APPROVED ENG RESUB1 BLD2022-1323+Bond_Quantity_Worksheet+1.26.2023_12.27.00_AM+3334569Site Improvement Bond Quantity Worksheet S15 Webdate: 04/03/201E
RESUB
LQ King County
1 /26/2023
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210 CITY OFEDM
Snoqualmie, Washington 98065-9266 For alternate formats, Call 206-296-6600. DEVELOPMENT
NDS
SERVICES
206-296-6600 TTY Relay 711
Project Name: Housing Hope ELC Field Apartments
Location: Edmonds, WA 98026
Clearing greater than or equal to 5,000 board feet of timber?
yes X no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
Date: 9/28/2022
Project No.:
Activity No.:
BLD2022-1323
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the IRS Means database.
PERFORMANCE BOND = TESC & ROW IMPROVEMENTS ONLY = $109,047.51 x 120% = $130,857.01
INSPECTION FEES = ALL IMPROVEMENTS = $667,084.21 x 3.3%= $22,013.78
FUTURE MAINTENACNE BOND = 15% OF THE PEFORMANCE BOND. THE BOND SHALL BE IN
PLACE PRIOR TO THE RELEASE OF THE PERFORMANCE BOND ONCE ALL IMPROVEMENTS HAVE
BEEN INSTALLED.
ENGINEERING DIVISION
APPROVED AS NOTED
05/10/2023
King County Bond Quantity worksheet
$130,857.01 x 15% = $19,628.55
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 11 /30/2022
Site Improvement Bond Quantity Worksheet S15 Webdate: 04/03/201E
EROSION/SEDIMENT CONTROL Number
Reference #
Unit
Price
Unit
Quantity
# of
Applications
Cost
Backfill & compaction -embankment
ESCA
$ 6.00
CY
0
$ -
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 80.00
Each
12
$ 960.00
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 95.00
CY
30
$ 2,850.00
Ditching
ESC-4
$ 9.00
CY
100
$ 900.00
Excavation -bulk
ESC-5
$ 2.00
CY
0
$ -
Fence, silt
ESC-6
SWDM 5.4.3.1
$ 1.50
LF
1000
$ 1,500.00
Fence, Temporary (NGPE)
ESC-7
$ 1.50
LF
200
$ 300.00
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.80
SY
2400
$ 1,920.00
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 3.50
SY
0
$ -
Mulch, by hand, straw, 3" deep
ESCA0
SWDM 5.4.2.1
$ 2.50
SY
100
$ 250.00
Mulch, by machine, straw, 2" deep
ESCA1
SWDM 5.4.2.1
$ 2.00
SY
0
$ -
Piping, temporary, CPP, 6"
ESC-12
$ 12.00
LF
200
$ 2,400.00
Piping, temporary, CPP, 8"
ESCA3
$ 14.00
LF
0
$ -
Piping, temporary, CPP, 12"
ESC-14
$ 18.00
LF
0
$ -
Plastic covering, 6mm thick, sandbagged
ESCA5
SWDM 5.4.2.3
$ 4.00
SY
300
$ 1,200.00
Rip Rap, machine placed; slopes
ESCA6
WSDOT 9-13.1(2)
$ 45.00
CY
130
$ 5,850.00
Rock Construction Entrance, 50'x15'x1'
ESCA7
SWDM 5.4.4.1
$ 1,800.00
Each
1
$ 1,800.00
Rock Construction Entrance, 100'x15'x1'
ESCA8
SWDM 5.4.4.1
$ 3,200.00
Each
0
$ -
Sediment pond riser assembly
ESC-19
SWDM 5.4.5.2
$ 2,200.00
Each
1
$ 2,200.00
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 19.00
LF
0
$ -
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$ 70.00
LF
0
$ -
Seeding, by hand
Sodding, 1" deep, level ground
ESC-22
SWDM 5.4.2.4
$ 1.00
SY
100
$ 100.00
ESC-23
SWDM 5.4.2.5
$ 8.00
SY
0
$ -
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 10.00
SY
0
$ -
TESC Supervisor
ESC-25
$ 110.00
HR
192
$ 21,120.00
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 140.00
HR
80
$ 11,200.00
WRITE -IN -ITEMS **** (see page 9)
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
Page 2 of 9
King County Bond Quantity worksheet
$ 54,550.00
$ 16,365.00
$ 70,915.00
A
ESUB
109Z:filk0*c1
TY OF EDMONDS
DEVELOPMENT
SERVICES
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 11/30/2022
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right -of -Way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
1/26/2023 I
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
GENERAL ITEMS
No.
