recommendation
Approve grade placement on AFSCME's pay scale and impacted employee pay recommendation.
Narrative
The proposed placement for the Permitting Program Manager is NE-33. This puts the position two
grades above the Sr. Permit Coordinators, maintaining the differential in that work group, and at the
same grade as the Building Inspectors and Executive Assistants. The result is a decrease in the pay grade
of about 2% in 2024.
The employee currently impacted by this change would be moved to NE-33, step 6. However, we
recommend that their pay not be reduced and instead they remain at their current rate of pay until the
AFSCME pay scale catches up.
Attachments:
Permitting Program Manager REV PAY GRADE
Packet Pg. 149
8.11.a
City of
EDMONDS
Washington
Permitting Program Manager
Department:
Development Services - Building
Pay Grade
^ENE-33
Bargaining Unit:
AFSCME
FLSA Status:
Non -Exempt
Created Date:
April 2021
Reports To:
Building Official
. .MAWAMAM
POSITION PURPOSE: Under general direction, plans, prioritizes the public permit processing center activities, and
assigns work to permit coordinators, emphasizing consistency in service delivery and excellent customer service.
Provides support to permit services provided by the Department; provides information regarding development
regulations, procedures, ordinances and codes to owners, contractors, architects, engineers, developers and the
general public; assists customers with resolution of questions, complaints, or application problems; coordinates with
other staff to develop and improve the permitting process. Performs technical development and maintenance
functions for the department. Provides guidance and training to permit coordinators.
ESSENTIAL FUNCTIONS AND RESPONSIBILITIES:
The following duties ARE NOT intended to serve as a comprehensive list of all duties performed by all employees
in this classification, only a representative summary of the primary duties and responsibilities. Incumbent(s) may
not be required to perform all duties listed and may be required to perform additional, position -specific duties.
• Coordinate complex construction projects between the developer, contractor, reviewers and inspectors
from Pre -Application through C of O for quality control. In some instances, working alongside permit
coordinators for training and/or assistance.
• Reviews building permit applications that are within the ESLHA (Earth Subsidence and Landslide Hazard
Area) designation for consistency with program requirements
• Programs the backend of online and internal permit software systems. Creates application configurations,
complex fee calculation formulas, user accounts, and mail merge/ SQL documents.
• Represents the Building Division at the public counter as scheduled and provides additional support for
public inquiries or for complex issues.
• Monitors and provides oversight for public records requests from the City Clerk's office.
• Assists Permit Coordinators during periods of heavy permitting cycles and provides vacation/ sick time off
coverage.
• Develops and maintains department procedures and forms for permitting, archiving, and other permit
related processes.
Permitting Program Manager Last Reviewed: 10/29/2024
Last Revised: 07/23/2024
Packet Pg. 150
8.11.a
2 of 4
JOB DESCRIPTION
Permitting Program Manager
• Assists in the development and preparation of updates to the building code ordinance.
• Reviews and keeps current with changes in technology and regulations.
• Provides administrative and technical support to permitting and software programs, document
management, website maintenance, and issue resolution.
• Assign work to permit coordinators and help develop individual work plans.
• Foster analytical thinking and creativity in methods of delivering City services for the permit coordinator
team.
• Provides reports and data analysis on a continual schedule and as requested for both management and
outside agencies.
• Creates and maintains department handouts, fee guide, plan review digital stamps, templates, and custom
reports.
• Assists in the preparation and monitoring of the Building Division budget.
• Represents the department and City on various technical and procedural committees.
• Investigates, authorizes and processes payment error corrections and refunds.
• Resolves permitting issues, sometimes outside standard procedures. Provides assistance and advocacy
to internal and external customers, contractor working with City departments and other regulatory agencies.
• Conducts and assists in special projects as assigned by the Building Official or Director. Projects may
involve extensive research and comparisons, administrative follow-up, liaison with community groups, other
agencies and City staff.
• Investigates customer service complaints and recommends corrective action, as necessary, to resolve
those complaints.
• Develops customer service surveys and provides data to management for analysis.
• Assists other staff in the performance of their duties as assigned.
• Performs other related duties within the scope of the classification.
Required Knowledge of:
• Development services permitting processes, current regulations and City codes.
• Building construction concepts and technology.
• Maps, building codes, code books and related processes.
• Principles of customer service.
• Research methods and advanced report creation and record keeping processes.
• Structure, organization and inter -relationships of city departments, agencies and related governmental
agencies and offices affecting assigned functions.
• Effective oral and written communication principles and practices to include customer service.
• Modern office procedures, methods and equipment including computers and computer applications.
• English usage, spelling, grammar, and punctuation.
• Principles of business letter writing.
Required Skill in:
• Reading a variety of plans, specifications, and other materials related to the permitting processes.
Permitting Program Manager
Last Reviewed: 10/29/2024
Last Revised: 07/23/2024
Packet Pg. 151
8.11.a
3 of 4
JOB DESCRIPTION
Permitting Program Manager
• Monitoring and organizing work to meet schedules and timelines.
• Performing basic mathematical calculations sufficient to perform assigned responsibilities.
• Maintaining required records and producing a variety of routine and advanced reports.
• Interpreting and applying federal, state and local policies, laws and regulations related to area of
responsibility.
• Utilizing personal computer software programs and other relevant software affecting assigned work.
• Establishing and maintaining effective working relationships with staff, management, vendors, outside
agencies, community groups and the general public
• Excellent customer service skills.
• Independent work and decision -making skills consistent with department objectives with minimal
supervision, adapt to changing work priorities, manage multiple tasks concurrently, communicate with
staff and the public on a variety of issues, multi -task by handling several high priority issues and projects
at the same time.
MINIMUM QUALIFICATIONS:
Education and Experience:
High School Diploma/GED Certificate and five years of experience in land use or building construction permitting
with customer service/public contact that includes permit/application review. OR an equivalent combination of
education, training and experience which allows the incumbent to successfully perform the essential functions of
the position.
Required Licenses or Certifications:
Possession of an ICC Permit Technician certification, or ability to obtain within one year.
A criminal background check is required following a verbal offer of employment. Criminal history is not an automatic
employment disqualifier. Results are reviewed on a case -by -case basis.
WORKING CONDITIONS:
Environment:
• Office and construction site environments.
Physical Abilities:
• Hearing, speaking or otherwise communicating to exchange information in person and on the telephone
• Operating a computer keyboard and various tools.
• Reading and understanding a variety of materials.
• Bending at the waist, kneeling or crouching, reaching above shoulders and horizontally or otherwise
positioning oneself to accomplish tasks.
Hazards:
• Contact with dissatisfied or potentially abusive individuals.
Permitting Program Manager
Last Reviewed: 10/29/2024
Last Revised: 07/23/2024
Packet Pg. 152
8.11.a
4 of 4
JOB DESCRIPTION
Permitting Program Manager
Incumbent Signature: Date:
Department Head: Date:
Permitting Program Manager
Last Reviewed: 10/29/2024
Last Revised: 07/23/2024
Packet Pg. 153
8.12
City Council Agenda Item
Meeting Date: 11/26/2024
Code Amendment ECC 2.10.010
Staff Lead: RaeAnn Duarte
Department: Human Resources
Preparer: RaeAnn Duarte
Background/History
Current ECC 2.10.010 does not allow the mayor to deviate from the timelines, processes, or other
requirements. This proposed change allows the mayor to request of council a deviation from the
timelines established in the code. The intended change will provide transparency for the appointive
processes to the public.
Staff Recommendation
Approve recommended Code change.
Narrative
Please see attached ordinance. Example of resolution is included.
Attachments:
2024-11-13 Ordinance amending ECC 2.10.010.G (002)
2024-11-13 resolution authorization deviation from recruiting timeline
Packet Pg. 154
8.12.a
ORDINANCE NO.
AN ORDINANCE OF THE CITY OF EDMONDS,
WASHINGTON, AMENDING SECTION 2.10.010 OF THE
EDMONDS CITY CODE, ENTITLED "REVIEW OF
VACANCIES, APPOINTMENT AUTHORITY AND
CONFIRMATION PROCESS," TO ESTABLISH A PROCESS
FOR DEVIATING FROM THE STANDARD REQUIREMENTS
OF THAT SECTION.
WHEREAS, RCW 35A.12.090 states that the mayor shall have the power of appointment
of all appointive officers and employees; and
WHEREAS, RCW 35A.12.090 further states that confirmation by the city council of
appointments of officers and employees shall be required only when the city charter, or the
council by ordinance, provides for confirmation of such appointments; and
WHEREAS, the city council has previously provided for the city council's confirmation
of director level mayoral appointments in chapter 2.10 of the Edmonds City Code along with
related procedural requirements; and
WHEREAS, the city council would like to provide some flexibility to deviate from the
requirements of ECC 2.10.010 when circumstances so warrant; NOW, THEREFORE,
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO ORDAIN
AS FOLLOWS:
Section 1. Section 2.10.010 of the Edmonds City Code, entitled "Review of vacancies,
appointment authority and confirmation process," is hereby amended to read as follows (new text
is shown in underline; deleted text is shown in strike *'wough):
2.10.010 Review of vacancies, appointment authority and confirmation
A. Periodically, when the city conducts a salary survey regarding its nonrepresented
employees, and whenever a vacancy occurs in one of the positions listed in this chapter,
the city council may review the specifications for the appointive officer position(s) and
revise them as needed before acting to confirm a permanent appointment. Nothing in this
subsection shall be construed to prevent the city council from reviewing such
specifications at other times. The council's revising of a specification will not have any
effect on a previously confirmed permanent appointment. Recruitment to fill a vacant
Packet Pg. 155
appointive office may be postponed until after the city council acts to revise the
specifications or determines them not to be in need of revision.
B. The mayor or his/her designee will review all applications and determine the persons
with the highest qualifications. Any city council member, upon request to the mayor, may
review the applications received for a vacant position. Additionally and/or alternatively,
the city council may evaluate the qualifications of an applicant for public employment in
executive session pursuant to RCW 42.30.110(1)(g).
C. If, on occasion of a vacant appointive office, the mayor elects to propose a
reorganization of the appointive offices which would alter the specifications of the vacant
appointive office, he shall have 60 days from the date of the vacancy to introduce a
reorganization proposal to the city council along with any necessary accompanying
budget amendment. If reorganization is proposed, recruitment to fill the vacant
appointive office may be postponed until after the city council acts upon the
reorganization proposal.
D. The mayor shall appoint, subject to council confirmation, the appointive officers. The
city council shall interview the top three candidates for each position prior to the mayor's
appointment; provided, that the city council may waive the three -interview requirement
by motion adopted by a majority plus one of the full council and may opt to interview as
few as two candidates for any vacant appointive office; and further provided, that when
an appointive office becomes vacant, or is about to become vacant, again within nine
months of the city council's confirmation of the last mayoral appointment to that office,
the city council may waive an additional round of interviews, by motion adopted by a
majority plus one of the full council, and proceed immediately to confirming the
appointment of a candidate interviewed by the city council during the most recent
recruitment for that appointive office. The mayor's appointments to all other employee
positions shall not be subject to city council confirmation.
E. The mayor shall have the authority to appoint, without city council confirmation, an
acting director to perform the functions and duties of a vacant appointive office, subject
to the term limitations described in ECC 2.10.040(B); provided, that there is budgetary
authority to fill the position. The city council shall be given written notice about any such
acting appointments including the effective date of the appointment. Acting directors
shall be compensated pursuant to applicable ordinances and personnel policies regarding
acting pay.
F. The mayor shall begin recruitment of candidates to fill vacant appointive offices no
later than 30 days after the latter of the two city council actions described in subsections
(A) and (C) of this section; provided, that such recruitment shall not be necessary where
the city council opts to make an immediate confirmation pursuant to a prior round of
interviews as set forth in subsection (D) of this section.
G. In the event that the mayor believes it to be in the city's best interest to deviate
from the timelines, processes, or other requirements of this section, the ma,, o�y
request that the city council consent to such deviation by adopting a resolution to that
PffPrt
Packet Pg. 156
8.12.a
Section 2. Severability. If any section, subsection, clause, sentence, or phrase of this
ordinance should be held invalid or unconstitutional, such decision shall not affect the validity of
the remaining portions of this ordinance.
Section 3. Effective Date. This ordinance, being an exercise of a power specifically
delegated to the City legislative body, is not subject to referendum and shall take effect five (5)
days after passage and publication of an approved summary thereof consisting of the title.
/_\».ZGITAa��i
MAYOR MIKE ROSEN
ATTEST/AUTHENTICATED:
CITY CLERK, SCOTT PASSEY
APPROVED AS TO FORM:
OFFICE OF THE CITY ATTORNEY:
Im
JEFF TARADAY
FILED WITH THE CITY CLERK:
PASSED BY THE CITY COUNCIL:
PUBLISHED:
EFFECTIVE DATE:
ORDINANCE NO.
Packet Pg. 157
8.12.a
SUMMARY OF ORDINANCE NO.
of the City of Edmonds, Washington
On the day of , 2024, the City Council of the City of Edmonds, passed
Ordinance No. A summary of the content of said ordinance, consisting
of the title, provides as follows:
AN ORDINANCE OF THE CITY OF EDMONDS,
WASHINGTON, AMENDING SECTION 2.10.010 OF
THE EDMONDS CITY CODE, ENTITLED "REVIEW
OF VACANCIES, APPOINTMENT AUTHORITY AND
CONFIRMATION PROCESS," TO ESTABLISH A
PROCESS FOR DEVIATING FROM THE STANDARD
REQUIREMENTS OF THAT SECTION.
The full text of this Ordinance will be mailed upon request.
DATED this day of 92024.
4840-7251-8158, v. 1
M
CITY CLERK, SCOTT PASSEY
Packet Pg. 158
8.12.b
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS,
WASHINGTON, CONSENTING TO THE MAYOR'S PROPOSED
DEVIATION FROM THE RECRUITMENT DEADLINES SET FORTH IN
ECC 2.10.010.
WHEREAS, there are currently vacancies in three of the city's appointive offices: finance director;
public works director; and planning and development director; and
WHEREAS, the city is in the midst of a budget crisis and is also in the midst of finalizing its budget
for the next biennium (its first biennial budget in many years); and
WHEREAS, the mayor would like to consider some extensive reorganization of departments after
the budget is adopted; and
WHEREAS, not immediately filling these appointive offices allows the mayor more flexibility to
reorganize as appropriate; and
WHEREAS, these circumstances suggest that he should not start recruiting for these vacant
appointive offices until sometime in the first quarter of 2025; and
WHEREAS, the mayor needs the city council's consent to deviate from the timelines set forth in
ECC 2.10.010; and
WHEREAS, an appropriate budget amendment could accompany any reorganization proposal that
comes forward next year; now therefore,
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY
RESOLVES AS FOLLOWS:
Section 1. Pursuant to ECC 2.10.010.G, the city council hereby consents to the mayor's requested
deviation from the recruitment commencement deadline set forth in ECC 2.10.010.F as long as the
mayor does one of the following by no later than March 1, 2025 for each of the three vacant
appointive offices:
1. introduce a reorganization proposal to the city council along with any necessary
accompanying budget amendment, pursuant to ECC 2.10.010.C; or
2. begin recruitment of candidates to fill the vacant appointive office.
RESOLVED this day of , 2024.
CITY OF EDMONDS
Packet Pg. 159
8.12.b
MAYOR, MIKE ROSEN
ATTEST:
CITY CLERK, SCOTT PASSEY
FILED WITH THE CITY CLERK:
PASSED BY THE CITY COUNCIL:
RESOLUTION NO.
Packet Pg. 160
8.13
City Council Agenda Item
Meeting Date: 11/26/2024
Confirm appointment of board/commission candidate
Staff Lead: Frances Chapin
Department: Mayor's Office
Preparer: Carolyn LaFave
Background/History
The Arts Commission unanimously approved to recommend Ms. Megan Joplin to Mayor Rosen for
appointment to Arts Commission position #2, Visual, which will be open on 1/1/2025 due to a term -
limited retirement.
Staff Recommendation
Confirm the appointment of Megan Joplin to position #2, Visual, of the Arts Commission for a full 4-year
term that will expire on 12/31/2028.
Narrative
Arts Commission members are appointed by the Mayor, subject to confirmation by the City Council.
Packet Pg. 161
9.1
City Council Agenda Item
Meeting Date: 11/26/2024
Int'I District Banner Update
Staff Lead: Frances Chapin
Department: Arts Commission
Preparer: Laurie Rose
Background/History
Starting in 2005, Economic Development, Engineering and Cultural Services worked together to apply for
a federal Transportation Enhancements grant for the Edmonds International District (238"-224th) on SR
99, receiving the first of three awards in 2006. The project goals were to strengthen the International
District identity through improving visual identity/aesthetics and pedestrian comfort with new gateway
elements including new artist made pedestrian level lighting, new district identification signage on
custom light poles, resurfacing of the island at 76th and the addition of a solar lit sculptural piece on the
island as part of the gateway. With additional funding awarded in 2008 - 2011 the project was expanded
to 14 custom light poles with 7 artist enhanced pedestrian lights.
The artist, Pam Beyette, selected through a competitive process and approved by City Council in 2008,
designed pedestrian level lighting lanterns called "Eight Paths of Light". In addition to the custom red
poles, and artwork lanterns, the project included a graphic district identification used on signage and
banners that were added to the light poles. The project was completed and dedicated in early 2014. The
temporary fiber banners, approximately 18" x 120", were taken down about a year later. The original
project intended to replace the fiber banners when worn, but replacement with standard temporary
banner materials was impractical and hazardous because of the wear from windy conditions.
The current project is to replace those banners with permanent artist designed cut metal banners.The
Arts Commission identified permanent replacement banners as a placemaking opportunity to add art
elements in the Hwy 99 corridor and approved use of additional funds from the municipal arts fund for
this purpose. City Council approved the artist RFQ and funding for the project in 2023. To ensure
consistency of fabrication and installation meeting City defined standards the banners are designed by
artists but fabrication and installation will be contracted out by the City as done with gateway signage
projects.
Staff Recommendation
Project update.
Narrative
Twenty-one artists responded to the City Council approved RFQ for design work and 7 were selected to
create concepts. After review of 21 concepts, 5 artists were selected to create final designs. The
selection panel included two City Councilmembers (Susan Paine and Jenna Nand), two Arts
Commissioners (Richard Chung and Katie Leute) and a member of the International District community
(Robert Ha). Eight final designs were selected and developed for fabrication. The next phase of the
Packet Pg. 162
9.1
project is for the City to proceed with fabrication of the artist designed banners and contract for
installation. Designs to be fabricated in cut metal will be viewable from both sides and the range of artist
themes includes reflecting the cultural and environmental contexts of the Edmonds International
District.
The designs shown are by 5 artists, with 6 of the designs repeated twice and two designs used on one
banner each, for a total of 14 banners. The multiple ethnic and cultural traditions of the International
District are reflected in the various designs, from textile to print patterns, Hispanic to Japanese and
Filipino, with additional references to the nearby habitats of lake and forest. The five artists are Romson
Regarde Bustillo, Rebecca Elaynow, Stuart Nakamura, June Sekiguchi, and Gabrielle Wildheart.
Attachments:
Hwy. 99 Banner Designs
Hwy. 99 Banner Locations
Packet Pg. 163
vm
1
., 115
k flq,
1 � 1
pa
99 Banner Graphics- Panel Collection- 14 C
#1.4
Group A #1-4
B #5-7
C #8 11
up -lb *Group A_ RC �`
C #8.11
XVIV
LALJ1
EAILjj
Aq
00
Ot
► 1 � 1
L
1
.� Nal % Nal %
�`�� � � Rom♦ - - ���
99 Banner Graphics- P
9.2
City Council Agenda Item
Meeting Date: 11/26/2024
Council 2025-26 Budget Deliberations, including possible voting on budget amendments proposed by
Councilmembers during meeting
Staff Lead: City Council
Department: City Council
Preparer: Beckie Peterson
Background/History
On August 13, Council was briefed on the outcome of the City of Edmonds Community Survey.
On August 16, Council, Administration and Staff held a budget retreat.
On September 10, Council adopted Resolution 1553 regarding Council's priorities for the 2025-26
Biennial Budget.
On October 1, Mayor Rosen presented the proposed 2025-26 Biennial Budget.
On October 8, 15 and 22 Council received budget presentations from each city department.
On October 22 Council held a public hearing on property tax and revenue.
On October 29 Council held a public hearing on the preliminary budget.
On November 2, Council held a workshop on revenues and budget.
On November 12 and 19, Council deliberated on staff recommendations and Council amendments. The
video recordings for these meeting is available on the city website.
Recommendation
N/A
Narrative
Councilmembers will have discussion on the budget and amendments they would like to consider for
the 2025-26 Biennial Budget.
Included in this packet are Staff Recommended Changes to the 2025-2026 Biennial Budget:
10 - Correction to Street Fund Interfund Services charge
Councilmember Amendments:
C2 - (Dotsch) Fund Balance Replenishment (motioned and deliberated on 11/12, tabled)
C6 - (Chen) Police Leadership Structure (postpone to 11/26))
C8 - (Chen) Reduce City Operations to 32 hours (postpone to 11/26)
C15A (Paine) Reduce work week to 35 hours (postponed to 11/26)
C15B (Paine) Workforce Planning Study (postponed to 11/26)
C15C (Paine) Project Completion Contingency Fund (postponed to 11/26)
C16 (Paine) Reinstate Funding for Police Community Engagement (postponed to 11/26)
C17 (Paine) Reinstate Funding for Police Public Records
Packet Pg. 166
9.2
C18 (Dotsch/Paine) Edmonds Permitting Fee Study
C19 (Dotsch) 10% Reduction General Fund Labor/Benefits (postponed to 11/26)
Attachments:
Council Recommendations
C2 Dotsch Fund Balance Replenishment 20241119
C15B Paine Workforce Planning 20241119
C15C Paine Project Completion Fund 20241119
C19 Dotsch 10% GF LaborBenefit Reduction 20241119
C6 Chen Police Leadership Structure 20241119
Staff Recommendations
Staff Recommended Change to Street Fund Interfund Rental Expense
C8 Chen Reduced Operations to 32 hours 20241119
C15A Paine Reduce work week to 35 hours 20241119
C18 Dotsch Paine Edmonds Permitting Fees Study 20241119
C16 Paine Reinstate Police Community Engagement 20241119
C17 Paine Reinstate Police Public Records
Packet Pg. 167
9.2.a
COUNCIL
OUTCOME
APPROVAL
FROM/DATE
COUNCIL
ASSIGNED #
COUNCIL
MEMBER
FUND#
FUND DESC
SUBJECT
DEPT#
DEPTTITLE
REV/EXP
INCREASE
OR
DECREASE
2025AMOUNT
2026AMOUNT
ON GOING /
ONETIME
Comments
Withdrawn
11/12/2024
C3
Dotsch
001
General Fund
Rate Study Plan/Dev
62
Planning&Dvmt
Expense
Increase
5,000.00
0.00
One Time
Conduct a Planning& Development Rate Study
Tabled 6 to 1
11/12/2024
C2
Dotsch
001
General Fund
Fund Balance Replenish
NA
NA
Expense
On Going
Incorporate General Fund Reserve Balance in adopted budget
Failed 2to5
11/12/2024
C3
Olson
001
General Fund
Reduce Parks Maintenance
64
Parks & Rec
Expense
Decrease
(200,000.00)
On Going
Reduce mowing
Passed 5to2
11/12/2024
C4
Olson
125
FEET
Reduce Johnson Project
64
Parks &Rec
Expense
Decrease
(100,000.00)
One Time
Remove 2026 $100K expenditure in the CIP for this property
Failed 0 to 7
11/12/2024
C5
Olson
001
General Fund
Reduce Parks Communications
64
Parks & Rec
Expense
Decrease
(100,000.00)
On Going
Reduce Parks Communications & Community Engagement Program
Postponed
11/12/2024
C6
Chen
001
General Fund
Police Leadership Structure
41
Police
Expense
On Going
Restructure Police Leadership Structure
Passed 6to 1
11/12/2024
C7
Chen
001
General Fund
Reduce Council Contingency
11
Council
Expense
Decrease
(10,000.00)
(10,000.00)
One Time
Reduce Council contingency
Postponed
11/12/2024
C8
Chen
Various
Various
Reduce Operations to32hours
Various
Various
Expense
Decrease
(2,500,000.00)
Reduce City Hall Operations to a 32 hours workweek
Passed 7 to 0
11/12/2024
C9
Chen
Various
Various
Budget Book- align positions
Various
Various
Expense
Align authorized positions with budgeted labor and benefit expenditures
Withdrawn
11/12/2024
C10
Chen
001
General Fund
Restructure Parks Leadership
64
Parks & Rec
Expense
Decrease
(225,000.00)
(231,750.00)
On Going
Restructure Parks & Rec Leadership Structure
not moved
11/12/2024
C31
Chen
001
General Fund
Remove Parks Communications
64
Parks & Rec
Expense
Decrease
(178,454.00)
(187,164.00)
On Going
Remove Parks Communications & Community Engagement Program
Passed 6-0
11/19/2024
C12
Olson/Nand
001
General Fund
Reduce Council Training
11
Council
Expense
Decrease
(2,400.00)
(2,400.00)
One Time
Reduce Council training budget
Fails
11/19/2024
C13
Olson
001
General Fund
Reduce Parks Training
64
Parks&Rec
Expense
Decrease
(35,218.00)
(36,006.00)
One Time
Eliminate Parks Professional Development&Training
Passed 6-0
11/19/2024
C14
Olson
001
General Fund
Reduce Mayor Travel
21
Mayor's Office
Expense
Decrease
(5,400.00)
One Time
Reduce Mayor's Travel Budget
Postponed
11/19/2024
C15A
Paine
lVarious
Reduce Work Week to35hours
Various
Various
Expense
Decrease
Reduced workweek for various work groups
Postponed
11/19/2024
C15B
Paine
001
General Fund
Workforce Planning Study
22
Human Resources
Expense
Increase
20,000.00
0.00
One Time
Increase professional services for a workforce study
Postponed
11/19/2024
C15C
Paine
001
General Fund
Project Completion Contingency Fund
39
Non -Department
Expense
Increase
100,000.00
0.00
One Time
Earmark $300Ktosupport reduced work hour transition
Postponed
11/19/2024
C16
Paine
001
General Fund
Reinstate fundingfor Police Community Engagement
41
Police Department
Expense
Increase
180,712.00
188,385.00
On Going
Reinstate this position
11/19/2024
C17
Paine
001
General Fund
Reinstate funding for Police Public Records
41
Police Department
Expense
Increase
145,024.00
158,083.00
On Going
Reinstate this position
11/19/2024
C18
Dotsch/Paine
001
General Fund
Edmonds Permitting Fees Study
62
Planning&Dvmt
Expense
Increase
10,000.00
0.00
One Time
Increase professional services for a Planning&Dev. Rate study
Postponed
11/19/2024
C19
Dotsch
001
General Fund
Reduce 10% GFLabor/Benefit
Various
Various
Expense
Decrease
(2,300,000.00)
(2,300,000.00)
On Going
Reduce salaries and benefits by10%
N
C
O
i
0)
d
7
m
N
U7
N
O
N
y
C
O
r
C
E
E
O
V
O
C
7
O
V
C
d
E
t
t�
R
r.+
Q
Packet Pg. 168
9.2.b
Amendment to Proposed 2025-2026 Biennial Budget
City of Edmonds — City Council
Amendment Title: Include Fund Balance Reserve Replenishment in Strategic
Outlook
Amendment Number: C-2
Councilmember:
Michelle Dotsch
Date Submitted:
11/6/2024
Fund:
General Fund 001
Agenda Packet:
11/12/2024
Department:
NA
Deliberated:
11/12/2024
Program:
Fund Balance
Outcome:
Tabled
Budget Year:
Amendment Motion:
I make a motion that the Fund Balance Reserve replenishment plan be incorporated into the Strategic
Outlook (Budget Book Pages 20 and 21) starting in 2027.
Amendment Description:
The Financial Policy Framework adopted by Council in September 2024 indicates that the Mayor will
present to City Council an Replenishment Plan with a plan and timeline for replenishing the Reserve
to policy mandated levels. Once the Replenishment Plan and timeline has been provided to Council ,
it would be prudent to incorporate the details into the strategic outlook.
Amendment Purpose (intended outcomes):
• Demonstrated intentions of replenishing the Reserve to policy mandated levels
Proiect Status (if Applicable)
[Project Status or N/A]
FISCAL DETAILS
Account/BARS
Notes:
Expenditures
$increase or ($decrease)
Revenues
($increase) or$decrease
Net Budget Impact:
No impact.
Packet Pg. 169
9.2.c
Amendment to Proposed 2025-2026 Biennial Budget
City of Edmonds — City Council
Amendment Title: Workforce Planning Study
Amendment Number: C-15(13)
Councilmember:
CM Paine
Date Submitted:
11/14/2024
Fund:
General Fund 001
Agenda Packet:
11/19/2024
Department:
Human Resources
Deliberated:
Council staff will complete
Program:
[PROGRAM IF APPLICABLE]
Outcome:
Council staff will complete
Budget Year:
2025 or 2026 or both 2025/2026
Amendment Motion:
Motion to authorize a Workforce Planning Study, to be completed in the first quarter of 2025.
A Workforce Planning Study is needed to establish what is the proper level of staffing based on
programs. This study was planned for 2025 and was brought up at the Council Retreat early this year
as a study which would be helpful for Council's mandated role in budgeting.
This study would be very useful for understanding our staffing levels and what would be appropriate
for the size of our city.
Amendment Purpose (intended outcomes):
• Determine the proper staffing levels, based on programs
More technical information to come from HR.
Describe All Funding Sources
General Fund 001 - this cost will come from the savings from the move to a 35 hour work week.
Describe Future on Ongoing Costs (Expenditure) or Savings (Reduction of Expenditure):
One- time expense
Protect Status (if Applicable)
[Project Status or N/A]
FISCAL DETAILS
Account/BARS
Notes:
Expenditures
001
$increase or ($decrease)
$20,000
Revenues
($increase) or $decrease
$0
Net Budget Impact:
$20,000
Packet Pg. 170
9.2.d
Amendment to Proposed 2025-2026 Biennial Budget
City of Edmonds — City Council
Amendment Title: Creation of a New Fund to Support the 35-hour Workweek
Amendment Number: C-15(C)
Councilmember:
CM Paine
Date Submitted:
11/14/2024
Fund:
GF 039
Agenda Packet:
11/19/2024
Department:
Non Departmental
Deliberated:
Council staff will complete
Program:
New Fund
Outcome:
Council staff will complete
Budget Year:
2025
Amendment Motion:
Motion to create a new, one-year nondepartmental fund to be called Project Completion Contingency
fund to support the city-wide process of moving to a 35-hour work week.
The creation of this new non departmental fund is to provide a supplementary funding source to
resolve incidental project completion funding needs related to the transition to a 35-hour work week
and other needs based on work force cuts in this budget. This fund would be managed by the
Administration based on their prioritization of needs.
The move to a 35-hour work week implementation will be very disruptive for work flow and transition
to an equal reduced work program and also a delay in services to be provided. The work hours
reduction must be joined with these 2 outcomes. One of the budget benefits of moving to a 35-hour
week includes that there are an additional 5 hours of potential work time before overtime would kick
in.
Amendment Purpose (intended outcomes):
• Provide a limited source of funds to complete projects which cannot be reasonably worked
into a 35-hour work week.
• Provide a limited source of funds for short projects where staffing has been reduced or
eliminated.
• Provide a limited use of funds which aren't yet identified, but directly related to the
implementation of a 35-hour work week.
Describe All Funding Sources
GF - Budget savings with the movement to a 35-hour work week.
Describe Future on Ongoing Costs (Expenditure) or Savings (Reduction of Expenditure):
This is a one-year transition fund, from the date of the actual implementation of the 35-hour work
week, after all of the labor negotiations have been completed.
Proiect Status (if Applicable)
[Project Status or N/A]
Packet Pg. 171
9.2.d
Amendment to Proposed 2025-2026 Biennial Budget
City of Edmonds — City Council
FISCAL DETAILS
Account/BARS
Notes:
Expenditures
GF039
$increase or ($decrease)
$100,000
Revenues
($increase) or $decrease
$0
Net Budget Impact:
$100,000
_
O
ca
m
0
a�
a�
3
m
N
LO
N
O
N
r
r
N
O
N
_
3
U-
r-
0
N
Q
E
O
U
t)
N
O
L
a
a�
M
a
U
LO
T-
U
r
_
d
E
s
0
ca
Q
Packet Pg. 172
9.2.e
Amendment to Proposed 2025-2026 Biennial Budget
City of Edmonds — City Council
Amendment Title: 10% General Fund Labor/Benefits Expenditure Reduction
Amendment Number:
Councilmember:
Michelle Dotsch
Date Submitted:
11/14/2024
Fund:
GF 001
Agenda Packet:
11/14/2024
Department:
Numerous
Deliberated:
Council staff will complete
Program:
Numerous
Outcome:
Council staff will complete
Budget Year:
both 2025/2026
Amendment Motion:
I make a motion to reduce the General Fund labor/benefits expenditures by 10% for both 2025 and
2026.
This would amend the amount of funds allocated for salaries and benefits by 10%, reducing the
budget by $2.5M in 2025 and $2.69M in 2026. This amount was determined by considering the
strategic outlook general fund expenditures on page 20 of the budget book — showing 2025 labor
expenditures of $25,252,431 and 2026 labor expenditures of $26,915,095. The resulting amount may
need to be adjusted with consideration of overtime that is included in these expenditure figures.
This proposed amendment is in contrast and should be considered as an alternative to other
amendments contemplating a 32- or 35-hour work week. This amendment intentionally does not
specify staffing/programmatic reductions that would be necessary as a result of this amendment.
Rather, those reductions would be best determined by the administration.
These reductions could be a combination of eliminating positions (impacting both labor and benefits
expenditures) or reducing positions to a partial FTE (impacting only labor expenditure). This method
of eliminating or reducing positions is with more long-term intentions than a furlough or a reduced
work week, and indicates that our fiscal recovery will require more long-term strategies than this
biennium.
Amendment Puraose (intended outcomes):
• Reduces the overall budget by $2.5M in 2025 and $2.69M in 2026.
• Reduces the City's workforce more intentionally for long-term fiscal recovery.
• Could enable Inter -fund loan amounts to be reduced and/or paid back more immediately.
• Could enable a levy -lid -lift amount to be lower, thus reducing the burden on taxpayers.
Describe All Funding Sources
General Fund
Describe Future on Ongoing Costs (Expenditure) or Savings (Reduction of Expenditure):
These expenditure reductions could be realized beyond 2025 and 2026 until the fiscal conditions
allow changes to the city workforce.
Packet Pg. 173
9.2.e
Amendment to Proposed 2025-2026 Biennial Budget
City of Edmonds — City Council
Project Status (if Applicable)
[Project Status or N/A]
FISCAL DETAILS
Account/BARS
Notes:
Expenditures
$increase or ($decrease)
($2,500,000)
($2,690,000)
2025
2026
Revenues
($increase) or $decrease
$0
Net Budget Impact:
($2,500,000)
($2,690,000)
2025
2026
Packet Pg. 174
9.2.f
Amendment to Proposed 2025-2026 Biennial Budget
City of Edmonds — City Council
Amendment Title: Police Leadership Structure
Amendment Number: C6
Councilmember:
Will Chen
Date Submitted:
11/6/2024
Fund:
001
Agenda Packet:
11/12/2024
Department:
Police 41
Deliberated:
11/12/2024
Program:
Police Administration
Outcome:
Postponed to next me
Budget Year:
both 2025/2026
Amendment Motion:
I motion to restructure the Police Department leadership structure to better align the management needs
of one Police Chief and One Assistant Police Chief.
Amendment Description:
This amendment is to restructure the Police Department's leadership structure to better align the
management needs of one Police Chief and One Assistant Police Chief.
Amendment Purpose (intended outcomes):
• To better align administration management team with the size of the city's police force.
Describe All Funding Sources
Describe funding —GF
Describe Future on Ongoing Costs (Expenditure) or Savings (Reduction of Expenditure):
The estimated ongoing savings (reduction of salary and benefits) to General Funds is $310,000 in 2025
and $319,300 in 2026.
Protect Status (if Applicable)
Police Administration on budget book page 106.
FISCAL DETAILS
Account/BARS
Notes:
Expenditures
001
$increase or ($decrease)
($310,000) in
2025;
($319,300) in
2026.
Revenues
($increase) or $decrease
$0
Net Budget Impact:
($310,000) in
Reduce GF
2025;
expenditures.
