APPROVED BLD BLD2024-1063+Plumbing_Plan+10.15.2024_11.03.31_PM+4562169City Of Edmonds
BEi[din❑ Department
--------------------------------------------
Work PLUMBING FOR T.I.
--------------------------------------------------
------------------------------------------------
Address 9627 FRIDALE AVE
---------------
Owner TRINI'SPANTRY
Approved Date ;--------1 -01 7/2024---------
--------------------------------
----------------------------------
Building Official:: Er(,('/
Permit Number BLD2024-1063
REVISIONS:
PLUMBING LEGEND
O
ANGLE STOP -HOT
•
ANGLE STOP COLD
SANITARY WASTE
CONDENSATE DRAIN
-
HOT WATER
--
COLD WATER
----
RECIRC RETURN LINE
•
FLOOR DRAIN
�
12"X12" FLR SINK
�
BACK FLOW DEVICE
EQUIPMENT LEGEND
NO. ITEM MANUFACTURER DESCRIPTION
05
HAND WASH SINK
ADVANCE TABCO
7-PS-23
24
HOT WATER TANK
BRADFORD WHITE
GAS 80 GAL CAP,
25
PREP SINK
ADVANCE TABCO
-1-24R
PREP SINK
ADVANCE TABCO
-
38
DISHWASHER
JACKSONWWS
DOOR TYPE VENTLESS VAPOR RECOVERY
39
DISH TABLE W/ POT SINKS
ADVANCE TABCO
DT - -1 2 - 4R
45
GREASE INTERCEPTOR
SCHIER
G131
0
WALK-IN COOLER COIL
AMERIKOOLER
1
AMERIKOOLER
58
ICE MAKER W/ INSUL BIN
MANITOWOC
IYTO500A
62
MOP SINK
ADVANCE TABCO
9-OP-20-EC-X
100
BEVERAGE COUNTER W SINK
ADVANCE TABCO
BEV-30-11L
103
SODA DISPENSER W/ ICE BIN
LANCER
852308C-122 FURNISHED BY BEV VENDOR
103a
REDUCED PRESSURE - BACK FLOW
WATTS.
REQ TESTING & REPORT PRIOR TO PLUMB FINAL
105
COFFEE BREWER
BY VENDOR
WASTE & VENT PLAN
1 /4" = 1'-0"
Provide L and I Boiler pressure vessel
approval for Hot water tank. a drain pan
may be required.
r-
U)
U o
4M
4W
RECEIVED
Oct 16 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
BY: CC
DATE: 10/14/2024
P 1
REVISIONS:
3" VTR 2' VTR
3" VTR (REST RM VENT)
3" 2"
3"
2„ 211 211 311 311 211 211 211 211
--------------------------T----i-----------------------------T----�---�
1" CW SUPPLY LINE I I I 11
____(jECIRC=RETURN -- -------I-----+------ ------------ ECIRC RETURN -- -----------------.-------.-----------J----I-KEE.PlR�RETURN -----
�� C 3/4" (11 5WSFU) I C 13/4" 11.5 SFU C 1/2"1(2WSFU) C 11/2" (2WSFU) C 1/2"1(2WSFU
PUMP
SWIITTCH H I 4 ►► W F ►► 1 ►► I I ►► '► I
3/ (9 S U) H 3/4 (9WSFU) H 1/2 (1WSFU) H 1/2 (1WSFU) H 1/2 (1W FU
�-AQIJASTST
3/4" COLD -I I I I
3/4 HOT 1
2 12 12 12 12 12 12 12 1 12 12 12 12 12 12 12 12
HWT
13"
EXTG 3" SW D�
TO MAIN 4" SW
il
ALL HW LINES TO BE
INSULATED
2"
/ FLOW
co co I co
UH B DRAIN 12" FLR FLR DRAIN :35OP SINK FLR DRAIN 12" FLR I FLR DRAIN HAND SINK 12" FLR FLR DRAIN
W/ TRAP PRIMER SINK 62 SINK 1 5 25��OK
EXTG ROUGH IN 58 co 38 DW. co I c
211 211 211 211 211 211 ,
2 SCHIER GB 1 2" 2n 211INTERCEPTOR 3"
211 FLOC FLOW 311 311 311 211 / 211
New supply piping to public lavatories are required
to comply with 2018 WSEC standards for piping
length.
RISER DIAGRAM.
EXTG 3" SW DN
TO MAIN 4" SW NEW 2" SW DN
3" TO MAIN 4" SW
I--, EXISTING 4" SW
12" FLR ND
SINK I HA10000 SINK
2" 1211
REDUCED PRESSURE
BACK FLOW DEVICE
NO COPPER PIPE DOWN
STREAM.
HAND SINK
5 /105
2" 2"
FLOW
FLR DRAIN
PERMIT SET
LO
RECEIVED
Oct 16 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
BY: CC
DATE: 10/14/2024
P2