Loading...
APPROVED ENG REVIEWED BLD2023-1355+Transportation_Impact_Form+10.24.2023_9.09.46_AM+38569571:319301YA]5KW1 APPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet -CC. l u-7 - PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: Owner/Applicant Signature Homes by Village Life, LLC Name 19020 33rd Ave West, Suite 450 Street/Mailing Address nnwood WA 98036 City State Zip Telephone: 425-678-1474 Applicant Contact Person: Cher Anderson Name 19020 33rd Ave West, Suite 450 Street/Mailing Address Lynnwood WA 98036 City State Zip Telephone: 425-678-1474 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Telephone: 1. PROJECT DESCRIPTION Contact Namc E-mail: a. Location - Street address: 8503 200th St SW Edmonds, WA 98026 Attach a vicinity map and site plan.) b. Specify existing land use: single family residence c. Specify proposed type and size of development: demo, build single family residence 3874 sgft (# of residential units and/or square footage of building) d. Date construction will begin and be completed: December 1, 2023 e. Define proposed access locations: Current f Define proposed sight distance at site egress locations: RECEIVED Nov 22 2023 HANDOUT UPDATED 05.09.2023 APPENDIX A Page 2 of 2 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC 3.36.130. Check the applicable box below and calculate the fees as necessary: X NO CHANGE PROJECT INCLUDES DEMO OF 1 SFR AND REBUILD OF 1 SFR ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. ITE Land Use Category Per Unit Fee Rate New Use $ Prior Use $ Units in square feet, Use Fee # of dwelling, etc. X — $ X — $ New Use Fee: $ - Prior Use Fee: $ — FEE DUE: $ ' ❑ NEW DEVELOPMENT Per Unit Fee ITE Land Use Category Rate FNew Use $ ❑ INDEPENDENT FEE CALCULATION Units in square feet, # of dwelling, vfb, etc. X Impact/Mitigation Fee: 1 $ Independent Review Fee: $296.00 (+ peer review fee) 1 $ FEE DUE FEE DUE ENGINEERING DIVISION APPROVED AS NOTED 2/23/2024 City of Edmonds, Engineering Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 05.09.2023 Form #E82 TYPES OF PROJECTS THAT DO NOT TRIGGER IMPACT FEES The following list is intended to provide examples of projects that are exempted from the payment of street impact fees as identified in ECC 3.36.040. The examples provided do not involve a change in use and do not expand the usable space or add any residential units and therefore, do not create additional demand on the roadway system. Traffic impact fees will not be required as a condition of development approval for these types of projects. N*%*i A project that involves demolition of one single family residential unit and replacement with one new single family residential unit on the same lot and within 12 months of demolition. ❑ A residential remodel that does not increase the number of residential units. ❑ A residential addition (e.g. garage, etc.) that does not increase the number of residential units. ❑ Decks, fences, retaining walls, etc. ❑ Accessory dwelling unit (ADU). (Approval of an ADU is regulated by the Edmonds Community Development Code, which limits the total number of individuals living at the property to one "family" as defined in the code) TYPES OF PROJECTS THAT DO TRIGGER IMPACT FEES The following project examples do increase the number of residential units or involve commercial or other activity using the roadway system and therefore, do create additional demand on the roadway system. Street impact fees shall be required as a condition of development approval for these types of projects. ❑ Construction of a single-family residence on a previously undeveloped, vacant or subdivided lot. ❑ Demolition of a single-family residence and construction of a commercial, mixed -use or multi -family facility or duplex on the same property. ❑ A tenant improvement that changes the use from general office to medical office. ❑ Remodel of an existing multi -family building that increases the number of residential units. Note: This information should not be used as a substitute for City codes and regulations. Edmonds City Code may be viewed at http://www.codepublishini,.com/WA/Edmonds/. The applicant is responsible for ensuring compliance with the fees and regulations that are applicable at the time of submittal. If you have a specific question about a certain aspect of your project, please contact the Engineering Division at 121 5th Ave N or (425) 771-0220. Please note that other local, state, and/or federal permits or approvals may be required. Impact fee rates can also be referenced in ECC 3.36.125. No impact fees will be due, nor will a credit be given, for ; :.; calculation resulting in a net negative. Additional fee for Independent Fee Calculation: Refer t. ree �)cneouie Updated on O510912023 Page 2 of 2