Loading...
APPROVED BLD FIR BLD2024-1391+Architectural_Plan+10.21.2024_2.26.33_PM+45721682 A3 5/8" TYPE 'X' GWB 20GA x 3 5/8" METAL STUDS UNFACED NAUF BATT INSULATION (2) LAYERS 5/8" TYPE 'X' GWB -LOCATE ON SAME SIDE OF WALL AS THE TAG ACOUSTICAL WALL -FULL HT TO BOTTOM OF ROOF DECK ABOVE - ALL PENETRATIONS THROUGH ACOUSTICAL ASSEMBLIES TO BE ACOUSTICALLY SEALED. METAL FRAMED PARTITION EXISTING RECEPT. COUNTER TO REMAIN -112", III II - IIL1I ��-_-1=== DEMO COMPRESSED AIR DROPS THROUGHOUT, CUT AND CAP ABOVE 10' OBT III TIECA RICAL REMAIN - REMOVE ALL ER as OM S AT'EcEAB INDUSTRIES ALL WORK SUBJECT O FIELD INSP CTION FOR CODE COMPLIANCE A PROVED PLA S MUST E O JOB SITE A5 DEMOLITION PLAN 3/16" � 5 SUSPENSION WIRE (TYP). 2x2 ACOUSTICAL CEILING PANELS IN SUSPENDED T-BAR SYSTEM. ARMSTRONG "OPTIMA PB" #3250PB WITH "PRELUDE XL HRC" 15/16 SUSPENSION GRID SUSPENDED ACOUSTICAL PANEL REMOVE PORTION OF WALL TO KING STUD AT RELITE 5" 5'- 7" +/ EXISTING DOOR, FRAP HARDWARE TO REMAII PREP EXG OPENING FI DOOR, FRAME AND H/ REMOVE EXG PARTIAL HT WALL, SINK & COUNTER EXISTING PARTITION WALLS TO REMAIN REMOVE EXISTING - SINK - RECONFIGURE PLUMBING IN FIRST FLOOR CEILING TO NEW SINK IN BREAK ROOM REMOVE EXISTING PARTITION WALLS EXISTING BU% i n EXISTING PARTITION �I WALLS TO REMAIN II REMOVE EXISTING CARPET THROUGHOUT AND PREP FLOOR FOR NEW CARPET CONSTRUCTION TYPE VB OCCUPANCY GROUP B OCCUPANT LOAD 26 4 WINDOW TYPES 0 DOOR TYPES 6". 2'- 0" 6" 1/4" TEMPERED FLOAT GLASS - DOUBLE PANE DOORS NUMBER TYPE MATL FINISH DOOR AND FRAME SCHEDULE FRAMES SIZE WIDTH HEIGHT TYPE MATL FINISH HARDWARE REMARKS 106A B SCW STN 36" 84" 1 HIMPNT 1 108A B SCW STN 36" 84" 1 HMI PNT 1 HARDWARE SET #1 FLOOR LEVEL LEVER LATCH SET W OFFICE FUNCTION 3 BUTT HINGES CONTINUOUS SOUND SEALS WALL STOP Approved Fire Marshal Chris Burt 11 /18/2024 11-18-2024 PLAN REVIEW NOTES: APPROVED WITH CONDITIONS: 1. A SEPARATE FIRE ALARM PERMIT MAY BE REQUIRED DUE TO CHANGES IN WALL CONFIGURATIONS. 2. SEPARATE FIRE SPRINKLER PERMIT MAY BE REQUIRED DUE TO CHANGES IN WALL CONFIGURATIONS. DFM BURT REMOVE EXISTING WALLS [AT CONTRACTORS OPTION: REMOVE GYPSUM BOARD FROM ONE SIDE, ADD SISTER STUD TO BOTTOM OF ROOF DECK, FILL CAVITY WITH INSULATION, AND PROVIDE NEW 5/8" GYP BD ON WALL FULL HEIGHT. ONE SIDE OF WALL TO HAVE (2) LAYERS TYPE 'X' GYP BD] DEMOLITION NOTES: 1. COORDINATE WITH ALL PLANS FOR CLARIFICATIONS OF DEMOLITION SCOPE PRIOR TO PROCEEDING. 