APPROVED ENG2024-0556 ROW PERMIT (2)RIGHT OF WAY MINOR PERMIT
PERMIT NUMBER
City of • • .
121 Sth Ave N, Edmonds WA 98020 ENG2024-0556
Description: ROW -CITY SOIL BORINGS FOR PERRINVILLE CREEK RECOVERY PROJECT ISSUED: 12/05/2024
Address: 121 5TH AVE N EDMONDS WA 98020
EXPIRES: 06/03/2025
Permit Type: RIGHTOF WAY MINOR Permit Subtype: CITY Parcel Number: 00434400100300
I 11-1411 a
NAME TYPE NAME ADDRESS PHONE
APPLICANT JENELLE HO 121 5TH AVE N, EDMONDS WA 98020 (425)725-1255
CONTACT CITY OF EDMONDS 121 5TH AVE N, EDMONDS WA 98020 (425)725-1255
CONTRACTOR SHANNON &WILSON INC 400 N 34TH STREET, SEATTLE WA 98103 (206)818-0663
OWNER EDMONDS CITY OF 250 5TH AVENUE N, EDMONDS WA 98020
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE - PER PERMIT
$45.00 $0.00
ROW - MINOR - 4.1.24 $132.00 $0.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: GRN DATE: 12/05/2024
Printed: Thursday, December 05, 2024 3:40:18 PM 1 of 2
RIGHT OF WAY MINOR PERMIT
PERMIT NUMIJBE
City of Edmonds
:• •ENG2024-05-56556
www.edmondswa.gov • •
CONDITIONS
CONDITION TYPE
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE DATE
RESULT
COMPLETE
X-2 ENGINEERING FINAL**
Printed: Thursday, December 05, 2024 3:40:18 PM 2 of 2
RECEIVED
DEC 4 2024
� of �EDA404!
4
INC. 1890
SECTION A
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
Requirements outlined in Right -of -Way permit Handout E63.
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
General •
Project Name Perri nville Creek Recovery Project
Site Address or if no site address use Property Address at NW corner of project area: 8219 Talbot Road, Edmonds, WA 98026
Associated Permits: BLD PLN ENG
owner and Entity Holdingapplicable)
Name of Company Franchise Ordinance No:
Point of Contact
Title
Address
City
State
Zip
Phone
Email
Contractor and Authorized Agent of Owner
Name of Company Shannon & Wilson
(see note below)
Contractor Contacts During Construction
Primary Name Rajan Ramya
Agent Name
Title Senior Geotechnical Engineer
Title
Mobile 6305364183
Address 400 N 34th Street, Suite 100
Email ramya.rajan@shanwil.com
City Seattle
State WA
Zip 98103
Secondary Name Tyler Stephens
Phone 2066328020
Title Vice President
Email info-seattle(_shanwil.com
Mobile 2068180663
City of Edmonds Business License No: NR-027016
Email tyler.stephens@shanwil.com
State License No: 578058207
❑ Contractor verifies it is currently bonded
® Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial x City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
Other, please specify: Geotechnical Soil Borings
❑ Utility Franchise Work associated with development (check one of the above boxes as well)
Dq Traffic Control Only (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
❑ Utility Franchise Work (no associated development)
Project Description
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
We will perform two soil borings in the City of Edmonds as shown in the attached Site Plan within the public right-
of-way. Borings will be drilled using truck- or track -mounted drill rigs and are planned to advance around 50 eet _
_ below ground surface (bgs) using mud -rotary drilling techniques. The work zone for each boring will be
—approximately 12 feet wide by 80 feet long to accommodate the truck- or track -mounted drill rig, support truck, and
_ sampling equipment. The work zone will be generally centered around each boring location. Traffic control plan is
_ attached for review. Utility potholing may be performed at the boring locations using vacuum excavation or airknife _
_to excavate to a depth of 8 to 10 feet to confirm absence of expected underground utilities. _
At one boring location, piezometer will be installed within the bore hole to allow for quarterly groundwater
_ monitoring. The flush mount steel monument has a secured lid to allow access for subsequent site visits to collect _
_ data. Each subsequent visit will involve placing traffic control devices to safely access the steel monument for up _
to one hour. Once data collection is completed. traffic control devices will be removed.
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
x
LF
SF
Alley 72 hours +
LF
x
LF
SF
Parking 72 hours +
LF
JxJ
LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTIONC.
. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
Details
1.
of Work to be Completed
Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
2.
Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)?
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility system?
5.
Does the work involve proposed additions to an aboveground utility system? If es:
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
Details of • to be Completed Yes No
6. Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
How many are existing? I I How many are to be added?
6b.
Does your project involve poles? If yes:
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE:!
APPLICANT PRINTED NAME: RAJAN RAMYA
APPLICANT TITLE: _ Senior Geotechnical Engineer
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
10/31 /2024
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
Legend
Proposed Soil Boring
� � _ ..a+�., •. �, F, �. •a '" �' r �a\p°�� ;'ill �'
v� 8120: ..'�
8200
Aff
Al
"�.