($319,300) in
2026.
ang
Packet Pg. 175
9.2.g
COUNCIL
APPROVED
(YES/NO)
APPROVAL
FROM/DATE
Staff
Assigned
Number
FUND#
FUND DESC
SUBJECT
DEPT#
DEPT TITLE
REV/EXP
INCREASE
OR
DECREASE
2025
AMOUNT
2026AMOUNT
ON GOING/
ONETIME
Comments
YES
11/12/2024
1
001
General Fund
SnoCounty 911 dept split
41
Police Department
Expense
Decrease
(400,000.00)
(440,000.00)
ON -GOING
Moving fire component of SnoCounty 911 expenses to Dept 39
YES
11/12/2024
1
001
General Fund
SnoCounty 911 dept split
39
Non Department
Expense
Increase
400,000.00
440,000.00
ON -GOING
Moving fire component of SnoCounty 911 expenses to Dept 39
YES
11/12/2024
2
001
General Fund
COLA Reduction
Various
Various
Expense
Decrease
(117,631.00)
(119,272.00)
ON -GOING
COLA decrease from 3.8%to 3.0%for the followingwork groups: Council,
Mayor, Non -Represented, ASFME, Teamsters (non -police), and Law Support
2026 COLA is still at 4%, the 2026 change is compounding effect of the 2025
reduction
YES
11/12/2024
2
111
Street Fund
COLA Reduction
Various
Various
Expense
Decrease
(7,590.00)
(7,749.00)
ON -GOING
Same as above
YES
11/12/2024
2
127
Gifts Catelog Fund
COLA Reduction
Various
Various
Expense
Decrease
(2,155.00)
(2,175.00)
ON -GOING
Same as above
YES
11/12/2024
2
130
Cemetery Fund
COLA Reduction
Various
Various
Expense
Decrease
(1,200.00)
(1,202.00)
ON -GOING
Same as above
YES
11/12/2024
2
421
Water Fund
COLA Reduction
Various
Various
Expense
Decrease
(9,041.00)
(9,160.00)
ON -GOING
Same as above
YES
11/12/2024
2
422
Storm Fund
COLA Reduction
Various
Various
Expense
Decrease
(8,001.00)
(8,140.00)
ON -GOING
Same as above
YES
11/12/2024
2
423
Sewer Fund
COLA Reduction
Various
Various
Expense
Decrease
(24,145.00)
(24,713.00)
ON -GOING
Same as above
YES
11/12/2024
2
511
Fleet Fund
COLA Reduction
Various
Various
Expense
Decrease
(3,523.00)
(3,566.00)
ON -GOING
Same as above
YES
11/12/2024
2
512
IT Fund
COLA Reduction
Laboratory Services
Various
72
Various
Expense
Decrease
(5,158.00)
(5,191.00)
ON -GOING
Same as above
Laboratory Services missed in Eden data entry
YES
11/19/2024
3
422
Storm Fund
Public Works
Expense
Increase
2,020.00
0.00
ON -GOING
YES
11/19/2024
4
423
Sewer Fund
ODS Pump Replacement
76
Public Works
Expense
Increase
0.00
350,000.00
ON -GOING
This project was added after proposed budget
YES
11/19/2024
5
423
Sewer Fund
Nutrient Removal Project
76
Public Works
Expense
Increase
350,000.00
0.00
ON -GOING
This project was added after proposed budget
YES
11/19/2024
6
112
Capital Street Fund
Safety Action Plan
NA
Public Works
Revenue
Increase
0.00
(300,000.00)
ONETIME
112 revenue finalized after DP's entered.
YES
11/19/2024
6
112
Capital Street Fund
Hwy 99 Stage 3
NA
Public Works
Revenue
Decrease
0.00
2,015,000.00
ONETIME
112 revenue finalized after DP's entered.
YES
11/19/2024
6
112
Capital Street Fund
Traffic Impact Fees
NA
Public Works
Revenue
Decrease
336,725.00
648,599.00
ON -GOING
Reduce Traffic Impact Fee Revenue Budget
YES
11/19/2024
6
112
Capital Street Fund
Interfund Transfer
68
Public Works
Expense
Increase
31,725.00
343,599.00
ON -GOING
Transfer of TIF from 502 to 000
YES
11/19/2024
6
112
Capital Street Fund
Interfund Transfer
NA
Public Works
Revenue
Increase
(31,725.00)
(343,599.00)
ON -GOING
Transfer ofTIFfrom 502to 000
YES
11/19/2024
7
120
Hotel/Motel Tax
Correct 2025 Revnenue
NA
Administrative Svc
Revenue
Decrease
(119,732.00)
0.00
ONETIME
Correct duplicate entry
YES
11/19/2024
8
120
Hotel/Motel Tax
Change funding source of Prof Svc
31
Administrative Svc
Expense
Decrease
0.00
(49,000.00)
ONETIME
Change funding source from Fund 120 to Fund 001
YES
11/19/2024
8
001
General Fund
Change funding source of Prof Svc
31
Administrative Svc
Expense
Increase
0.00
49,000.00
ONETIME
Change funding source from Fund 120 to Fund 001
NO
11/19/2024
9
001
General Fund
Arts& Cultural Svcs Manager
61
Com,Cul,&Econ
Public Works
Expense
Increase
0.00
161,875.00
ON -GOING
In 2026 make a commitment to the Arts community and reinstate the Arts &
Cultural Services Mgr position
10
111
Street Fund
Correction to ER&R calculation
68
Expense
Decrease
(170,000.00)
(170,000.00)
ONETIME
This is an on -going expense but a one time correction to Street Fund
Interfund Rate calcuation to Fund 511
rr
Q
Packet Pg. 176
9.2.h
Staff Recommended Change to Proposed 2025-2026 Biennial Budget
City of Edmonds
Staff Recommendation Title: Correction to Street Fund IF Services charge
Staff Recommendation Number: 10
Staffinember
Kim Dunscombe
Date Submitted:
11/21/2024
Fund:
Street Fund 111
Agenda Packet:
1112112024
Department:
Street Department
Deliberated:
staff will complete
Program:
Street Fleet
Outcome:
staff will complete
Budget Year:
2025 and 2026
Staff Recommendation:
I make a motion to reduce the street fund interfund services line item by $170,000 to $3247,230 in
each year of the biennium.
This staff -recommended budget adjustment is necessary to correct a keying error identified in the
computation of the internal services rate for the Street Fund. The correction ensures accurate
allocation of internal service charges, aligning with the intended methodology.
The adjustment results in an overall reduction to the Street Fund, reflecting the corrected rate.
Importantly, the Equipment Rental and Replacement (ER&R) Fund remains unaffected by this change,
as the correction pertains solely to the rate applied within the Street Fund's allocation.
Staff Recommendation Purpose (intended outcomes):
• This revision maintains the integrity of financial management practices and ensures that
internal service charges are properly aligned with operational needs.
Describe All Funding Sources
Street Fund
Describe Future on Ongoing Costs (Expenditure) or Savings (Reduction of Expenditure):
Street Fund
Proiect Status (if Applicable)
NA
FISCAL DETAILS
Account/BARS
Notes:
Expenditures
111.000.68.542.90.45.10
($decrease)
($170,000)
Revenues
($increase) or $decrease
$0
Net Budget Impact:
$0
Packet Pg. 177
9.2.i
Amendment to Proposed 2025-2026 Biennial Budget
City of Edmonds — City Council
Amendment Title: Reduce city hall operations to 32-hours a week except for Police, Court, and
Wastewater Treatment.
Amendment Number: C-8
Councilmember:
Will Chen
Date Submitted:
11/6/2024
Fund:
GF001
Agenda Packet:
11/12/2024
Department:
Various
Deliberated:
11/12/2024
Program:
Various
Outcome:
Postponed (5-2)
Budget Year:
2025
Amendment Motion:
I motion to reduce city hall operations to 32-hours a week except for Police, Court, and Wastewater
Treatment.
Amendment Description:
reduce city hall operations to 32-hours a week except for Police, Court, and Wastewater Treatment.
Amendment Purpose (intended outcomes):
• Reduce city hall operations to 32-hours a week to generate GF salary savings, as well as
letting public know that city needs additional funding to maintain normal service hours.
Describe All Funding Sources
GF and others
Describe Future on Ongoing Costs (Expenditure) or Savings (Reduction of Expenditure):
Estimated 10% labor reduction, which is 10%*$25,252,431, rounding down to $2,500,000.
Protect Status (if Applicable)
N/A
FISCAL DETAILS
Account/BARS
Notes:
Expenditures
001
$increase or ($decrease)
($2,500,000)
in 2025
Revenues
($increase) or $decrease
$0
Net Budget Impact:
10% labor savings.
($2,500,000)
in 2025
Packet Pg. 178
9.2.j
Amendment to Proposed 2025-2026 Biennial Budget
City of Edmonds — City Council
Amendment Title: Reduce work week to 35 hours/week, with exceptions
Amendment Number: C-15(A)
Councilmember:
CM Paine
Date Submitted:
Nov 13, 2024
Fund:
GF 001
Agenda Packet:
11/19/2024
Department:
Various
Deliberated:
Council staff will complete
Program:
Various
Outcome:
Council staff will complete
Budget Year:
both 2025/2026
Amendment Motion:
Motion to reduce the regular work hours from 40 hours per week to 35 hours., for majority of city
workgroups.
Amendment Description:
Reduce labor costs through work hour reduction. The work groups which are exempted are the
WWTP personnel, Courts, and Police Command and Commissioned officers. Also excluded are
Directors and others who are voluntarily taking furloughs.
Amendment Purpose (intended outcomes):
• Reduce the fiscal impacts of labor costs for the City,
• Offer stability for the workforce through a 2-year commitment of reduced hours, and
• Maintaining a high -quality workforce, without going through layoffs
Describe All Funding Sources
Various
Describe Future on Ongoing Costs (Expenditure) or Savings (Reduction of Expenditure):
The impacts of this proposal will need to be negotiated with our labor groups. The anticipated start
would be mid -year 2025. This proposal is anticipated for the upcoming biennium, and may need to be
extended.
Protect Status (if Applicable)
N/A
FISCAL DETAILS
Account/BARS
Notes:
Expenditures
001
$decrease
$3,000,000
$1,000,000 in
2025;
$2,000,000 in
2026
Revenues
($increase) or $decrease
$0
Net Budget Impact:
$0
Labor savings
0
w
M
L
s
0
d
a�
3
m
N
LO
N
0
N
Packet Pg. 179
9.2.j
Amendment to Proposed 2025-2026 Biennial Budget
City of Edmonds — City Council
0
L
d
0
d
m
N
LO
N
O
N
N
O
N
Ln
L
O
t
LO
CO
O
r
Y
d
d
3
L
O
3
a�
d
a:
as
_
a
Q
U
_
d
E
t
0
r
Q
Packet Pg. 180
9.2.k
Amendment to Proposed 2025-2026 Biennial Budget
City of Edmonds — City Council
Amendment Title: Edmonds Permitting Fees Study
Amendment Number: c-zs
Councilmember:
CMs Paine and Dotsch
Date Submitted:
11/14/2024
Fund:
GF 001 & Other??
Agenda Packet:
11/19/2024
Department:
Planning and Development
Deliberated:
Council staff will complete
Program:
Outcome:
Council staff will complete
Budget Year:
2025
Amendment Motion:
Motion to add up to $10,000 for a consultant study to evaluate the current permitting fee schedule
and update permitting fee methodology.
Amendment Description:
Permitting fees currently pay for 41% of the staff labor costs. Next year is the scheduled year to
update the permit fee schedule and in light of the past 4 years of inflation, the past fee schedule
setting methodology needs to be revalidated.
• Provide an external review and comparison of Edmonds' permitting fees versus other cities.
• Determine if there are gaps in our current permit fee schedule.
• Reduce general fund impacts based on an inadequate fee schedule.
• Review the permitting fees of other local, Puget Sound region, particularly in cities which have
experienced a recent burst of development (Shoreline, Bothell, Lynnwood, Everett, and
Seattle) as a comparative analysis.
• Have the permitting fees be indexed to the regional inflation rate used for construction
during the years when there isn't a permitting fee rate study.
• The cost of the rate study should be included in the calculation of the permitting fees.
Describe All Funding Sources
Initially this study would be funded by the general fund. The cost of this study is to be included in the
calculation of the permitting fees to recover those costs.
Describe Future on Ongoing Costs (Expenditure) or Savings (Reduction of Expenditure):
This is an expense that would happen every 3 or 4 years.
Protect Status (if Applicable)
[Project Status or N/A]
FISCAL DETAILS
Account/BARS
Notes:
Expenditures
$increase or ($decrease)
$10,000
Revenues
($increase) or $decrease
$0
Packet Pg. 181
9.2.k
Amendment to Proposed 2025-2026 Biennial Budget
City of Edmonds — City Council
Net Budget Impact: $10,000
0
�a
L
r
M
M�
W
W
N
LO
N
O
N
N
(D
N
3
r
N
N
N
d
LL
0)
E
L
a
_
0
E
Lu
m
_
a
s
0
0
CO
r
ci
y.i
_
d
E
t
V
f4
Q
Packet Pg. 182
9.2.1
Amendment to Proposed 2025-2026 Biennial Budget
City of Edmonds — City Council
Amendment Title: Reinstate funding for the Police Community
Engagement/Crime Prevention position
Amendment Number: C-16
Councilmember:
CM Paine
Date Submitted:
11/13/2024
Fund:
001
Agenda Packet:
1111912024
Department:
Police
Deliberated:
Council staff will complete
Program:
Outcome:
Council staff will complete
Budget Year:
2025/2026
Amendment Motion:
Motion to reinstate funding for the Police Community Engagement / Crime Prevention Coord postion.
Amendment Description:
This position provides a great service to our community by providing outreach to the public, making
and keeping community connections regarding crime prevention programs.
Amendment Purpose (intended outcomes):
• To maintain this function within our police agency.
Describe All Funding Sources
G F 001
Describe Future on Ongoing Costs (Expenditure) or Savings (Reduction of Expenditure):
On -going expenditure for Community Engagemet Crime Prevention Coordinator (NE-11)
Proiect Status (if Applicable)
[Project Status or N/A]
FISCAL DETAILS
Account/BARS
Notes:
Expenditures
$increase or ($decrease)
$180,000
$188,000
FY 25
FY 26
Revenues
($increase) or $decrease
$0
Net Budget Impact:
$180,000
$188,000
FY 25
FY 26
0
�a
d
Q
0
r
m
as
3
m
ca
N
LO
N
0
N
Packet Pg. 183
9.2.m
Amendment to Proposed 2025-2026 Biennial Budget
City of Edmonds — City Council
Amendment Title: Reinstate funding for the Police Public Records position
Amendment Number: C-17
Councilmember:
CM Paine
Date Submitted:
Nov 13, 2024
Fund:
001
Agenda Packet:
11/19/2024
Department:
Police
Deliberated:
Council staff will complete
Program:
Outcome:
Council staff will complete
Budget Year:
2025/2026
Amendment Motion:
Motion to reinstate funding for the Police Dept Public Records position.
Amendment Description:
This is position requires technical and legal training and decision -making, along with an understanding
of timelines and deadlines associated with records requests.
Amendment Purpose (intended outcomes):
• Maintain the smooth functioning of the Police department records processing program.
• There are legal requirements for this public records program and increases the risk of legal
liability if this program is under resourced.
Describe All Funding Sources
G F 001
Describe Future on Ongoing Costs (Expenditure) or Savings (Reduction of Expenditure):
[Describe ongoing costs or savings]
Protect Status (if Applicable)
[Project Status or N/A]
FISCAL DETAILS
Account/BARS
Notes:
Expenditures
001
$increase or ($decrease)
$145,000
$158,000
FY 25
FY 26
Revenues
($increase) or $decrease
$0
Net Budget Impact:
$145,000
$158,000
FY 25
FY 26
Packet Pg. 184
9.3
City Council Agenda Item
Meeting Date: 11/26/2024
2025-2030 Capital Facilities Plan (CFP) and Capital Improvement Program (CIP)
Staff Lead: Angie Feser and Rob English
Department: Parks, Recreation & Human Services
Preparer: Angie Feser
Background/History
The City's Capital Facilities Plan (CFP) Element is updated annually and identifies capital projects for at
least the next six years, which support the City's Comprehensive Plan. CFP projects are capital
improvement projects that expand capacity in existing facilities/infrastructure or provide new capital
facilities to accommodate the City's projected population growth in accordance with the Growth
Management Act. Also, capital projects that preserve existing capital facilities through maintenance
efforts are not classified as CFP projects. These preservation and maintenance projects are part of the
six -year capital improvement program (CIP). The two capital project components combine to encompass
the estimated funding expenditure needs for all city capital related projects.
Public Works capital work includes the city's Transportation, Utilities and Facilities programs and the
Parks & Recreation encompasses the city's parkland and recreation amenities and facilities located
within those park sites.
Planning Board Review
Both the Public Works and Parks & Recreation Departments presented their proposed 2026 - 2030
capital programs to the Planning Board on September 11, 2024 and as well as a Public Hearing on
September 29, 2024. The Planning Board recommends to City Council to adopt the CFP/CIP as
presented. (Memo is attached)
City Council Review
These departments provided a presentation to City Council on October 8, 2024 and a Public Hearing was
conducted by Council on October 22, 2024. Council members were able to submit questions and
requests for additional information through the 2025 Budget Query program up until the capital budget
was scheduled for adopted on November 26, 2024.
One amendment was approved by City Council on November 12, 2024 in the Parks CIP/CFP to remove
$100,000 allocated for a 2026 Johnson Property Master Plan project. The attached Parks capital plan is
revised to reflect that change.
Staff Recommendation
For the City Council to adopt the 2025 - 20230 Public Works and Parks & Recreation Capital Facilities
Plan and Capital Improvement Program as presented.
Narrative
Packet Pg. 185
9.3
The 2025-2030 Capital Facilities Plan (CFP) and Capital Improvement Program (CIP) identify Capital
Facility projects including geographic distribution and location and information sheets with estimated
expenditures and funding sources. The Public Works and Utilities Department proposed 2025-2030
CFP/CIP is included as Attachment 1. The Parks & Recreation proposed 2025-2030 CFP/CIP is included as
Attachment 2.
With the city transitioning to a biennium operating budget format, the years alternating operating
budget adoption provide a better opportunity to review capital budgets in greater depth. Next year in
2025 there will be more time and staff capacity to review in detail, and incorporate, the 2024
Transportation Plan, the Stormwater and Surface Water Plan Update, as well as the 2024 Comprehensive
Plan (including a Facilities Element). In addition, the city's 2025-2026 operating budget will be adopted
and impacts of budget reductions will be in place to more realistic about staff capacity for project
management. Recommendations from these three significant plans, which will not be completed for this
year's capital program review, plus having an establish operating budget will be instrumental in
developing the 2026-2031 CFP/CIP Plans.
Attachments:
2025 - 2030 Public Works CIP-CFP FINAL DRAFT
2025-2030 Parks CIP_CFP FINAL DRAFT
2025-2030 CIPCFP Memo from Planning Board
Packet Pg. 186
pp-
Packet Pg. 187
TRANSPORTATION & UTILITY PROJECT MAP
iii
FACILITIES & WWTP PROJECT MAP
iv
TRANSPORTATION
1
PRESERVATION/MAINTENANCE
6
SAFETY/CAPACITY ANALYSIS
14
NON -MOTORIZED TRANSPORTATION
38
FERRY PROJECTS
61
TRAFFIC CALMING
63
TRAFFIC PLANNING
65
GREEN STREETS
68
WATER
70
STORMWATER
76
EDMONDS MARSH ESTUARY RESTORATION
81
PERRINVILLE CREEK BASIN
85
STORM DRAINAGE IMPROVEMENT
89
COMPLIANCE RELATED
91
SEWER
93
FACILITIES
99
WASTEWATER TREATMENT
122
CFP/CIP COMPARISION 2024-2025
140
Packet Pg. 188
9.3.a
M42 rw i-ui PWW-02
rWS�02 PW�T-70 PWT-
PWT-65 NWT-04:=l
M.
PWTPWT -36.0=
• I D\A1"� �
-- ems
PWT-03
h
PW 5PWT-09 c
PWT-12
r ' PWT-35 4WT-16
1 �� PWT-48 PWT-19
T-41 PWT-11
C
PWT-25
PWT-15
�•'� PWT-20 PWT-22
PWT-08
e
PWT-21
PWT-29 •
� PWT-20 PWT-13 PWT-14 e
PWT-30 I � �
PWT-47 P.WT K, � _ PWT-31
WE�1 i WT-06 I PWT-�3 PWTi64 PWT-5,
PWT-06 PWS-11
07
■� f PWD=06 �
* Site specific projects only. Citywide/annual PWT-10 PWT-26 P
2024 citywide projects not shown. PWT-43 9 0 Packet Pg. 189
9.3.a
tilq�h ♦ *,R s« p--07 PWF-01 ra ■
47
PWR 3 all
1101
CO, P_W F_10 C
IMP rt ryr-
Jlvii
MOwP
PWF=23 PWF- _
W 4i•
:r,f,m*.i1�■�
o W ■
o���
16 1 �
elm4p
�� r�ir■ ;1 44"
a � -!]
_;• ft •4 I a 9 . Fi--_
PWF-0 " vv11
PWF-09
04 PWF-03 ♦ • PWI
1•
o ' 09M o F-23 R
PWF 13���
a■*'+E'm 1i ■0'■
0PWF-08
•
yj '
rim'
rjl11 1■ ■ Jlm.WA
■ L ■ WA,
eFAm
®R`
r�
* Site specific projects only. Citywide/annual citywide projects no sown:
PWF-1 c
Packet Pg. 190
V.
TRANSPORTAT101
- �
..► it �'
how
46
F `
_
- `
•' CflTER
t
-
2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS
9.3.a
TRANSPORTATION
M
PRESERVATION/ MAINTENANCE
a
v
PWT-01
Annual Street Preservation Program Str-25020/22/33
$1,801,800
$855,850
$2,630,000
$2,630,000
$2,630,000
$2,630,000
$13,177,650
$39,450,000
$52,627,1 e
FL
PWT-04
Main St Overlay from 6th Ave to 8th Ave
$642,020
$0
$0
$0
$0
$0
$642,020
$0
U)
$642,1 T
PWT-05
Puget Dr @ OVD Signal Upgrades
$0
$0
$0
$95,000
$526,000
$0
$621,000
$0
$621,1 �i
PWT-06
Signal Upgrades - 100th Ave @ 238th St
$0
$0
$0
$175,000
$820,000
$0
$995,000
$0
$995,1 1
SW
U
PWT-07
Main St @ 3rd Signal Upgrades
$0
$0
$0
$117,000
$406,000
$0
$523,000
$0
$523,1 c
PWT-61
Olympic View Dr Overlay 196th I SR 524 Str-25031/32
$484,000
$963,700
$0
$0
$0
$0
$1,447,700
$0
N
$1,447,' N
to Talbot Rd
N
PWT-68 88th Avenue Overlay and Sidewalk Repair Str-25018 $1,180,000 $0 $0 $0 $0 $0 $1,180,000 $0 $1,180,1 �
9
SAFETY/ CAPACITY ANALYSIS
o
PWT-08
228th St SW from Hwy 99 to 95th PI W
$0
$0
$0
$1,533,000
$2,650,000
$13,900,000
$18,083,000
$0
Q
$18,083,1 Z
Corridor
PWT-09
Hwy 99 Revitalization & Gateway Project - Str-25002
$15,000
$0
$0
$0
$0
$0
$15,000
$0
$15,1 U
Stage 2
v
PWT-10
✓
Hwy 99 Revitalization Project - Stage 3 Str-25004/5
$1,984,000
$1,683,000
$2,489,000
$10,000,000
$9,607,000
$0
$25,763,000
$0
d
$25,763,1 v
PWT-11
✓
Hwy 99 Revitalization Project - Stage 4 Str-25006/7
$825,000
$1,620,000
$5,000,000
$4,955,000
$13,100,000
$10,000,000
$35,500,000
$0
$35,500,1
PWT-12
✓
Hwy 99 Revitalization Project - Stage 5
$0
$0
$0
$530,000
$1,060,000
$2,090,000
$3,680,000
$46,293,000
2
$49,973,1
IL
PWT-13
✓
Hwy 99 Revitalization Project - Stage 6
$0
$0
$0
$0
$0
$0
$0
$22,500,000
$22,500,1 M
0
N
PWT-14
✓
Hwy 99 Revitalization Project - Stage 7
$0
$0
$0
$0
$0
$0
$0
$42,900,000
$42,900,1
N
O
PWT-15
✓
Hwy 99 Revitalization Project - Stage 8
$0
$0
$0
$0
$0
$0
$0
$37,500,000
$37,500,1 N
m
PWT-16
✓
Hwy 99 Revitalization Project - Stage 9
$0
$0
$0
$0
$0
$0
$0
$22,500,000
$22,500,1 t
PWT 17
✓
196th St SW 188th Ave W - Intersection
$0
$0
$0
$279,000
$252,000
$835,000
$1,366,000
$0
$1,366,1 Q
Improvements
Packet Pg. 192
9.3.a
TRANSPORTATION
PWT-18
✓
Main St @ 9th Ave Intersection Str-25010
Improvements
PWT-19
✓
76th Ave W @ 220th St SW - Intersection Str-25028/29
Improvements
PWT-20
SR-104 Adaptive System - 236th to 226th Str-25008
PWT-21
✓
SR-104 @ 100th Ave W Intersection
Improvements
PWT-22
✓
SR-104 @ 95th PI W Intersection
Improvements
PWT-23
✓
SR-104 @ 238th St SW Intersection
Improvements
PWT-24
✓
Olympic View Dr @ 76th Ave W
Intersection Improvements
PWT-25
✓
84th Ave W (212th St SW to 238th St SW) Str-25011
PWT-26
✓
SR-104 @ 76th Ave W Intersection
Improvements
PWT-27
✓
Olympic View Dr @ 174th St SW
Intersection Improvements
PWT-28
175th St SW Slope Repair
PWT-59
Traffic Signal Program Str-25016/17
PWT-70
Safety Action Plan 670-25011
.•^-7RTATION
PWT-29
✓
232nd St SW Walkway from 100th Ave to
SR-104
PWT-30
✓
236th St SW Walkway from Madrona
Elem to 97th Ave W
PWT-31
✓
236th St SW Walkway from Hwy 99 to
76th Ave W
PWT-32
✓
84th Ave W Walkway from 238th St SW to
234th St SW
PWT-33
✓
80th Ave W Walkway from 212th St SW to
206th St SW
Total2025-30
$0
$0
$0
$210,000
$1,157,000
$0
$1,367,000
$0
a
$1,367,1 v
$198,000
$1,488,500
$2,100,000
$3,370,000
$3,300,000
$0
$10,456,500
$0
c
$10,456,! a
$67,740
$0
$0
$3,515,000
$0
$0
$3,582,740
$0
u)
$3,582,' ��—_'
$0
$0
$0
$200,000
$1,350,000
$2,650,000
$4,200,000
$0
$4,200,1
�a
r
$0
$0
$0
$45,000
$242,000
$0
$287,000
$0
$287,1 cm
c)
$0
$0
$0
$241,000
$1,370,000
$0
$1,611,000
$0
$1,611,1CD
N
$0
$0
$0
$0
$0
$0
$0
$1,428,000
Lo
$1,428,10
$0
$0
$0
$0
$0
$0
$0
$18,672,000
$18,672,1 LL
Q
$0
$0
$0
$0
$0
$0
$0
$3,630,000
$3,630,10
J
Q
$0
$0
$0
$0
$0
$0
$0
$758,000
$758,1
ILL
$0
$0
$0
$1,060,000
$0
$0
$1,060,000
$0
$1,060,1 v
d
$30,280
$30,280
$0
$0
$0
$0
$60,560
$0
$60,! N
Y
i
$375,000
$0
$0
$0
$0
$0
$375,000
$0
$375,1 0
2
a
$0
$0
$0
$0
$284,000
$1,572,000
$1,856,000
$0
$1,856,1 Co
0
N
$0
$0
$0
$313,000
$1,794,000
$0
$2,107,000
$0
$2,107,1 L,
N
O
$0
$0
$0
$0
$0
$0
$0
$2,054,000
$2,054,1 w
c
d
$100,000
$0
$0
$625,000
$2,550,000
$0
$3,275,000
$0
$3,275,1 t
$0
$0
$0
$117,000
$127,000
$1,433,000
$1,677,000
$0
c�
$1,677,1 Q
Packet Pg. 193
9.3.a
TRANSPORTATION
Project .-
M
PWT-34
✓
80th Ave W Walkway from 188th St SW to
$0
$0
$0
$511,000
$1,962,000
$0
$2,473,000
$0
$2,473,1
Olympic View Dr
v
PWT-35
1/g4th
218th St SW Walkway from 76th Ave W to
$0
$0
$0
$280,000
$1,563,000
$0
$1,843,000
$0
r
$1,843,1 a
Ave W
PWT 36
✓
Walnut St Walkway from 6th Ave S to 7th
$0
$0
$0
$308,000
$0
$0
$308,000
$0
m
$308,1
Ave S
PWT-37
✓
216th St SW Walkway from Hwy 99 to
$0
$0
$0
$233,000
$0
$0
$233,000
$0
$233,1 Li
72nd Ave W
r
PWT-39
✓
Citywide Bicycle Improvements Project Str-25001
$10,000
$0
$0
$0
$0
$0
$10,000
$0
$10,1
tU
PWT-40
✓
Maplewood Dr Walkway from Main St to
$0
$0
$0
$233,000
$233,000
$2,662,000
$3,128,000
$0
$3,128,1
200th St SW
N
PWT-41
✓
95th PI W Walkway from 224th St SW to
$0
$0
$0
$139,000
$775,000
$0
$914,000
$0
Lo
$914,1 c
220th St SW
N
PWT-43
✓
SR-104 & 76th Non -Motorized
$0
$0
$0
$277,000
$1,389,000
$0
$1,666,000
$0
$1,666,1 LL
Transportation Improvements
Q
PWT 45
✓
SR-104 Walkway HAWK to Pine/Pine
$0
$0
$0
$0
$0
$3,473,000
$3,473,000
$0
$3,473,1 0
from SR-104 to 9th
PWT-46
1/W
191 st St SW from 80th Ave W to 76th Ave
$0
$0
$0
$0
$0
$0
$0
$762,000
z
$762,1 K
PWT 47
✓
104th Ave W I Robinhood Ln from 238th
$0
$0
$0
$0
$0
$0
$0
$1,192,000
U_
$1,192,1 t)
St to 106th Ave W
a
PWT-48
✓
SW Ave W from 218th St SW to 220th St
$0
$0
$0
$0
$0
$0
$0
$365,000
$365,1 y
Y
PWT-49
✓
Ave W from 188th St SW to 186th St
$0
$0
$0
$0
$0
$0
$0
$369,000
i
$369,1 �
SW
PWT-50
✓
238th St SW from Hwy 99 to 76th Ave W
$0
$0
$0
$211,000
$1,234,000
$0
$1,445,000
$0
$1,445,1
a
PWT-55
✓
Elm Way Walkway from 8th Ave. S to 9th
Str-25003
$5,000
$0
$0
$0
$0
$0
$5,000
$0
cD
$5,1 M
Ave. S
N
PWT-60
Pedestrian Safety Program Str-25014/15
$20,180
$20,180
$0
$0
$0
$0
$40,360
$0
$40,; N
0
N
PWT-66
4th Avenue Cultural Corridor
$0
$0
$0
$1,000,000
$1,000,000
$6,000,000
$8,000,000
$0
$8,000,1
a�
E
FFRRV F?FI d TF
s
c�
PWT-51
Ferry Storage Improvements from Pine St
$0
$0
$0
$403,000
$0
$0
$403,000
$0
c°
$403,1 Q
to Davton St
Packet Pg. 194
9.3.a
TRANSPORTATION
TRAFFIC CALMING
PWT-52 Traffic Calming Program Str-25012/13
TRAFFIr. PI ANNINC.
PWT-53 ADA Transition Plan (Right -of -Way)
Update
PWT-54 Transportation Plan Update Str-25009
rL?FFAI CTI?FFT
PWT-64 Green Streets 236th St SW - 84th Ave W
to Highway 99
EXPENSE TOTAL
Federal Grants
Fund 112 - Street (Gas Tax & Multi -
Modal)
Fund 125 - REET
Fund 126 - REET
Fund 421 -Water Utility
Fund 422 - Stormwater Utility
Fund 423 - Sewer Utility
State Grants
Transportation Impact Fees
Unsecured Funding
FUNDING TOTAL
2025-30
)25 2026
2027
2028 2029
2030
2031-45
Grand
To
Total
c
$80,650 $80,650 $22,000 $22,000 $22,000 $22,000 $249,300 $330,000 $579,: a
m
$0 $0 $0 $440,000 $0 $0 $440,000 $0 $440,11i
r
$35,000 $0 $0 $0 $0 $0 $35,000 $0 $35,1 R
v
0
M
O
N
Lo
$0 $0 $0 $0 $0 $3,710,000 $3,710,000 $0 $3,710,10
$7,853,670 $6,742,160 $12,241,000 $34,067,000 $51,403,000 $50,977,000 $163,283,830 $240,703,000 $403,986,1 l.-
LL
Q
G
1 1 J
2025 20261 128 2029 2030 1 • To Q
TotalZ
$1,351,200 $2,507,500 $4,463,000 $0 $0 $0 $8,321,700 $0 $8,321,' a
LL $168,595 $0 $0 $0 $0 $0 $168,595 $0 $168,! a
v
$836,465 $295,200 $750,000 $750,000 $750,000 $750,000 $4,131,665 $11,250,000 $15,381,1 Y
L
$2,037,610 $773,060 $772,000 $1,247,000 $772,000 $772,000 $6,373,670 $11,580,000 $17,953,1 0
_2
$212,000 $194,400 $0 $0 $0 $0 $406,400 $0 $406,j .0
M
a
$501,000 $6,500 $0 $0 $0 $0 $507,500 $0 $507,! M
O
$236,800 $0 $0 $0 $0 $0 $236,800 $0 $236,1 N
LO
$2,486,000 $2,683,000 $2,547,000 $10,000,000 $9,607,000 $0 $27,323,000 $0 $27,323,1 N
$24,000 $282,500 $2,579,000 $475,000 $0 $0 $3,360,500 $0 $3,360,!
E
$0 $0 $1,130,000 $21,595,000 $40,274,000 $49,455,000 $112,454,000 $217,873,000 $330,327,1
�a
$7,853,670 $6,742,160 $12,241,000 $34,067,000 $51,403,000 $50,977,000 $163,283,830 $240,703,000 $403,986,1 Q
Packet Pg. 195
PRESERVATION/ MAINTENANC
- •alo
Loll
OIL
ir
Oil
• --7 r h :��C_
-' � - .c: � - -fir •. _ •�
F
2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS
PWT-01
ANNUAL STREET
PRESERVATION
PROGRAM
Benefit
Description
Estimated Project Cost
'includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Fund 125 - REET
Fund 126 - REET
Fund 421 - Water Utility
Fund 423 - Sewer Utility
Unsecured Funding
Funding Source Total
Maintains the City's pavement infrastructure and reduces the need for larger capital
investment to rebuild City streets.
Annual pavement preservation program to maintain City streets.
$1,800,000 (2025)
2025
2026
2027
2028
2029
2030
2031-45
$110,000
$110,000
$130,000
$130,000
$130,000
$130,000
$1,950,000
$1,691,800
$745,850
$2,500,000
$2,500,000
$2,500,000
$2,500,000
$37,500,000
$1,801,800
$855,850
$2,630,000
$2,630,000
$2,630,000
$2,630,000
$39,450,000
$732,500
$295,200
$750,000
$750,000
$750,000
$750,000
$11,250,000
$732,500
$378,250
$750,000
$750,000
$750,000
$750,000
$11,250,000
$200,000
$182,400
$0
$0
$0
$0
$0
$136,800
$0
$0
$0
$0
$0
$0
$0
$0
$1,130,000
$1,130,000
$1,130,000
$1,130,000
$16,950,000
$1,801,800
$855,850
$2,630,000
$2,630,000
$2,630,000
$2,630,000
$39,450,000
Packet Pg. 197
PWT-04
MAIN ST OVERLAY
FROM 6TH AVE TO 8TH
AVE
:amonas route ena
Municipal Court Bell St
RAJ z
z
r
m
MAIN ST
M
- r e Snodsle
Frances
Anderson
Library
Anderson
Center
¢'
.m C
Center
Field
L
�
v
I
Benefit Improve pavement conditions, pedestrian accessibility (with ADA curb ramps) and bik,
safety on this segment of Main Street.
Description The project will provide a full -width grind and pavement overlay of Main St. from 6th
Ave to 8th Ave. This project also includes upgrading all non -compliant ADA
pedestrian curb ramps within the project limits, an eastbound bike lane and westboun
bike sharrow markings.
Estimated Project Cost $1,855,000
'includes prior year expenditures
Budget
Project Cost
Construction
Expense Total
Fund 125 - REET
Federal Grants
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$642,020
$0
$0
$0
$0
$0
$0
$642,020
$0
$0
$0
$0
$0
$0
$84,820
$0
$0
$0
$0
$0
$0
$557,200
$0
$0
$0
$0
$0
$0
$642,020
$0
$0
$0
$0
$0
$0
Packet Pg. 198 1
PWT-05
PUGET DR @ OVD
SIGNAL UPGRADES
Benefit
Z ..
puw,l of PUGET DR
w
>
w
> _U
Q .. Edmonds a
= Elementary
H }
01 J
St. Peters O I
Lutheran Church
This upgrade will provide safer roadway conditions since the hanging signal heads wil
be replaced with fixed signal heads on mast arms. The new vehicle detection will c
guarantee that all vehicles will be detected.
Description The project will rebuild the existing traffic signal and remove the signal heads currentl
on span wire and install standard traffic signal poles with mast arms. Vehicle detectioi
will also be upgraded as part of this project.