2. SCOPE OF DEMOLITION WORK LIMITED TO THIS SUITE. ACCESS TO FIRST FLOOR UTILITIES MAY BE REQUIRED. WORK INCLUDING BUT NOT LIMITED TO ALL BUILDING SERVICES, UTILITIES, DATA, TELECOM, SECURITY, FIRE/LIFE SAFETY, AND HVAC SERVING OTHER SPACES SHALL REMAIN OPERATIONAL AND UNAFFECTED BY THE DEMOLITION. ANY DISRUPTIONS IN SERVICES AND ANY TENANT SPACE OCCUPANTS SHALL BE SCHEDULED WITH THE TENANT AND BUILDING OWNER. COORDINATE WITH THE TENANT AND BUILDING OWNER TO IDENTIFY ITEMS SERVING ADJACENT SPACES. 3. PROTECT ALL EXISTING CONSTRUCTION TO REMAIN. PATCH AND REPAIR ALL DAMAGE DUE TO DEMOLITION/NEW WORK. PREPARE SURFACES TO RECEIVE NEW FINISHES IN ACCORDANCE WITH MANUFACTURE'S RECOMMENDATIONS. ALL DAMAGE CAUSED BY THE CONTRACTOR, WHETHER RELATED TO DEMOLITION OR NEW CONSTRUCTION, SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE TO LIKE -NEW CONDITION OR SHALL MATCH EXISTING ADJACENT FINISH CONDITION. THIS INCLUDES AREAS OF THE BUILDING RELATED TO THE PROJECT BUT NOT DIRECTLY IN THE SCOPE OF WORK, SUCH AS LAYDOWN AREAS, STORAGE AREAS, AND AREAS WHERE MOVEMENT OF EQUIPMENT AND MATERIALS TAKES PLACE. 4. NO STRUCTURAL CHANGES ARE BEING MADE TO THE STRUCTURE OF THE BUILDING. 1. DIMENSIONS ARE TO FACE OF STUD AT NEW WALLS AND FACE OF FINISH AT EXISTING WALLS DIMENSIONS INDICATED AS "CLEAR" ARE BETWEEN FINISHED SURFACES. 2. GC TO PROVIDE SUBMITTALS/SHOP DRAWINGS TO THE TENANT FOR REVIEW FOR THE FOLLOWING MATERIALS UNLESS GC PROVIDES SPECIFIED PRODUCT: DOORS, DOOR FRAMES, DOOR HARDWARE, LIGHTING FIXTURES, PLUMBING FIXTURES AND TRIM, FLOOR FINISHES, WALL FINISHES, CEILING FINISHES, APPLIANCES. City Of Edmonds Building Department Work OFFICE REMODEL Address 123 2ND AVE S #202 Owner DESIGN WEST ENGINEERING —Approved Date 11 /18/2024 ui ding Official ; Eri & STRG 102 36 SF WORKROOM 101 157 SF N w 574"+/ EXG ADD DUPLEX GFI OUTLET BELOW COUNTER UNDER SINK STRG NEW CASEWORK, 2 Ca _ 103 COUNTERTOP, SINK 33 SF AND FAUCET ADD 5 NEW DUPLEX OUTLETS ABOVE COUNTER AND BEHIND FRIDGE BREAK D4 104 240 SF �A3 D2 VINYL PLANK A2 FLOOR PLAN 2 CARPET PATCH AND REPAIR END WALL WHERE PORTION C WALL WAS REMOVED 106A OPEN OFFICE 100 2380 SF EXISTING PARTITION WALLS TO REMAIN, TYP —� 48'-8 314" +/ EXG OFFICE 105 208 SF + M OFFICE 106 213 SF OFFICE 107 179 SF OFFICE 108 150 SF 0 2'-4" OFFICE 102EOF REGISTERED- ARCHITECT AUSS SNGTON 0 :I- C) E O m OV CV � 00 o N rn �n Q N 0 -0 3 Ln w d � .0 r__1 r__1 r4 F-- j 0 O N J 4J 0 N O 00 L.I.J � U � C� U. Z LL C/j w 0 � W � � W p Z � w � Z � w (D w o C/� Q W p � Z N co N RECEIVE Oct 23 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT REVISION SCHEDULE # DESCRIPTION DATE JOB NO. 2024-017 DATE 28 SEPT 2024 DRAWN LMS REVIEWED IMS SHEET NAME FLOOR PLANS SHEET NO. A2 0 CV C B 5 1/2" SOLID SURFACE COUNTER EDGE 1 2' - 1" 1/2" SOLID