Loading...
Building PermitType: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED Parcel No: 00595100000702 Site Address: 1402 10TH PL N EDMONDS,WA 98020-2629 Subdivision: 005319, 005951, LLA LL-2001-110 Lot: 0 Fire Sprinklers: Lot Area: 11,935 Zoning: RS-12 Valuation: $5,000.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: MAYBERRY-BASEMENT REMODEL, DECK REMOVAL, ENTRY WAY, *COD WA State Contractor L & I #: Applied: 3/17/2023 Issued:12/3/2024 Final: Expiration Date: 12/3/2026 Issued by: BAC NAME TYPE NAME ADDRESS FE PHONE EMAIL APPLICANT Christopher Gerrick WA (206)369-8434 chris@gerricoffice.com CONTACT Christopher Gerrick WA (206)369-8434 chris@gerrickoffice.com CONTRACTOR CONTRACTOR UNKNOWN OWNER ROSS L T MAYBERRY 1402 10TH PL N, EDMONDS WA 98020 (206)735-9592 JL DESCRIPTION FEE ACCOUNT INFORMATION AMOUNT PAID PAID DATE RECEIPT# BLD - RES VALUE BASED FEE 001.000.345.83.000.00 $217.00 $217.00 12/3/24 R41666 BLD - RES VALUE BASED REVIEW 001.000.345.83.000.00 $184.45 $184.45 3/28/23 R27389 CITY TECHNOLOGY FEE - PER PERMIT 001.000.321.99.100.00 $45.00 $45.00 3/28/23 R27389 STATE BUILDING CODE SURCHARGE RES 001.000.237.150 $6.50 $6.50 12/3/24 R41666 TOTALS: $452.95 $452.95 CONDITION TYPE STATUS NOTES Printed: Tuesday, December 03, 2024 3:02:45 PM 1 of 3 'RESIDENTIAL BLDG PermitCity • • • • - EL 98020 1 1 • www.edmondswa.gov• 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ESC REQUIREMENTS FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD INFORMATION REQUIREMENTS. As required by Ord 3632 the geotechnical engineer of record shall monitor this site during construction for compliance with the recommendations in the geotechnical report including site excavation, shoring, soil support for foundation, including piles, soil bearing capacity, sub drainage installation, soil compactions, and other geotechnical aspects of the construction. Specific recommendations contained in the approved geotechnical report must be implemented by the owner. The geotechnical engineer shall make written dated reports on the progress of the construction and submit the report to the City on a weekly basis until all site grading, drainage, foundation and associated ground work is complete. Omissions or deviations from the approved geotechnical report and or approved plans or specs shall be highlighted and immediately submitted in a separate letter to the City for review. The City shall be advised in writing of work stoppages of FOR more than one week. In addition to the geotechnical monitoring special inspections ESLHA REPORTS INFORMATION based on the provisions of IBC Section 1704 are required when specified. Other special inspections may also be required by the geotechnical engineer, architect, or structural engineer of record. At the completion of final site grading and all permitted structures a final geo technical report prepared by the geotechnical engineer shall be submitted to the City. This report shall contain a statement that, based upon his/her professional opinion, site observations, and testing during the monitoring of the construction, the completed development substantially complies with the recommendations in the geotechnical report and with all geotechnical related requirements. Any deviations or omissions in the report, plans, or specifications that occurred during construction shall be addressed separately. Occupancy, final approval, or release of the bond for the project shall not be granted until the report has been reviewed and accepted by the Building Official. FOR Not permitted for ADU use. Any future use of an ADU will need to have an approved PLANNING CONDITION INFORMATION conditional use permit. Printed: Tuesday, December 03, 2024 3:02:45 PM 2 of 3 'RESIDENTIAL BLDG Permit PERMIT NUM of Edmonds EdmondsCity •:� i 1 1 • . •. • Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES B-7 BUILDING OTHER INSP B-4 FRAMING Work complete. Verify life safety compliance. X-3 BUILDING FINAL" Work complete. Verify life safety compliance. B-1 SETBACKS B-3 MECH ROUGH IN Printed: Tuesday, December 03, 2024 3:02:45 PM 3 of 3