SPECIAL INSPECTION AND TESTING AGREEMENT
Permit Number: BLD2022-1323 and BLD2022-1319
Project: Hope Housing Fill/Grade and BLD A, B, C and D
Prior to issuance of a permit, this form must be completed in its entirety and returned to the City for
approval. The completed form must have signatures of acknowledgment by all parties.
DUTIES AND RESPONSIBILITIES
Special Inspection Firm and Special Inspectors
The Special Inspection firm of MT C - Materials Testing & Consulting, Inc.
will perform special inspection for the following types of work (separate forms must be submitted if more than one
firm is to be employed).
N Reinforced Concrete
N Bolting in Concrete
❑ Prestressed Concrete
❑ Shotcrete
❑ Structural Masonry
N Structural Steel/Welding
❑ High Strength Bolting
❑ Spray applied Fireproofing
❑ Smoke Control Systems
N Lateral Wood
❑ Structural Observation by design professional
N Grading/soils as per Geotechnical Report
❑ Retaining Wall Block Installation
❑ Retaining Wall Footings
All individual inspectors to be employed on this project will be WABO certified for the type of work they are to
inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified,
a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector and the firm
are qualified by education and experience to perform the work and testing required by the project design and
specifications.
The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and
addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall
include:
A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall
be brought to the immediate attention of the contractor for resolution.
A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any
nonconforming work and resolution of nonconforming items.
A final report shall be submitted to the building department prior to the Certificate of Occupancy being
issued. This report will indicate that inspection and testing was completed in conformance with the approved
plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in
the final report.
\\edmsvr-userfs\userprof$\dakau\Desktop\Comments Letters and Special Inspection forms 2019\Special Inspection forms\SI 2022-1323 and BLD2022-1319
Hope Housing Fill grade and BLDGS A,B,C and D.docx 11/30/2022
Contractor
The contractor shall provide the special inspector or agency adequate notification of work requiring, inspection. The
City approved plan and specifications must, be made available, at the jobsite for the use of the special inspector and
the City inspector. The contractor shall maintain all daily inspection reports, on, site, for review by all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by the City and
.the contractor .is responsible for contacting the City to schedule. regular inspections. No concrete shall be poured or
other work covered until approval is given by the City inspector.
Building Department
The building department shall. review any revisions_ and addenda.. The 'city inspector win monitor the special
inspection functions for compliance with the agreement and the approved plans. The City inspector shall be
responsible for approving various stages of construction to be covered and .for work to proceed.
Design Professionals
The architect and/or engineer will clearly indicate on the plans and specifications the specific types of .special
inspection required and .shall include a schedule for inspection and testing. The architect and/or engineer will
coordinate their revision and addenda.process in such a way as to ensure that all required City approvals are. obtained,
prior to work. shown on the revisions being performed in the. field.
Owner
The project owner, or the architect or engineer acting as the ownet-s agent, shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved plans
and, this document, may void this agreementgad the Building Official's approval of the special inspector: in such'a
case a new special inspector and/or firm would need. to be proposed forapproval..A failure of thedesign and/or
construction parties to perform in accordance. with this agreement may result in a.STOP WORK notice being posted
on the project until nonconforming items have been resolved.
ACKNOWLEDGMENTS
1 have read and agree to comply with the terms and conditions of this agreement.
Owner: �,,,,� s.9 htn Signature
Contractort)G("Signature
Arch/Engr: 't}4A1.1�taJ
Speciallnsp:
Special Inspection Agency:
MTC
Civil Engineer: David Harmsen f
Signature
Signature
Date V /,x a 3
Date 14W-7-043
Date ty 2U-1023
Date 1-:/6-.A17Z3
signature P2tw-o_ Date 1-13-2023
Signature L.,n---Date _
1-24-23 __.
ACCEPTED FOR THE CITY OF EDMONDS MELDING DIVISION
By: W. W o 1111 c Date 4/24 2023
\ledipsvr userrsluserpro5AdakaulDesktop\Comments fetters and ial lndpectio forms 19\Special Inspection formsl5) 2022-1323 and BLD2o22-1319
Hope Housing Fill grade and BLDGS A B,C Snd D.d6ac 11/30
Architect: Daniel Nelson Signature Date -