SURFACE COUNTERTOP, IUNTER WIDTH OVER 1/2" PLYWOOD UNDERLAYMENT NEW FAUCET W/ METERED HANDLES 1/2" SOLID SURFACE BACKSPLASH (& SIDE SPLASHES WHERE OCCURS) TOP MNT, STAINLESS STEEL SINK - SET IN CONT BEAD OF SEALANT 3/4" SOLID SURFACE COVE ALL SPLASHES - SIZED TO MATCH THICKNESS OF COUNTERTOP AND SPLASHES - CAULK ALL 8„ JOINTS AND SET IN SEALANT --------- - CONNECT TO EXG PLUMBING IN WALL, TYP P.LAM BASE CABINET WITH I REMOVABLE FRONT PANEL(S) FINISH END OF BASE CABINET BEYOND WITH LAMINATE TO MATCH EXG 1'-5 ACCESSIBLE SINK BASE PATCH AND REPAIR WALL AND FLOOR WHERE EXPOSED BY NEW CABINET - PROVIDE SUBSTRATES AND FINISHES TO MATCH 6" (CABINET DIMS) (KNEE SPACE DIMS) (KNEE SPACE DIMS) Ll j n,��BREAK ROOM ELEVATION A L--' Z % 1/2" = 1 '-0" 3 B36 30" ACCESSIBLE B24 LZ36 SINK BASE ROOM FINISH SCHEDULE RM NUM ROOM NAME FLOOR BASE WALLS COMMENTS / NOTES NORTH WALL EAST WALL SOUTH WALL WEST WALL 100 OPEN OFFICE EXG EXG PAINT PAINT PAINT PAINT 101 WORKROOM LVP RUBBER PAINT PAINT PAINT PAINT 102 STRG LVP RUBBER PAINT PAINT PAINT PAINT 103 STRG LVP RUBBER PAINT PAINT PAINT PAINT 104 BREAK LVP RUBBER PAINT PAINT PAINT PAINT 105 OFFICE EXG EXG PAINT PAINT PAINT PAINT 106 OFFICE EXG EXG PAINT PAINT PAINT PAINT 107 OFFICE EXG EXG PAINT PAINT PAINT PAINT 108 OFFICE EXG EXG PAINT PAINT PAINT PAINT WALL ASSEMBLY AS SCHEDULED SEALANT, TYPICAL BOTH SIDES HOLLOW METAL FRAME AS SCHEDULED APPLIED GLASS STOP GLAZING AS SCHEDULED HOLLOW METAL INTERIOR WINDOW HEAD B5 (JAMB SIM) 3" = 1'-0" GLAZING AS SCHEDULED APPLIED GLASS STOP HOLLOW METAL FRAME AS SCHEDULED BACKER ROD AND SEALANT SHIM ON SILL SEALER CONCRETE FOUNDATION HOLLOW METAL INTERIOR WINDOW SILL 3" = 1'-0" 5 STRG STRG 102 103 F F WORKROOM 101 157 SF PROVIDE NEW CARPET TILES THESE THREE ROOMS - I�I OPEN OFFICE 100 2380 SF PROPOSED FURNITURE PLAN - 20 EMPLOYEES 1 /8" = 1'-0" 4 1 100 101 102 103 7104 105 106 107 108 115 2 STRG STRG 102 103 36 SF 33 SF WORKROOM 101 157 SF -3 OPEN OFFICE 100 238n cc a LZ36 DB24 BREAK ROOM ELEVATION B V L i 1/2" = 1'-0" REFLECTED CEILING PLAN 3/16" = V-0" -�--� BREAK i 104 240 SF L Fw w OFFICE 105 208 SF INFILL CEILING THIS SPACE OFFICE 106 213 SF OFFICE 107 179 SF OFFICE 108 150 SF 10241 REGISTERED AMMITWT LAURA M. STRAUSS STATE OF WASMINGTOId 0 v 0 n E O O m CV � QJ o N 7 O1 'j Q NQ N :E 0 -0-0 r--1 r--1 r4 I-- j 3 0 0 'N J Q) N C) 00 W � U � V z cn w O o � z U) O w ��� vJ G uj 0 z � w Z (/ U) � w W M r_^ V! W 0 z N Co N RECEIVED Oct 23 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT REVISION SCHEDULE JOB NO. 2024-017 DATE 28 SEPT 2024 DRAWN Ims REVIEWED LS SHEET NAME DETAILS SHEET NO. Al