Estimated Project Cost $621,000
'includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$95,000
$0
$0
$0
$0
$0
$0
$0
$526,000
$0
$0
$0
$0
$0
$95,000
$526,000
$0
$0
$0
$0
$0
$95,000
$526,000
$0
$0
$0
$0
$0
$95,000
$526,000
$0
$0
Packet Pg. 199
PWT-06
SIGNAL UPGRADES -
IOOTH AVE @ 238TH ST
SW
iickmen Perk ■' 4
3
P', .. Afton r
`
MIWi 3�
237th PI SWT 1
Edmonds
L
Memorial
,
S
:emetery Faith
Community
-
Wood, i
a
41111�1110 4%+ & Elemer =
1 Church
.
73Eth St SW
00.
L 3 'vW
v
0
t<
?39th n, 1 a ; t
rn
�
/ S
Benefit The existing traffic signal is near the end of its anticipated service life.
Description Install new traffic signal and vehicle detection system.
Estimated Project Cost $995,000
Includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$175,000
$0
$0
$0 1
$0
$0
$0
$0
$820,000
$0
$0
$0
$0
$0
$175,000
$820,000
$0
$0
$0
$0
$0
$175,000
$820,000
$0
$0
$0
$0
$0
$175,000
$820,000
$0
$0
Packet Pg. 200
PWT-07
MAIN ST a@ 3RD SIGNAL
UPGRADES
Underwater Park.
F Civic
Sprague
Puget Washington State
Bracketts Ferry
St
oDryS Play
^
Sound
Landing Terminal
Fire
Station 17
d
144 South
ailroad Ave
^-
'%9
J�
r
b 9'
Polic
()
Tidelands
Port Office
/N
Q r • _
Q
�Edmonds
Municipal
�y
E
ST
�Q' >' ,
and
`o
.� 4,
Vaterfront
s _
Mini Park_
;enter
YAW
Railroad
Q
Station
ryry�r..
Z
N
"
ourt
• Veteran's
b Edmonds Centennial Plaza
City Hall Plaza
Cl) d� Museum
r
J
Fountain MAIN ST
Cr
I
Benefit The existing traffic signal is near the end of its anticipated service life.
Description Install new traffic signal and vehicle detection system.
Estimated Project Cost $523,000
*includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$117,000
$0
$0
$0
$0
$0
$0
$0
$406,000
$0
$0
$0
$0
$0
$117,000
$406,000
$0
$0
$0
$0
$0
$117,000
$406,000
$0
$0
$0
$0
$0
$117,000
$406,000
$0
$0
Packet Pg. 201
„
PWT-61
OLYMPIC VIEW DR
OVERLAY - 196TH / SR-
524 TO TALBOT RD
P
O�YMPIc VNo�
3
a
U
Eo
C0 r
of ymp c
I
Benefit Improve pavement condition and improve accessibility for pedestrians of all abilities.
Description Pavement overlay along Olympic View Dr, from 196th St. SW / SR-524 to Talbot Roa
along with ADA pedestrian curb ramp upgrades.
Estimated Project Cost $1,500,000
Includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Fund 126 - REET
Federal Grants
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$100,000
$15,000
$0
$0
$0
$0
$0
$384,000
$948,700
$0
$0
$0
$0
$0
$484,000
$963,700
$0
$0
$0
$0
$0
$484,000
$263,700
$0
$0
$0
$0
$0
$0
$700,000
$0
$0
$0
$0
$0
$484,000
$963,700
$0
$0
$0
$0
$0
Packet Pg. 202
PWT-68
88TH AVENUE
OVERLAY AND
SIDEWALK REPAIR
J
2
0��2>
GET
Benefit Improve pavement conditions, pedestrian accessibility (with ADA curb ramps) and
pedestrian safety.
Description This project will resurface 88th Ave and improve the existing asphalt sidewalk on the
east side of 88th Ave from 196th St SW to 185th PI SW in the Seaview neighborhood
All City utilities along this section of 88th Ave have been upgraded in recent years an(
the street is ready to pave. The existing curb is in poor condition and varies in height.
The project will install 6" concrete vertical curbs and repave the existing asphalt
sidewalk.
Estimated Project Cost $1,180,000
'includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Fund 126 - REET
Fund 422 - Stormwater Utility
Fund 423 - Sewer Utility
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$110,000
$0
$0
$0
$0
$0
$0
$1,070,000
$0
$0
$0
$0
$0
$0
$1,180,000
$0
$0
$0
$0
$0
$0
$585,000
$0
$0
$0
$0
$0
$0
$495,000
$0
$0
$0
$0
$0
$0
$100,000
$0
$0
$0
$0
$0
$0
$1,180,000
$0
$0
$0
$0
$0
$0
Packet Pg. 203
I
}tic�'=�
i
-As
SAFETY/ CAPACITY ANALYSI
.=-;..ow
if - _-
2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS
PWT-08
228TH ST SW FROM
HWY 99 TO 95TH PL W
CORRIDOR
1 •- --_•-' : ' .-
.r -` nan
ESPERANCE
Stsv
I �
2ian s
--'.
_.
ZUIWISi•SW
° 1 i ��
„'.
3 a � i
Y 6i Y• -�.
�-"^y 1 �1 I•l t II.•:�::S�1i
� 1.i Y I I`° . i
. I. - r•1 •,
� � 1�- • , A l a i r`1 r_
I
. t•a11m, i -•r�•
•1 �Y Jml-..-j
3° -�-•' ri •/ -�����
2
i
-• • 13 °
~ •Si �� ai..1
c 22Mh S.I. SW (
4•-T {m11 i/� 1L 1;�.r
22Nh S1 SW
° wI! /� .. Y: '6; •:-t.°I
rn i ��F TS.-r
J.' l; r.�11 F�i,1
:""�.I gam•.-� �8$i_rPl SW.CU
3°
NW3NNNNNhWJNJL2-28TH ST
2Jo2 li A_.s-r l.•�Y•-�IIi�`�mi
_ • �,. Q .. .S c
O� +I,.•r Q•.'•1 .1 =.. y.�3.-230th S1 SW S
9L - •,ta.is± • ear l I.�.we Ai 03. - U
m1'4 23i. t l f a. ;° ; rd I♦ fyy J� e3 -�
r 1 5 Ye.- -I� �.'•:�+i 1S I"I _ ° 1 a' ]alyr
4.
Benefit This project would improve active transportation safety and traffic flows along this
corridor. Community Transit will evaluate the possibility of creating a new east -west bi
route along 228th St. SW, if this project moves forward (connecting Edmonds Transit
Station to Mountlake Terrace Transit Station).
Description Widen 228th St. SW from Hwy. 99 to 95th PI. W to three lanes (with center two-way
left turn lane), with curb and gutter, sidewalk, and bike lanes. The section of 228th St
SW between 92nd Ave W and 80th Ave W is within Snohomish County.
Estimated Project Cost $18,083,000
'includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$0
$0
$0
$1,533,000
$1,590,000
$0
$0
Right of Way
$0
$0
$0
$0
$1,060,000
$0
$0
Construction
$0
$0
$0
$0
$0
$13,900,000
$0
Expense Total
$0
$0
$0
$1,533,000
$2,650,000
$13,900,000
$0
Unsecured Funding
$0
$0
$0
$1,533,000
$2,650,000
$13,900,000
$0
Funding Source Total
$0
$0
$0
$1,533,000
$2,650,000
$13,900,000
$0
Packet Pg. 205
PWT-09
HWY 99
REVITALIZATION &
GATEWAY PROJECT -
STAGE 2
N N N
a
a a
3 3
0
�p5
�
�
o
SAP
` O
r O
3
3 a
212TH 51 SIV
U
= 0 3
� ~ N
o N >
3
220TH ST SW
3 0
r w a 3
= 228TH T SW m a 3
N
m � Q
N =
236TH ST SWp
-, 244TH ST SW
I
Benefit The conversion of the center two-way left turn lane to a landscaped raised median wil
improve corridor safety along this Highway of Regional Significance (HRS), with an
Average Daily Traffic (ADT) of — 35,000 vehicles per day. The new HAWK signal will
provide a signalized pedestrian crossing between the existing traffic signals at 238th
and 228th St.
Description In 2023, the project constructed landscaped center medians on Highway 99 from 244
St. SW to 212th St. SW, a HAWK signal — 600' north of 234th St. SW, and gateway
signs on both ends of the corridor. Plant establishment was completed in 2024. The
project close-out will be completed in 2025.
Estimated Project Cost $9,400,000
*includes prior year expenditures
Budget
Project Cost
Construction
Expense Total
State Grants
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$15,000
$0
$0
$0
$0
$0
$0
$15,000
$0
$0
$0
$0
$0
$0
$15,000
$0
$0
$0
$0
$0
$0
$15,000
$0
$0
$0
$0
$0
$0
Packet Pg. 206
PWT-10
HWY 99
REVITALIZATION
PROJECT - STAGE 3
a
P,
Mad one
Ur$ i
Fp� 238TH ST a
School 'js� _
Os Koreen
I'll, Presbyterian
Church
Mathay
Ballinger
Park
Seattle
Baptist
Church
�• '''� '' 244TH ST 1AKE BALLINGER WAY N 205TH ST
'J 204TH ST
N 205Ti, I
Benefit Improve aesthetics, safety, and user experience along this segment of the Hwy 99
corridor.
Description The Stage 3 Highway 99 project limits are from 244th St SW to -400 feet north of
238th St. SW. The project will provide new sidewalk, landscaped planter strips, stree
lighting, separated bike lanes, ADA compliant pedestrian curb ramps and utility
improvements (including undergrounding of overhead utility lines). The project will al:
widen the intersection of Highway 99 and 238th St. SW to provide a second
northbound left turn lane widen 238th St. from Highway 99 to 84th Ave.
Estimated Project Cost $27,500,000
'includes prior year expenditures
Budget
Project Cost
Design
Right of Way
Construction
Expense Total
State Grants
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$1,100,000
$799,000
$257,000
$0
$0
$0
$0
$884,000
$884,000
$2,232,000
$0
$0
$0
$0
$0
$0
$0
$10,000,000
$9,607,000
$0
$0
$1,984,000
$1,683,000
$2,489,000
$10,000,000
$9,607,000
$0
$0
$1,984,000
$1,683,000
$2,489,000
$10,000,000
$9,607,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,984,000
$1,683,000
$2,489,000
$10,000,000
$9,607,000
$0
$0
Packet Pg. 207
PWT-11
HWY 99
REVITALIZATION
PROJECT - STAGE 4
ri
3z
ir W w-stsw O F-
��. r� V.I• Ox
Esperence Q
Perk O F
wZ
Inactive z
School Site O
Esperence
Baptist
Church
Benefit Improve aesthetics, safety, and user experience. In addition, future economic
development would be improved.
Description The Stage 4 Highway 99 project limits are from 224th St SW to -800 feet north of
220th St. SW. The project will provide new sidewalk, landscaped planter strips, stree
lighting, separated bike lanes, ADA compliant pedestrian curb ramps and utility
improvements (including undergrounding of overhead utility lines). The project will al:
widen the intersection of Highway 99 and 220th St. SW to provide a second left turn
lane for the northbound, southbound, and westbound movements.
Estimated Project Cost $37,000,000
Includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$825,000
$1,000,000
$1,000,000
$475,000
$0
$0
$0
Right of Way
$0
$620,000
$4,000,000
$4,480,000
$0
$0
$0
Construction
$0
$0
$0
$0
$13,100,000
$10,000,000
$0
Expense Total
$825,000
$1,620,000
$5,000,000
$4,955,000
$13,100,000
$10,000,000
$0
Transportation Impact Fees
$0
$84,000
$2,295,500
$475,000
$0
$0
$0
Federal Grants
$338,000
$536,000
$2,646,500
$0
$0
$0
$0
State Grants
$487,000
$1,000,000
$58,000
$0
$0
$0
$0
Unsecured Funding
$0
$0
$0
$4,480,000
$13,100,000
$10,000,000
$0
Funding Source Total
$825,000
$1,620,000
$5,000,000
$4,955,000
$13,100,000
$10,000,000
$0
Packet Pg. 208
PWT-12
- _ Edmonds Public Works
HWY 99
REVITALIZATION
PROJECT - STAGE 5
t
� r �
' t zr.�in Fi sW .a+c
_ ~ ;
'am mpg
2,51h St SW _
Swedish
Edmonds
Benefit Improve aesthetics, safety, and user experience. In addition, future economic
development will be improved along the corridor.
Description Along Hwy 99 from 216th St SW to 212th St. SW, the project will add a planter strip c
both sides of the street, new street lighting, better stormwater management, targeted
utility replacements, potential undergrounding of overhead utilities, landscaping and
other softscape treatments to identify the area as being in Edmonds.
Estimated Project Cost $49,700,000
'includes prior year expenditures
Budget
Project Cost
Design
Right of Way
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$530,000
$1,060,000
$1,590,000
$1,689,000
$0
$0
$0
$0
$0
$500,000
$4,188,000
$0
$0
$0
$0
$0
$0
$40,416,000
$0
$0
$0
$530,000
$1,060,000
$2,090,000
$46,293,000
$0
$0
$0
$530,000
$1,060,000
$2,090,000
$46,293,000
$0
$0
$0
$530,000
$1,060,000
$2,090,000
$46,293,000
Packet Pg. 209 1
PWT-13 .!I .�. I I � , �i,. _. " 11:5rtnAM<t
HWY 99
M 1'i
REVITALIZATION Christ
� 32- � Lutheren
3 Perk end Church
PROJECT - STAGE 6 a Ride
m
.'38TH ST SW I
Benefit Improve aesthetics, safety, and user experience. In addition, future economic
development would be improved along the corridor.
Description Along Hwy 99 from 238th St. SW to 234th St. SW, the project will add a planter strip
both sides of the street, new street lighting, better stormwater management, targeted
utility replacements, potential undergrounding of overhead utilities, landscaping and
other softscape treatments to identify the area as being in Edmonds.
Estimated Project Cost $22,500,000
'includes prior year expenditures
Budget
Project Cost
Design, ROW, and
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$0
$0
$0
$22,500,000
$0
$0
$0
$0
$0
$0
$22,500,000
$0
$0
$0
$0
$0
$0
$22,500,000
$0
$0
$0
$0
$0
$0
$22,500,000
Packet Pg. 210
PWT-14
HWY 99
REVITALIZATION
PROJECT - STAGE 7
tort KANILt
PUD
Water Tenka
.'28 TH Sr Shy
SubStation
x
, LDS
229t41..hSt
� � Church%i
)
�
W cc
Ethiopian r.w►�. ;�.
- '
Lr
Orthodox Saint 2301A S, SW
a 1ri
y
Michael Church _3i. 1a'1¢`�4
-_ 2
_ a] 7n1 m I tee•
_ ac
> mr �mr i
. 1741`rT►�.,�-♦ -]♦ •-'�I
O Nile Country
.j`�r��ya V•�I I-i �! ~ .0
Club Golf
..�.� .:•� —� a :•
Co.—
�:-t
wee ��•e
,-
SW
Benefit Improve aesthetics, safety, and user experience. In addition, future economic
development would be improved along the corridor.
Description Along Hwy 99 from 234th St. SW to 228th St. SW, the project will add a planter strip 1
both sides of the street, new street lighting, better stormwater management, targeted
utility replacements, potential undergrounding of overhead utilities, landscaping and
other softscape treatments to identify the area as being in Edmonds.
Estimated Project Cost $42,900,000
'includes prior year expenditures
Budget
Project Cost
Design, ROW, and
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$0
$0
$0
$42,900,000
$0
$0
$0
$0
$0
$0
$42,900,000
$0
$0
$0
$0
$0
$0
$42,900,000
$0
$0
$0
$0
$0
$0
$42,900,000
Packet Pg. 211 1
PWT-15
HWY 99
REVITALIZATION
PROJECT - STAGE 8
Unitarian Esperance Inactive
;3,-2SeiMsnS:
Church Park School SiteWe
+� Esperance
~�
.8 � • Baptist
- Ir I
S 1 r church
i�
2251n w SW a
I • . , 3 . ' 225th M SW
tty
'e r .- ttt- a' ~,
lt� tlttttttt�.
?26th St SW 5
YPI*^t3LMrFii
x
^y ti L
• r?I 5'Church ■.
r
EDMONDS w
MOUNTLAKE Z
o PUD Sub 226 TH PL S
Station
Nile Country
228TH ST SW Club Golf I
Cour—
Benefit Improve aesthetics, safety, and user experience. In addition, future economic
development would be improved along the corridor.
Description Along Hwy 99 from 228th St. SW to 224th St. SW, the project will add a planter strip I
both sides of the street, new street lighting, better stormwater management, targeted
utility replacements, potential undergrounding of overhead utilities, landscaping and
other softscape treatments to identify the area as being in Edmonds.
Estimated Project Cost $37,500,000
'includes prior year expenditures
Budget
Project Cost
Design, ROW, and
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$0
$0
$0
$37,500,000
$0
$0
$0
$0
$0
$0
$37,500,000
$0
$0
$0
$0
$0
$0
$37,500,000
$0
$0
$0
$0
$0
$0
$37,500,000
Packet Pg. 212
PWT-16
HWY 99
REVITALIZATION
PROJECT - STAGE 9
Swedish
Edmonds
I
Bth St sW-
216th St SW
-
J�
�O
Benefit Improve aesthetics, safety, and user experience. In addition, future economic
development would be improved along the corridor. c
Description Along Hwy 99 from approximately 500 feet north of 220th St. SW to 216th St. SW, thi
project will add a planter strip on both sides of the street, new street lighting, better
stormwater management, targeted utility replacements, potential undergrounding of
overhead utilities, landscaping and other softscape treatments to identify the area as
being in Edmonds.
Estimated Project Cost $22,500,000
'includes prior year expenditures
Budget
Project Cost
Design, ROW, and
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$0
$0
$0
$22,500,000
$0
$0
$0
$0
$0
$0
$22,500,000
$0
$0
$0
$0
$0
$0
$22,500,000
$0
$0
$0
$0
$0
$0
$22,500,000
Packet Pg. 213
PWT-17
196TH ST SW / 88TH
AVE W -
INTERSECTION
IMPROVEMENTS
a t94n N Sw Ins-
r
Y* Seventh Day t T 4 yy 4. Fire
Adventist Station 16
V � � ,o
Church Meplew
Presbytt
196TH ST SW Chur,
PUD Sub •
AC Station �
Q
�R =
Maplewood �
Hill Perk co
W
I
Benefit Improve traffic flow characteristics and safety at the intersection. The improvement
would modify LOS to A, but increase the delay along 196th St. SW.
Description
Install traffic signal at the intersection of 196th St. SW @ 88th Ave. W. The modeling
the 2009 Transportation Plan indicated that restricting northbound and southbound
traffic to right -turn -only (prohibiting left -turn and through movements) would also
address the deficiency identified at this location through 2025. This is same alternativ
as one concluded by consultant in 2007 study but not recommended by City Council.
This could be implemented as an alternate solution, or as an interim solution until
traffic signal warrants are met. The existing LOS is F (below City Standards: LOS D).
This project was ranked #6 in the Roadway Project Priority in the 2015 Transportatior
Plan.
Estimated Project Cost
$1,366,000
"includes prior year expenditures
Budget
Project Cost
2025 2026 2027 2028 2029 2030 2031-45
Design
$0 $0 $0 $279,000 $0 $0 $0
Right of Way
$0 $0 $0 $0 $252,000 $0 $0
Construction
$0 $0 $0 $0 $0 $835,000 $0
Expense Total
$0 $0 $0 $279,000 $252,000 $835,000 $0
Unsecured Funding
$0 $0 $0 $279,000 $252,000 $835,000 $0
Funding Source Total
$0 $0 $0 $279,000 $252,000 $835,000 $0
Packet Pg. 214
Civic '1n ttummrngbnd Ldrnonds
PWT-18 Playfieldt ; Z Perk
UJ
MAIN ST @ 9TH AVE z Ali #'o~ _
a Bell St ¢ Q c
INTERSECTION rT
Sno-Isle MAIN ST
IMPROVEMENTS Library Anderson •
Frances
Anderson Center to
Center Field W Yost Park
2
H
I
Benefit The existing intersection is stop -controlled for all approaches and the projected '
intersection LOS in 2035 is LOS F (below the City's concurrency standards: LOS D). c
The installation of a traffic signal would improve the intersection delay to LOS B.
Description Installation of a traffic signal or mini -roundabout. The project ranked #4 in the
Roadway Project Priority of the 2015 Transportation Plan. The preliminary cost
estimate for a new traffic signal is $1,290,000. A conceptual cost estimate for a mini -
roundabout is $500,000.
Estimated Project Cost $1,367,000
*includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$210,000
$0
$0
$0
$0
$0
$0
$0
$1,157,000
$0
$0
$0
$0
$0
$210,000
$1,157,000
$0
$0
$0
$0
$0
$210,000
$1,157,000
$0
$0
$0
$0
$0
$210,000
$1,157,000
$0
$0
Packet Pg. 215
PWT-19
MW
76TH AVE W @ 220TH
ST SW -
INTERSECTION
IMPROVEMENTS
_ 220TH ST SW
Benefit Reduce the intersection delay and improve the LOS. The projected LOS in 2050 woul
be improved from LOS F to LOS D. Improve active transportation conditions for
pedestrians and bicycle riders.
a
1t _ P
V'RV N 'a I � Jra �
ML, • •' L .' $' •
i i ♦ � ■ a
L to
■ yy
L ms ~ I'. CCDCDAAIrC
Description Reconfigure eastbound lanes to a left turn lane and through/ right turn lane. Add
eastbound and westbound dedicated left turn lanes with a protected -permitted phase.
Provide right turn overlap for westbound movement during southbound left turn phasE
Additional improvements include wider sidewalk, bike lanes, street lighting, and variot
utility improvements (including conversion overhead utility lines to underground).
ROADWAY PROJECT PRIORITY #1 in 2015 Transportation Plan .
Estimated Project Cost $11,000,000
*includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$198,000
$253,500
$100,000
$0
$0
$0
$0
Right of Way
$0
$1,235,000
$2,000,000
$0
$0
$0
$0
Construction
$0
$0
$0
$3,370,000
$3,300,000
$0
$0
Expense Total
$198,000
$1,488,500
$2,100,000
$3,370,000
$3,300,000
$0
$0
Transportation Impact Fees
$24,000
$198,500
$283,500
$0
$0
$0
$0
Fund 421 - Water Utility
$12,000
$12,000
$0
$0
$0
$0
$0
Fund 422 - Stormwater Utility
$6,000
$6,500
$0
$0
$0
$0
$0
Federal Grants
$156,000
$1,271,500
$1,816,500
$0
$0
$0
$0
Unsecured Funding
$0
$0
$0
$3,370,000
$3,300,000
$0
$0
Funding Source Total
$198,000
$1,488,500
$2,100,000
$3,370,000
$3,300,000
$0
$0
Packet Pg. 216
PWT-20
SR-104 ADAPTIVE
SYSTEM - 236TH TO
226TH
rtlgpq,r.n A
;T SW
Benefit Improve traffic flows along this regional corridor with a current Average Daily Traffic
(ADT) of 25,000 vehicles per day.
Description The project will add a traffic signal adaptive system on a 1.25-mile segment of SR104
from 236th St to 226th St. The system will monitor and synchronize the timing of fivE !
existing signalized intersections (SR104 @ 236th St, SR104 @ 232nd St, SR104 @
95th PI, SR104 @ 100th Ave, SR104 @ 226th St) and improve traffic flows along i
SR104.
Estimated Project Cost $4,000,000
'includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Fund 112 - Street (Gas Tax &
Multi -Modal)
Fund 125 - REET
Fund 126 - REET
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$67,740
$0
$0
$0
$0
$0
$0
$0
$0
$0
$3,515,000
$0
$0
$0
$67,740
$0
$0
$3,515,000
$0
$0
$0
$58,595
$0
$0
$0
$0
$0
$0
$9,145
$0
$0
$0
$0
$0
$0
$0
$0
$0
$475,000
$0
$0
$0
$0
$0
$0
$3,040,000
$0
$0
$0
$67,740
$0
$0
$3,515,000
$0
$0
$0
Packet Pg. 217
PWT-21
SR-104 @ 100TH AVE W
INTERSECTION Sherwood
E lementnry
IMPROVEMENTS
PUD Su
• EDMONDS WAY
stetlo'
w
Q
2
F—
o
O
P\.,
:'31st I
Benefit Improve access and safety at the intersection and improve active transportation safet,
Description Implement Westgate Circulation Access Plan, install mid -block pedestrian crossing
along 100th Ave. W, improve safety to access the driveways within proximity to the
intersection, and re -striping of 100th Ave. W with the potential addition of bike lanes
This project was identified in the SR-104 Completed Streets Corridor Analysis
(completed in 2015).
Estimated Project Cost $4,200,000
'includes prior year expenditures
Budget
Project Cost
Design
Right of Way
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$200,000
$250,000
$0
$0
$0
$0
$0
$0
$1,100,000
$0
$0
$0
$0
$0
$0
$0
$2,650,000
$0
$0
$0
$0
$200,000
$1,350,000
$2,650,000
$0
$0
$0
$0
$200,000
$1,350,000
$2,650,000
$0
$0
$0
$0
$200,000
$1,350,000
$2,650,000
$0
Packet Pg. 218 1
PWT-22
�
°227th PI �,. _ a Q a * ,O
SR-104 @ 95TH PL W
INTERSECTION - -'
228th St S'r:
-. 228TH ST SW
IMPROVEMENTS ■WEIJ
`py Westgate a - --
C7 Chapel c
_^ �� 10
PUD Sub
Station
Benefit Improve intersection safety for pedestrians and vehicles.
Description Upgrade all ADA Curb Ramps; and add C-Curb for access management. This project
was identified in the SR-104 Complete Streets Corridor Analysis (completed in 2015).
Estimated Project Cost $287,000
'includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$45,000
$0
$0
$0
$0
$0
$0
$0
$242,000
$0
$0
$0
$0
$0
$45,000
$242,000
$0
$0
$0
$0
$0
$45,000
$242,000
$0
$0
$0
$0
$0
$45,000
$242,000
$0
$0
Packet Pg. 219 1
PWT-23
a
SR-104 @a 238TH ST SW
INTERSECTION
Mad
IMPROVEMENTS Schooll o238TH ST SW
sch
O,y
OS,
�L'9V
Korean
Presbyterian I
Church
Benefit Improve vehicular and pedestrian safety.
Description Install traffic signal. This project was identified in the SR-104 Complete Street Corridl
Analysis (completed in 2015).
Estimated Project Cost $1,611,000
'includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$241,000
$0
$0
$0
$0
$0
$0
$0
$1,370,000
$0
$0
$0
$0
$0
$241,000
$1,370,000
$0
$0
$0
$0
$0
$241,000
$1,370,000
$0
$0
$0
$0
$0
$241,000
$1,370,000
$0
$0
Packet Pg. 220 1
PWT-24
Pd9e
OLYMPIC VIEW
1 dlth
DR @ W
l�•
■
��
-� i '
,,
Q
Post
�
1aacngsw
F
76TH AVE W
=
Office
r
INTERSECTION
Seaview Park
otYM # `�
PAC VIEW
y
�
IMPROVEMENTS
DR
00
o�
2Z
Z
ll.l J
P.—
Benefit
The improvement will reduce the intersection delay. The
projected Level of Service is
LOS F in 2035, which is below the City's concurrency
standards (LOS D).
The project
will improve the Level of Service to LOS B.
Description Install traffic signal (the intersection currently stop controlled for all movements)
(ROADWAY ROJECT PRIORITY in 2015 Transportation Plan: #11).
Estimated Project Cost $1,428,000
'includes prior year expenditures
Budget
Project Cost
Design
Right of Way
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$0
$0
$0
$244,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,184,000
$0
$0
$0
$0
$0
$0
$1,428,000
$0
$0
$0
$0
$0
$0
$1,428,000
$0
$0
$0
$0
$0
$0
$1,428,000
Packet Pg. 221
PWT-25
� Q
a v, N Q 212TNSlSW 3
84TH AVE W (212TH ST ¢ ` Bo�oo1"�P ' "3
N P ~ N
22°TH ST SW
SW TO 238TH ST SW)
3 3 3
c� a' a 3
a
N o I
228TH ST SW 3 228TH ST3�
D =
as F4
n �
A
236TH ST:
I
Benefit Improve traffic flow, access and active transportation uses by installing a center two
way left turn lane, sidewalks, bike lanes and street lighting.
Description Widen 84th Ave. W to (3) lanes with curb, gutter, bike lanes, and sidewalk on each
side of the street. (part of this project was ranked #6 in the Long Walkway list of the !
2015 Transportation Plan).
Estimated Project Cost $18,672,000
'includes prior year expenditures
Budget
Project Cost
Design
Right of Way
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$0
$0
$0
$2,380,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$16,292,000
$0
$0
$0
$0
$0
$0
$18,672,000
$0
$0
$0
$0
$0
$0
$18,672,000
$0
$0
$0
$0
$0
$0
$18,672,000
Packet Pg. 222 1
PWT-26
Seattle Lake
SR-104 a@ 76TH AVE W Baptist > Ballinger
FO Church Q
INTERSECTION
IMPROVEMENTS N205TH ST N2DSTH ��'" •
`r sT LAKE BALLINGER WAY
,2 W
N 204TH Plv ?fib TH Pt
4 Q
Q
(O Z
2 p
Q:
rry.iO3RDR. 3 g Op.N��N�Q7ryn.y
Benefit Improve access, safety and delay at the intersection.
Description Add a second westbound left turn lane along SR-104. This project was identified in tl
SR-104 Complete Street Corridor Analysis (completed in 2015).
Estimated Project Cost $3,630,000
'includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$0
$0
$0
$541,000
$0
$0
$0
$0
$0
$0
$3,089,000
$0
$0
$0
$0
$0
$0
$3,630,000
$0
$0
$0
$0
$0
$0
$3,630,000
$0
$0
$0
$0
$0
$0
$3,630,000
Packet Pg. 223
PWT-27
OLYMPIC VIEW DR @
174TH ST SW
INTERSECTION
IMPROVEMENTS
172nd PI `'� 'W 172nd St St.,
MF, • V % O` 172nd St Sw
9 as >>3 0
Olympic o� rd St SW 173rd 5! C.
Q View Open aaa
'14F B�Cl/�O space 1'3rd PI SW
=o
Warn St sw 3 �
0
s
a Q
v � +
3
176th St S4'J
St. Thomas
Moore School
Benefit Improve intersection efficiency and safety of drivers accessing either street.
Description Widen Olympic View Dr. to add a northbound left turn lane for 50' storage length. Shi
the northbound lanes to the east to provide an acceleration lane for eastbound left
turns. Install traffic signal to increase the LOS and reduce intersection delay.
(ROADWAY PROJECT PRIORITY in 2015 Transportation Plan: #13)
Estimated Project Cost $758,000
'includes prior year expenditures
Budget
Project Cost
Design
Right of Way
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$0
$0
$0
$127,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$631,000
$0
$0
$0
$0
$0
$0
$758,000
$0
$0
$0
$0
$0
$0
$758,000
$0
$0
$0
$0
$0
$0
$758,000
Packet Pg. 224
PWT-28
175TH ST SW SLOPE
REPAIR
Snohomish
County Perk
Benefit Repair roadway and stabilize slope embankment.
Description The project will stabilize the roadway subgrade and embankment and rebuild the
damaged pavement on 175th St. SW.
Estimated Project Cost $1,060,000
'includes prior year expenditures
Budget
Project Cost
Design
Right of Way
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$0
$0
$0
$0 !
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,060,000
$0
$0
$0
$0
$0
$0
$1,060,000
$0
$0
$0
$0
$0
$0
$1,060,000
$0
$0
$0
$0
$0
$0
$1,060,000
$0
$0
$0
Packet Pg. 225
PWT-59
TRAFFIC SIGNAL
PROGRAM
Benefit Improve reliability of traffic signal operation.
Description This program started in 2019 and will provide new signal upgrades, such as vehicle
detection at intersections, new vehicle/pedestrian head equipment and other signal -
related upgrades. These improvements will improve the safety of the City's
transportation system.
Estimated Project Cost $30,280
'includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Fund 126 - REET
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$1,000
$1,000
$0
$0
$0
$0
$0
$29,280
$29,280
$0
$0
$0
$0
$0
$30,280
$30,280
$0
$0
$0
$0
$0
$30,280
$30,280
$0
$0
$0
$0
$0
$30,280
$30,280
$0
$0
$0
$0
$0
Packet Pg. 226
PWT-70
SAFETY ACTION PLAN
Benefit
[-I
pr)R
Complete this document so safety projects for all modes of transportation can be
completed (by securing future grants).
Description A comprehensive safety plan aimed at reducing and eliminating serious -injury and fat
crashes affecting all roadway users. In order to qualify for future Infrastructure
Implementation Grant or Planning / Demonstration Grant (through Safe Streets for Al
SS4A, the project needs to be identified in this plan. i
Estimated Project Cost $375,000
'includes prior year expenditures
Budget
Project Cost
Design
Expense Total
Federal Grants
Fund 112 - Street (Gas Tax &
Multi -Modal)
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$375,000
$0
$0
$0
$0
$0
$0
$375,000
$0
$0
$0
$0
$0
$0
$300,000
$0
$0
$0
$0
$0
$0
$75,000
$0
$0
$0
$0
$0
$0
$375,000
$0
$0
$0
$0
$0
$0
Packet Pg. 227 1
NON -MOTORIZED TRANSPORTATIO
44,
oil
oil
.x 1 ,
1 _
4 J
0
2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS
PWT_29 EDh10NDS WAY
I PUD Sub Westgate
Station
232ND ST SW
WALKWAY FROM
100TH AVE TO SR-104
3 Salem
Edmonds > Lutheran
Heights < Church
x
K-'12 0
Scriber
Lake High
School
Benefit This project would improve pedestrian safety.
Description Install sidewalk along 232nd St. SW from 100th Ave. W to SR-104. This project rankE
#3 in the Long Walkway List of 2015 Transportation Plan.
Estimated Project Cost $1,856,000
*includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$0
$284,000
$0
$0
$0
$0
$0
$0
$0
$1,572,000
$0
$0
$0
$0
$0
$284,000
$1,572,000
$0
$0
$0
$0
$0
$284,000
$1,572,000
$0
$0
$0
$0
$0
$284,000
$1,572,000
$0
Packet Pg. 229
PWT-30
236TH ST SW
WALKWAY FROM -
MADRONA ELEM TO -
97TH AVE W
Elementary
maarona I
Benefit
This project would improve pedestrian safety.
Description Install sidewalk with curb and gutter along 236nd St. SW from Madrona Elementary tc
97th Ave. W. This project ranked #4 in Long Walkway list of the 2015 Transportation
Plan. L
Estimated Project Cost $2,107,000
`includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$313,000
$0
$0
$0
$0
$0
$0
$0
$1,794,000
$0
$0
$0
$0
$0
$313,000
$1,794,000
$0
$0
$0
$0
$0
$313,000
$1,794,000
$0
$0
$0
$0
$0
$313,000
$1,794,000
$0
$0
Packet Pg. 230
PWT-31
236TH ST SW
WALKWAY FROM HWY
Benefit
Description
�
3
a
a
>
a
sCU
0
I
This project would improve pedestrian safety.
Install sidewalk along 236th St. SW from Hwy 99 to 76th Ave. W. This project rankec
#10 in Long Walkway List of the 2015 Transportation Plan.
Estimated Project Cost $2,054,000
'includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$0
$0
$0
$0
$0
$0
$293,000
Right of Way
$0
$0
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
$0
$1,761,000
Expense Total
$0
$0
$0
$0
$0
$0
$2,054,000
Unsecured Funding
$0
$0
$0
$0
$0
$0
$2,054,000
Funding Source Total
$0
$0
$0
$0
$0
$0
$2,054,000
Packet Pg. 231 1
PWT-32
84TH AVE W
WALKWAY FROM Lutheer`hr
an
- Perk and Church
238TH ST SW TO Ride
m
0
234TH ST SW N
$ 3
9L
a
x
238TH ST SW
Benefit This project would improve pedestrian safety.
Description The walkway project proposed approximately 1,000 LF of new sidewalk on the east
side of 84th Ave W with ADA compliant pedestrian curb ramps.
Estimated Project Cost $3,325,000
'includes prior year expenditures
Budget
Project Cost
Design
ROW
Construction
Expense Total
Fund 126 - REET
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$100,000
$0
$0
$296,000
$0
$0
$0
$0
$0
$0
$329,000
$0
$0
$0
$0
$0
$0
$0
$2,550,000
$0
$0
$100,000
$0
$0
$625,000
$2,550,000
$0
$0
$100,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$625,000
$2,550,000
$0
$0
$100,000
$0
$0
$625,000
$2,550,000
$0
$0
Packet Pg. 232
PWT-33
80TH AVE W
WALKWAY FROM
212TH ST SW TO
206TH ST SW
Benefit
Description
Elementary
College
Pine Ridge Place
Park Middle
MAIN ST LYNNWOODz08TH ST SW
EDMONDS
Edmc
Pub
Edmonds I
Water Tank Jeremiah Woodway 212TH ST SW
Center High School
The improvements will improve active transportation safety (including for school kids '
due to proximity of several schools). c
Install sidewalk along 80th Ave. W from 206th St. SW to 212th St. SW with curb and
gutter. This project ranked #1 in Long Walkway List of the 2015 Transportation Plan
Estimated Project Cost $1,677,000
*includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$117,000
$127,000
$0
$0
$0
$0
$0
$0
$0
$1,433,000
$0
$0
$0
$0
$117,000
$127,000
$1,433,000
$0
$0
$0
$0
$117,000
$127,000
$1,433,000
$0
$0
$0
$0
$117,000
$127,000
$1,433,000
$0
Packet Pg. 233 1
PWT-34
80TH AVE W
WALKWAY FROM
188TH ST SW TO
OLYMPIC VIEW DR
MON�yO 3
LYNNWOOD
o
181In P1 SW I
1881h PI w
Benefit This project would improve pedestrian safety.