�sAe�rinville
At
RECEIVED
8233
vIf CITY OF EDMONDS
DEVELOPMENT
'`t... :► ���r, lr�''`, ram• •\ �'•SERVICES '
EPAR WENT
Google-
�: yr, ',''c ,� �♦a _ �,;•,,.� , .,
www.invarion.com
KHAN IN UIN &- W 1LNUIN
Location: B-1-24
47.841842361833336,-122.34450378033333
B-2-24
47.84189922833333,-122.3444496215
Job Description: 2 Geotechnical Borings
Shoulder Closure/ Lane Closure
Contact: Ramya Rajan ramya.rajan@shanwil.com
Site Days/ Hours; M-F 7am-5:30pm
W 20-1
SAFETY & APPAREL v J FLAGGING & EQUIPMENT
j p >
a
o
o
Driveways will have full In/out access >
O / \ 20-7a
W 3-4 W 20-7a
Job Notes
* All signs and spacing shall conform to MUTCD
* NOT TO SCALE
* Notify all local emergency services of closure times
and dates
* Sign spacing may be reduced to fit roadway conditions
* Alert Metro Impact 5 days in advance of any Bus stop
changes 206-477-1140
* No Parking must be placed 72 hours in advance of work
* No Parking signs spaced out at 40'
MPH
TAPER
TANGENT
50/70
40
80
35/45
30
60
25/30
20
40
One Lane Two Way Taper 50'-100'
Downstream Taper 50'-100'
Channelization Device Spacing 20'
SUGGESTED ADVANCE WARNING SIGN PLACEMENT
ROAD TYPE
SPEED
DISTANCE
A
JJ 200'
350'
BETWEEN
SIGNS
B
C
D
UPIMV CWMM
25/30
200'
200'
X
UNa HicHMPH)
35/40
350'
350'
X
aurxnL
45/60
500'
800'
1500'
500'
500'
500'
RURALMYS
60/65
800'
800'
800'
exaaesswnvs
55/70
1500'
1500'
1500'
Traffic Control Plan
ti
F
s
Legend
1 Cone
r flagger flagger
♦ W3-4 be prepared to stop
♦ W20-1 Road Work Ahead
♦ W20-7a flagger
Work Area
SPEED
LIMIT
25
\ \ e
\ PAR
T. s*ovD
\ 3-4 Al
RDAD
WDRR
\ o AHEAD
W 20-1
\ Talbot Rd
Jera Kane a I RECEIVED
TC01268i I DEC 4 2024
Phone: 206-573-962 ci
Trafficplandesigns@gm2ail.com
Ex Date: 1 /31 /2025
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
RECEIVED
DEC 4 2024
CITY OF EDMONDS MyBuildingPermit.con!
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
Right -of -Way Application #1586225 - Perrinville Creek Recovery Project
Applicant
First Name Last Name Company Name
Jenelle Ho City of Edmonds
Number Street Apartment or Suite Number E-mail Address
121 5th Ave N jenelle.ho@edmondswa.gov
City State Zip Phone Number Extension
Edmonds WA 98020 (425) 725-1255
Contractor
Company Name
SHANNON & WILSON INC
Number Street Apartment or Suite Number
400 N 34th Street
City State Zip Phone Number Extension
Seattle WA 98103 (206) 818-0663
State License Number License Expiration Date UBI # E-mail Address
SHANNW*378N0 3/25/2026 57RnsP9n7 ramya.rajan@shanwil.com
Project Location
Number Street Floor Number Suite or Room Number
City Zip Code County Parcel Number
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions)_
Work Location
8219 Talbot Road, Edmonds WA 98026
Property Owner
First Name Last Name or Company Name
Number Street Apartment or Suite Number
City State Zip
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 12/4/2024 Submitted By: Jenelle Ho
Page 1 of 2
i
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1586225 - Perrinville Creek Recovery Project
Project Contact
Company Name: City of Edmonds
Name: Jenelle Ho
Address: 121 5th Ave N
Edmonds WA 98020
Email: jenelle.ho@edmondswa.gov
Phone #: (425) 725-1255
Project Type Activity Type Scope of Work
Government Capital Improvement Project Disturbance of Surface
Project Perrinville Creek Recovery Project
Name:
We will perform two soil borings in the City of Edmonds as shown in the attached Site Plan within
the public right-of-way. Borings will be drilled using truck or track- mounted drill rids and are
planned to advance around 50 feet below ground surface (bgs) using mud -rotary drilling
techniques. The work zone for each boring will be approximately 12 feet wide by 80 feet long to
accommodate the truck- or track -mounted drill rig, support truck, and sampling equipment. The
Description work zone will be generally centered around each boring location. Traffic control plan is attached
of Work: for review. Utility potholing may be performed at the boring locations using vacuum excavation or
airknife to excavate to a depth of 8 to 10 feet to confirm absence of expected underground
utilities. At one boring location, piezometer will be installed within the bore hole to allow for
quarterly groundwater monitoring. The flush mount steel monument has a secured lid to allow
access for subsequent site visits to collect data. Each subsequent visit will involve placing traffic
control devices to safely access the steel monument for up to one hour. Once data collection is
completed, traffic control devices will be removed.
Project Details
Project Information
Job Number
c623.st.stm
Page 2 of 2