Loading...
Building PermitType: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED Parcel No: 00405800000700 Site Address: 23618 102ND PL W EDMONDS,WA 98020-5765 Applied: 11/9/2024 Subdivision: 004058 Lot: 0 Issued: 11/25/2024 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $50,000.00 Occupancy Type: Construction Type: Expiration Date: 11/25/2026 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: GIRE-REMODEL M INLC P SEP I WA State Contractor L & I #: TOPAZRI7770A I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT SCOTT BOYER 12216 CORLISS AVE N, SEATTLE (206)235-0935 BOYERSCOTTI@GMAIL.COM WA 98133 CONTACT HALLER ARCHITECTS LLC 12216 CORLISS AVE N, SEATTLE (206)235-0935 boyerscottl@gmail.com WA 98133 CONTRACTOR TOPAZ REMODELING INC 800 5TH AVE STE 101-800, (818)284-7474 SEATTLE WA 98104 OWNER DAVID H & ARISA GIRE 23618 102ND PL W, EDMONDS (303)618-2002 WA 98020 DESCRIPTION 7BLD..RES ACCOUNT AMOUNT PAID PAID DATE RECEIPT # - PERMIT - VALUATION 001.000.345.83.000.00 $750.00 $750.0011/22/24 R41551 S BLD - RES - PLAN REVIEW 001.000.345.83.000.00 $637.50 $637.50 11/14/24 R41353 CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 11/14/24 R41353 PERMIT STATE BUILDING CODE SURCHARGE 001.000.237.150 $6.50 $6.50 11/22/24 R41551 RES TOTALS: $1,439.00 $1,439.00 7 • • CONDITION TYPE STATUS NOTES Printed: Monday, November 25, 2024 8:27:52 AM 1 of 2 'RESIDENTIAL BLDG PermitCity - • • • • EL 98020 1 � www.edmondswa.gov• 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. CARBON MONOXIDE ALARMS SHALL BE INSTALLED OUTSIDE OF EACH SEPARATE SLEEPING AREA IN THE IMMEDIATE VICINITY OF THE BEDROOMS AND ON EACH LEVEL IN FOR CARBON MONOXIDE SYSTEMS NEW CONSTRUCTION AND IN EXISTING DWELLINGS WHEN ALTERATIONS, REPAIRS OR INFORMATION ADDITIONS REQUIRING A PERMIT OCCUR, OR WHEN ONE OR MORE SLEEPING ROOMS ARE ADDED OR CREATED. ELECTRICAL PERMIT FOR 1 Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION IIIIIII.— INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES B-1 SETBACKS B-2 FOOTINGS B-4 FRAMING B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" Printed: Monday, November 25, 2024 8:27:52 AM 2 of 2