Description Install sidewalk along 80th Ave. W from 188th St. SW to OVD. This project ranked #1
in Long Walkway List of the 2015 Transportation Plan.
Estimated Project Cost $2,473,000
'includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$511,000
$0
$0
$0
$0
$0
$0
$0
$1,962,000
$0
$0
$0
$0
$0
$511,000
$1,962,000
$0
$0
$0
$0
$0
$511,000
$1,962,000
$0
$0
$0
$0
$0
$511,000
$1,962,000
$0
$0
Packet Pg. 234 1
PWT-35
218TH ST SW
WALKWAY FROM 76TH
AVE W TO 84TH AVE W
Chase Lake Elementary tamonas vwooaway nign Swedish
3 - School Edmo
u, 3
> Chase Lake
Q School W
_ Q
00
Edmonds
ESPERANCE Church of God 220TH ST SW
Benefit The improvements will improve pedestrian safety.
Description Install sidewalk along 218th St. SW from 76th Ave. W to 84th Ave. W with curb and
gutter. This project ranked #2 in Long Walkway List of the 2015 Transportation Plan
Estimated Project Cost $1,843,000
'includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$280,000
$0
$0
$0
$0
$0
$0
$0
$1,563,000
$0
$0
$0
$0
$0
$280,000
$1,563,000
$0
$0
$0
$0
$0
$280,000
$1,563,000
$0
$0
$0
$0
$0
$280,000
$1,563,000
$0
$0
Packet Pg. 235
PWT-36
WALNUT ST WALKWAY
FROM 6TH AVE S TO
w
7TH AVE S
Benefit This project will improve pedestrian safety along this stretch.
Maple St N
a
Cedar St
s
f
Description Install sidewalk on the south side of Walnut St. from 6th Ave. S to 7th Ave. S. This
project is ranked #9 in the Short Walkway List (from 2015 Transportation Plan).
Estimated Project Cost $308,000
"includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$53,000
$0
$0
$0
$0
$0
$0
$255,000
$0
$0
$0
$0
$0
$0
$308,000
$0
$0
$0
$0
$0
$0
$308,000
$0
$0
$0 i
$0
$0
$0
$308,000
$0
$0
$0
Packet Pg. 236
PWT-37 21 sch sc sw ,
216TH ST SW
� Q r
WALKWAY FROM HWY o?�o
Swedish Q�2
99 TO 72ND AVE W Edmonds ;, .,i, �vr �,ce 216th St sw
a�
Benefit To provide a safe and desirable walking route.
Description Install 150' sidewalk on north side of 216th St. SW from Hwy. 99 to 72nd Ave. W -
(completing a missing link on north side of 216th St. SW). This project is ranked #3 in
the Short Walkway List (from 2015 Transportation Plan).
Estimated Project Cost $233,000
`includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$35,000
$0
$0
$0
$0
$0
$0
$198,000
$0
$0
$0
$0
$0
$0
$233,000
$0
$0
$0
$0
$0
$0
$233,000
$0
$0
$0
$0
$0
$0
$233,000
$0
$0
$0
Packet Pg. 237
PWT-39
CITYWIDE BICYCLE
IMPROVEMENTS
PROJECT
Benefit This project will create new bike connections to various destination points throughout
the City (such as schools, parks, Downtown, Sound Transit Station). Sound Transit
awarded the grant to fund improvements that will provide more convenient access so
that more people can use Sound Transit services.
Description The project added bike lanes or sharrows on the following streets:
• 100th Ave/9th Ave from 244th St to Walnut St
• Walnut/Bowdoin Way from 9th Ave to 84th Ave
• 228th St. from 76th Ave to 80th Ave
• Bike sharrows on 80th Ave from 228th St. to 220th St.
Pedestrian crossing improvements including curb ramps, rectangular rapid flashing
beacons (RRFB) and signing were installed at 100th Ave & 224th St, 9th Ave & Pine
St, Bowdoin Way& 96th Ave and Bowdoin Way & Pioneer Way. The construction wa:
completed in 2024 and project close-out is scheduled for 2025.
Estimated Project Cost $2,800,000
Includes prior year expenditures
Budget
Project Cost
Construction
Expense Total
Fund 125 - REET
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$10,000
$0
$0
$0
$0
$0
$0
$10,000
$0
$0
$0
$0
$0
$0
$10,000
$0
$0
$0
$0
$0
$0
$10,000
$0
$0
$0
$0
$0
$0
Packet Pg. 238
PWT-40
MAPLEWOOD DR
WALKWAY FROM MAIN
ST TO 200TH ST SW
a
-
U
a
a
Benefit Create pedestrian connection between Maplewood Elementary School on 200th St. S
and Main St., by encouraging kids to use non -motorized transportation to walk to / froi
school.
Description Construct sidewalk on Maplewood Dr. from Main St. to 200th St. SW (- 2,700'). A
sidewalk currently exists on 200th St. SW from Main St. to 76th Ave. W, adjacent to
Maplewood Elementary School (rated #18 in the Long Walkway list of the 2015
Transportation Plan).
Estimated Project Cost $3,128,000
'includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$233,000
$233,000
$0
$0
$0
$0
$0
$0
$0
$2,662,000
$0
$0
$0
$0
$233,000
$233,000
$2,662,000
$0
$0
$0
$0
$233,000
$233,000
$2,662,000
$0
$0
$0
$0
$233,000
$233,000
$2,662,000
$0
Packet Pg. 239
PWT-41
'H ST SW
95TH PL W WALKWAY
o�
p" F
U
FROM 224TH ST
SW TO Westgate
Elementary '�
�a 'r 's $c i
v
j W W 111s�5 ''+ ^ ,
3
a
L
220TH ST SW
G
4r L 3'`
a ` ♦ �.
fv .
d
L ►0,
I -Ill J
3
>
O
�r r►
a -mot �•.wn
nan ssw
WINN • ..IA r� .�
Q=
C
1 I
Benefit
This project would improve pedestrian safety.
U
Description
Install sidewalk along 95th PI. W from 224th St. SW to 220th St. SW with curb and
gutter. This project ranked #8 in the Long Walkway List of the 2015 Transportation
Plan.
U_
Estimated Project Cost $914,000
`includes prior year expenditures
lb -
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$0
$0
$0
$139,000
$0
$0
$0
Construction
$0
$0
$0
$0
$775,000
$0
$0
Expense Total
$0
$0
$0
$139,000
$775,000
$0
$0
Unsecured Funding
$0
$0
$0
$139,000
$775,000
$0
$0
Funding Source Total
$0
$0
$0
$139,000
$775,000
$0
$0
I"
Packet Pg. 240
PWT-43
Senttle 3
Baptlst w Lake
N- FoMoy Church = saving..
SR-104 & 76TH NO
MOTORIZED
TRANSPORTATION N 205TH ST N 205TH ST LAKE BALLINGER WAY
IMPROVEMENTS N20dTH PL y?04fH Pl w
a
Z
a a
0 0
F.Nf_rh•u7Np.
`fy,V Ae\
Benefit Improve active transportation safety along this section of the Interurban Trail and
across SR-104.
Description Extend bike lanes within proximity of the intersection in northbound and southbound
directions. Install APS on all corners and new ADA curb ramps.
Estimated Project Cost $1,666,000
"includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$277,000
$0
$0
$0
$0
$0
$0
$0
$1,389,000
$0
$0
$0
$0
$0
$277,000
$1,389,000
$0
$0
$0
$0
$0
$277,000
$1,389,000
$0
$0
$0
$0
$0
$277,000
$1,389,000
$0
$0
Packet Pg. 241
PWT-45
SR-104 WALKWAY
HAWK TO PINE/PINE
FROM SR-104 TO 9TH
Marsh
Ed,
City Park
C
Benefit This project will improve pedestrian connectivity between the residential areas along i
3rd Ave. S to Downtown Edmonds and City Park.
s
s
Description Installation of sidewalk with ADA curb ramps along SR-104 from the HAWK signal to
Pine St and along Pine St from SR-104 to 9th Ave S
Estimated Project Cost $3,473,000 °
s
*includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$0
$0
$579,000
$0
$0
$0
$0
$0
$0
$2,894,000
$0
$0
$0
$0
$0
$0
$3,473,000
$0 F
$0
$0
$0
$0
$0
$3,473,000
$0 �
°
$0
$0
$0
$0
$0
$3,473,000
$0 C
Packet Pg. 242
PWT-46
191 ST ST SW FROM
80TH AVE W TO 76TH
AVE W
190th St SW Lynndale Park
1is . 5
■• I <y
i ALI( • i �Jti� L nnc
f Sierra Park ,. 1b O O '1- y
3 'iisOO /9's( 3r �lemer S
t
I
t
3
w
> t
Q
2 t
� a
� It`
Benefit This project would improve pedestrian safety.
Description Install sidewalk along 191th St. SW from 80th Ave. W to 76th Ave., with curb and
gutter. This project ranked #8 in Long Walkway List of the 2015 Transportation Plan
Estimated Project Cost $762,000
'includes prior year expenditures
Budget
Project Cost
Design, ROW, and
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$0
$0
$0
$762,000
$0
$0
$0
$0
$0
$0
$762,000
$0
$0
$0
$0
$0
$0
$762,000
$0
$0
$0
$0
$0
$0
$762,000
Packet Pg. 243
PWT-47
104T H AVE W /
ROBINHOOD LN FROM
238TH ST TO 106TH
AVE W
£
Salem
5
Edmonds
Lutheran
Heights
Church
Wach�isett Rrl
K-12
C
y �
Scriber Lake
l
t
Z
High School
s
00
i
O�
3
G
3�
Q
i361h P, SW
Hickman
ti
o
=
S
S
Perk
3
8
Edmonds
Faith
s
Memorial
Community
{
Cemetery
Church
Benefit This project would improve pedestrian safety. .611
Description Install sidewalk along 104th Ave. W from 238th ST. SW to 106th Ave. W, with curb al s
gutter. This project ranked #10 in the Long Walkway List of the 2015 Transportation `
Plan. u
c
s
Estimated Project Cost $1,192,000
0
'includes prior year expenditures t
Budget
Project Cost
Design, ROW, and
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45 1
$0
$0
$0
$0
$0
$0
$1,192,000
$0
$0
$0
$0
$0
$0
$1,192,000 ;
$0
$0
$0
$0
$0
$0
$1,192,000 i
$0
$0
$0
$0
$0
$0
$1,192,000
Packet Pg. 244
PWT-48
80TH AVE W FROM
218TH ST SW TO
220TH ST SW
3 Chase Lake .. � .
School W > 0 M
w ra �'• ��•c
d � i
� i
Q y •r l* MGM .. , •• _ •iA
= 218th St SW 3 3
00 ° a �•. a
I
220TH ST SW AM
` + 3
ss Edmonds ■ � na1' 4b > � CIA i ■ S 7 Lo Jr
7. Church .r=. ■ • �' ' '
of God ESPERANCE I Benefit This project would improve pedestrian safety.
Description Install sidewalk along 80th Ave. W from 218th ST. SW to 220th ST. SW, with curb an !
gutter. This project ranked #7 in the Short Walkway List of the 2015 Transportation
Plan.
Estimated Project Cost $365,000
'includes prior year expenditures
Budget
Project Cost
Design, ROW, and
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$0
$0
$0
$365,000
$0
$0
$0
$0
$0
$0
$365,000
$0
$0
$0
$0
$0
$0
$365,000
$0
$0
$0
$0
$0
$0
$365,000
Packet Pg. 245 1
PWT-49 3 185th PI SW it ` ' ' ` Seaview
LLJ Park
84TH AVE W FROM St SW
188TH ST SW TO 187th PI SW PAP
186TH ST SW 4 IL4 3 187th St SW 3
r z , S a, ri`
i N Ig � �� q,* <�
3th St sW 3
7 API w� �,•
Seaview a I
Elementary _
Benefit This project would improve pedestrian safety.
Description Install sidewalk along 84th Ave. W from 188th St. SW to 186th St. SW., with curb anc !
gutter. This project ranked #5 in Short Walkway List of the 2015 Transportation Plan
Estimated Project Cost $369,000
'includes prior year expenditures
Budget
Project Cost
Design, ROW, and
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$0
$0
$0
$369,000
$0
$0
$0
$0
$0
$0
$369,000
$0
$0
$0
$0
$0
$0
$369,000
$0
$0
$0
$0
$0
$0
$369,000
Packet Pg. 246 1
PWT-50
h
238TH ST SW FROMT7: - t
HWY 99 TO 76TH AVE
W >
.� .•
r■� to �
000
;gnrh SI SWMethey
Bellinger I
Perk
Benefit This project would improve pedestrian safety.
Description Install sidewalk along 238th St. SW from Hwy 99 to 76th Ave. W. This project rankec
#10 in Long Walkway List of the 2015 Transportation Plan.
Estimated Project Cost $1,445,000
'includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$211,000
$0
$0
$0
$0
$0
$0
$0
$1,234,000
$0
$0
$0
$0
$0
$211,000
$1,234,000
$0
$0
$0
$0
$0
$211,000
$1,234,000
$0
$0
$0
$0
$0
$211,000
$1,234,000
$0
$0
Packet Pg. 247 1
PWT-55
ELM WAY WALKWAY
FROM 8TH AVE. S TO
9TH AVE. S
7th and
Elm Park
LA
s to
A
�3
W
Q
220TH ST SW
Benefit The project will improve pedestrian safety and provide a missing link of sidewalk on
Elm Way between 8th Ave and 9th Ave.
Description The walkway project is ranked #6 on the short walkway list from the 2015
Transportation Plan. The project constructed approximately 700 feet of new sidewalk;
six pedestrian curb ramps and modify the existing stormwater system on Elm Way
between 8th Ave. S and 9th Ave. S. Construction was completed in 2024. Project
closeout in 2025.
Estimated Project Cost $1,000,000
'includes prior year expenditures
Budget
Project Cost
Construction
Expense Total
Fund 126 - REET
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$5,000
$0
$0
$0
$0
$0
$0
$5,000
$0
$0
$0
$0
$0
$0
$5,000
$0
$0
$0
$0
$0
$0
$5,000
$0
$0
$0
$0
$0
$0
Packet Pg. 248
PWT-60
PEDESTRIAN SAFETY
PROGRAM
Benefit Improve safety at pedestrian crossings.
Description This program started in 2019 and will provide pedestrian safety improvements, such
additional signage / striping, flashing LED's around stop signs, or other improvement;
These improvements will improve the safety of the City's transportation system.
Estimated Project Cost $20,180
'includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Fund 126 - REET
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$1,000
$1,000
$0
$0
$0
$0
$0
$19,180
$19,180
$0
$0
$0
$0
$0
$20,180
$20,180
$0
$0
$0
$0
$0
$20,180
$20,180
$0
$0
$0
$0
$0
$20,180
$20,180
$0
$0
$0
$0
$0
Packet Pg. 249
PWT-66
4TH AVENUE
CULTURAL CORRIDOR
Benefit The corridor improvements in the public right of way will encourage pedestrian traffic
and provide a strong visual connection between the ECA and downtown retail.
Improvements will enhance connectivity as an attractive walking corridor and contribu
to the economic vitality in downtown. The project has been supported by the commun
in the 2014 Community Cultural Plan and in the goals and priorities for the State
certified Creative District. This project is supported by the 2022 Parks, Recreation anc
Open Space (PROS) Plan.
Description Final design of 4th Avenue Cultural Corridor to include site design and construction
documents for a safe, pedestrian friendly, and art enhanced corridor in the public righ
of way which provides a strong visual connection along 4th Avenue N between Main
Street and Edmonds Center for the Arts. Interim work on this project since the concei
was developed includes a 2015 temporary light artwork "Luminous Forest", as well as
preliminary design development through 2020-21. Funding for this project has not be(
secured at this time. The 4th Avenue Cultural Corridor Project is managed by the
Community Services/Economic Development Department.
Estimated Project Cost $9,206,600
Includes prior year expenditures
Budget
Project Cost
Design
Right of Way
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$1,000,000
$500,000
$0
$0
$0
$0
$0
$0
$500,000
$0
$0
$0
$0
$0
$0
$0
$6,000,000
$0
$0
$0
$0
$1,000,000
$1,000,000
$6,000,000
$0
$0
$0
$0
$1,000,000
$1,000,000
$6,000,000
$0
$0
$0
$0
$1,000,000
$1,000,000
$6,000,000
$0
Packet Pg. 250
9.3.a
New—
I Packet Pg. 251 1
PWT-51 Olympic Railroad Sno-Isle)
Beech Park Station Dayton Lib
FERRY STORAGE St Edmlazaonds
Hazel Christian
Pugel Sound City Edmonds Miller
Science
Port d Treatment Plant Plaza Church
Edmonds
IMPROVEMENTS FROM Wildlife
Refuge
PINE ST TO DAYTON ST a a
Edmonds Marsh a
Edmonds Marsh
Marina Beach city Perk
i
0
Benefit Reduce conflicts between ferry storage and access to local driveways.
Description Modify existing lane channelization on SR104 to add vehicle storage for ferry users.
Estimated Project Cost $403,000
'includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$61,000
$0
$0
$0
$0
$0
$0
$342,000
$0
$0
$0
$0
$0
$0
$403,000
$0
$0
$0
$0
$0
$0
$403,000
$0
$0
$0
$0
$0
$0
$403,000
$0
$0
$0
Packet Pg. 252
9.3.a
v
15
M P H
I Packet Pg. 253 I
EML9.3.a��
PWT-52
TRAFFIC CALMING
PROGRAM
Benefit Reduce vehicle speeds on City streets that qualify under the City's Traffic Calming
Policy.
Description Install traffic calming devices along selected stretches throughout the City with
speeding issues (through completion of detailed evaluation). This ongoing annual
program started in 2015 and is included in the City's 6-year Transportation
Improvement Program (TIP) and Capital Improvement Program (CIP).
Estimated Project Cost $80,650
'`includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Fund 126 - REET
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$10,000
$10,000
$2,000
$2,000
$2,000
$2,000
$30,000
$70,650
$70,650
$20,000
$20,000
$20,000
$20,000
$300,000
$80,650
$80,650
$22,000
$22,000
$22,000
$22,000
$330,000
$80,650
$80,650
$22,000
$22,000
$22,000
$22,000
$330,000
$80,650
$80,650
$22,000
$22,000
$22,000
$22,000
$330,000
Packet Pg. 254
TRAFFIC PLANNINI
I 'lip
�\ I
ni ►�_ .y
wL IL
1,2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS
PWT-53
ADA TRANSITION
PLAN (RIGHT-OF-WAY)
UPDATE
Benefit Inventories and prioritizes ADA issues in the City right of way, as well as City building:
and parks facilities.
Description The 2017 Transition Plan completed an ADA evaluation and prioritization of the City's
street right-of-way. This decision package will update the 2017 plan and expand the
evaluation to include City Buildings and Parks facilities. The Plan will inventory
physical barriers preventing accessibility and develop actions and preliminary cost
estimates to address ADA non-compliance.
Estimated Project Cost $440,000
*includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$0
$0
$0
$440,000
$0
$0
$0
Expense Total
$0
$0
$0
$440,000
$0
$0
$0
Unsecured Funding
$0
$0
$0
$440,000
$0
$0
$0
Funding Source Total
$0
$0
$0
$440,000
$0
$0
$0
-10
Packet Pg. 256
PWT-54
TRANSPORTATION
PLAN UPDATE
Benefit Based upon existing and projected future land use and travel patterns, the
Transportation Plan describes roadway pedestrian, bicycle and transit infrastructure
and services and provides an assessment of existing and projected future
transportation needs. The Plan will establish the transportation priorities and guides &
development of the six -year Transportation Improvement Program (TIP), Capital
Improvement Program (CIP), Capital Facilities Plan (CFP) and introduce Multimodal
Level of Service (MMLOS).
Description The Transportation Plan serves as the transportation element of the City's
Comprehensive Plan and is being updated in coordination with the 2024
Comprehensive Plan Update. The plan was last updated in 2015.
The Transportation Plan Update will be completed in Fall 2024. The funding in 2025
will develop the new multi -modal impact fee and provide staff training on implementin,
the program on private development projects.
Estimated Project Cost $406,000
"includes prior year expenditures
Budget
Project Cost 2025
Planning $35,000
Expense Total $35,000
Fund 112 - Street (Gas Tax & $35,000
Multi -Modal)
Funding Source Total $35,000
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0 A
$0
$0
$0
$0
Packet Pg. 257
GREEN STREET;
• 11 ' +T a3♦ ` •�I — �) •` Y• , � I
t A
Anilm• ' .• ',� ..�
44
_ - \ y � / - fir! Y ���P1� ` �. �,.0 �! ♦ .
2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM CAPITAL IMPROVEMENTS PROJECTS
PWT-64
GREEN STREETS
236TH ST SW - 84TH
AVE W TO HIGHWAY 99
" ry
Benefit Incorporating green streets into the urban fabric of the City of Edmonds is intended to
demonstrate how trees, vegetation, engineered green stormwater solutions, physical
and visual narrowing of vehicular lane widths, and shortening pedestrian crossings wii
curb bulbs help to slow traffic, ameliorate climate change impacts, and reinforce
desired land use and transportation patterns on appropriate street rights -of -way. This
project is intended to increase the livability of a diverse, growing city.
Description The City of Edmonds proposes the development of this project to demonstrate how
green infrastructure can both address stormwater flows and enhance the streetscape
to benefit the Hwy 99 neighborhood and the downtown core.
This project includes the following elements:
• Roadway narrowing to reduce traffic speeds and to reduce impervious surface
(vehicular capacity retained)
• Sidewalks and planting strips added
• Bioretention cells collect runoff from the road through curb cuts
• Bioretention cells collect runoff directly from sidewalks
• Public private partnership potential with Housing Hope and Terrace Place
developments.
Estimated Project Cost $3,710,000
Includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$0
$0
$371,000
$0
$0
$0
$0
$0
$0
$3,339,000
$0
$0
$0
$0
$0
$0
$3,710,000
$0
$0
$0
$0
$0
$0
$3,710,000
$0
$0
$0
$0
$0
$0
$3,710,000
$0
Packet Pg. 259
WAT E
it
tea.: k l A:. - �� low�� `
It
s i ` OHM
k-4 '
•w i C.
2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM CAPITAL IMPROVEMENTS PROJECTS
9.3.a
ProjectDIP
20252026
2027
20281'
20301
1 1
.
-a
. . r-
M
PWW-01
Annual Waterline Overlay (2024)
Str-25025
$500
$0
$0
$0
$0
$0
$500
$0
a
$! v
PWW-02
2027 Water Comprehensive Plan Update
670-25017
$0
$150,000
$350,000
$0
$0
$0
$500,000
$0
c
$500,1 a
PWW-03
Phase 14 Annual Replacement Program (2024)
Cap-25029
$15,000
$0
$0
$0
$0
$0
$15,000
$0
rn
$15,1 r
PWW-04
Phase 15 Annual Replacement Program (2025)
Cap-25003
$3,533,000
$0
$0
$0
$0
$0
$3,533,000
$0
$3,533,1 li
r
PWW-05
Phase 16 Annual Replacement Program (2026)
Cap-25004/35
$547,000
$3,289,000
$0
$0
$0
$0
$3,836,000
$0
$3,836,1 M
U
PWW-06
Phase 17 Annual Replacement Program (2027)
Cap-25036
$0
$569,000
$3,966,000
$0
$0
$0
$4,535,000
$0
0
$4,535,1 c
N
PWW-07
Phase 18 Annual Replacement Program (2028)
$0
$0
$592,000
$4,124,000
$0
$0
$4,716,000
$0
Lo
$4,716,1 c
N
PWW-08
Phase 19 Annual Replacement Program (2029)
$0
$0
$0
$616,000
$4,289,000
$0
$4,905,000
$0
$4,905,1 �
Q
PWW-10
Phase 20 Annual Replacement Program (2030)
$0
$0
$0
$0
$641,000
$4,460,000
$5,101,000
$0
$5,101,1 0
J
Q
PWW-11
Yost & Seaview Reservoir Repairs & Upgrades
Cap-25001/34
$4,760,000
$3,850,000
$0
$0
$0
$0
$8,610,000
$0
$8,610,1
PWW-20
Phase 21 Annual Replacement Program (2031) &
$0
$0
$0
$0
$0
$666,000
$666,000
$106,764,000
$107,430,1 v
Future Projects
-
a
EXPENSE TOTAL
$8,855,500
$7,858,000
$4,908,000
$4,740,000
$4,930,000
$5,126,000
$36,417,500
$106,764,000
$143,181,! v
N
Y
i
O
Funding Source
2025
2026
2027
20281'
2030
1 1
2031-45.
To. V
Total
7
Fund 421 - Water Utility
$8,855,500
$7,858,000
$4,908,000
$4,740,000
$4,930,000
$5,126,000
$36,417,500
$106,764,000
$143,181,! o
FUNDING TOTAL
$8,855,500
$7,858,000
$4,908,000
$4,740,000
$4,930,000
$5,126,000
$36,417,500
$106,764,000
M
$143,181,! N
In
N
O
N
C
N
E
M
t)
r
r
Q
Packet Pg. 261
PWW-01
ANNUAL WATERLINE
OVERLAY (2024)
Benefit Improve overall pavement condition in locations that were excavated and patched duE '
to the Annual Waterline Replacement Projects.
Description Road pavement overlays will cover areas of roadways that were excavated and
patched in previous years as part of the Waterline Replacement Projects.
Estimated Project Cost $295,000 (2024)
'includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Construction
$500
$0
$0
$0
$0
$0
$0
Expense Total
$500
$0
$0
$0
$0
$0
$0
Fund 421 - Water Utility
$500
$0
$0
$0
$0
$0
$0
Funding Source Total
$500
$0
$0
$0
$0
$0
$0
Packet Pg. 262
PWW-02
2027 WATER
COMPREHENSIVE
PLAN UPDATE
Benefit Maintain a high level of drinking water quality, improve overall system reliability,
decrease probability of breakages and leakage, improve fire flows, and decrease
overall day to day maintenance costs.
Description The existing water comprehensive plan was last updated in 2017 and is required to bi
updated by the State Dept of Health (DOH) every 10 years. This project would be a
comprehensive evaluation of the City's drinking water system, its replacement
program, and operations. It will include recommendations for improvements or
adjustments with recommended priorities for selecting future capital maintenance
projects.
Estimated Project Cost $500,000
*includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$0
$150,000
$350,000
$0
$0
$0
$0
Expense Total
$0
$150,000
$350,000
$0
$0
$0
$0
Fund 421 -Water Utility
$0
$150,000
$350,000
$0
$0
$0
$0
Funding Source Total
$0
$150,000
$350,000
$0
$0
$0
$0
Packet Pg. 263
PWW-03-09,20
PHASE 14-35 WATER
REPLACEMENT
PROJECTS (2024-45)
Benefit Maintain a high level of drinking water quality, improve overall system reliability,
decrease probability of breakages and leakage, improve fire flows, and decrease
overall day to day maintenance costs.
Description Per the approved 2017 Water Comprehensive Plan, the projects will replace/maintain
pipe and related appurtenances at various locations throughout the City due to old ag
being undersized, need to increase flow or pressure, or more prone to breakage due
its material properties.
Estimated Project Cost $4.2 to $9.2 million/year
'includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Fund 421 - Water Utility
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$590,100
$569,000
$592,000
$616,000
$641,000
$666,000
$13,873,000
$3,504,900
$3,289,000
$3,966,000
$4,124,000
$4,289,000
$4,460,000
$92,891,000
$4,095,000
$3,858,000
$4,558,000
$4,740,000
$4,930,000
$5,126,000
$106,764,000
$4,095,000
$3,858,000
$4,558,000
$4,740,000
$4,930,000
$5,126,000
$106,764,000
$4,095,000
$3,858,000
$4,558,000
$4,740,000
$4,930,000
$5,126,000
$106,764,000
Packet Pg. 264
PWW-11
YOST & SEAVIEW
RESERVOIR REPAIRS
& UPGRADES
Benefit Maintain a high level of drinking water quality, improve overall system reliability,
decrease probability of leakage, retrofit structures so that they meet current structural
codes to improve their resiliency during earthquakes, and decrease overall day to day
maintenance costs.
Description
This work is being done to provide structural upgrades, repair leakages, and upgrade
to our two underground potable water storage reservoirs. Preliminary findings
completed in early 2023 were used to determine order of magnitude/preliminary costE
and next steps for the now planned repairs and upgrades project. The Yost Reservoi
report shows that it will need a major structural and seismic retrofit, plus repairs to
address leakage from the reservoir. The report for the Seaview Reservoir shows
similar issues as the Yost Reservoir, with a less serious leakage issue.
Estimated Project Cost $9,659,000
"includes prior year expenditures
Budget
Project Cost
2025 2026 2027 2028 2029 2030 2031-45
Design
$260,000 $0 $0 $0 $0 $0 $0
Construction
$4,500,000 $3,850,000 $0 $0 $0 $0 $0
Expense Total
$4,760,000 $3,850,000 $0 $0 $0 $0 $0
Fund 421 - Water Utility
$4,760,000 $3,850,000 $0 $0 $0 $0 $0
Funding Source Total
$4,760,000 $3,850,000 $0 $0 $0 $0 $0
Packet Pg. 265
STORMWATEI
i
`.'' k' ��'+,� > > '� � .. � � yr' ., , +` �. a "` • ^` �
1�r` t',� t' v h'+►. .�1, � ��k. ,� -r 'Mir .,'� �. ,� �, n � --_ �,;
\{ 3'��'. f'J `i�Z+. ��1., ij 4 '1tae , �, e`-. - - /,�► d � +, r' �;�`�._ �� .�i�:n fdiFk-_
* xAn—
R
Aq
>t
.t
a
G
.� .•1► j1 C- H
s +'�
S
2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM CAPITAL IMPROVEMENTS PROJECTS
9.3.a
STORMWATER
PWD-11
Phase 4 Storm Maintenance Project (2024)
Cap-25030
PWD-12
Phase 5 Storm Maintenance Project (2025)
Cap-25016
PWD-13
Phase 6 Storm Maintenance Project (2026)
Cap-25017/32
PWD-14
Phase 7 Storm Maintenance Project (2027)
Cap-25033
PWD-15
Phase 8 Storm Maintenance Project (2028)
PWD-16
Phase 9 Storm Maintenance Project (2029)
PWD-18
Phase 10 Annual Storm Replacement (2030)
PWD-07
Phase 11 Storm Maintenance Project (2031)
& Future Projects
PWD-19
Annual SD Overlays (2024)
Str-25026
EDMONDS MARSH ESTUARY RESTORATION
PWD-01
Edmonds Marsh Water Quality Improvements
Cap-25012
(phase 1)
PWD-05
Edmonds Marsh Water Quality Improvements
Cap-25013
(phase 2)
PWD-24
Edmonds Marsh Estuary Planning Study
670-25007
PERRINVILLE CREEK BASIN
PWD-03
Perrinville Creek Flow Management Projects
Cap-25010/11
PWD-04
Lower Perrinville Creek Restoration Project
Cap-25014/15
PWD-23
Perrinville Creek Basin Analysis Update
670-25006
STORM DRAINAGE IMPROVEMENT
PWD 06
Lake Ballinger Regional Facility Design
2025-30
Total
$10,000
$0
$0
$0
$0
$0
$10,000
$0
a
$10,( v
$1,597,000
$0
$0
$0
$0
$0
$1,597,000
$0
c
$1,597,( a
$249,000
$981,000
$0
$0
$0
$0
$1,230,000
$0
L0
$1,230,(
$0
$351,000
$1,825,000
$0
$0
$0
$2,176,000
$0
$2,176,(
7a
r
$0
$0
$365,000
$1,898,000
$0
$0
$2,263,000
$0
$2,263,( cm
v
$0
$0
$0
$380,000
$1,974,000
$0
$2,354,000
$0
0
$2,354,( c
N
$0
$0
$0
$0
$395,000
$2,053,000
$2,448,000
$0
uf)
$2,448,( N
N
$0
$0
$0
$0
$0
$411,000
$411,000
$51,280,000
$51,691,1 �
9
$500
$0
$0
$0
$0
$0
$500
$0
$! c
J
Q
Z
LL
$321,928
$0
$0
$0
$0
$0
$321,928
$0
a
$321,5 v
a
$386,708
$0
$0
$0
$0
$0
$386,708
$0
$386,1 y
L
$89,000
$0
$0
$0
$0
$0
$89,000
$0
$89,( 0
2
a
$104,000
$108,000
$112,000
$116,000
$120,000
$125,000
$685,000
$2,641,000
0
$3,326,( c
N
$350,000
$1,520,000
$2,122,500
$0
$0
$0
$3,992,500
$0
$3,992,! N
0
N
$468,343
$0
$0
$0
$0
$0
$468,343
$0
$468,:
d
E
t
U
$0
$0
$200,000
$3,000,000
$0
$0
$3,200,000
$0
w
w
$3,200,615
CGRAM
CAPITAL
IMPROVEMENTS'
Packet Pg. 267
9.3.a
STORMWATER
1 1 .0 D- 2025 2026 2027 20281' 2030 1 • To._
M
7317 Lake Ballinger Way Floodplain Purchase �
PWD-22 &Structure Removal Cap-25008/9 $256,000 $5,000 $0 $0 $0 $0 $261,000 $0 $261,( v
c
M
COMPLIANCE RELATED a
N
PWD-17 Storm and Surface Water Comprehensive Plan 670-25003 $213,000 $0 $0 $0 $0 $0 $213,000 $0 $213,( °r
EXPENSE TOTAL $4,045,479 $2,965,000 $4,624,500 $5,394,000 $2,489,000 $2,589,000 $22,106,979 $53,921,000 $76,027,E li
M
.Q
Funding Source
20251
•
2027
20281'
2030
1 1
TotalM
1
L)
• • O
O
Citizen Cash Donation
$25,000
$0
$0
$0
$0
$0
$25,000
$0
$25,(LO
N
O
City of Lynnwood
$30,086
$0
$0
$0
$0
$0
$30,086
$0
$30,( v
u-
Federal Grants
$35,000
$0
$0
$0
$0
$0
$35,000
$0
$35,(
0
Fund 422 - Stormwater Utility
$3,081,476
$1,825,000
$3,032,625
$3,144,000
$2,489,000
$2,589,000
$16,161,101
$53,921,000
J
$70,082,' z
u-
Marsh Preservation Fund
$29,000
$0
$0
$0
$0
$0
$29,000
$0
$29,( 0.
U
Secured Grants
$582,417
$0
$0
$0
$0
$0
$582,417
$0
$582,1 v
Unsecured Grants
$262,500
$1,140,000
$1,591,875
$2,250,000
$0
$0
$5,244,375
$0
N
$5,244,' c
FUNDING TOTAL $4,045,479 $2,965,000 $4,624,500 $5,394,000 $2,489,000 $2,589,000 $22,106,979 $53,921,000 $76,027,f 3:_
a
0
M
O
N
LO
N
O
N
w
Q
Packet Pg. 268
PWD-07,11-16,18
PHASE 4-25 STORM
MAINTENANCE
PROJECTS (2025-45)
Benefit Improve system reliability and capacity, decrease breakages, and decrease overall de
to day maintenance costs.
Description Annual storm drain replacement/maintenance projects. Projects propose to replace o
rehab storm drain infrastructure in several locations throughout the City. Locations of
work identified by City crews and staff via firsthand knowledge or video inspection
results. Much of Edmonds stormwater infrastructure is past its useful lifespan and
requires routine replacement or repair to preserve the function of the storm drain
system. Failure to conduct annual maintenance projects will increase chances of ston
drain system failures.
Estimated Project Cost $1.2 to $4.4 million/year
'includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$249,000
$351,000
$365,000
$380,000
$395,000
$411,000
$8,539,000
Construction
$1,607,000
$981,000
$1,825,000
$1,898,000
$1,974,000
$2,053,000
$42,741,000
Expense Total
$1,856,000
$1,332,000
$2,190,000
$2,278,000
$2,369,000
$2,464,000
$51,280,000
Fund 422 - Stormwater Utility
$1,856,000
$1,332,000
$2,190,000
$2,278,000
$2,369,000
$2,464,000
$51,280,000
Funding Source Total
$1,856,000
$1,332,000
$2,190,000
$2,278,000
$2,369,000
$2,464,000
$51,280,000
Packet Pg. 269
PWD-19
ANNUAL SD
OVERLAYS (2024)
Benefit
s
Improve overall pavement condition in locations that were excavated and patched due
to the Annual Storm Replacement Projects.
Description Road pavement overlays to cover areas of roadways that were excavated and patche
in previous years as part of the Annual Storm Maintenance Projects.
Estimated Project Cost $35,000 (2024) °
c
*includes prior year expenditures
Budget
Project Cost
Construction
Expense Total
Fund 422 - Stormwater Utility
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$500
$0
$0
$0
$0
$0
$0
$500
$0
$0
$0
$0
$0
$0
$500
$0
$0
$0
$0
$0
$0
$500
$0
$0
$0
$0
$0
$0
Packet Pg. 270 1
EDMONDS MARSH ESTUARY RESTORATIO
l '
• �� },ty:. ���ttt L ��t ILA.', �, r. , J
•1. < r �,�rr .` .1r
. '�;{,; •fig � • y �,: �,� .
• �. )+` - ' t� •ate
' •' � i i 'I f
2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM CAPITAL IMPROVEMENTS PROJECTS
PWD-01 Edmonds
Marsh
EDMONDS MARSH
WATER QUALITY Edmonds Marsh N
w
IMPROVEMENTSEdmonds Marsh �•
(PHASEI) 3 M
fN
0 City Perk
Z
O
L
w
Benefit Improve water quality of stormwater discharging into the Edmonds Marsh from the we
portions of SR-104 located near the marsh. The improvements will provide better
habitat for the return of salmon to the marsh.
Description The project will be improving water quality of stormwater runoff by replacing existing
catch basins along the west side of SR-104 funded via a DOE grant. The catch basir
will be replaced with catch basins that include water filter cartridges. Staff proposes
this effort in order to provide water quality mitigation for all discharges that directly
enter the marsh from these locations.
Estimated Project Cost $418,000
'includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Construction
$321,928
$0
$0
$0
$0
$0
$0
Expense Total
$321,928
$0
$0
$0
$0
$0
$0
Fund 422 - Stormwater Utility
$80,482
$0
$0
$0
$0
$0
$0
Secured Grants
$241,446
$0
$0
$0
$0
$0
$0
Funding Source Total
$321,928
$0
$0
$0
$0
$0
$0
Packet Pg. 272
PWD-05 Edmonds
Marsh
EDMONDS MARSH
WATER QUALITY Edmonds Marsh N
w
IMPROVEMENTS Edmonds Marsh �•
(PHASE 2)
(N
0 City Perk
Z
O
o I
w
Benefit Improve water quality of stormwater discharging into the Edmonds Marsh from the we
portions of SR-104 located near the marsh. The improvements will provide better
habitat for the return of salmon to the marsh.
Description The project will be improving water quality of stormwater runoff by replacing existing
catch basins along the east side of SR-104 via a state funded appropriation. The cats
basins will be replaced with catch basins that include water filter cartridges. Staff
proposes this effort in order to provide water quality mitigation for all discharges that
directly enter the marsh from these locations.
Estimated Project Cost $458,000
Includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$39,868
$0
$0
$0
$0
$0
$0
Construction
$346,840
$0
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
$0
$0
Expense Total
$386,708
$0
$0
$0
$0
$0
$0
Fund 422 - Stormwater Utility
$386,708
$0
$0
$0
$0
$0
$0
Secured Grants
$0
$0
$0
$0
$0
$0
$0
Unsecured Grants
$0
$0
$0
$0
$0
$0
$0
Funding Source Total
$386,708
$0
$0
$0
$0
$0
$0
Packet Pg. 273
Wildlife
PWD-24 AW
Refuge
EDMONDS MARSH Eds
dmMarsh
ESTUARY PLANNING
STUDY Z
0
Edmonds Marsh 0
Edmonds Marsh
0
W
City Park
I
Benefit Aid for future planning of Marsh Restoration.
Description This study will include completing a gap analysis of existing data, hydrologic
evaluation, hydraulic modeling, listing restoration alternatives, minimizing the potentia
for exposure to contamination, listing permits and approvals required for restoration,
evaluating project land purchase and restoration funding options, identifying a proces
that defines community goals for the marsh, and producing scoping documents that li
the tasks required to complete the restoration plan.
Estimated Project Cost $204,000
`includes prior year expenditures
Budget
Project Cost
Design
Expense Total
Federal Grants
Marsh Preservation Fund
Citizen Cash Donation
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$89,000
$0
$0
$0
$0
$0
$0
$89,000
$0
$0
$0
$0
$0
$0
$35,000
$0
$0
$0
$0
$0
$0
$29,000
$0
$0
$0
$0
$0
$0
$25,000
$0
$0
$0
$0
$0
$0
$89,000
$0
$0
$0
$0
$0
$0
Packet Pg. 274
PERRINVILLE CREEK BASII
lz
To
t f�•
t ! _
'Z
dW
VL
Ar
o.
Ao
�r..�y .'1 '�.. i1y� �' cif •,� �� •
2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM CAPITAL IMPROVEMENTS PROJECTS
PWD-03
PERRINVILLE CREEK
FLOW MANAGEMENT
PROJECTS
Benefit The project will reduce peak flows in Perrinville creek, improve fish passage and
decrease creek bed scour during peak flow events.
Description Reducing scouring flows to reduce sediments load in Perrinville Creek was identified
a previous basin report completed in 2015 as a critical element of restoring this creek
which has been significantly impacted by urban development. The projects funded by
this program are incremental steps toward recovering this stream run as adequate fis
habitat. These efforts have become even more critical given recent challenges arounc
the Perrinville Creek outfall area. This program is a fund for implementing projects
within the Perrinville Creek basin to reduce scour flows in the creek. It allows staff
flexibility to respond to ad -hoc opportunities such as rain garden cluster projects, or
ensure matching funds are available for chasing grant applications for flow reductions
projects.
Estimated Project Cost $100,000 to $229,000 per year
Includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$10,400
$10,800
$11,200
$11,600
$12,000
$12,500
$300,000
Construction
$93,600
$97,200
$100,800
$104,400
$108,000
$112,500
$2,341,000
Expense Total
$104,000
$108,000
$112,000
$116,000
$120,000
$125,000
$2,641,000
Fund 422 - Stormwater Utility
$104,000
$108,000
$112,000
$116,000
$120,000
$125,000
$2,641,000
Funding Source Total
$104,000
$108,000
$112,000
$116,000
$120,000
$125,000
$2,641,000
Packet Pg. 276
PWD-04
LOWER PERRINVILLE
CREEK RESTORATION
PROJECT
Benefit The project will reduce City maintenance needs in the future and improve fish passag�
Description
The purpose of this project is to improve the environmental health of the creek
necessary to support fish habitat, and to restore the storm water capacity. The projec
consists of the modifications to three structures that currently prevent fish passage ar
are undersized for the flows on the creek, (1) the culvert at the BNSF track, remove
and replace with a fish -friendly culvert or bridge with adequate flow capacity, which W
be led and funded by BNSF and the Tulalip Tribes using grant funds, (2) return flow t(
the creek between the high flow bypass structure and the BNSF culvert by blocking tY
structure and restoring creek capacity and (3) culvert at Talbot Road, will be removed
and replaced with a fish -friendly culvert or bridge that provides adequate fish passagE
and storm water flow capacity. This project will increase the resiliency of the watershE
by building the structures that mimic the natural channel performance necessary for
fish habitat and stormwater flow capacity. The project also includes time and effort to
research and apply for supplemental/additional funding sources for construction of thl
Edmonds portions of the work (Items 2 & 3). Due to the project complexity and numbf
of stakeholders, the planning and design phase is estimated to be 2-years.
Estimated Project Cost
$4,500,000
"includes prior year expenditures
Budget
Project Cost
2025 2026 2027 2028 2029 2030 2031-45
Design
$350,000 $450,000 $0 $0 $0 $0 $0
Construction
$0 $1,070,000 $2,122,500 $0 $0 $0 $0
Expense Total
$350,000 $1,520,000 $2,122,500 $0 $0 $0 $0
Fund 422 - Stormwater Utility
$87,500 $380,000 $530,625 $0 $0 $0 $0
Unsecured Grants
$262,500 $1,140,000 $1,591,875 $0 $0 $0 $0
Funding Source Total
$350,000 $1,520,000 $2,122,500 $0 $0 $0 $0
Packet Pg. 277
PWD-23
J
PERRINVILLE CREEK t `
BASIN ANALYSIS
",1J
UPDATE Pertinvdle
Cr�. Lynnwood
i
f/Cdricr�'c �
Benefit Improve overall basin and stream health, by using green stormwater infrastructure
methods. This will make it so that rainfall is not simply collected and conveyed
downstream and instead behaves as close as possible to natural conditions. This
includes infiltrating rainfall runoff as close as possible to where it fell. This will also
decrease stream peak flows, which will decrease stream erosion and improve the
overall stream habitat for aquatic life.
Description City of Edmonds and Lynnwood joint project to supplement/update the Perrinville
Creek 2015 basin analysis that determined possible locations for projects that would
help decrease the peak storm flows during high rain events. Project will be updated tc
reflect projects completed and also determine if there are other locations within the
basin to aid in the reduction of peak flows in the basin.
Estimated Project Cost $649,200
'includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$468,343
$0
$0
$0
$0
$0
$0
Expense Total
$468,343
$0
$0
$0
$0
$0
$0
Fund 422 - Stormwater Utility
$97,286
$0
$0
$0
$0
$0
$0
Secured Grants
$340,971
$0
$0
$0
$0
$0
$0
City of Lynnwood
$30,086
$0
$0
$0
$0
$0
$0
Funding Source Total
$468,343
$0
$0
$0
$0
$0
$0
Packet Pg. 278
9.3.a
.lr
Y
[-, BOWN
E
A
I Packet Pg. 279 1
ff
mmt-m9.3.a��
PWD-22 P I
7317 LAKE BALLINGER
WAY FLOODPLAIN
PURCHASE &
STRUCTURE REMOVAL r
Benefit Improve the health and water quality of Lake Ballinger by removing hard surfaces and
home that is generally uninhabitable. Project will also provide a future location to trea
stormwater runoff from portions SR-104.
Description The project purchases an existing single family residential property in 2023 located
within the Lake Ballinger flood plain. The City secured a $500,000 Department of
Ecology grant to aid in this process. The home is the lowest property on the lake and
is badly damaged from previous flooding to the point it is generally uninhabitable.
The City intends to remove the home and any pollution generating surfaces from the
site in 2024 as part of the initial 2023 purchase. The grant has restrictions that prever
this parcel to be used for public use. After demolition of the structures and imperviouE
surfaces, the planned site use would be for public utility benefit only. Because the Cit.
storm drain line for SR-104 cuts through in an easement immediately adjacent to this
parcel, the City plans to pursue a future project to split appropriate flows from the City
storm drain system and provide water quality treatment to the maximum extent
feasible. The future project would provide water quality treatment for a very heavily
trafficked highway (SR-104) and would make significant improvement in water quality
to Lake Ballinger and its downstream course to Lake Washington via McAleer Creek.
Estimated Project Cost $940,000
Includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$43,000
$0
$0
$0
$0
$0
$0
Construction
$213,000
$5,000
$0
$0
$0
$0
$0
Expense Total
$256,000
$5,000
$0
$0
$0
$0
$0
Fund 422 - Stormwater Utility
$256,000
$5,000
$0
$0
$0
$0
$0
Funding Source Total
$256,000
$5,000
$0
$0
$0
$0
$0
Packet Pg. 280
9.3.a
AVI" f
PC, , 'i '� , I b
jI,
t
&COLL
J""lj' J
I
,e, <� Nz:
v
Al
I Packet Pg. 281 1
PWD-17
STORM AND SURFACE
WATER
COMPREHENSIVE PLAN
Benefit A holistic summary of the City's Stormwater system with recommended priorities for
selecting future capital maintenance and improvements projects.
Description The City of Edmonds (City) owns and operates an extensive system of drainage pipe!
ditches, and other assets to convey stormwater runoff into streams, lakes, and Puget
Sound to prevent and minimize damage to private property, streets, and other
infrastructure. The City is faced with the challenge of conveying this runoff safely and
cost-effectively while preventing or minimizing the adverse impacts of high flows
(erosion, flooding, and sediment deposition) and of stormwater pollutants on water
quality and aquatic habitat. In addition, recent state and federal stormwater regulatior
make it technically and financially challenging to address these issues while balancinc
utility ratepayer costs. To proactively address these challenges and remain in
compliance with the State -mandated National Pollutant Discharge Elimination Systerr
Western Washington Phase II Municipal Stormwater Permit (NPDES Phase II permit;
and other increasing regulatory requirements, the City is updating its current
comprehensive storm and surface water management plan. This permit has and will
continue to have a significant impact on the workload and operational budget of both
the Engineering Division and the Storm Crews within the Public Works Department.
Per the State Department of Ecology, the plan will also include the work findings from
their required (Stormwater Management Action Plan) SMAP process of City drainage
watersheds. Project will also include recommendations for stormwater utilities rates t
be adjusted at the discretion of Council.
Estimated Project Cost $733,000
'includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$213,000
$0
$0
$0
$0
$0
$0
Expense Total
$213,000
$0
$0
$0
$0
$0
$0
Fund 422 - Stormwater Utility
$213,000
$0
$0
$0
$0
$0
$0
Funding Source Total
$213,000
$0
$0
$0
$0
$0
$0
Packet Pg. 282
�e
Or -
SEWEI
Am
10,
,�� r yH �•-� _ ' ♦ ,. �,.� .cam
MI&A
2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM CAPITAL IMPROVEMENTS PROJECTS
9.3.a
SEWER
Project.-
Total
r-
M
PWS-01
Annual Sanitary Sewer Replacement Overlays
Str-25027
$500
$0
$0
$0
$0
$0
$500
$0
$, v
(2024)
PWS-02
2027 Sanitary Sewer Comprehensive Plan Update
670-25010
$0
$150,000
$350,000
$0
$0
$0
$500,000
$0
_
$500,( a
PWS-03
Phase 11 Sewer Replacement (2024)
Cap-25031
$10,000
$0
$0
$0
$0
$0
$10,000
$0
$10,(
PWS-04
Phase 12 Sewer Replacement (2025)
Cap-25020
$2,302,000
$0
$0
$0
$0
$0
$2,302,000
$0
$2,302,( Li
Ta
r
PWS-05
Phase 13 Sewer Replacement (2026)
Cap-25021/22
$378,000
$2,126,000
$0
$0
$0
$0
$2,504,000
$0
$2,504,( R
v
PWS-06
Phase 14 Sewer Replacement (2027)
Cap-25023
$0
$393,000
$2,210,000
$0
$0
$0
$2,603,000
$0
0
$2,603,( M
N
PWS-07
Phase 15 Sewer Replacement (2028)
$0
$0
$409,000
$2,299,000
$0
$0
$2,708,000
$0
u'
$2,708,( c
N
PWS-08
Phase 16 Sewer Replacement (2029)
$0
$0
$0
$425,000
$2,391,000
$0
$2,816,000
$0
$2,816,( �
9
PWS-12
Phase 17 Sewer Replacement (2030)
$0
$0
$0
$0
$442,000
$2,487,000
$2,929,000
$0
$2,929,( o
PWS-13
Phase 18 Sewer Replacement (2031) & Future
$0
$0
$0
$0
$0
$460,000
$460,000
$61,348,000
$61,808,1 z
Projects
9
PWS-10
Annual Citywide CIPP Sewer Rehabilitation
$0
$0
$587,000
$611,000
$636,000
$662,000
$2,496,000
$13,735,000
a
$16,231,( v
d
PWS-11
Lake Ballinger Sewer
$0
$0
$1,000,000
$6,000,000
$0
$0
$7,000,000
$0
$7,000,(
EXPENSE TOTAL
$2,690,500
$2,669,000
$4,556,000
$9,335,000
$3,469,000
$3,609,000
$26,328,500
$75,083,000
L
$101,411,! 0
2
Fundingi
i
i
2030
� r
i
a
o
M
0
Fund 423 - Sewer Utility
$2,690,500
$2,669,000
$4,556,000
$9,335,000
$3,469,000
$3,609,000
$26,328,500
$75,083,000
$101,411,! N
FUNDING TOTAL
$2,690,500
$2,669,000
$4,556,000
$9,335,000
$3,469,000
$3,609,000
$26,328,500
$75,083,000
LO
$101,411,! N
:.o
m
E
M
c�
w
w
Q
Packet Pg. 284
PWS-01
ANNUAL SANITARY
SEWER REPLACEMENT
OVERLAYS (2024)
i
Benefit Improve overall pavement condition in locations that were excavated and patched due
to Sanitary Sewer Replacement Projects. t
s
Description Road pavement overlays to cover areas of roadways that were excavated and patche
in previous years as part of the Sanitary Sewer Replacement Projects.
Estimated Project Cost $30,000
`includes prior year expenditures
Budget
Project Cost
Construction
Expense Total
Fund 423 - Sewer Utility
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$500
$0
$0
$0
$0
$0
$0 c
$500
$0
$0
$0
$0
$0
$0 c
$500
$0
$0
$0
$0
$0
$0
$500
$0
$0
$0
$0
$0
f
$0
Packet Pg. 285
PWS-02
2027 SANITARY
SEWER
COMPREHENSIVE
PLAN UPDATE
Benefit Improve system reliability and capacity, decrease infiltration and inflow, decrease
breakages, and decrease overall day to day maintenance costs.
Description The existing sewer comprehensive plan was last updated in 2013 and is in need of ar
update. This project would be a comprehensive evaluation of the City's sewer systen
its replacement program and operations, with recommendations for improvements or
adjustments and recommended priorities for selecting future capital maintenance
projects.
Estimated Project Cost $500,000
'includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$0
$150,000
$350,000
$0
$0
$0
$0
Expense Total
$0
$150,000
$350,000
$0
$0
$0
$0
Fund 423 - Sewer Utility
$0
$150,000
$350,000
$0
$0
$0
$0
Funding Source Total
$0
$150,000
$350,000
$0
$0
$0
$0
Packet Pg. 286
PWS-03-08,12,13
PHASE 11-30 SEWER
REPLACEMENT (2025-
45)
Benefit Improve system reliability and capacity, decrease infiltration and inflow, decrease
breakages, and decrease overall day to day maintenance costs.
Description Per the approved 2013 Sewer Comprehensive Plan, the projects will replace/rehab
pipe and related appurtenances at various locations throughout the City due to old ag
being undersized, need to increase capacity, or more prone to breakage due to its
material properties.
Estimated Project Cost $2.7 to $5.3 million/year
'includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Fund 423 - Sewer Utility
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$378,000
$393,000
$409,000
$425,000
$442,000
$460,000
$9,568,000
$2,312,000
$2,126,000
$2,210,000
$2,299,000
$2,391,000
$2,487,000
$51,780,000
$2,690,000
$2,519,000
$2,619,000
$2,724,000
$2,833,000
$2,947,000
$61,348,000
$2,690,000
$2,519,000
$2,619,000
$2,724,000
$2,833,000
$2,947,000
$61,348,000
$2,690,000
$2,519,000
$2,619,000
$2,724,000
$2,833,000
$2,947,000
$61,348,000
Packet Pg. 287
PWS-10
ANNUAL CITYWIDE
CIPP SEWER
REHABILITATION
tit
Benefit Improve system reliability and capacity, decrease infiltration and inflow, decrease
breakages, and decrease overall day to day maintenance costs.
Description Per the approved 2013 Sewer Comprehensive plan and current video inspections of
sewer mains, the project will line existing sewer mains that are subject to root intrusio
infiltration and inflow, and damage that can be repaired by this trenchless method.
2025 and 2026 funds will be combined with the Annual Sewer Replacement Program
This is because the annual replacement rehab program for these years will be focusir
on pipe lining as well thereby requiring only 1 design and 1 construction contract to
administer.
Estimated Project Cost $587,000 to $662,000/year
"includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$0
$0
$88,000
$92,000
$96,000
$100,000
$2,070,000
Right of Way
$0
$0
$0
$0
$0
$0
$0
Construction
$0
$0
$499,000
$519,000
$540,000
$562,000
$11,665,000
Expense Total
$0
$0
$587,000
$611,000
$636,000
$662,000
$13,735,000
Fund 423 - Sewer Utility
$0
$0
$587,000
$611,000
$636,000
$662,000
$13,735,000
Funding Source Total
$0
$0
$587,000
$611,000
$636,000
$662,000
$13,735,000
Packet Pg. 288
FACILITIE
d
f J rt
i
.r
W
H I S T O R I C A L
-
MUSEUM AL,
*191
[� L IL
• �- � -�-�� -�we -ass- �.�� . _
2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM CAPITAL IMPROVEMENTS PROJECTS ��
9.3.a
FACILI-'--
#
UP Project
.-
2025-30
'a
M
PWF-01
Boys and Girls Club
Bld-25001
$27,733
$37,453
$32,077
$15,101
$20,000
$0
$132,364
$0
a
$132,: v
PWF-02
Cemetery Building
Bld-25001
$8,414
$3,377
$818
$1,000
$5,000
$2,500
$21,109
$0
c
$21,' a
PWF-03
City Hall
Bld-25001
$25,000
$25,000
$258,628
$150,949
$65,000
$50,000
$574,577
$0
N
$574,! r
PWF-04
Fishing Pier/Beach Ranger Station
Bld-25001
$2,918
$5,628
$1,043
$1,500
$3,000
$5,000
$19,089
$0
$19,( Li
r
PWF-05
Frances Anderson Center
Bld-25001
$20,000
$30,000
$98,892
$385,274
$113,029
$80,000
$727,195
$0
$727,'
U
PWF-06
Fire Station 16
Bld-25001
$35,000
$40,000
$69,388
$30,107
$31,631
$35,000
$241,126
$0
0
$241,' c
N
PWF-07
Fire Station 17
Bld-25001
$30,000
$25,000
$221,922
$27,575
$122,245
$45,000
$471,742
$0
'0
$471,1 c
N
PWF-08
Fire Station 20
Bld-25001
$5,000
$5,500
$94,248
$69,782
$23,765
$20,000
$218,295
$0
$218,, �
Q
PWF-09
Historic Log Cabin
Bld-25001
$1,000
$30,000
$6,469
$1,500
$2,000
$1,500
$42,469
$0
$42,'
Q
PWF-10
Historical Museum
Bld-25001
$3,000
$45,000
$10,000
$4,621
$10,199
$5,000
$77,820
$0
$77,i
PWF-11
Library
Bld-25001
$160,000
$100,000
$53,325
$45,038
$35,000
$25,000
$418,363
$0
(L
$418,: c".)
d
PWF-12
Meadowdale Club House
Bld-25001
$7,985
$4,446
$1,159
$5,000
$5,000
$5,000
$28,590
$0
$28,! y
Y
i
PWF-13
Old Public Works
Bld-25001
$25,000
$25,000
$25,000
$25,000
$24,519
$25,000
$149,519
$0
$149,! 0
PWF-14
Parks Maintenance Building
Bld-25001
$9,349
$5,177
$69,228
$20,000
$10,000
$10,000
$123,754
$0
$123,i =
a
PWF-15
Public Safety
Bld-25001
$50,000
$10,000
$55,169
$151,481
$515,071
$80,000
$861,721
$0
0
$861J c
N
PWF-16
Public Works 0&M
Bld-25001
$524,000
$1,017,000
$80,315
$79,348
$43,821
$50,000
$1,794,484
$0
$1,794,1 N
0
N
PWF-17
Wade James Theater
Bld-25001
$3,000
$45,000
$43,880
$115,734
$21,872
$25,000
$254,486
$0
$254,'
a�
E
PWF-18
Yost Pool House
Bld-25001
$5,000
$8,409
$19,127
$30,389
$30,000
$25,000
$117,925
$0
$117,�
cu
r
r
Q
Packet Pg. 290
FACILITIES
9.3.a
PWF-23 ✓ Library Plaza Deck Waterproofing Project $0
$0
$0
$0
$0
$4,900,000
$4,900,000
$0
PWF-25 ✓ Police Station $0
$0
$0
$0
$100,000
$0
$100,000
$0
EXPENSE TOTAL $942,399
$1,461,990
$1,140,688
$1,159,399
$1,181,152
$5,389,000
$11,274,628
$0
Fund 016 (2021 Facilities Bond)
$450,000
$350,000
$0
$0
$0
$0
$800,000
$0
Fund 016 (non -bond)
$93,399
$134,813
$151,159
$70,949
$0
$0
$450,320
$0
Fund 421 - Water Utility
$133,000
$324,000
$0
$0
$0
$0
$457,000
$0
Fund 422 - Stormwater Utility
$133,000
$324,000
$0
$0
$0
$0
$457,000
$0
Fund 423 - Sewer Utility
$133,000
$324,000
$0
$0
$0
$0
$457,000
$0
Unsecured Funding
$0
$5,177
$989,529
$1,088,450
$1,181,152
$5,389,000
$8,553,308
$0
FUNDING TOTAL
$942,399
$1,461,990
$1,140,688
$1,159,399
$1,181,152
$5,389,000
$11,174,628
$0
a
$4,900,( v
c
$100,( a
$11,274,f m
0
m
. r
a
m
$800,( c
M
O
$450,;
in
O
$457,(
U_
$457,(
0
$457,( Q
z
M
$8,653,: m
$11,274,( a
U
Y
i
O
c�
w
Q
Packet Pg. 291
PWF-01
BOYS AND GIRLS CLUB
Benefit Public owned facilities and properties are maintained to assure safe and efficient
operating conditions and to assure to the protection of the asset throughout an
expected lifespan
Description This building built in 1900 was the original field house for Edmonds High School. The
property is located at Civic Field and not part of the large Civic Field Park restoration
project. The building is solely operated by the Snohomish County Boys and Girls Clut
in partnership with the City's Parks and Recreation department. The building has
sustained some interior settling that will require immediate repair to back hallway floor
and the back stairway. It has significant need for major renovations if it is expected to
be in operation for another 10 years. Renovation and deferred maintenance may
eclipse the building value in its current location. Floor stabilization work was
completed, and building is now on a run to fail model waiting replacement of building
through a private public partnership. Building will be maintained in operational
readiness to support the Boys and Girls Club, until their new building is constructed.
Projects: Exterior plumbing access, Window replacement, Roof replacement, Siding
replacement, ADA Access, Plumbing replacement, Front entry door replacement, FirE
Alarm System new installation, Fire Sprinkler updates, Baseboard heating replaceme
If the Boys and Girls Club builds a new facility in the future, then maintenance fundinc
programmed for the building will be adjusted to align with the project schedule.
Estimated Project Cost $27,733 (2025)
'includes prior year expenditures
Budget
Project Cost 2025 2026 2027 2028 2029
Construction\Professional $27,733 $37,453 $32,077 $15,101 $20,000
Services
Expense Total
$27,733
$37,453
$32,077
$15,101
$20,000
Fund 016 (non -bond)
$27,733
$37,453
$0
$0
$0
Unsecured Funding
$0
$0
$32,077
$15,101
$20,000
Funding Source Total
$27,733
$37,453
$32,077
$15,101
$20,000
2030 2031-45
$0 $0
$0
$0
$0
$0
$0
$0
$0
$0
Packet Pg. 292
PWF-02
CEMETERY BUILDING
Benefit Public owned facilities and properties are maintained to assure safe and efficient
operating conditions and to assure to the protection of the asset throughout an
expected lifespan
Description This small structure houses the Edmonds Cemetery funerary services and the
cemetery Sextant office. The building is in relatively good condition and has little
deferred maintenance backlog. Minor security and communications updates will be
needed as technology dictates.
Projects:
Minor repair and maintenance
Estimated Project Cost $8,414 (2025)
"includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Construction\Professional
$8,414
$3,377
$818
$1,000
$5,000
$2,500
$0
Services
Expense Total
$8,414
$3,377
$818
$1,000
$5,000
$2,500
$0
Fund 016 (non -bond)
$8,414
$3,377
$0
$0
$0
$0
$0
Unsecured Funding
$0
$0
$818
$1,000
$5,000
$2,500
$0
Funding Source Total
$8,414
$3,377
$818
$1,000
$5,000
$2,500
$0
Packet Pg. 293 1
PWF-03
CITY HALL
Benefit
V,
a
Public owned facilities and properties are maintained to assure safe and efficient
operating conditions and to assure to the protection of the asset throughout an
expected lifespan.
Description City Hall was built in 1979 and was operated as a private business office center until
the City purchased and renovated the building in the 1990s. The City has operated
Edmonds City Hall from this location since the renovations were completed. The
building is in near original condition and needs substantial repair and maintenance.
Projects: All Mechanical, Electrical and Plumbing systems need replacement,
Restroom remodels w/gender neutral consideration, Center Stairway Code updates
and replacement, Lobby remodel, Entry Awning re -glazing, Interior Painting, ADA
accessibility improvements.
Estimated Project Cost $25,000 (2025)
'includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Construction\Professional
$25,000
$25,000
$258,628
$150,949
$65,000
$50,000
$0
Services
Expense Total
$25,000
$25,000
$258,628
$150,949
$65,000
$50,000
$0
Fund 016 (2021 Facilities
$25,000
$25,000
$0
$0
$0
$0
$0
Bond)
Fund 016 (non -bond)
$0
$0
$150,000
$70,949
$0
$0
$0
Unsecured Funding
$0
$0
$108,628
$80,000
$65,000
$50,000
$0
Funding Source Total
$25,000
$25,000
$258,628
$150,949
$65,000
$50,000
$0
Packet Pg. 294
PWF-04
FISHING PIER/BEACH
RANGER STATION
Benefit Public owned facilities and properties are maintained to assure safe and efficient
operating conditions and to assure to the protection of the asset throughout an
expected lifespan.
Description The Pier was recently renovated and is generally in good condition. The Beach Rangl
Office is a 1200 square foot office and restroom facility located near the east end of
the pier. There are season programs and visitor support functions that operate out of
this facility.
Projects: Electrical panel clean up and safety inspection, minor repairs, and
maintenance, Beach Ranger Station/restroom roof replacement.
Estimated Project Cost $2,971 (2025)
*includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Construction\Professional
$2,918
$5,628
$1,043
$1,500
$3,000
$5,000
$0
Services
Expense Total
$2,918
$5,628
$1,043
$1,500
$3,000
$5,000
$0
Fund 016 (non -bond)
$2,918
$5,628
$0
$0
$0
$0
$0
Unsecured Funding
$0
$0
$1,043
$1,500
$3,000
$5,000
$0
Funding Source Total
$2,918
$5,628
$1,043
$1,500
$3,000
$5,000
$0
Packet Pg. 295 1
PWF-05
FRANCES ANDERSON
CENTER
Benefit Public owned facilities and properties are maintained to assure safe and efficient
operating conditions and to assure to the protection of the asset throughout an
expected lifespan.
Description The Frances Anderson Center serves as the City's main recreation center offering ari
athletic and cultural programing year round. Due to the age and high usage of the
building there are many building systems that are in need of replacement or
restoration. Projects: Replacement of Heating Boilers with Electric alternatives that wi
add ventilation, cooling and heating Investment grade audit approved by City Council,
Replacement of all exterior doors scheduled for 2024/25, ADA accessible door
closures, Plumbing drainage collector, Restroom remodels (w/ gender neutral
consideration), Replacement of all plumbing fixtures, Addition of building security car(
readers, Building HVAC controls to maximize efficiency, Fire Sprinkler replacement,
and clean building act compliance efforts will be addresses by IGA.)
Estimated Project Cost $20,000 (2025)
'includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Construction\Professional
$20,000
$30,000
$98,892
$385,274
$113,029
$80,000
$0
Services
Expense Total
$20,000
$30,000
$98,892
$385,274
$113,029
$80,000
$0
Fund 016 (2021 Facilities
$20,000
$30,000
$0
$0
$0
$0
$0
Bond)
Unsecured Funding
$0
$0
$98,892
$385,274
$113,029
$80,000
$0
Funding Source Total
$20,000
$30,000
$98,892
$385,274
$113,029
$80,000
$0
Packet Pg. 296
PUBLIC WORKS - FACILITIES
=.
FIRE STATION 16
Benefit Public owned facilities and properties are maintained to assure safe and efficient
operating conditions and to assure to the protection of the asset throughout an
expected lifespan.
Description This facility is operated by South Snohomish County Fire and Rescue and was built it
2003 and has a building area of 10,700 square feet. The building is in fair condition
and will require some infrastructure updates or replacements to remain operationally
ready for the needs of the City.
Projects: Roll -up Bay door controller replacements, HVAC unit assessment, Gutter
replacement, interior coatings updates.
Estimated Project Cost $35000 (2025)
*includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
ConstructionTrofessional
$35,000
$40,000
$69,388
$30,107
$31,631
$35,000
$0
Services
Expense Total
$35,000
$40,000
$69,388
$30,107
$31,631
$35,000
$0
Fund 016 (2021 Facilities
$35,000
$40,000
$0
$0
$0
$0
$0
Bond)
Unsecured Funding
$0
$0
$69,388
$30,107
$31,631
$35,000
$0
Funding Source Total
$35,000
$40,000
$69,388
$30,107
$31,631
$35,000
$0
Packet Pg. 297
PUBLIC WORKS - FA
MMMMMMt-M���
FIRE STATION 17
Benefit Public owned facilities and properties are maintained to assure safe and efficient
operating conditions and to assure to the protection of the asset throughout an
expected lifespan.
Description This building is operated by South Snohomish County Fire and Rescue, was built in
1999 and has a building area of 9,800 square feet. This building has had some
updates but will need some infrastructure upgrades to remain operationally ready.
Projects: Bay Door assessment, Electrical infrastructure updates, roof soffit enclosurE
interior painting.
Estimated Project Cost $30,000 (2025)
*includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Construction\Professional
$30,000
$25,000
$221,922
$27,575
$122,245
$45,000
$0
Services
Expense Total
$30,000
$25,000
$221,922
$27,575
$122,245
$45,000
$0
Fund 016 (2021 Facilities
$30,000
$25,000
$0
$0
$0
$0
$0
Bond)
Unsecured Funding
$0
$0
$221,922
$27,575
$122,245
$45,000
$0
Funding Source Total
$30,000
$25,000
$221,922
$27,575
$122,245
$45,000
$0
Packet Pg. 298
MEMEMEMEM111
9.3.a
PUBLIC WORKS - FACILITIES
=.
FIRE STATION 20
Benefit Public owned facilities and properties are maintained to assure safe and efficient
operating conditions and to assure to the protection of the asset throughout an
expected lifespan.
Description This building is the eldest of the City's three fire stations and is operated by South
County Fire and Rescue. This station serves Esperance and supports the other two fi
stations in Edmonds. The building is 6400 square feet and was built in 1990. The
building has had significant updates to the exterior envelope and is in need of interior
and HVAC system updates.
Projects: interior painting, restroom fixture replacement
Estimated Project Cost $5000 (2025)
"includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Construction\Professional
$5,000
$5,500
$94,248
$69,782
$23,765
$20,000
$0
Services
Expense Total
$5,000
$5,500
$94,248
$69,782
$23,765
$20,000
$0
Fund 016 (non -bond)
$5,000
$5,500
$0
$0
$0
$0
$0
Unsecured Funding
$0
$0
$94,248
$69,782
$23,765
$20,000
$0
Funding Source Total
$5,000
$5,500
$94,248
$69,782
$23,765
$20,000
$0
Packet Pg. 299
PWF-09
HISTORIC LOG CABIN
Benefit Public owned facilities and properties are maintained to assure safe and efficient
operating conditions and to assure to the protection of the asset throughout an
expected lifespan.
fx
Description This Historic log cabin is home to the Edmonds Chamber of Commerce visitor center;
the structure was a purpose built cabin from the turn of the century. The structure is
professionally maintained on a three year cycle by a log cabin specialist and requires
only minor maintenance and upkeep annually.
Projects: new thick cut shingle replacement, chinking of exterior log finish, interior
lighting. `.
Estimated Project Cost $1000 (2025)
"includes prior year expenditures
Budget
Project Cost
Construction\Professional
Services
Expense Total
Fund 016 (2021 Facilities
Bond)
Fund 016 (non -bond)
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$1,000
$30,000
$6,469
$1,500
$2,000
$1,500
$0
$1,000
$30,000
$6,469
$1,500
$2,000
$1,500
$0
$0
$30,000
$0
$0
$0
$0
$0
$1,000
$0
$0
$0
$0
$0
$0
$0
$0
$6,469
$1,500
$2,000
$1,500
$0
$1,000
$30,000
$6,469
$1,500
$2,000
$1,500
$0
Packet Pg. 300
PWF-10
HISTORICAL MUSEUM
Benefit Public owned facilities and properties are maintained to assure safe and efficient
operating conditions and to assure to the protection of the asset throughout an
expected lifespan.
Description The 110-year-old original Carnegie Library building is home to the Edmonds Museum
The building is on the State of Washington Historic registry and has been well
maintained over the last several years. Buildings of this age require specialized
maintenance and coordination with the state historic architect to maintain the historic
status. Structural stabilization, weatherproofing, and updating the restroom to meet
ADA compliance are the most significant priorities to maintain this facility.
Projects: minor structural reinforcement, entry fagade masonry repair, lower entry
restoration
Estimated Project Cost $3000 (2025)
'includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Construction\Professional
$3,000
$45,000
$10,000
$4,621
$10,199
$5,000
$0
Services
Expense Total
$3,000
$45,000
$10,000
$4,621
$10,199
$5,000
$0
Fund 016 (2021 Facilities
$0
$45,000
$0
$0
$0
$0
$0
Bond)
Fund 016 (non -bond)
$3,000
$0
$0
$0
$0
$0
$0
Unsecured Funding
$0
$0
$10,000
$4,621
$10,199
$5,000
$0
Funding Source Total
$3,000
$45,000
$10,000
$4,621
$10,199
$5,000
$0
Packet Pg. 301
PWF-11
Benefit Public owned facilities and properties are maintained to assure safe and efficient
operating conditions and to assure to the protection of the asset throughout an
expected lifespan.
Description The Edmonds Library is operated by the Sno-Isle Library system with exception of the
Second floor Plaza room rental space. The library is a 19,000 square foot building bul
in 1982. The building hosts special event rentals and daily Library programming and
community services. This is one of the City's most heavily used buildings by the publil
and has significant deferred maintenance needs, including the building fagade, roof
and plaza deck waterproofing.
Projects: window replacement, ADA access device upgrades or replacement, gender
inclusive public restroom creation, Plaza Room restroom/changing facilities, Plaza
Room AN installation, building masonry restoration or building cladding, exterior
stairway restoration, HVAC ventilation fan assessment, building breezeway remodel,
flood damage restoration, and plaza level green roof now on CIP.
Estimated Project Cost $160,000 (2025)
*includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Construction\Professional
$160,000
$100,000
$53,325
$45,038
$35,000
$25,000
$0
Services
Expense Total
$160,000
$100,000
$53,325
$45,038
$35,000
$25,000
$0
Fund 016 (2021 Facilities
$160,000
$100,000
$0
$0
$0
$0
$0
Bond)
Unsecured Funding
$0
$0
$53,325
$45,038
$35,000
$25,000
$0
Funding Source Total
$160,000
$100,000
$53,325
$45,038
$35,000
$25,000
$0
Packet Pg. 302
PWF-12
MEADOWDALE CLUB
HOUSE
Benefit Public owned facilities and properties are maintained to assure safe and efficient
operating conditions and to assure to the protection of the asset throughout an
expected lifespan.
Description This 4000 square foot facility was built in 1965 as a community theater facility and latf
was transformed into the Meadowdale community club house. The building is currentl
owned and maintained by the City of Edmonds and houses the City operated
Meadowdale pre-school and the 1500 square foot Meadowdale club house rental
facility. This facility while dated has been well maintained and only requires minor
maintenance and repairs.
Projects: minor maintenance and repairs, interior flooring and painting, and bath fixtui
replacement.
Estimated Project Cost $7,985 (2025)
'includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Construction\Professional
$7,985
$4,446
$1,159
$5,000
$5,000
$5,000
$0
Services
Expense Total
$7,985
$4,446
$1,159
$5,000
$5,000
$5,000
$0
Fund 016 (non -bond)
$7,985
$4,446
$1,159
$0
$0
$0
$0
Unsecured Funding
$0
$0
$0
$5,000
$5,000
$5,000
$0
Funding Source Total
$7,985
$4,446
$1,159
$5,000
$5,000
$5,000
$0
Packet Pg. 303
MMMML9.3.a��
PWF-13
OLD PUBLIC WORKS
Benefit Public owned facilities and properties are maintained to assure safe and efficient
operating conditions and to assure to the protection of the asset throughout an
expected lifespan.
Description This facility was built in 1965 to house the City's Public Works Department, the buildir
was converted in 1995 to tenant space and City storage, as well as Edmonds Police
large evidence storage. This is a vital piece of property adjacent to the Waste Water
Treatment Plant, and could be converted for utility use if regulatory requirements
dictate. Building is primarily used as storage and will need some updates to maintain
current operational readiness.
Projects: HVAC updates, roll -up door replacement, security camera system.
Estimated Project Cost $25000 (2025)
"includes prior year expenditures
Budget
Project Cost
Construction\Professional
Services
Expense Total
Fund 016 (non -bond)
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$25,000
$25,000
$25,000
$25,000
$24,519
$25,000
$0
$25,000
$25,000
$25,000
$25,000
$24,519
$25,000
$0
$25,000
$25,000
$0
$0
$0
$0
$0
$0
$0
$25,000
$25,000
$24,519
$25,000
$0
$25,000
$25,000
$25,000
$25,000
$24,519
$25,000
$0
Packet Pg. 304
PWF-14
PARKS MAINTENANCE
BUILDING
Benefit Public owned facilities and properties are maintained to assure safe and efficient
operating conditions and to assure to the protection of the asset throughout an
expected lifespan.
Description This facility was built in 1967 by Ed Huntley who at the time was the City Facilities
supervisor. The 4800 square foot facility now houses all City Facility Operations
staff(11) and all of Park and Rec Parks Maintenance Staff(12+ seasonal help) This
Facility is home to the City Carpentry Shop, Key Shop, City Flower program, Parks
engine repair shop and Parks and Facilities maintenance supply storage as well as
Parks and Facilities Manager offices. This Facility is near end of life and is undersizec
to support the departmental staffing that are assigned to this facility.
Projects: maintenance and repair to maintain operational capacity, ADA restroom
updates, shop floor replacement, Pine St. facility exit, exterior painting.
Estimated Project Cost $9,349 (2025)
'includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Construction\Professional
$9,349
$5,177
$69,228
$20,000
$10,000
$10,000
$0
Services
Expense Total
$9,349
$5,177
$69,228
$20,000
$10,000
$10,000
$0
Fund 016 (non -bond)
$9,349
$0
$0
$0
$0
$0
$0
Unsecured Funding
$0
$5,177
$69,228
$20,000
$10,000
$10,000
$0
Funding Source Total
$9,349
$5,177
$69,228
$20,000
$10,000
$10,000
$0
Packet Pg. 305
PWF-15
J.
PUBLIC SAFETY
Benefit Public owned facilities and properties are maintained to assure safe and efficient
operating conditions and to assure to the protection of the asset throughout an
expected lifespan.
Description The Public Safety building houses Edmonds Police Department, Edmonds Municipal
Court and the City Council Chambers. The building was built in 1999 encompassing
30,000 square feet of office, court and municipal government uses. The building
houses one of the City emergency operations centers, large police training, simulator
facilities and evidence processing and storage. The building has had minimal system
updates over its life and has a significant amount of deferred maintenance and shoulc
be retrofitted with new fire sprinklers.
Projects: air handler and outdoor ventilation unit replacements, parking lot
reconfiguration to meet current usage, fire sprinkler installation, interior hallway
renovation and painting, sleeping room remodel and gender specific/neutral
accommodations, gender inclusive public restrooms, operable windows in specific
locations, court's flat roof replacement.
Estimated Project Cost $50000 (2025)
"includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
ConstructionRofessional
$50,000
$10,000
$55,169
$151,481
$515,071
$80,000
$0
Services
Expense Total
$50,000
$10,000
$55,169
$151,481
$515,071
$80,000
$0
Fund 016 (2021 Facilities
$50,000
$10,000
$0
$0
$0
$0
$0
Bond)
Unsecured Funding
$0
$0
$55,169
$151,481
$515,071
$80,000
$0
Funding Source Total
$50,000
$10,000
$55,169
$151,481
$515,071
$80,000
$0
Packet Pg. 306
ML9.3.a��
PWF-16
PUBLIC WORKS O&M
Benefit Public owned facilities and properties are maintained to assure safe and efficient
operating conditions and to assure to the protection of the asset throughout an
expected lifespan.
Description This building built in 1995 houses four Public Works divisions and the auxiliary City
Emergency Operations Center. This building is 28,000 square feet and is capable of
operations 24/7 during weather emergencies and natural disasters. The building has
significant deferred maintenance needs and infrastructure updates.
Projects: vehicle yard leveling, HVAC unit replacements, roof system for material
bunkers, ventilation fan replacements, fire alarm system replacement, lobby remodel,
restroom remodel with gender inclusivity considerations, electric vehicle charging and
maintenance infrastructure, emergency communications updates, interior hallway
flooring thresholds, utility bay HVAC replacement, water main replacement (building
connection).
Estimated Project Cost $125000 (2025)
"includes prior year expenditures
Budget
Project Cost
Construction\Professional
Services
Expense Total
Fund 016 (2021 Facilities
Bond)
Unsecured Funding
Fund 421 -Water Utility
Fund 422 - Stormwater Utility
Fund 423 - Sewer Utility
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$524,000
$1,017,000
$80,315
$79,348
$43,821
$50,000
$0
$524,000
$1,017,000
$80,315
$79,348
$43,821
$50,000
$0
$125,000
$45,000
$0
$0
$0
$0
$0
$0
$0
$80,315
$79,348
$43,821
$50,000
$0
$133,000
$324,000
$0
$0
$0
$0
$0
$133,000
$324,000
$0
$0
$0
$0
$0
$133,000
$324,000
$0
$0
$0
$0
$0
$524,000
$1,017,000
$80,315
$79,348
$43,821
$50,000
$0
Packet Pg. 307
PWF-17
WADE JAMES THEATER
Benefit Public owned facilities and properties are maintained to assure safe and efficient
operating conditions and to assure to the protection of the asset throughout an
expected lifespan.
Description This community theater was built by the Driftwood Players theater group in 1967 and
was deeded to City ownership at a later date. The facility is 6,300 square feet in size
and houses the Driftwood Players theatrical performances and City meetings. The
City's maintenance responsibilities are limited to large infrastructure, parking lot,
roofing, and grounds.
Projects: parking lot repair and recoating, minor repair, and maintenance.
Estimated Project Cost $3000 (2025)
*includes prior year expenditures
Budget
Project Cost
Construction\Professional
Services
Expense Total
Fund 016 (2021 Facilities
Bond)
Fund 016 (non -bond)
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$3,000
$45,000
$43,880
$115,734
$21,872
$25,000
$0
$3,000
$45,000
$43,880
$115,734
$21,872
$25,000
$0
$0
$0
$0
$0
$0
$0
$0
$3,000
$45,000
$0
$0
$0
$0
$0
$0
$0
$43,880
$115,734
$21,872
$25,000
$0
$3,000
$45,000
$43,880
$115,734
$21,872
$25,000
$0
Packet Pg. 308
PUBLIC WORKS - FACILITIES
9.3.a
YOST POOL HOUSE
Benefit Public owned facilities and properties are maintained to assure safe and efficient
operating conditions and to assure to the protection of the asset throughout an
expected lifespan.
Description This recreational facility houses the City's aquatic programing and some Parks and
Recreation programs. Built in 1971 the pool house historically was only operated
seasonally. The tenant run aquatic programing is currently expanding to year round IE
and team aquatic activities and will continue to support summer open swim
programing. The facility requires minimal maintenance to remain operational and is
subject to tenant lease terms of use.
Projects: security updates, roof replacement, gutter replacement, plumbing fixture
updates, exterior door replacements, operational repair and maintenance to
accommodate 365 operations.
Estimated Project Cost $5000 (2025)
'includes prior year expenditures
Budget
Project Cost
ConstructionTrofessional
Services
Expense Total
Fund 016 (2021 Facilities
Bond)
Fund 016 (non -bond)
Unsecured Funding
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$5,000
$8,409
$19,127
$30,389
$30,000
$25,000
$0
$5,000
$8,409
$19,127
$30,389
$30,000
$25,000
$0
$5,000
$0
$0
$0
$0
$0
$0
$0
$8,409
$0
$0
$0
$0
$0
$0
$0
$19,127
$30,389
$30,000
$25,000
$0
$5,000
$8,409
$19,127
$30,389
$30,000
$25,000
$0
Packet Pg. 309
PWF-23
LIBRARY PLAZA DECK
WATERPROOFING
PROJECT
Benefit Maintaining building in operational and safe condition, in order to maintain partnership
with Sno-Isle Library system. Preservation of the City's physical assets in appropriate
condition vs. the age of the facility and historic capital investment.
Description The Library Plaza Deck is essentially a green roof on the second floor of the Edmond
Sno-Isle Library. The deck surface was waterproofed and remodeled in 2003, since
that project continuous water intrusion has occurred through the waterproof
membrane. This water intrusion has been successfully mitigated over the years and
has not been deemed a project of significance previously. In 2018 Western Specialty
Contractors inspected the water intrusion and offered an initial ROM price to demolisl•
and waterproof the existing plaza deck. Rebuilding the plaza deck and replacement o
landscape, planters, grass, pavement, flashing and hand railings would be a separatE
construction project. The Parks Director in 2018 offered an estimate to replace
landscaping and irrigations systems. In 2021 a draft structural report was performed t
MLA Engineering to discover any structural consequences from the years of water
intrusion, building was deemed structurally sound and water intrusion not factoring in
building structural stability.
Estimated Project Cost $4,900,000 (2030)
Includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
Construction\Professional
$0
$0
$0
$0
$0
$4,900,000
Services
Expense Total
$0
$0
$0
$0
$0
$4,900,000
Unsecured Funding
$0
$0
$0
$0
$0
$4,900,000
Funding Source Total
$0
$0
$0
$0
$0
$4,900,000
2031-45
$0
$0
$0
$0
Packet Pg. 310
PWF-25
POLICE STATION
Benefit
Description Feasibility Study to relocate the existing Police Station or create a new substation
Design, location and funding TBD.
Estimated Project Cost TBD
'includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$0
$0
$0
$0
$100,000
$0
$0
Expense Total
$0
$0
$0
$0
$100,000
$0
$0
Unsecured Funding
$0
$0
$0
$0
$100,000
$0
$0
Funding Source Total
$0
$0
$0
$0
$100,000
$0
$0
Packet Pg. 311 1
�^ Q
Packet Pg. 312
WASTEWATER TREATMENT PLANT
9.3.a
PWP-01
PWP-04
PWP-08
PWP-10
PWP-11
PWP-12
PWP-13
PWP-14
PWP-15
PWP-16
PWP-17
PWP-18
PWP-19
PWP-20
PWP-21
WWTP Annual Capital Replacement In -
House Projects
Nutrient Removal Project
Gasification Bypass (Class A Solids
Production)
VFD Upgrades
760-25016
Primary Clarifier 2 Rehab
Primary Clarifier 3 Rehab
ODS (Primary Sludge) Pump Replacement
Chlorine Contact Channel Sluice Gates
Replacement
Screw Press Feed System Rehab
760-25005
NPW Pumping System Improvements
760-25004
600 Bldg Air Quality Evaluation
760-25006
LPA Blower 303 Rehab
760-25007
600 Bldg Electrical Rehab
760-25009
600 Bldg Air Quality Rehab/Upgrade
760-25011
Secondary Clarifier 2 Rehab
760-25010
EXPENSE TOTAL
City of Shoreline
Fund 423 - Sewer
,0025
20261
128
2029
2030
1 1
1
'Z3
_
. .Total
$100,000
$0
$1,000,000
$1,250,000
$1,250,000
$1,300,000
$4,900,000
$19,500,000
a
$24,400,1 v
$100,000
$650,000
$5,000,000
$5,000,000
$0
$0
$10,750,000
$0
$10,750,11i
$0
$0
$300,000
$0
$0
$0
$300,000
$0
rn
$300,1
$250,000
$250,000
$0
$0
$0
$0
$500,000
$0
$500,11i
�a
r
$0
$0
$0
$0
$0
$0
$0
$0
R
v
$0
$0
$0
$0
$0
$0
$0
$950,000
$950,10
N
$0
$350,000
$250,000
$0
$0
$0
$600,000
$0
$600,1 N
CD
$0
$0
$0
$375,000
$0
$0
$375,000
$0
$375,1 LL
Q
Q
$150,000
$0
$0
$0
$0
$0
$150,000
$0
$150,1
J
Q
$75,000
$0
$0
$0
$0
$0
$75,000
$0
$75,1 9
$50,000
$0
$0
$0
$0
$0
$50,000
$0
a
$50,1 v
d
$35,000
$0
$0
$0
$0
$0
$35,000
$0
$35,( y
L
$0
$250,000
$0
$0
$0
$0
$250,000
$0
$250,( 0
V
$0 $250,000 $0 $0 $0 $0 $250,000 $0 $250,( 3
a
$0 $450,000 $0 $0 $0 $0 $450,000 $0 $450,1CD
N
$760,000 $2,200,000 $6,550,000 $6,625,000 $1,250,000 $1,300,000 $18,685,000 $20,450,000 $39,135,( �
N
O
N
1 1 ++
P025 = 2026 2027 20281 IF 1 1 1 • • _
Total
E
$72,124 $208,780 $621,595 $628,712 $118,625 $123,370 $1,773,206 $1,940,705 $3,713,1
$386,005 $1,117,380 $3,326,745 $3,364,838 $634,875 $660,270 $9,490,113 $10,386,555 $19,876,668
9.3.a
WASTEWATER TREATMENT PLANT
ling Source 2025 2026 2027 2028 2029 2030 2025-30 2031-45 Grand To
Total IF
a -
Mountlake Terrace $176,092 $509,740 $1,517,635 $1,535,013 $289,625 $301,210 $4,329,315 $4,738,265 $9,067,! v
c
Olympic View Water Sewer District $125,779 $364,100 $1,084,025 $1,096,437 $206,875 $215,150 $3,092,366 $3,384,475 $6,476,1 a
U)
m
FUNDING TOTAL $760,000 $2,200,000 $6,550,000 $6,625,000 $1,250,000 $1,300,000 $18,685,000 $20,450,000 $39,135,(
R
u_
r
Q
M
U
O
M
O
N
LO
N
Co
N
Packet Pg. 314
PWP-01
WWTP ANNUAL
CAPITAL
REPLACEMENT IN-
HOUSE PROJECTS
Benefit
This project ensures that critical infrastructure is maintained and equipment is replace
in order to reduce risk
to the City.
Description
The WWTP Annual
Capital Replacement In -House Projects is intended
to maintain
infrastructure and equipment to ensure that the
treatment plant is well maintained.
Estimated Project Cost
$100,000 (2024)
'includes prior year expenditures
Budget
Project Cost
2025 2026
2027
2028
2029
2030
2031-45
Design
$0 $0
$200,000
$250,000
$250,000
$300,000
$4,875,000
Construction
$100,000 $0
$800,000
$1,000,000
$1,000,000
$1,000,000
$14,625,000
Expense Total
$100,000 $0
$1,000,000
$1,250,000
$1,250,000
$1,300,000
$19,500,000
Fund 423 - Sewer Utility
$50,790 $0
$507,900
$634,875
$634,875
$660,270
$9,904,050
Mountlake Terrace
$23,170 $0
$231,700
$289,625
$289,625
$301,210
$4,518,150
Olympic View Water Sewer
$16,550 $0
$165,500
$206,875
$206,875
$215,150
$3,227,250
District
City of Shoreline
$9,490 $0
$94,900
$118,625
$118,625
$123,370
$1,850,550
Funding Source Total
$100,000 $0
$1,000,000
$1,250,000
$1,250,000
$1,300,000
$19,500,000
Packet Pg. 315
PWP-04
NUTRIENT REMOVAL
PROJECT
Benefit To meet new permit requirements and increase capacity for projected 20-year service
area expansion.
Description The WA Dept of Ecology has imposed the Puget Sound Nutrient General Permit upoI
us. It is anticipated that our current process will not be able to meet these new permi
requirements. This decision package will allow us to team with an engineering firm tc
study our current process and design a solution that will allow our plant to meet the
new PSNGP requirements as well as accommodate projected service area growth ov
the next decade.
Estimated Project Cost $10,750,000
'includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Fund 423 - Sewer Utility
Mountlake Terrace
Olympic View Water Sewer
District
City of Shoreline
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$100,000
$650,000
$0
$0
$0
$0
$0
$0
$0
$5,000,000
$5,000,000
$0
$0
$0
$100,000
$650,000
$5,000,000
$5,000,000
$0
$0
$0
$50,790
$330,135
$2,539,500
$2,539,500
$0
$0
$0
$23,170
$150,605
$1,158,500
$1,158,500
$0
$0
$0
$16,550
$107,575
$827,500
$827,500
$0
$0
$0
$9,490
$61,685
$474,500
$474,500
$0
$0
$0
$100,000
$650,000
$5,000,000
$5,000,000
$0
$0
$0
Packet Pg. 316
PWP-08
GASIFICATION
BYPASS (CLASS A
SOLIDS PRODUCTION)
Benefit Allow solids handling system redundancy and the ability to run the dryer unit
independently in the event of a gasification system failure or repair. The dryer is
capable of producing Class A biosolids, which would negate the need for temporary
hauling and disposal of wet cake at a rate of up to $200,000/month.
Description
This allows the ability to continue production of class A solids if/when the gasification
system is shut down for repairs or preventative maintenance. The ability to produce
and haul class A solids will eliminate a temporary but substantial cost increase haulini,
as this product is essentially the same in volume as biochar or concentrated minerals
and is accepted at the local transfer station whereas if this option is not available,
sludge will need to be loaded into trailers and hauled to Oregon as was done during
the Carbon Recovery Project at a cost of up to $200,000 per month. This redundant
solids processing mode was an option to add to the Carbon Recovery Project and wa
rejected by previous administration. Along with the savings in hauling costs, there wil
be no additional odor issues or daily sludge truck traffic in the adjacent neighborhood
Estimated Project Cost
$300,000
"includes prior year expenditures
Budget
Project Cost
2025 2026 2027 2028 2029 2030 2031-45
Design
$0 $0 $50,000 $0 $0 $0 $0
Construction
$0 $0 $250,000 $0 $0 $0 $0
Expense Total
$0 $0 $300,000 $0 $0 $0 $0
Fund 423 - Sewer Utility
$0 $0 $152,370 $0 $0 $0 $0
Mountlake Terrace
$0 $0 $69,510 $0 $0 $0 $0
Olympic View Water Sewer
$0 $0 $49,650 $0 $0 $0 $0
District
City of Shoreline
$0 $0 $28,470 $0 $0 $0 $0
Funding Source Total
$0 $0 $300,000 $0 $0 $0 $0
Packet Pg. 317
PWP-10
VFD UPGRADES
Benefit
To keep critical equipment reliable and in working condition.
Description The WWTP has several VFD's (variable frequency drives) on various critical
equipment influent pumps, effluent pumps, RAS/WAS pumps, aeration blowers, etc.
These VFD's have an expected useful life of 15-20 years. Several of the VFD's here
the plant range in age between 20-30 years old. There have already been some
failures and replacements made. These outdated VFD's need to be replaced to avoic
a catastrophic failure event that could happen to these weakened state VFD's for any
number of reasons, including abrupt starting and stopping due to power bumps/loss,
switching from grid to generator power supply or just a parts failure. If multiple critical
components fail simultaneously, then the plant may lose it's ability to treat wastewater
that meets NPDES permit requirements resulting in pollution of our receiving waters
and possible fines by our governing agency.
Estimated Project Cost $500,000
'includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Fund 423 - Sewer Utility
Mountlake Terrace
Olympic View Water Sewer
District
City of Shoreline
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$50,000
$50,000
$0
$0
$0
$0
$0
$200,000
$200,000
$0
$0
$0
$0
$0
$250,000
$250,000
$0
$0
$0
$0
$0
$126,975
$126,975
$0
$0
$0
$0
$0
$57,925
$57,925
$0
$0
$0
$0
$0
$41,375
$41,375
$0
$0
$0
$0
$0
$23,725
$23,725
$0
$0
$0
$0
$0
$250,000
$250,000
$0
$0
$0
$0
$0
Packet Pg. 318
PWP-11
PRIMARY CLARIFIER 2
REHAB
A 9.3.a
a
U
Benefit Improve reliability of critical infrastructure as it is in a state of imminent failure. Ensur(
WWTP's ability to treat wastewater up to its rated capacity and meet discharge permi-
requirements.
Description Primary Clarifier #2 cage, center column, feedwell, corner sweeps, weir, counterweigl
skimming device and rake arms need replacement due to severe corrosion. The stee
has not been replaced since the original construction. The limited access will require
that pieces be assembled inside the tank. The concrete structure also needs to be
inspected and repaired as needed as corrosion of the concrete in spots has led to
exposed rebar and may have compromised the structural integrity of the clarifier. Th(
project was delayed in 2024 and a carryforward budget amendment will move funds ti
2025 to complete project.
Estimated Project Cost $600,000
"includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$0
$0
$0
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$0
$0
$0
Expense Total
$0
$0
$0
$0
$0
$0
$0
Fund 423 - Sewer Utility
$0
$0
$0
$0
$0
$0
$0
Mountlake Terrace
$0
$0
$0
$0
$0
$0
$0
Olympic View Water Sewer
$0
$0
$0
$0
$0
$0
$0
District
City of Shoreline
$0
$0
$0
$0
$0
$0
$0
Funding Source Total
$0
$0
$0
$0
$0
$0
$0
Packet Pg. 319
PWP-12
PRIMARY CLARIFIER 3
REHAB
4
r
Benefit Improve reliability of critical infrastructure as it is approaching a state of imminent
failure. Ensure WWTP's ability to treat wastewater up to its rated capacity and meet
discharge permit requirements.
Description Primary Clarifier #3 (dual drive) cages, center columns, feedwells, corner sweeps,
weirs, counterweights, skimming devices and rake arms need replacement due to
severe corrosion. The steel is in a highly corrosive environment and has not been
replaced since the original construction approximately 30 years ago. The limited
access will require that pieces be assembled inside the tank. The concrete structure
also needs to be inspected and repaired as needed as corrosion of the concrete in
spots has led to exposed rebar and may have compromised the structural integrity of
the clarifier. After recent evaluation od PC 3 it was determined, based on the current
condition of the clarifier, this rehab can occur after 2030.
Estimated Project Cost $950,000
'includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Fund 423 - Sewer Utility
Mountlake Terrace
Olympic View Water Sewer
District
City of Shoreline
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$0
$0
$0
$0
$0
$150,000
$0
$0
$0
$0
$0
$0
$800,000
$0
$0
$0
$0
$0
$0
$950,000
$0
$0
$0
$0
$0
$0
$482,505
$0
$0
$0
$0
$0
$0
$220,115
$0
$0
$0
$0
$0
$0
$157,225
$0
$0
$0
$0
$0
$0
$90,155
$0
$0
$0
$0
$0
$0
$950,000
Packet Pg. 320
PWP-13
ODS (PRIMARY
SLUDGE) PUMP
REPLACEMENT
Benefit
I
Improve reliability, redundancy and efficiency of the primary sludge and scum pumps
by replacing 30+ year old pumps and improving piping system.
Description The ODS pumps are over 30 years old and are at the end of their useful life. The
maintenance, reliability and efficiency of the primary sludge pumping system would bE
greatly improved by replacing the current diaphragm pumps with progressive cavity
pumps. During this pump replacement, piping modifications would also be done to
allow pumps to support more than one clarifier, improving system redundancy along
with reliability.
Estimated Project Cost $600,000
"includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$0
$100,000
$0
$0
$0
$0
$0
Construction
$0
$250,000
$250,000
$0
$0
$0
$0
Expense Total
$0
$350,000
$250,000
$0
$0
$0
$0
Fund 423 - Sewer Utility
$0
$177,765
$126,975
$0
$0
$0
$0
Mountlake Terrace
$0
$81,095
$57,925
$0
$0
$0
$0
Olympic View Water Sewer
$0
$57,925
$41,375
$0
$0
$0
$0
District
City of Shoreline
$0
$33,215
$23,725
$0
$0
$0
$0
Funding Source Total
$0
$350,000
$250,000
$0
$0
$0
$0
Packet Pg. 321
PWP-14
CHLORINE CONTACT
CHANNEL SLUICE
GATES REPLACEMENT
Benefit To replace problematic, yet critical valves with more reliable technology that helps to
ensure disinfection system functionality and the ability to continue to meet NPDES
discharge permit requirements.
Description Replace two gate valves and actuators at the inlets of the two chlorine contact
channels. These gates have repeatedly failed. Repair is often expensive and time
consuming, as access is an issue, so it is necessary to rent scaffolding and other
equipment to make repairs. When a gate fails, it effectively cuts the disinfection
capacity of the plant in half. These are critical pieces of equipment and need to be
replaced with a different technology to improve performance and reliability.
Estimated Project Cost $375,000
"includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$0
$0
$0
$75,000
$0
$0
$0
Construction
$0
$0
$0
$300,000
$0
$0
$0
Expense Total
$0
$0
$0
$375,000
$0
$0
$0
Fund 423 - Sewer Utility
$0
$0
$0
$190,463
$0
$0
$0
Mountlake Terrace
$0
$0
$0
$86,888
$0
$0
$0
Olympic View Water Sewer
$0
$0
$0
$62,062
$0
$0
$0
District
City of Shoreline
$0
$0
$0
$35,587
$0
$0
$0
Funding Source Total
$0
$0
$0
$375,000
$0
$0
$0
Packet Pg. 322
PWP-15
SCREW PRESS FEED
SYSTEM REHAB
Benefit
Description
Replacing these pumps allows for consistent and reliable operation of the sludge
dewatering system which supplies dewatered biosolids to the new gasification system i
Replace two sludge feed pumps and three polymer pumps that are reaching the end
their useful life and are often down for repairs.
Estimated Project Cost $150,000
'includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Construction
$150,000
$0
$0
$0
$0
$0
$0
Expense Total
$150,000
$0
$0
$0
$0
$0
$0
Fund 423 - Sewer Utility
$76,185
$0
$0
$0
$0
$0
$0
Mountlake Terrace
$34,755
$0
$0
$0
$0
$0
$0
Olympic View Water Sewer
$24,825
$0
$0
$0
$0
$0
$0
District
City of Shoreline
$14,235
$0
$0
$0
$0
$0
$0
Funding Source Total
$150,000
$0
$0
$0
$0
$0
$0
Packet Pg. 323 1
PWP-16
NPW PUMPING
SYSTEM
IMPROVEMENTS
Benefit
Description
Current NPW system is non-functional as currently built. Currently, only one pump
provides the needed system pressure to allow the standby generator to function. In th
event of that pump failing, the standby generator (which is required as a backup powE
source per our NPDES permit) is not operable. This project will allow for much needec
NPW redundancy.
Relocate one NPW pump, replace one NPW pump and modify piping as needed to
achieve system functionality.
Estimated Project Cost $75,000
"includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Construction
$75,000
$0
$0
$0
$0
$0
$0
Expense Total
$75,000
$0
$0
$0
$0
$0
$0
Fund 423 - Sewer Utility
$38,093
$0
$0
$0
$0
$0
$0
Mountlake Terrace
$17,378
$0
$0
$0
$0
$0
$0
Olympic View Water Sewer
$12,412
$0
$0
$0
$0
$0
$0
District
City of Shoreline
$7,118
$0
$0
$0
$0
$0
$0
Funding Source Total
$75,000
$0
$0
$0
$0
$0
$0
Packet Pg. 324
PWP-17
600 BLDG AIR
QUALITY EVALUATION
Benefit After rehab/upgrade project is complete (2026-part 2 of this project), it will improve
performance and reliability as well as lowering operational and maintenance costs for
the systems mentioned above.
Description Evaluate the AQ issues within the 600 Bldg with a focus on the lower level where H2S
gas appears to be accumulating at levels that are high enough to do damage to
sensitive electronic equipment such as VFD's, control boards and relay switches.
These electronic failures cause shutdowns in the primary sludge pumping system, hic
pressure plant air system and sludge dewatering system.
Estimated Project Cost $50,000
Includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$50,000
$0
$0
$0
$0
$0
$0
Expense Total
$50,000
$0
$0
$0
$0
$0
$0
Fund 423 - Sewer Utility
$25,395
$0
$0
$0
$0
$0
$0
Mountlake Terrace
$11,585
$0
$0
$0
$0
$0
$0
Olympic View Water Sewer
$8,275
$0
$0
$0
$0
$0
$0
District
City of Shoreline
$4,745
$0
$0
$0
$0
$0
$0
Funding Source Total
$50,000
$0
$0
$0
$0
$0
$0
Packet Pg. 325
PWP-18
LPA BLOWER 303 AND
305 REHAB
Benefit
I
As these are our medium sized blowers, this allows for more efficient and cost -saving
operation of the LPA system.
Description Blowers are currently running at 75% capacity, are at the end of their useful life
(30,000 hrs, put in service in 2017), and due for rebuild.
Estimated Project Cost $70,000
"includes prior year expenditures
Budget
Project Cost
Construction
Expense Total
Fund 423 - Sewer Utility
Mountlake Terrace
Olympic View Water Sewer
District
City of Shoreline
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45 ;
$35,000
$35,000
$0
$0
$0
$0
$0
$35,000
$35,000
$0
$0
$0
$0
$0
$17,777
$17,777
$0
$0
$0
$0
$0
I
$8,110
$8,110
$0
$0
$0
$0
$0
$5,792
$5,792
$0
$0
$0
$0
I
$0
$3,322
$3,322
$0
$0
$0
$0
$0 i
$35,000
$35,001
$0
$0
$0
$0
I
$0
Packet Pg. 326
PWP-19
600 BLDG ELECTRICAL
REHAB
Benefit
Rehab of the 600 bldg electrical system will result in a tremendous increase in the
reliability of the critical systems within the 600 bldg including sludge dewatering, c
primary sludge pumping, high-pressure air, chemical disinfection pumps and several
others.
Description Both the high and low voltage electrical systems are in a degraded state and have
functionality issues during periods of high demand, often resulting in equipment failun i
due to MCC or breaker failures. This is a critical system and is at the end of its useful
life, being well over thirty years old.
Estimated Project Cost $250,000
"includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Fund 423 - Sewer Utility
Mountlake Terrace
Olympic View Water Sewer
District
City of Shoreline
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$50,000
$0
$0
$0
$0
$0
$0
$200,000
$0
$0
$0
$0
$0
$0
$250,000
$0
$0
$0
$0
$0
$0
$126,975
$0
$0
$0
$0
$0
$0
$57,925
$0
$0
$0
$0
$0
$0
$41,375
$0
$0
$0
$0
$0
$0
$23,725
$0
$0
$0
$0
$0
$0
$250,000
$0
$0
$0
$0
$0
Packet Pg. 327
PWP-20
600 BLDG AIR
QUALITY
REHAB/UPGRADE
'"NW
_;aml
Benefit Improve performance and reliability as well as lowering operational and maintenance
costs for the systems mentioned above.
Description Perform AQ system repairs and modifications from the prior years' AQ Evaluation
Project to resolve the AQ issues within the 600 bldg with a focus on the lower level
where 1-12S gas appears to be accumulating at levels that are high enough to do
damage to sensitive electronic equipment such as VFD's, control boards and relay
switches. These electronic failures cause shutdowns in the primary sludge pumping
system, high pressure plant air system and sludge dewatering system.
Estimated Project Cost $250,000
Includes prior year expenditures
Budget
Project Cost
2025
2026
2027
2028
2029
2030
2031-45
Design
$0
$50,000
$0
$0
$0
$0
$0
Construction
$0
$200,000
$0
$0
$0
$0
$0
Expense Total
$0
$250,000
$0
$0
$0
$0
$0
Fund 423 - Sewer Utility
$0
$126,975
$0
$0
$0
$0
$0
Mountlake Terrace
$0
$57,925
$0
$0
$0
$0
$0
Olympic View Water Sewer
$0
$41,375
$0
$0
$0
$0
$0
District
City of Shoreline
$0
$23,725
$0
$0
$0
$0
$0
Funding Source Total
$0
$250,000
$0
$0
$0
$0
$0
Packet Pg. 328
PWP-21
SECONDARY
CLARIFIER 2 REHAB
Benefit
This will increase reliability/redundancy in the secondary system and help ensure the
final effluent meets NPDES discharge permit standards.
Description Secondary Clarifier 2 has reached the end of useful life as its components are over 31
years old and need to be replaced. Clarifier drive, drive motor and steel structure have !
corroded and need repair or replacement. Concrete needs to be evaluated and
repaired if necessary. i
Estimated Project Cost $450,000
'includes prior year expenditures
Budget
Project Cost
Design
Construction
Expense Total
Fund 423 - Sewer Utility
Mountlake Terrace
Olympic View Water Sewer
District
City of Shoreline
Funding Source Total
2025
2026
2027
2028
2029
2030
2031-45
$0
$50,000
$0
$0
$0
$0
$0
$0
$400,000
$0
$0
$0
$0
$0
$0
$450,000
$0
$0
$0
$0
$0
$0
$228,555
$0
$0
$0
$0
$0
$0
$104,265
$0
$0
$0
$0
$0
$0
$74,475
$0
$0
$0
$0
$0
$0
$42,705
$0
$0
$0
$0
$0
$0
$450,000
$0
$0
$0
$0
$0
Packet Pg. 329
CFP/CIP COMPARISION 2024-20
all
2025-2030 PUBLIC WORKS CAPITAL FACILITIES PROGRAM CAPITAL IMPROVEMENTS PROJECTS
9.3.a
CFP /CIP COMPARISON (2024 TO 2025)
PROJECTS ADDED
iiljm• .
Transportation
Safety Action Plan
Secured federal grant to complete plan.
Water
2027 Water Comprehensive Plan Update
Estimated costs for update to existing water comprehensive plan
Water
Phase 21 Annual Replacement Program (2031)
Estimated future costs for waterline replacements.
Storm
Edmonds Marsh Water Quality Improvements (Phase 2)
Estimated future costs for road repairs due to storm replacements
Storm
Phase 11 Storm Maintenance (2031)
Estimated future costs for stormline replacements
Storm
Edmonds Marsh Estuary Planning Study
Estimated future costs for Marsh Planning Study
Sewer
2027 Sewer Comprehensive Plan Update
Estimated costs for update to existing sewer comprehensive plan
Sewer
Phase 18 Annual Sewer Replacement/Rehab (2031)
Estimated future costs for sewerline replacements
WWTP
Screw Press Feed System Rehab
Estimated future costs for waste water treatment plant project.
WWTP
NPW Pumping System Improvements
Estimated future costs for waste water treatment plant project.
WWTP
600 Bldg air Quality Evaluation
Estimated future costs for waste water treatment plant project.
WWTP
LPA Blower 303 Rehab
Estimated future costs for waste water treatment plant project.
WWTP
600 Bldg Air Quality Rehab/Upgrade
Estimated future costs for waste water treatment plant project.
WWTP
Secondary Clarifier 2 Rehab
Estimated future costs for waste water treatment plant project.
Facilities
Police Station
Estimated and future costs for facilities project.
Facilities
Boys and Girls Club
Estimated and future costs for facilities project.
c
a
LL
U_
c
a
m
LL
w
.Q
M
U
0
Cl)
0
N
LO
N
O
N
Packet Pg. 331
9.3.a
CFP /CIP COMPARISON (2024 TO 2025)
PROJECTS REMOVED
Transportation
76th Ave. Overlay from 196th to OVD
completed in 2024
Transportation
2024 Traffic Signal Upgrades
to be completed in late 2024
Transportation
2024 Pedestrian Safety Program
to be completed in late 2024
Water
Phase 13 Annual Replacement Program
Completed
Sewer
Phase 10 Annual Sewer Replacement/Rehab
Completed
Sewer
Citywide CIPP Sewer Rehabilitation Phase 4
Completed
Facilities
Landmark 99
Six -year cost and funding (2025-2030) removed
Facilities
Fire Life Safety Communications
Six -year cost and funding (2025-2030) removed
WWTP
WWTP Asset Criticality Ranking and Condition Assessment
to be completed in late 2024
WWTP
Primary Clarifier
Completed
WWTP
Joint Sealant
lCompleted
WWTP
Vacuum Filter
Icompleted
c
a
a_
U_
c
a
m
u_
w
.Q
U
0
Cl)
0
N
LO
N
0
N
Packet Pg. 332
9.3.a
CFP /CIP COMPARISON (2024 TO 2025)
PROJECTS REVISED
1-1101
a
Transportation
Puget Dr. @ OVD Signal Upgrades
Cost and funding moved from 2027-2028 to 2028-2029 LL
U
Transportation
Signal Upgrades - 100th Ave @ 238th St. SW
Cost and funding moved from 2027-2028 to 2028-2029
Transportation
Main St. @ 3rd Signal Upgrades
Cost and funding moved from 2027-2028 to 2028-2029 a
Transportation
228th St. SW from Hwy 99 to 95th PI. W Corridor
Cost and funding revised, moved from 2027-2029 to 2028-2030 ai
Transportation
Hwy 99 Revitalization & Gateway Project - Stage 3
Cost and funding revised, moved from 2022-2028 to 2022-2029
Transportation
Hwy 99 Revitalization & Gateway Project - Stage 4
Cost and funding revised, moved from 2022-2028 to 2022-2029 LL
Transportation
SR 524 (196th St. SW) / 88th Ave. W - Intersection Improvements
Cost and funding moved from 2027-2028 to 2028-2030 cwa
Transportation
Main St. @ 9th Ave. Intersection Improvements
Cost and funding revised, moved from 2027-2028 to 2028-2029 is
Transportation
76th Ave. W @ 220th St. SW - Intersection Improvements
Cost and funding revised, moved from 2023-2027 to 2023-2029 c
Transportation
SR-104 Adaptive System - 236th to 226th
Cost and funding revised, moved from 2023-2027 to 2024-2028 N
Transportation
SR-104 @100th Ave W. Intersection Improvements
Cost and funding revised, moved from 2027-2029 to 2028-2030 LO
N
Transportation
SR-104 @ 95th PI. W Intersection Improvements
Cost and funding revised, moved from 2027-2028 to 2028-2029 N
Transportation
SR-104 @ 238th St. SW Intersection Improvements
Cost and funding revised, moved from 2027-2028 to 2028-2029 LL
Transportation
SR-104 @ 76th Ave. W Intersection Improvements
Cost and funding revised, moved from 2027-2028 to 2028-2029
Transportation
Olympic View Dr @ 76th Ave. W Intersection Improvements
Cost and funding revised, moved from 2030-2044 to 2031-2045
J
Transportation
175th St SW Slope Repair
Construction cost moved from 2027 to 2028 z
Transportation
232nd St. SW Walkway from 100th Ave. to SR-104
Cost and funding revised, moved from 2028-2029 to 2029-2030 LL
Transportation
236th St. SW Walkway from Madrona Elementary to 97th Ave. W
Cost and funding revised, moved from 2027-2028 to 2028-2029 LL
Transportation
84th Ave. W Walkway from 238th St. SW to 234th St. SW
U
Cost and funding revised, moved from 2024-2025 to 2025-2029 d
Transportation
80th Ave. W Walkway from 212th St. SW to 206th St. SW
Cost and funding revised, moved from 2027-2029 tto 2028-2030 v
Transportation
80th Ave. W Walkway from 188th St. SW to Olympic View Dr.
Cn
Cost and funding revised, moved from 2027-2029 to 2028-2030
0
Transportation
218th St. SW Walkway from 76th Ave. W to 84th Ave. W
Cost and funding revised, moved from 2027-2029 to 2028-2030 3:
Transportation
Walnut St. Walkway from 6th Ave. S to 7th Ave S
Cost and funding revised, moved from 2027 to 2028 •9
Transportation
216th St. SW Walkway from Hwy. 99 to 72nd Ave W
Cost and funding revised, moved from 2027 to 2028 '
a
Transportation
Maplewood Dr. Walkway from Main St. to 200th St. SW
Cost and funding revised, moved from 2027-2029 to 2028-2030 M
Transportation
95th PI. W Walkway from 224th St. SW to 220th St. SW
Cost and funding revised, moved from 2027-2028 to 2028-2029 N
Transportation
SR-104 @ 76th Ave. W Non -Motorized Trans Improvements
Cost and funding revised, moved from 2027-2028 to 2028-2029 uO
N
Transportation
SR-104 Walkway: HAWK to Pine / Pine from SR-104 to 9th
Cost and funding revised, moved from 2029 to 2030 N
Transportation
Ferry Storage Improvements from Pine St. to Dayton St.
Moved from 2027 to 2028
Transportation
Transportation Plan Update
Cost and funding revised, extended to 2025 E
Transportation
Green Streets 236th St SW - 84th Ave W to Highway 99
Cost and funding revised, moved from 2029 to 2030-2045 C.)
c�
w
w
• • PUBLIC WORKS• •PROJECTS
Packet Pg. 333
9.3.a
CFP /CIP COMPARISON (2024 TO 2025)
Storm Lower Perrinville Creek Restoration Project Cost and Funding Revised
Storm 7317 Lake Ballinger Way Purchase & Structure Removal Costs of building demolishment added to 2025 with 2026 closeout
Storm Lake Ballinger Regional Facility Design and Construction Moved project funding from 2026-2027 to 2027-2028
Storm I Storm and Surface Water Comprehensive Plan $213,000 in 2024 funds moved to 2025
Sewer Annual Citywide CIPP Sewer Rehabilitation ICost and funding (2025-2030) revised
Sewer Lake Ballinger Sewer lCost and funding shifted from 2026-2027 to 2027-2028
WWTP Nutrient Removal Project Six -year cost and funding (2025-2030) revised
WWTP VFD Upgrades Six -year cost and funding (2025-2030) revised
WWTP Gasification Bypass (Class A Solids Production) Project postponed to 2027
WWTP Primary Clarifier 3 Rehab Six -year cost and funding (2025-2030) revised
WWTP ODS (Primary Sudge) Pump Replacement Six -year cost and funding (2025-2030) revised
WWTP Chlorine Contact Channel Sluice Gates Replacement Six -year cost and funding (2025-2030) revised
Facilities
Cemetery Building
Six -year cost and funding (2025-2030) revised
Facilities
City Hall
Six -year cost and funding (2025-2030) revised
Facilities
Fishing Pier/Beach Ranger Station
Six -year cost and funding (2025-2030) revised
Facilities
Frances Anderson Center
Six -year cost and funding (2025-2030) revised
Facilities
Fire Station 16
Six -year cost and funding (2025-2030) revised
Facilities
Fire Station 17
Six -year cost and funding (2025-2030) revised
Facilities
Fire Station 20
Six -year cost and funding (2025-2030) revised
Facilities
Historic Log Cabin
Six -year cost and funding (2025-2030) revised
Facilities
Historical Museum
Six -year cost and funding (2025-2030) revised
Facilities
Library
Six -year cost and funding (2025-2030) revised
Facilities
Library Plaza Deck Waterproofing
Six -year cost and funding (2025-2030) revised
Facilities
Meadowdale Club House
Six -year cost and funding (2025-2030) revised
Facilities
Old Public Works
Six -year cost and funding (2025-2030) revised
Facilities
Parks Maintenance Building
Six -year cost and funding (2025-2030) revised
Facilities
Public Safety
Six -year cost and funding (2025-2030) revised
Facilities
Public Works O&M
Six -year cost and funding (2025-2030) revised
Facilities
Wade James Theater
Six -year cost and funding (2025-2030) revised
Facilities
Yost Pool House
Six -year cost and fundinq (2025-2030) revised
a
U-
U_
c
a
m
:r
LL
r
Q
M
U
0
M
0
N
uO
N
0
Packet Pg. 334
A ,!P�EDMONDS
0,
PARKS, RECREATION & HUMAN SERVICES
2025-2030
CAPITAL FACILITIES PLAN &
CAPITAL IMPROVEMENT PROGRAM
F777 777�'
FINAL NOVEMBER 2024
"EDMONDS
PARKS, RECREATION & HUMAN SERVICES
Table of Contents
Director's Letter................................................................ 2
CIP/CFP Worksheets.......................................................3-6
Project Distribution Map ................................................. 7
Project Descriptions......................................................8-26
Program Descriptions...................................................27-29
Acquisition Descriptions...............................................30-31
FundDetail.....................................................................
32
Fund 332 (Capital Const. & Impact Fee) Detail ............33-34
Fund 125 (REET II) Detail ................................................
35
Fund 126 (REET 1) Detail .................................................
36
Fund 143 (Tree) Detail ....................................................
37
Fund 137 (Cemetery) Detail ...........................................
38
Annual Project Comparison ............................................ 39
9.3.b
EDMONDS
PARKS, RECREATION & HUMAN SERVICES
September 30, 2024
Members of the City Council, Parks & Planning Board, Staff and Citizens of Edmonds,
The Parks, Recreation & Human Services Department presents the City of Edmonds Parks 6-year Parks Capital
Improvement Program (CIP) and Capital Facilities Plan (CFP). The CIP/CFP serve as a planning guide identifying
parks capital projects and related funding sources. It reflects the priorities established in the 2022 Parks,
Recreation and Open Space (PROS) Plan priorities as well as unforeseen opportunities and demands. The CIP/CFP
is updated annually through a public process including presentations and Public Hearings hosted by both the Parks
& Planning Board and the City Council during the budget process.
Highlights of the 2024 parks capital project accomplishments through August include:
1. Acquisition of the Mee property expands the Mathay Ballinger Park by 50% and the purchase and related
costs were 80% grant funded ($880,000 grant).
2. Demolition of unusable structures, removal of invasive plants and site security of the 1-acre parcel
donated by Shirley Johnson adjacent to Yost was completed.
3. Improvements to the McAleer Lake Ballinger Access area.
4. Installation of automated door locks on all park restrooms to decrease damage and vandalism.
5. Standardization of park entry signage.
6. Replacement of the outdoor shower, an additional foot wash station and installation of ADA compliant
water bottle filler to replace a non -working drinking fountain.
The remaining 2024 capital projects in process include:
1. Improvements continue at Mathay Ballinger Park with installation of a permanent restroom and
remaining improvements including ADA accessible pathway, parking improvement, picnic shelter and
additional park amenities.
2. Completing open space improvements to meet a 2008 State of Washington grant non-compliance issue.
3. Installation of "No Boating" buoys along the Waterfront as resulting from US Coast Guard audit.
Currently, the focus of our capital work is on deferred maintenance throughout the city's existing parks system
and recreation facilities. With an aging system and lack of adequate asset management through Edmonds' parks
and facilities, amenities are reaching the end of their useful life and require significant repairs or replacement.
Some of which require significant permitting due to proximity to salmon -bearing waterways.
Another priority in our capital work is addressing ADA accessibility compliance issues both during renovation and
repair work as well as stand-alone new projects to address the issue. Ensuring our parks, trails, open spaces and
recreation facilities and amenities are inclusive and welcoming and equitability available to all Edmond's residents
and visitors is an emphasis of all our parks capital work.
Your Parks, Recreation & Human Services Department strives to keep our parks safe, accessible, and enjoyable for
all and we are proud to continue to implement the parks capital program to better serve the Edmonds community.
Sincerely,
Ii \X
Angie Feser, Edmonds Parks, Recreation & Human Services Director
425-771-0256 Angie.Feser@EdmondsWA.gov
Page 2
Packet Pg. 337
2025-2030 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN
9.3.b
Costs inflated at 3% per year
Project
CFP
Project Site & Description
2025
2026
2027
2028
2029
2030
6-Year Total
#
Shell Creek Restoration Phase 2
R19
Project to provide improved environmental health and erosion control of Shell
$ 380,000
$
$
$
$
$
$ 380,00(
Creek in Yost Park, may include trail, bridge and boardwalk repair or relocation.
Lake Ballinger Park Mountlake Terrace ILA *CARRYFORWARD*
D19
Funding to support City of Mountlake Terrace Ballinger Park Phase III
$ 200,000
$
$
$
$
$
$ 200,00(
Development. Payment due upon completion of project.
Columbarium Expansion - Phase II
D8
Expansion of the current columbarium. Funding provided through the Cemetery
$ 175,000
$
$
$
$
$
$ 175,00(
Trust Fund 137.
Mee Property
X
D13
Master plan and future development providing expansion of the Mathay
$ 80,000
$
$ 250,000
$
$
$
$ 330,00(
Ballinger neighborhood park. Property purchased in 2024.
Johnson Property
X
Master plan for future use and expansion of Yost Park. Site development not
$
$
$
$
$
$
$
P5
included in estimate. Demolition, debris removal and site security completed in
2023.
Parks & Facilities Maintenance and Operations Building
X
D2
Replace and/or renovate Parks & Facilities Maintenance Shop located in City
$
$ 250,000
$ 875,500
$ 4,700,000
$
$
$ 5,825,50(
Park. Preliminary design in 2026.
Marsh Boardwalk Replacement
D21
Renovation and replacement of northwest Edmonds Marsh boardwalk to include
$
$ 75,000
$ 750,000
$ -
$
$
$ 825,00(
R20
ADA upgrades.
Yost Pool Upgrades & Renovation
R11
Repairs and renovations of 50+year old pool as needed to include a complete
$
$ -
$ 350,000
$
$
$
$ 350,00(
replaster of the pool.
Woodway Campus Athletic Complex - Phase I - Lighting
X
D20
In cooperation with the Edmonds School District, complete a community park
$
$
$ 1,500,000
$
$
$
$ 1,500,00(
and athletic complex at Former Woodway High School to include lighting and
future construction of two additional fields.
Project Type: A: Acquisition - R: Replacement/Upgrade - P: Master Planning - D: Development (new)
r
Q
M
U
C
ltf
a
ILL
U_
c
a
N
LL
r.+
.Q
U
O
CO)
O
N
u7
N
O
Page 3
Packet Pg. 338
9.3.b
2025-2030 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN
Costs inflated at 3% per year
Project
CFP
Project Site & Description
2025
2026
2027
2028
2029
2030
6-Year Total
#
Sierra Park
R8
Replacement of a 25+ year old playground and related improvements to included
$
$
$ 50,000
$ 350,000
$
$
$ 400,00(
ADA compliance.
D10
Pine Street Park
D11
Park enhancements to include the addition of a small shelter with picnic tables,
$
$
$
$ 100,000
$ 60,000
$ 200,000
$ 360,00(
D12
canopy shade trees and a paved connecting pathway.
Maplewood Hill Park
R12
Replacement of a nearly 40 year old playground for improved play experience
$
$
$
$ 50,000
$ 350,000
$ -
$ 400,00(
and ADA compliance.
Neighborhood Park SR99
X
D15
Master plan and development of a new neighborhood park in Southeast
$
$
$
$
$ 80,000
$ 850,000
$ 930,00(
Edmonds (funding is in Parkland Acquisition program for purchase).
D16
Elm Street Park
D17
Park enhancements to include the addition of a nature playground, small shelter
$
$
$
$
$ 105,000
$ 385,000
$ 490,00(
R14
with picnic tables, habitat restoration and possible addition of a dog park.
Neighborhood Park SE 2
X
Master plan and development of a new neighborhood park in Southeast
$
$
$
$
$ -
$ 82,000
$ 82,00(
D18
Edmonds (funding is in Parkland Acquisition program for purchase).
Pool Replacement
X
R15
Replacement of the existing Yost pool due to end of life cycle. Design, location,
$
$
$
$
$ -
$ 24,000,000
$ 24,000,00(
and funding TBD and consideration of possible partnerships.
Edmonds Marsh Estuary Restoration (Willow Creek Daylighting)
Master Plan development and implementation of the Edmonds Marsh to
P4
daylight the waterway connection of Puget Sound to the Edmonds Marsh and
X
D9
two fresh water creeks providing restoration of fresh water/salt water estuary
TBD
TBD
TBD
TBD
TBD
TBD
$ -
D1
and natural tidal exchange. (All expenses are TBD per Council direction in
December 2022). Property acquisition identified in Parkland Acquisition program.
(A) SUBTOTAL PARKS CIP/CFP PROJECTS
$ 835,000
$ 325,000
$ 3,775,500
$ 5,200,000
$ 595,000
$ 25,517,000
$ 36,247,50(
Project Type: A: Acquisition - R: Replacement/Upgrade - P: Master Planning - D: Development (new)
.r
.Q
m
U
c
IL
LL
U_
c
a
W
2D
U
M
LL
M
.r
Q
ca
V
O
CO)
O
N
u7
N
O
N
Page 4
Packet Pg. 339
9.3.b
2025-2030 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN
Costs inflated at 3% per year
Project
PARKS CIP PROGRAMS
2025
2026
2027
2028
2029
2030
6-Year Total
Citywide Park Improvements / Capital Replacement Program
Ongoing program of funding allocation for regular, major and deferred
R17
$
450,000
$
450,000
$
450,000
$
450,000
$
450,000
$
450,000
$ 2,700,00(
maintenance, repair and replacement of parks amenities, structures and
equipment.
ADA Improvements & Replacement
R16
Ongoing replacement or improvements to meet ADA standards within park
$
$
200,000
$
300,000
$
$
$
$ 500,001
system. (Example is of the Seaview Park restroom replacement and
-
-
-
-
improvements to pathway).
Debt Service and Interfund Transfers
Debt service on Civic Park $1.6M bond (2021), Marina Beach Acquisition and
$
412,518
$
416,188
$
410,438
$
416,350
$
407,912
$
414,225
$ 2,477,631
Interfund transfers to Engineering for Capital Project Support.
(B) SUBTOTAL - PARKS CIP PROGRAMS
1 $
862,518
1 $
1,066,188
1 $
1,160,438
1 $
866,350
1 $
857,912
1 $
864,225
1 $ 5,677,631
Costs inflated at 3% per year
Project
PARKLAND ACQUISITION
2025
2026
2027
2028
2029
2030
6-Year Total
X
A3
Neighborhood Park SR99
$
$
$
$ 900,000
$ -
$
$ 900,00(
Acquisition of parkland near SR 99 to fill park system gaps.
X
A4
Neighborhood Park SE 2
$ -
$ -
$ -
$ -
$ 900,000
$ -
$ 900,001
Acquisition of parkland in South Edmonds to fill park system gaps.
Edmonds Marsh Estuary Restoration (Willow Creek Daylighting)
X
Al
Acquisition of the Unocal property in support of greater Edmonds Marsh
TBD
TBD
TBD
TBD
TBD
TBD
$
restoration project.
(C) SUBTOTAL - PARKLAND ACQUISITION
$
$ -
$
$ 900,000
$ 900,000
$
$ 1,800,001
.Q
U
C
a
LL
U_
C
a
to
u_
.r
.Q
U
0
M
O
N
u7
N
O
H
u_
Q
Q'
J
Q
Z
a
LL
U
I
a_
U
N
Y
a
0
M
O
(D) TOTAL PARKS CIP/CFP EXPENDITURES (A+B+C) $ 1,697,518 $ 1,391,188 $ 4,935,938 $ 6,966,350 $ 2,352,912 $ 26,381,225 $ 43,725,131
LO
O
Project Type: A: Acquisition - R: Replacement/Upgrade - P: Master Planning - D: Development (new) N
C
N
t
ct
r
r
Q
Page 5 Packet Pg. 340
9.3.b
2025-2030 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN
PARKS CIP REVENUE
2025
2026
2027
2028
2029
2030
6-Year Total
Real Estate Excise Tax (REET) I - Fund 126
$ 512,518
$ 516,188
$ 510,438
$ 516,350
$ 507,912
$ 514,225
$ 3,077,63(
Real Estate Excise Tax (REET) II - Fund 125
$ 1,110,000
$ 975,000
$ 1,150,000
$ 950,000
$ 910,000
$ 950,000
$ 6,045,00(
Park Impact Fees - Fund 332-100
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$ 1,200,00(
Tree Fund 143 - Land Acquisition
$ 84,192
$ 60,419
$ 58,419
$ 61,140
$ 63,997
$ 56,997
$ 385,16-
Cemetery Trust Fund 137 - Columbarium Expansion
$ 175,000
$ 175,00(
Investment Interest (3%)
$ 7,870
$ 8,220
$ 35,132
$ 34,363
$ 46,081
$ 54,385
$ 186,051
Donations
$
$
$
$
$
$
$
Bond Proceeds
$
$
$
$
$
$
$
Secured Grants
$
$
$
$
$
$
$
Unsecured Grants/Funding - non -land acquisition
1$ 3,125,000
$ 4,700,000
$ 55,000
1$ 24,167,000
1 $ 32,047,001
(E) TOTAL PARKS CIP REVENUE
$ 2,089,580
$ 1,759,827
1 $ 5,078,988
1 $ 6,461,853
1 $ 1,782,990
1 $ 25,942,607
1 $ 43,115,84,
Parks Fund 6-Year Overview
2025
2026
2027
2028
2029
2030
(F) Beginning Fund Balance
$ 1,458,932
$ 1,846,994
$ 2,211,633
$ 2,350,684
$ 1,842,187
$ 1,268,265
(E) Revenue
$ 2,089,580
$ 1,759,827
$ 5,078,988
$ 6,461,853
$ 1,782,990
$ 25,942,607
(D) Expenditures
$ 1,701,518
$ 1,395,188
$ 4,939,938
$ 6,970,350
$ 2,356,912
$ 26,385,225
(G) Ending Fund Balance (F+E-D)
$ 1,846,994
$ 2,211,633
$ 2,350,684
$ 1,842,187
$ 1,268,265
$ 825,647
Restricted Land Acquisition Funds: $ 1,352,583 $ 1,509,002 $ 1,663,421 $ 920,561 $ 180,557 $ 333,554
Available Funding (assuming $2001(in PIF+Interest): $ 494,411 $ 702,631 $ 687,263 $ 921,626 $ 1,087,707 $ 49ZO93
Page 6
R
R
U
C
a
ILL.
U_
C
a
N
M
LL
.r
.Q
M
C.)
0
CO)
0
N
u7
N
0
N
Packet Pg. 341
I 9.3.b I
2025-2030
Parks Capital Improvement Program
& Capital Facilities Plan
PROJECTS
t
v EDMONDS
PARKS, RECREATION & HUMAN SERVICES
Page 8
Packet Pg. 343 1
9.3.b
Parks & Recreation
Shell Creek Restoration Phase 2 - R19
O
Driftwood
PWyers
Yost Park Trails
City of Edmonds
Bridge
— Boardwalk
---- Trail
Creek
Park Boundary
_ Service Road
— pavement
0 100 200
Feet
Main St
NlghlineTrall
Existing Conditions Area ; I
I
�hP��cePk Bzl( Approximate Project Outline -'-`
V+�_ ate, • �, , ' `I
Cedar Loop Trail—�
II
` IM
�
E I
lax
cl
`
�� tti ❑
�� Crow's Nest Loop
ENTRANCE
Project Summary: The goal of this project is the restoration of the northern portion of Yost Park and may include habitat
and environmental protection and enhancement, mitigation opportunities, bridge, trail and boardwalk
replacement/relocation and concrete structure removal or modification. After completion of the Existing Conditions
Analysis, funding is needed for the next phase which includes scope of work development and may include architecture,
engineering and ecological design, document development to support and start the permit process and potential
construction estimates.
Project Justification: The 45-acre Yost Park, containing a portion of Shell Creek, is experiencing environmental degradation
to the creek's ecosystem and the bridges are nearing end of life cycle. Shell Creek is identified as a salmon -bearing stream
and erosion and silting issues within Yost Park impact stream bed conditions and spawning habitat within the park and
downstream. This erosion has caused the closure of a pedestrian bridge in the upper creek corridor, resulting in significant
impact to trail users by lack of ability to cross the creek to access both sides of the park. Additional pedestrian bridges are
deteriorating and will require replacement or repair.
2022 Parks, Recreation & Open Space (PROS) Plan - Goal 3: Parks, Trails & Open Space, Objectives 3.7, 3.8 and 3.9; Goal
4: Waterfront Use & Access, Objectives 4.2 and 4.4; Goal 5: Natural Resource & Habitat Conservation Objectives, 5.1, 5.3
and 5.4; Goal 6: Climate Change, Adaptation & Resiliency, Objective 6.5; and Goal 9: Park Operations & Administration
Objectives 9.1 and 9.2. PROS Plan Recommendations 3.1, 3.10. 5.2 and 6.2.
Estimated Cost: Phase 1- $250,000 & Phase 2 - $380,000 = $630,000 total
Page 9
Packet Pg. 344
9.3.b
Parks & Recreation
Lake Ballinger Park/Mountlake Terrace ILA - D19
Interurban Trail
Improved Park Entry
Proposed Crossing by the U.S. -
Army Corps of Engineers
Y Senior Center
y
Proposed Channel by the
)halt Path y U.S. Army Corps of Engineers
�r
6 ft Wood Chips Path r y
6 ft Gravel Path
Proposed Boardwalk by the U.S.
Army Corps of Engineers
Boardwalk & Viewing Platform
Lake Ballinger
Lake Ballinger Park, City of Mountlake Terrace
Project Summary: Through an Interlocal Agreement (ILA) with the City of Mountlake Terrace, the City of Edmonds will
support the construction of the planned improvements in the northwest area of Lake Ballinger Park including a pedestrian
entry, pathways and access to Lake Ballinger. The ILA was executed in 2023, with the project underway and payment is
due upon completion.
Project Justification: This western boundary of the park is Edmonds city limits, and these improvements will provide better
access to Lake Ballinger Park for Edmonds residents. The revenue contribution supports the construction of the
improvements which will benefit the City of Edmonds. This project is supported by the 2022 Parks, Recreation and Open
Space (PROS) Plan including a goal, three objectives and three recommendations. PROS Goal 3, Objectives 3.2, 3.8 and
3.11. Recommendation 1.2 Expand partnerships and agreements with other nearby jurisdictions. Recommendation 3.6
Explore options for access to Lake Ballinger with the City of Mountlake Terrace to include possible joint development and
consideration of a fishing pier. Recommendation 5.2 Repair and improve or extend trails and boardwalks to allow
improved public access to natural areas for nature/wildlife viewing, hiking and outdoor experience.
Estimated Cost: $200,000
Construction (D19) — ILA
2025 2026
$200,000
2027i i
$200,000
Total Expenses
$200,000
$200,000
Real Estate Excise Tax II - Fund 125
$200,000
$200,000
Total Revenue
Unsecured Funding
$200,000
so
$200,000
$0
Page 10
Packet Pg. 345
9.3.b
Parks & Recreation
Columbarium Expansion Phase 2 - D8
820 15th St SW, Edmonds Memorial Cemetery
Project Summary: Expansion of the existing Edmonds Memorial Cemetery Columbarium. Funding is provided through the
Cemetery Trust Fund 137 which is designated for capital projects such as this. This accumulated fund balance is generated
from revenue collected through ongoing cemetery sales and services.
Project Justification: As the existing columbarium continues to fill up, it is appropriate to begin planning for the Phase 2
expansion to accommodate additional inurnments. The project design was developed with the original design and
therefore, could be relatively simple to implement.
Estimated Cost: $159,100
Page 11
Packet Pg. 346
9.3.b
Parks & Recreation
Mee Property - P2, D13
24024 76th Ave.
Project Summary: This project is the Master Planning process supporting development of the recently acquired Mee
Property adjacent to and expanding Mathay Ballinger Park. This planning effort is the next step to providing improvements
to expand the adjacent park and address park services gap and inequities in geographic distribution in underserved areas
of Edmonds. The Master Plan relies on community engagement and will be developed in collaboration with Edmonds
community. Opening this property to the public requires site improvements determined by a community -based Master
Plan.
Project Justification: The addition of new parkland and amenities is supported by the 2022 Parks, Recreation and Open
Space (PROS) Plan including Goal 1, Objective 1.1; Goal 2, Objectives 2.1 and 2.3, Goal 3, Objectives 3.2, 3.3, 3.4, 3.5, 3.6,
3.7, 3.8, 3.9 and 3.10; Goal 5, Objectives 5.1, 5.3, and 5.4; and Goal 6, Objectives 6.1, 6.3, and 6.4. Recommendations
include 6.2 which supports development of a new park and recommendations 3.2 and 3.5.
Estimated Cost: $330,000
Planning —Neighborhood Park SE 1 (P2)
$80,000
$80,000
Construction — Neighborhood Park SE 1 (D13)
$250,000
$250,000
Total Expenses
$80,000
$250,000
$330,000
Real Estate Excise Tax II - Fund 125
$80,000
$80,000
Park Impact Fees — Fund 332-100
$250,000
$250,000
Total Revenue
$80,000
$250,000
$330,000
Unsecured Funding
i
i
*Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP)
Page 12
Packet Pg. 347
9.3.b
Parks & Recreation
Johnson Property - P5
9309 Bowdoin Way
Project Summary: This project is for the first phase of design including a Master Plan for the 1-acre property donated by
Shirley Johnson in 2021. The house, outbuildings and invasive plants material were removed in 2023 and the site is
currently secured with fencing. The master planning process uses a combination of park system -wide goals (PROS Plan),
property opportunities and constraints, property donation conditions and community input on future design and usage
for the space as well as providing documentation for grant opportunities for future improvements.
Project Justification: This project is supported by five goals and 11 related objectives and a recommendation of the 2022
Parks, Recreation and Open Space (PROS) Plan. They include Goal 1, Objective 1.1; Goal 3, Objectives 3.7, 3.8 and 3.10;
Goal 5, Objective 5.1; Goal 6, Objectives 6.1, 6.4 and 6.5; Goal 9, Objectives 9.1, 9.3 and 9.5 support this project. In
addition, Plan Recommendation 3.1 - Maintain, renovate, or replace aging or damaged infrastructure in existing City
properties to ensure public accessibility, use and safety applies to this work.
Estimated Cost: $100,000**
*Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP)
**Project funding removed via council budget amendment in 2024
Page 13
Packet Pg. 348
9.3.b
Parks & Recreation
Parks & Facilities Maintenance Building - P1 & D2
6003 d Avenue South, City Park
Project Summary: Replacement of 40+ year old Parks and Facilities Maintenance building and renovation of the yard
area in City Park. Currently undersized to accommodate staff, vehicles and equipment, mechanical workspaces and
employee facilities and the facility is reaching the end of its useful life.
Project Justification: Parks and Facilities Divisions have long outgrown this existing facility and need additional work areas
and fixed equipment storage to more efficiently maintain City parks and Capital facilities. The city's small equipment
repair garage is used as the Park Maintenance locker room, daily meeting room, computer access (two for 17 FTEs) and
work preparation space. It is insufficient for work efficiency and creates a conflicting workspace of small machinery
repair and gathering space. This project is supported by a Goal and three Objectives in the 2022 Parks, Recreation and
Open Space (PROS) Plan including Goal 9, Objectives 9.1, 9.3 and 9.9.
Estimated Cost: $5,825,000
Planning & Design (P1)
2025
2026i
$250,000
$875,000
i28
2029
2030
Total
$1,125,000
Construction (D2)
$4,700,000
$4,700,000
Total Expenses
$250,000
$875,000
$4,700,000
$5,825,000
Real Estate Excise Tax II - Fund 125
$250,000
$250,000
Bond Proceeds
Operating Contribution —General Fund
Park Donations
Total Revenue
$250,000
$250,000
*Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP)
Page 14
Packet Pg. 349
9.3.b
Parks & Recreation
Marsh Boardwalk Replacement - D21, R20
180 West Dayton, Edmonds Marsh
Project Summary: Initial work for repair and possible replacement of the failing Marsh Boardwalk. Work may include
evaluation of existing structure, architecture and engineering design for repair or replacement, development of
construction drawings and the start of a complex permitting process.
Project Justification: The deck of the wooden boardwalk is nearing the end of its useful life and the supporting structure
and footings may be starting to settle into the underlying marsh. If this repair/replacement is not completed, there may
need to be closed to the public due to unsafe surface conditions and trip hazards.
2022 Parks, Recreation & Open Space (PROS) Plan - Goal 3: Parks, Trails & Open Space, Objectives 3.4, 3.7, 3.8 and 3.9;
Goal 4: Waterfront Use & Access, Objectives 4.2 and 4.4; Goal 5: Natural Resource & Habitat Conservation Objectives, 5.1,
5.3 and 5.4; Goal 6: Climate Change, Adaptation & Resiliency, Objective 6.1, 6.4 and 6.5; and Goal 9: Park Operations &
Administration Objectives 9.1 and 9.5. PROS Plan Recommendations 3.1 and 3.10, 5.2 and 6.2.
Estimated Cost: $825,000
Planning & Design (D21)
$75,000
$75,000
Construction (R20)
$750,000
7
$750,000
Total Expenses
$75,000
$750,000
$825,000
Real Estate Excise Tax II - Fund 125
$75,000
$75,000
Total Revenue
FundingUnsecured
$75,000
000
$75,000
000
Page 15
Packet Pg. 350
9.3.b
Parks & Recreation
Yost Pool Upgrades & Renovation - R11
96th Ave W & Bowdoin Way, Yost Park
Project Summary: Future pool repair and maintenance to include a full replaster project.
Project Justification: The outdoor Yost Pool, built in the early 1970's, is more than 50 years old and has numerous
maintenance needs to enable the pool to remain operational and meet safety requirements. These repairs and amenity
replacements are supported in the 2022 Parks, Recreation and Open Space (PROS) Plan including Goal 1, Objective 1.4;
Goal 2, Objective 2.1, Goal 3, Objectives 3.6, 3.8 and 3.9; Goal 4, Objective 4.4; Goal 6, Objective 6.3; Goal 7, Objectives
7.2 and 7.4; Goal 9, Objectives 9.1 and 9.5 and Recommendation 3.1, and 6.2.
Estimated Cost: $350,000
Construction (1111)
2025 2026 2027 2028i
$350,000
Total
$350,000
Total Expenses
$350,000
$350,000
Real Estate Excise Tax II - Fund 125
$350,000
$350,000
Total Revenue
Unsecured Funding
$350,000
$0
$350,000
$0
Page 16
Packet Pg. 351
9.3.b
Parks & Recreation
Woodway Campus Athletic Complex Phase 1 Lighting - D20
23200 100th Ave. W
Project Summary: This project consists of two components: Phase 1 lighting addition, Phase 2 renovation of existing
underdeveloped athletic field and would be coordinated with the property owner, Edmonds School District.
Project Justification: By adding lighting to the renovated Phase 1 year-round field, usage of the multi -use facility would
significantly increase. Phase 2 would renovate a currently poorly maintained and underutilized large athletic field to
provide community significantly more multi -sport use of an existing facility. This Athletic Complex serves a densely
populated area of more than 150,000 residents within 5-mile radius. Future maintenance costs could be offset by user
fees. Phase I without lighting installation was completed in 2015 for $4.2M, Phase II estimated at $6-8M with funding and
timing undetermined. This partnership improvement is supported by a Recommendation, 2 Goals and 5 Objectives in the
2022 PROS Plan including Recommendation 3.2 "expand partnerships and agreements with Edmonds School District ... to
provide public access and opportunities for outdoor recreation". And PROS Plan Goal 3, Objectives 3.3, 3.9, 3.10 and 3.11;
and Goal 9, Objective 9.4.
Estimated Cost: Phase 1 Lighting: $1,500,000; Phase 2: $6 — 8M
Construction (D20) - Lighting
$1,500,000
2029
2030Total
$1,500,000
Total Expenses
$1,500,000
$1,500,000
Real Estate Excise Tax II - Fund 125
Park Impact Fees — Fund 332-100
Total Revenue
Unsecured Funding
$0
E.21MIII)iIIIII)MI
$0
*Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP)
Page 17
Packet Pg. 352
9.3.b
Parks & Recreation
Sierra Park - R8
81st Ave W & 190th St SW
Project Summary: Replacement of the playground and fall surfacing at Sierra Park. The playground is 27 years old and is
currently the smallest and most limited playground in the park system. The new playground will be ADA accessible and
could be an inclusive level design.
Project Justification: These improvements are supported by three Goals and Objectives and two Recommendations in the
2022 Parks, Recreation and Open Space (PROS) Plan. The improvement project is supported by Goal 1, Objective 1.1; Goal
3, Objective 3.8, Goal 9, Objective 9.1 and Recommendation 3.1. In addition, Recommendation 3.4 states "replace the
playgrounds at Maplewood Hill Park, Sierra Park and Yost Memorial Park".
Estimated Cost: $400,000
Construction (R8) — Playground Replacement
i
$50,000 $350,000
$400,000
Total Expenses
$50,000 $350,000
$400,000
Real Estate Excise Tax II - Fund 125
$50,000 $350,000
$400,000
Total Revenue
Unsecured Funding
$50,000 $350,000
so $0
$400,000
$0
Page 18
Packet Pg. 353
9.3.b
Parks & Recreation
Pine Street Park - D10, D11 & D12
6th and Pine Street
Project Summary: Park improvements to include the addition of a small shelter with picnic tables, canopy shade trees and
a paved interior connecting pathway.
Project Justification: These improvements are supported by 2 Recommendations, 2 Goals and 2 Objectives in the 2022
Parks, Recreation and Open Space (PROS) Plan. Recommendation 3.5 is to add amenities to existing parks, such as picnic
shelters to Mathay Ballinger Park, Elm Street Park and Pine Street Park and paved pathway connections in Mathay
Ballinger Park and Pine Street Park. PROS Plan Goal 3, Objective 3.8; Goal 9, Objective 9.1 and Recommendation 6.2 also
align with these improvements.
Estimated Cost: $360,000
Construction (D10) — Shelter w/Picnic Tables
$100,000
$100,000
Construction (D11) — Paved Pathway
$35,000
$200,000
$235,000
Construction (D12) — Canopy Shade Trees
$25,000
$25,000
Total Expenses
$100,000
$60,000
$200,000
$360,000
Real Estate Excise Tax II - Fund 125
$100,000
$60,000
$200,000
$360,000
Total Revenue
$100,000
$60,000 1
$200,000
$360,000
Page 19
Packet Pg. 354
9.3.b
Parks & Recreation
Maplewood Hill Park — R12
19800 89th PI W
Project Summary: Replacement of the existing playground installed in 1985. This playground is 38 years old and is the
oldest in the park system.
Project Justification: This improvement is supported by three Goals and Objectives as well as two Recommendations in
the 2022 Parks, Recreation and Open Space (PROS) Plan. PROS Plan Goal 1, Objective 1.1; Goal 3, Objective 3.8; Goal 9,
Objective 9.1 and Recommendation 3.1 also align with this improvement. Recommendation 3.4 specifically states "replace
the playgrounds at Maplewood Hill Park, Sierra Park and Yost Memorial Park".
Estimated Cost: $400,000
Construction (R12) — Playground Replacement
$50,000
$350,000
$400,000
Total Expenses
$50,000
$350,000
$400,000
Real Estate Excise Tax II - Fund 125
$50,000
$350,000
$400,000
Total Revenue
$50,000
$350,000
$400,000
Unsecured Funding
so
$0
Page 20
Packet Pg. 355
9.3.b
Parks & Recreation
Neighborhood Park SR 99 - P6 & D15
Project Summary: Design and development of an additional neighborhood park in the SR 99 area to address an existing
gap in park services and inequities in parkland distribution. Once an acquisition has been authorized (see Land Acquisition
Section for details) a Master Plan should be developed in collaboration with the surrounding community. Eventual
development of the park will be based on the Master Plan.
Project Justification: The addition of a new park is supported by three Goals and 11 Objectives two recommendations in
the 2022 Parks, Recreation and Open Space (PROS) Plan. PROS Plan Goal 1, Objective 1.1; Goal 2, Objectives 2.1 and 2.3,
Goal 3, Objectives 3.1, 3.2, 3.3, 3.6, 3.7, 3.8, 3.9 and 3.10 and Recommendation 6.2 also align with the development of a
new park. Recommendation 1 states "to fill the park system gaps ... 1.1 Acquire property for neighborhood parks in
underserved areas such as the south Edmonds area and the SR 99 corridor".
Estimated Cost: $930,000 + Parkland Acquisition
Planning —Neighborhood Park SR99 (P6)
$80,000
$80,000
Construction — Neighborhood Park SR 99 (D15)
$850,000 $850,000
Total Expenses
$80,000
$850,000 $930,000
Real Estate Excise Tax II - Fund 125
Park Impact Fees — Fund 332-100
$80,000
$850,000 $930,000
Total Revenue
Unsecured Funding
$80,000
$850,000 $930,000
*Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP)
Page 21
Packet Pg. 356
9.3.b
Parks & Recreation
Elm Street Park - D16, D17 & R14
7th & Elm Street
Project Summary: Park enhancements to include the addition of a nature playground, small shelter with picnic tables,
habitat restoration and public process to consider possible off -leash dog park area.
Project Justification: These improvements are supported by two Goals and Objectives and two Recommendations in the
2022 Parks, Recreation and Open Space (PROS) Plan. PROS Plan Goal 6, Objective 6.5; Goal 9, Objective 9.1; and
Recommendation 3.5 support these improvements. Recommendation 3.1 is to "add amenities to existing parks, such as
picnic shelters to Mathay Ballinger Park, Elm Street Park and Pine Street Park".
Estimated Cost: $490,000
Construction (R14) — Habitat Restoration
$55,000
$55,000
Construction (D16) — Nature Play & Dog park
$50,000
$300,000
$350,000
Construction (D17) — Shelter w/Picnic Tables
$85,000
$85,000
Total Expenses
$105,000
$385,000
$490,000
Real Estate Excise Tax II - Fund 125
$50,000
$300,000
$350,000
Total Revenue
Unsecured Funding
$50,000
(55,000)
$300,000
($85,000)
$350,000
($140,000)
Page 22
Packet Pg. 357
9.3.b
Parks & Recreation
Neighborhood Park SE 2 - P7, D18
Project Summary: Design and future development of an additional neighborhood park in the SE Edmonds area to address
an existing gap in park services and inequities in parkland distribution. Once an acquisition (see Land Acquisition Section
for details) has been authorized a Master Plan will be developed in collaboration with the surrounding community.
Development of the park will be based on the Master Plan.
Project Justification: The addition of a new park is supported by three Goals and 11 Objectives and two
Recommendations in the 2022 Parks, Recreation and Open Space (PROS) Plan including Goal 1, Objective 1.1; Goal 2,
Objectives 2.1 and 2.3, Goal 3, Objectives 3.1, 3.2, 3.3, 3.6, 3.7, 3.8, 3.9 and 3.10 and Recommendation 6.2 support the
development of a new park. Recommendation 1 states "to fill the park system gaps, 1.1 Acquire property for
neighborhood parks in underserved areas such as the south Edmonds area and the SR 99 corridor".
Estimated Cost: $82,000 + Parkland Acquisition
2025 2026 2027i
Planning — Neighborhood Park SE 2 (P7) $82,000 $82,000
Construction — Neighborhood Park SE 2 (D18)
Total Expenses $82,000 $82,000
Real Estate Excise Tax II - Fund 125
Total Revenue
Unsecured Funding 000000
*Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP)
Page 23
Packet Pg. 358
9.3.b
Parks & Recreation
Yost Pool Replacement - R15
96th Ave W & Bowdoin Way, Yost Park
Project Summary: Yost Pool was built nearly 50 years ago and continues to provide recreational opportunities for many
residents and visitors. In addition to teaching youth lifesaving water safety, the pool serves as an opportunity for
community members of all ages to lead healthy and active lifestyles. Funding for this project has not been identified, may
need partnerships and would likely require voter approval.
Project Justification: Replacing Yost Pool is supported by four Goals and six Objectives in the 2022 Parks, Recreation and
Open Space (PROS) Plan lists Goal 1, Objective 1.1; Goal 3, Objectives 3.7, 3.8 and 3.9; Goal 7, Objective 7.4; Goal 9,
Objective 9.1 and Recommendations 3.1, 4.1, 4.2 and 6.2. Recommendation 4 actually states "replace Yost Pool".
Estimated Cost: $24,000,000
Planning & Construction (1115)
2025
2026
2027i
i
$24,000,000 $24,000,000
Total Expenses
$24,000,000 $24,000,000
Real Estate Excise Tax II - Fund 125
Fund 332 Balance + Park Impact Fees
Secured Grants
Bonds
Total Revenue
Unsecured Funding
$0 1 $0
($24,000,000) ($24,000,000)
*Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP)
Page 24
Packet Pg. 359
9.3.b
Parks & Recreation
Edmonds Marsh -Estuary Expansion & Restoration - Al, P4, D9 & D1
Edmonds Marsh - City of Edmonds Marsh, Marina Beach Park and property owned by Unocal (Chevron)
Project Summary: Reconnect the Puget Sound with the Edmonds Marsh near -shore estuary by restoring the natural tidal
exchange. This project will impact the existing Marina Beach Park and its proposed renovation including daylighting of
Willow Creek within the park and the Edmonds Marsh. In addition, this project encompasses the possible acquisition or
use of the adjacent 21-acre parcel known as the Unocal property to support a larger estuary restoration project. Once
acquired, an integrated restoration plan can be developed to restore functioning conditions of the tidal wetland for
salmon recovery, wildlife conservation and improved public access for recreational use, environmental education and
wildlife viewing.
Project Justification: The marsh estuary restoration project will allow for and provide a natural tidal exchange, allow
salmon to again migrate into Willow Creek, support migratory birds and waterfowl, provide a natural redistribution of
saltwater -freshwater flora and fauna and address sea level rise impacts. This project is supported by 3 Recommendations,
5 Goals and 8 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 2.2 — Expand the
Edmonds Marsh/Estuary to include the Unocal property. Develop funding strategy for purchase of the Unocal property or
negotiate with the State of Washington to have the property become part of the Edmonds Marsh/Estuary. PROS Plan
Goal 1, Objective 1.1; Goal 4, Objective 4.3; Goal 5, Objectives 5.1, 5.3 and 5.4; Goal 6, Objective 6.5 and 6.7; Goal 9,
Objective 9.1; Recommendation 2.1 and 3.11 also align with this project.
Estimated Cost: TBD Acquisition and Planning + Restoration + Marina Beach Park renovation
Continued on next page.
Page 25
Packet Pg. 360
9.3.b
Edmonds Marsh -Estuary Expansion & Restoration— continued.
Land Acquisition (Al)
TBD
TBD
TBD
TBD
TBD
030
TBD
Total
TBD
Master Plan (P4)
TBD
TBD
TBD
TBD
TBD
TBD
TBD
Master Plan Implementation (D9)
TBD
TBD
TBD
TBD
TBD
TBD
TBD
Restoration (D1) - TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
Total Expenses
TBD
TBD
TBD
TBD
TBD
TBD
TBD
Real Estate Excise Tax II - Fund 125
Real Estate Excise Tax I — Fund 126
Fund 332 Balance + Park Impact Fees
Bond Proceeds
Secured Grants
Tree Fund 143 — Land Acquisition
Park Donations
Operating Contribution —General Fund
Stormwater— Fund 422
Total Revenue
Unsecured Funding
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
Project Accounting #M070
*Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP)
Expense estimates and funding sources changed to TBD per Council direction December 2022.
Page 26
Packet Pg. 361
I 9.3.b I
2024-2029
Parks Capital Improvement
& Capital Facilities Plan
PROGRAMS
Y EDMONDS
PARKS, RECREATION & HUMAN SERVICES
Page 27
Packet Pg. 362 1
9.3.b
Parks & Recreation
Citywide Park Improvements / Capital Replacement Program - R17
fth: , - - _. L A S
Project Summary: The 2022 Parks, Recreation & Open Space (PROS) plan identified a significant list of deferred park
maintenance projects. With the addition of a Parks Capital Project Manager, hired in 2022 and the Job Order Contracting
program, the Parks Department will continue to make progress on the numerous system -wide repairs, renovations and
replacements of an aging parks infrastructure and ADA accessibility.
Project Justification: Insufficiently maintained parks and related assets lead to higher deferred maintenance costs,
increased City liability and decreased level of service and community satisfaction. This program is supported by six Goals
and 21 Objectives and five Recommendations in the 2022 Parks, Recreation and Opens Space (PROS) Plan. These include
Goal 2, Objectives 2.1 and 2.3; Goal 3, Objectives 3.6, 3.7, 3.8 and 3.9; Goal 4, Objectives 4.1, 4.2, and 4.4; Goal 5,
Objectives 5.1, 5.3, and 5.4; Goal 6, Objectives 6.1, 6.3, 6.4, 6.5 and 6.7; and Goal 9, Objectives 9.1, 9.2, 9.3 and 9.9.
Recommendation 3.1 is "Maintain, renovate, or replace aging or damaged infrastructure in existing City properties to
ensure public accessibility, use and safety' and additional recommendations are found in 3.7, 6.2, 6.3 and 6.4.
Estimated Cost: $2,700,000 (6-year total)
2025
2026
2027
2028
2029
2030
Total
Repair & Maintenance $300,000
$300,000 $300,000
$300,000
$300,000 $300,000
$1,800,000
Professional Services $150,000
$150,000 $150,000
$150,000
$150,000 $150,000
$900,000
Total Expenses $450,000
$450,000 $450,000
$450,000
$450,000 $450,000
$2,700,000
Real Estate Excise Tax II - Fund 125 $450,000
$450,000 $450,000
$450,000
$450,000 $450,000
$2,700,000
Total Revenue 1 $450,000 1
Unsecured Funding i
$450,000 1 $450,000 1
i
$450,000
1 $450,000 1 $450,000 1
i
$2,700,000
Page 28
Packet Pg. 363
9.3.b
Parks & Recreation
ADA Improvements / Replacement - R16
Project Summary: Systemic accessibility installations, upgrades, replacements and or renovations are needed throughout
the City of Edmonds parks, open spaces, trails and recreation facilities and amenities. Examples of projects include Seaview
Park restroom access and pathway to the playground, ADA compliant access in the Marina Beach Park dog park and
Edmonds Marsh viewing pier and platform and among other numerous projects throughout the city parks and city -owned
public spaces. This funding to be used for professional design, permits and arranging construction of these projects.
Project Justification: In addition to building code compliance and ADA requirements, these improvements are supported
by three goals and objectives and three recommendations in the 2022 Parks, Recreation and Open Space (PROS) Plan.
Included are Goal 2, Objective 2.1; Goal 3, Objectives 3.3, 3.7, 3.8 and 3,9; and Goal 9, Objective 9.1. Recommendations
3.1 "ensuring public accessibility" and 6.2 includes "improvements to park facilities to conform with American with
Disabilities Act (ADA) and ensure universal accessibility". In addition, recommendation 6.3 is to replace or renovate
restrooms at Olympic Beach, Seaview Park and Brackett's Landing North.
Estimated Cost: $500,000
Page 29
Packet Pg. 364
I 9.3.b I
2024-2029
Parks Capital Improvement
& Capital Facilities Plan
PARKLAND
ACQUISITION
EDMONDS
PARKS, RECREATION & HUMAN SERVICES
Page 30
Packet Pg. 365 1
9.3.b
Parks & Recreation
Parkland Acquisition - Neighborhood Park SR 99 & SE 2 - A3 & A4
Project Summary: Acquisition of parkland that will benefit the Edmond community and support the priorities identified
in the PROS Plan. Currently, $1,140,625 is reserved for parkland and open space acquisition. These funds were
accumulated from 2019 through 2024. There is no specific request to purchase a particular parcel as opportunities are
somewhat limited in a mostly built -out city, but staff continues to search for, develop and negotiate opportunities.
Project Justification: Parkland acquisitions are supported by two Goals and five Objectives (land purchase only, see
previous projects for development) and a Recommendation in the 2022 Parks, Recreation & Open Space (PROS) Plan.
Those include Goal 2, Objective 2.1; Goal 3, Objectives 3.1, 3.2, 3.3 and 3.9 also support the acquisition of parkland.
Recommendation 1 is to "Fill the park system gaps, 1.1 Acquire property for neighborhood parks in underserved areas such
as the south Edmonds area and the SR 99 corridor".
Estimated Cost: $1,800,000
Acquisition — Neighborhood Park SR99 (A3)
2025
2026
2027 2028 2029 2030
$900,000
Total
$900,000
Acquisition — Neighborhood Park SE 2 (A4)
$900,000
$900,000
Total Expenses
$900,000 $900,000
$1,800,000
Real Estate Excise Tax I - Fund 126
$900,000 $700,000
$1,600,000
Tree Fund 143 - land acquisition - TBD
$200,000
$200,000
Snohomish County Conservation Futures
Total Revenue
$900,000 $900,000
$1,800,000
*Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP)
Page 31
Packet Pg. 366
I 9.3.b I
2024-2029
Parks Capital Improvement & Capital Facilities Plan
FUND DETAIL
{ EDMONDS
PARKS, RECREATION & HUMAN SERVICES
Page 32
Packet Pg. 367 1
9.3.b
Fund 332
Costs inflated at 3% per year
Fund 332 Expenditures
2025
2026
2027
2028
2029
2030
6-Year Total
D9
Edmonds Marsh Estuary Restoration (Master Plan Implementation)
$
D1
Edmonds Marsh Estuary Restoration (Restoration)
$
R14
Elm Street Park Habitat Restoration
$ 55,000
$ 55,000
D17
Elm Street Park (Shelter w/Picnic Tables)
$ 85,000
$ 85,000
R20
Marsh Boardwalk Replacement
$ 750,000
$ 750,000
D13
Mee Property (Park Development)
$ 250,000
$ 250,000
D15
Neighborhood Park - SR99 (Park Development)
$ 80,000
$ 850,000
$ 930,000
D18
Neighborhood Park - SE2 (Park Development)
$ 82,000
$ 82,000
R15
Pool Replacement
$24,000,000
$ 24,000,000
P1
Parks Facilities M&O Building (Design)
$ 875,500
$ 875,500
D2
Parks Facilities M&O Building (Construction)
$ 4,700,000
$ 4,700,000
D20
Woodway Campus Athletic Complex - Phase I - Lighting
$ 1,500,000
$ 1,500,000
(C) TOTAL Fund 332 Expenditures
$
$
$ 3,375,500
$ 4,700,000
$ 135,000
$25,017,000
$33,227,500
Fund 332 Revenue
2025
2026
2027
2028
2029
2030
6-Year Total
Park Impact Fees (Fund 332-100)
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$ 1,200,000
Miscellaneous Park Donations
$ -
Bond Proceeds
$ -
Park Impact Fees - Mee Property (Park Development)
$ 250,000
$ 250,000
Park Impact Fees - Neighborhood Park SR99 (Development)
$ 80,000
$ 850,000
$ 930,000
Unsecured Funding - Woodway Campus Athletic Complex Phase 1
$ 1,500,000
$ 1,500,000
Unsecured Grants - Marsh Estuary Restoration
$ -
Unsecured Grants - Elm Street Park Habitat Restoration & Shelter
$ 55,000
$ 85,000
$ 140,000
Unsecured Grants - Neighborhood Park SE 2 (Development)
$ 82,000
$ 82,000
Unsecured Funding (Bonds, Levy, Misc.) Pool Replacement
$ 24,000,000
$ 24,000,000
Unsecured Funding Park Facilities M&O Building
$ 875,000
$ 4,700,000
$ 5,575,000
Unsecured Grants - Marsh Walkway Replacement
$ 750,000
$ 750,000
(D) TOTAL Fund 332 Revenue
$ 200,000
$ 200,000
$ 3,575,000
$ 4,900,000
$ 335,000
$25,217,000
$37,357,000
Fund 332 Parks Fund 6-Year Overview
2025
2026
2027
2028
2029
2030
(E) Beginning Fund Balance (332)
$ 106,309
$ 110,729
$ 115,349
$ 120,617
$ 126,648
$ 132,980
(F) Investment Interest (5%)
$ 4,420
$ 4,620
$ 5,767
$ 6,031
$ 6,332
$ 6,649
(D) Revenue - Non Park Impact Fees
$ -
$ -
$ 3,375,000
$ 4,700,000
$ 135,000
$25,017,000
(C) Expenditures
$ -
$ -
$ 3,375,500
$ 4,700,000
$ 135,000
$25,017,000
(H) Ending Fund Balance (E+F+D-C)
$ 110,729
$ 115,349
1 $ 120,617
1 $ 126,648
1 $ 132,980
$ 1397629
r
.Q
R
U
C
ro
a
LL
U_
C
a
N
LL
CU
Q
M
U
0
CO)
0
N
u7
N
0
N
I-
LL
Q
f�
J
Q
Z
a
LL
U
I
a_
U
W
Y
L
a
0
M
0
N
uO
N
0
N
C
N
E
t
ct
R
r
Q
Page 33
Packet Pg. 368
Fund 332
9.3.b
Fund 332-100 Fund Park Impact Fee 6-Year Overview
2025
2026
2027
2028
2029
2030
(E) Beginning Fund Balance (332-100) - Park Impact Fees
$
180,232
$
383,682
$
587,282
$ 566,646
$ 794,978
$ 954,727
(F) Investment Interest (5%)
$
3,450
$
3,600
$
29,364
$ 28,332
$ 39,749
$ 47,736
(D) Revenue - Park Impact Fees Only
$
200,000
$
200,000
$
200,000
$ 200,000
$ 200,000
$ 200,000
(C) Expenditures
$
-
$
$
250,000
$ -
$ 80,000
$ 850,000
(I) Ending Fund Balance (E+F+D-C)
$
383,682
$
587,282
$
566,646
$ 794,978
$ 954,727
$ 352,464
Project Type:
A Acquisition
P Master Planning
D Development - New
R Replacement / Upgrade
Page 34
Packet Pg. 369
REET II Fund 125
9.3.b
Costs inflated at 3% per year
REET II(Fund 125)Expenditures
2025
2026
2027
2028
2029
2030
6-Year Total
P4
Edmonds Marsh Estuary Restoration (Master Plan)
$ -
D16
Elm Street Park (Nature Playground & Dog Park)
$ 50,000
$ 300,000
$ 350,000
P5
Johnson Property (Master Plan)**
$
R12
Maplewood Hill Park (Playground Replacement)
$ 50,000
$ 350,000
$ 400,000
R20
Marsh Boardwalk Replacement (Design)
$ 75,000
$ 75,000
D19
Mountlake Terrace ILA (Lake Ballinger Park)*
$ 200,000
$ 200,000
P2
Mee Property - (Master Plan)
$ 80,000
$ 80,000
P1
Parks Facilities M&O Building (Design)
$ 250,000
$ 250,000
D10
Pine Street Park (Shelter w/Picnic Tables)
$ 100,000
$ 100,000
D11
Pine Street Park (Paved Connecting Pathway)
$ 35,000
$ 200,000
$ 235,000
D12
Pine Street Park (Canopy Shade Trees)
$ 25,000
$ 25,000
R19
Shell Creek Restoration Phase 2 (Yost Park)
$ 380,000
$ 380,000
R8
Sierra Park (Playground Replacement)
$ 50,000
$ 350,000
$ 400,000
R11
Yost Pool Upgrades & Renovation
$ 350,000
$ 350,000
R16
ADA Improvements (Seaview Restroom & Pathway)
$ 200,000
$ 300,000
$ 500,000
R17
Citywide Park Improvements / Capital Replacement Program
$ 450,000
$ 450,000
$ 450,000
$ 450,000
$ 450,000
$ 450,000
$ 2,700,000
(C) TOTAL PARKS REET II (Fund 125) Expenditures
$ 1,110,000
$ 975,000
$ 1,150,000
$ 950,000
$ 910,000
$ 950,000
$ 6,045,000
REET II(Fund 125)Revenue
2025
2026
2027
2028
2029
2030
6-Year Total
Real Estate Excise Tax (REET) II - Fund 125
$ 1,110,000
$ 975,000
$ 1,150,000
$ 950,000
$ 910,000
$ 950,000
$ 6,045,000
(D) TOTAL PARKS REET I (Fund 126) Revenue
$ 1,110,000
$ 975,000
$ 1,150,000
$ 950,000
$ 910,000
$ 950,000
$ 6,045,000
REET II (Fund 125) Parks Fund 6-Year Overview
2025
2026
2027
2028
2029
2030
(E) Beginning Fund Balance
$ -
$ -
$ -
$ -
$ -
$ -
(D) Revenue
$ 1,110,000
$ 975,000
$ 1,150,000
$ 950,000
$ 910,000
$ 950,000
(C) Expenditures
$ 1,110,000
$ 975,000
$ 1,150,000
$ 950,000
$ 910,000
$ 950,000
(G) Ending Fund Balance (E+D-C)
$ -
$ -
$ -
$ -
$ -
$
Page 35
*Project added via Council amendment in 2023
** Project funding ($100,000) eliminated via Council amendment in 2024 Packet Pg. 370
REET I Fund 126
9.3.b
Costs inflated at 3% per year
REET I(Fund 126)Expenditures
2025
2026
2027
2028
2029
2030
6-Year Total
Al
Edmonds Marsh Estuary Restoration (Acquisition)
$
A2
Neighborhood Park - SE1 (Acquisition)
$ -
A3
Neighborhood Park - SR99 (Acquisition)
$ 900,000
$ 900,000
A4
Neighborhood Park -SE2 (Acquisition)
$ 700,000
$ 700,000
Debt Interest & Principal (Civic & Marina Beach)
$ 412,518
$ 416,188
$ 410,438
$ 416,350
$ 407,912
$ 414,225
$ 2,477,630
(C) TOTAL PARKS REET I (Fund 126) Expenditures
$ 412,518
$ 416,188
$ 410,438
$ 1,316,350
$ 1,107,912
$ 414,225
$ 4,077,630
REET I(Fund 126)Revenue
2025
2026
2027
2028
2029
2030
6-Year Total
Real Estate Excise Tax (REET) I - Fund 126 - Land Acquisition
$ 100,000
$ 100,000
$ 100,000
$ 100,000
$ 100,000
$ 100,000
$ 600,000
Real Estate Excise Tax (REET) I - Fund 126 - Debt Interest & Principal
$ 412,518
$ 416,188
$ 410,438
$ 416,350
$ 407,912
$ 414,225
$ 2,477,630
(D) TOTAL PARKS REET I (Fund 126) Revenue
$ 512,518
$ 516,188
$ 510,438
$ 516,350
$ 507,912
$ 514,225
$ 3,077,630
REET I (Fund 126) Parks Fund 6-Year Overview
2025
2026
2027
2028
2029
2030
(E) Beginning Fund Balance
$
1,140,625
$
1,240,625
$ 1,340,625
$
1,440,625
$ 640,625
$ 40,625
(D) Revenue
$
512,518
$
516,188
$ 510,438
$
516,350
$ 507,912
$ 514,225
(C) Expenditures
$
412,518
$
416,188
$ 410,438
$
1,316,350
$ 1,107,912
$ 414,225
(G) Ending Fund Balance (E+D-C)
$
1,240,625
1 $
1,340,625
1 $ 1,440,625
1 $
640,625
1 $ 40,625
1 $ 140,625
R
r
.Q
m
U
z3
c
ro
a
LL
U_
C
M
a
W
La
LL
.r
.Q
C.)
O
CO)
O
N
N
O
N
I-
LL
Q
d'
J
Q
Z
a
LL
U
I
a_
U
W
Y
L
M
a
O
Cl)
O
N
LO
N
O
N
C
N
>_
t
U
R
r
r
Q
Page 36 Packet Pg. 371
TREE Fund 143
9.3.b
Costs inflated at 3% per year
TREE (Fund 143)Expenditures
2025
2026
2027
2028
2029
2030
6-Year Total
Park and Open Space Acquisition Program
$
Mee Property Acquisition
$ -
A4
Neighborhood Park -SE2 (Acquisition)
$ 200,000
$ 200,000
Tree Board Supplies and Minute Taker
$ 4,000
$ 4,000
$ 4,000
$ 4,000
$ 4,000
$ 4,000
$ 24,000
(C) TOTAL TREE (Fund 143) Expenditures
1 $ 4,0001
$ 4,000
1 $ 4,0001
$ 4,000
1 $ 204,000
1 $ 4,000
1 $ 224,000
TREE (Fund 143)Revenue
2025
2026
2027
2028
2029
2030
6-Year Total
Tree - Fund 143
$ 70,152
$ 45,749
$ 50,000
$ 50,000
$ 50,000
$ 50,000
$ 315,901
Investment Interest (@5%)
$ 14,040
$ 14,670
$ 8,419
$ 11,140
$ 13,997
$ 6,997
$ 69,262
(D) TOTAL TREE (Fund 143) Revenue
$ 84,192
$ 60,419
$ 58,419
$ 61,140
$ 63,997
$ 56,997
$ 385,163
TREE (Fund 143) 6-Year Overview
2025
2026
2027
2028
2029
2030
(E) Beginning Fund Balance
$ 31,766
$
111,958
$ 168,377
$ 222,796
$
279,936
$ 139,932
(D) Revenue
$ 84,192
$
60,419
$ 58,419
$ 61,140
$
63,997
$ 56,997
(C) Expenditures
$ 4,000
$
4,000
$ 4,000
$ 4,000
$
204,000
$ 4,000
(G) Ending Fund Balance (E+D-C)
$ 111,958
$
168,377
$ 222,796
$ 279,936
$
139,932
$ 192,929
.r
.Q
U
C
co
a
IL
U_
C
a
a�
LC
u_
Q
La
U
0
CO)
O
N
u7
N
O
N
I-
u_
Q
J
Q
Z
a
IL
U
I
a_
U
W
Y
L
a
0
Cl)
O
N
LO
N
O
N
C
N
E
t
U
R
r
r
Q
Page 37 Packet Pg. 372
CEMETERY Trust Fund 137
9.3.b
Costs inflated at 3% per year
CEMETERY Trust (Fund 137) Expenditures
2025
2026
2027
2028
2029
2030
6-Year Total
D8
lColumbarium Expansion -Phase II
$ 175,000
$ 175,000
Repair & Maintenance
$ 25,000
$ 25,000
$ 25,000
$ 25,000
$ 25,000
$ 25,000
$ 150,000
(C) TOTAL CEMETERY Trust(Fund 137) Expenditures
$ 200,000
$ 25,000
$ 25,000
$ 25,000
$ 25,000
$ 25,000
$ 325,000
CEMETERY Trust (Fund 137) Revenue
2025
2026
2027
2028
2029
2030
6-Year Total
Cemetery Trust - Fund 137 Investment Interest (@5%)
$ 77,880
$ 81,400
$ 70,091
$ 73,145
$ 76,352
$ 79,720
$ 458,588
Cemetery Trust - Fund 137 Sales Revenue
$ 18,540
$ 19,096
$ 16,000
$ 16,000
$ 16,000
$ 16,000
$ 101,636
(D) TOTAL CEMETERY Trust (Fund 137) Revenue
$ 96,420
$ 100,496
$ 86,091
$ 89,145
$ 92,352
$ 95,720
$ 560,224
CEMETERY Trust (Fund 137) 6-Year Overview
2025
2026
2027
2028
2029
2030
(E) Beginning Fund Balance
$ 1,429,895
$ 1,326,315
$ 1,401,811
$ 1,462,902
$ 1,527,047
$ 1,594,399
(D) Revenue
$ 96,420
$ 100,496
$ 86,091
$ 89,145
$ 92,352
$ 95,720
(C) Expenditures
$ 200,000
$ 25,000
$ 25,000
$ 25,000
$ 25,000
$ 25,000
(G) Ending Fund Balance (E+D-C)
$ 1,326,315
$ 1,401,811
$ 1,462,902
$ 1,527,047
$ 1,594,399
$ 1,665,119
Page 38 1 Packet Pg. 373
9.3.b
PARKS CIP /CFP COMPARISON 2025 - 30 vs. 2024-29
PROJECTS ADDED
Type
PROJECT NAME
CFP
DESCRIPTION
Parks
ADA Improvements & Replacement
Ongoing replacement or improvements to meet ADA Standards.
Parks
Marsh Boardwalk Replacement
Renovation and replacement of NW Edmonds Marsh Boardwalk to include ADA upgrades.
Parks
Mee Property Master Plan
X
Was part of Parkland Acquisition, now stand alone project.
PROJECTS REMOVED
Type
PROJECT NAME
CFP
DESCRIPTION
Parks
Interurban Trail Extension
Removed due to lack of available funding.
Parks
Mathay Ballinger Park
Project completion scheduled for 2024.
Parks
Neighborhood Park SE 1
Mee Property Purchased in 2024. Master Plan listed above as new item.
Parks
Olympic Beach Park Restroom
Interior renovation completed.
Parks
Parkland Acquisition Support
Removed, will be requested if/when potential acquisition is identified.
Parks
Signage & Wayfinding
Project completion scheduled for 2024.
Parks
Waterfront Walkway (missing link)
Removed due to lack of available funding and other capital priorities.
Parks
Yost Park Playground Improvements
Project expenses deemed replacement as not feasible at this time.
PROJECTS REVISED
Type
PROJECT NAME
CFP
CHANGE
Parks
Elm Street Park Improvements
Moved to 2029-30 vs. 2028-29.
Parks
Johnson Property Master Plan
X
Expenditure allocation of $100,000 in 2026 removed per council budget amendment.
Parks
Lake Ballinger Park Mountlake Terrace ILA
ILA completed in 2023; payment due upon construction completion estimated for 2025, carryforward.
Parks
Maplewood Hill Park Improvements
Moved to 2028-29 vs. 2027.
Parks
Neighborhood Park SE 2
X
Acquisition moved to 2029 vs. 2026 and Master Plan moved to 2030 vs. 2027.
Parks
Neighborhood Park SR 99
X
Acquisition moved to 2028 vs. 2025 and Master Plan/Construction moved to 2029-30 vs. 2026-27.
Parks
Parks & Facilities Maintenance Building
X
Construction shifted to 2028 vs. 2027; preliminary design funded via REET Fund 125.
Parks
Pine Street Park Improvements
Moved to 2028, 29 & 30 vs. 2025-26.
Parks
Pool Replacement
X
Moved to 2030 vs. 2029.
Parks
lSeaview Park Restroom Replacement
lMoved into ADA Improvements & Replacement Program 2026-2027 vs. 2028.
Parks
Sierra Park Improvements
Moved to 2027-28 vs. 2026.
Parks
Woodway Campus Athletic Complex Phase 1
X
Moved to 2027 vs. 2025 due to required ESD partnership development and coordination.
Parks
Yost Pool Upgrades & Renovation
Moved to 2027 vs. 2025.
Parks
Yost Pool Replacement
X
Replacement of existing pool - moved to 2030 vs. 2029.
Page 39
Packet Pg. 374
9.3.c
October 3, 2024
Memo
To: Edmonds City Council Members
From: Edmonds Planning Board Members (PB)
Subject: 2025 — 2030 Capital Improvement Plan (CIP) and Capital Facilities Plan (CFP)
On September 11, 2024, the Planning Board received a presentation from the Public Works
(PW) and Parks (PR) Departments on the list of projects that comprise the 2025 — 2030
CIP/CFP. On September 25, 2024, the PB held a Public Hearing (PH) on the proposed
plans.
The format of the presentation was similar to those provided in the past. Specifically, PW
projects were organized by functional groups (Transportation, Utilities, Facilities and
Wastewater Treatment Plant). Within each functional group, projects were listed based on
their recommended priority for completion (including info such as cost, and source of
funds). Similarly, a prioritized list of PR projects contained the same information. PB
acknowledges the thought and consideration that went into developing these lists;
however, the plans lack the specificity of providing the assessment criteria, ranking
methodology and ranking results (scores) to understand recommended project
prioritization.
At the PH, following the presentation, comment was provided from one citizen in
attendance and by others by e-mail. Specifically:
- Public concern was raised about insufficient attention to Critical Aquifer Recharge
Areas (CARA's) in the proposed CIP/CFP plans. In addition, although the CIP
mentions a stormwater comprehensive plan, it does not provide specifics on aquifer
protection to prevent the risk of contamination. PW emphasized that these
projects were not yet in their planning phase and that further development work was
necessary before work begins.
- Public concern was raised about ensuring that restoration plans for existing critical
salmon habitat be prioritized over developing new habitat (Edmonds Marsh
Daylighting).
Of note, both PW and PR indicated that their plans had been drafted using models which
considered Centers and Hubs as in the Draft Comprehensive Plan.
Based on the information presented to the PB and with the recommendations provided
above, we recommend the 2025 — 2030 CIP/CFP for your consideration.
Packet Pg. 375