SERVICES
Backfill & Compaction- embankment
GI - 1
$ 6.00
CY
Ar 2,000.00
$12 000.00
Backfill & Compaction- trench
GI - 2
$ 9.00
CY
$
$
Clear/Remove Brush, by hand
GI - 3
$ 1.00
SY
$
$
Clearing/Grubbing/Tree Removal
GI - 4
$ 10,000.00
Acre
0.25
$2,500.00
,$l 1.00
$10,000.00
Excavation - bulk
GI - 5
$ 2.00
CY
100
$200.00
,$f 5,200.00
$10,400.00
Excavation - Trench
GI - 6
$ 5.00
CY
$ -
Fencing, cedar, 6' high
GI - 7
$ 20.00
LF
$ -
,�l 835.00
$ 16,700.00
Fencing, chain link, vinyl coated, 6' high
GI - 8
$ 20.00
LF
$
$ -
Fencing, chain link, gate, vinyl coated, 21
GI - 9
$ 1,400.00
Each
$
$
Fencing, split rail, 3' high
GI - 10
$ 15.00
LF
$
$
Fill & compact - common barrow
GI - 11
$ 25.00
CY
$
$
Fill & compact - gravel base
GI - 12
$ 27.00
CY
$
$
Fill & compact - screened topsoil
GI - 13
$ 39.00
CY
$
$
Gabion, 12" deep, stone filled mesh
GI - 14
$ 65.00
SY
$
$
Gabion, 18" deep, stone filled mesh
GI - 15
$ 90.00
SY
$
$
Gabion, 36" deep, stone filled mesh
GI - 16
$ 150.00
SY
$
$
Grading, fine, by hand
GI - 17
$ 2.50
SY
$
$
Grading, fine, with grader
GI - 18
$ 2.00
SY
$
$
Monuments, 3' long
GI - 19
$ 250.00
Each
$
Sensitive Areas Sign
GI - 20
$ 7.00
Each
$
$
Sodding, 1" deep, sloped ground
GI - 21
$ 8.00
SY
$ -
$ -
Surveying, line & grade
GI - 22
$ 850.00
Day
4
$ 3,400.00
Ar 12.00
$ 10,200.00
Surveying, lot location/lines
GI - 23
$ 11800.00
Acre
1
$ 1,800.00
4" 1.00
$ 1,800.00
Traffic control crew ( 2 flaggers)
GI - 24
$ 120.00
HR
80
$ 9,600.00
$ -
Trail, 4" chipped wood
GI - 25
$ 8.00
SY
$ -
$
Trail, 4" crushed cinder
GI - 26
$ 9.00
SY
$
$
Trail, 4" top course
GI - 27
$ 12.00
SY
$
$
Wall, retaining, concrete
GI - 28
$ 55.00
SF
$
$
Wall, rockery
GI - 29
$ 15.00
SF
$
Page 3 of 9
SUBTOTAL
$17, 500.00 14-866"66
$61,100.00 2Z--8A-8ff-
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
King County Bond Quantity worksheet Report Date: 11/30/2022
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
n�C+l io
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
1/26/2023
Unit Price
Unit
Quant. Cost
Quant, Cost
Quant. Cost
DEVELOPMENT
ROAD IMPROVEMENT
No.
AC Grinding, 4' wide machine < 1000sy
RI - 1
$ 30.00
SY
50
$ 1,500.00
$
AC Grinding, 4' wide machine 1000-2000
RI - 2
$ 16.00
SY
$ -
$
AC Grinding, 4' wide machine > 2000sy
RI - 3
$ 10.00
SY
$ -
$
AC Removal/Disposal
RI - 4
$ 35.00
SY
20
$ 700.00
$
Barricade, type III ( Permanent)
RI - 6
$ 56.00
LF
$ -
$
Curb & Gutter, rolled
RI - 7
$ 17.00
LF
$ -
Curb & Gutter, vertical
RI - 8
$ 12.50
LF
195
$2,437.50
,$/ 1,440.00
$ 18,000.00
Curb and Gutter, demolition and disposal
RI - 9
$ 18.00
LF
$
$ -
Curb, extruded asphalt
RI - 10
$ 5.50
LF
$
$
Curb, extruded concrete
RI - 11
$ 7.00
LF
$ -
$
Sawcut, asphalt, 3" depth
RI - 12
$ 1.85
LF
200
$ 370.00
$
Sawcut, concrete, per 1" depth
RI - 13
$ 3.00
LF
$ -
$
Sealant, asphalt
RI - 14
$ 2.00
LF
300
$ 600.00
$
Shoulder, AC, ( see AC road unit price )
RI - 15
$ -
SY
$ -
$
Shoulder, gravel, 4" thick
RI - 16
$ 15.00
SY
$ -
$ -
Sidewalk, 4" thick
RI - 17
$ 38.00
SY
37
$ 1,406.00
$- 2,333.00
$ 88,654.00
Sidewalk, 4" thick, demolition and dispos
RI - 18
$ 32.00
SY
$ -
$ -
Sidewalk, 5" thick
RI - 19
$ 41.00
SY
$
Sidewalk, 5" thick, demolition and dispos
RI - 20
$ 40.00
SY
$
$ -
Sign, handicap
RI - 21
$ 85.00
Each
$
K 2.00
$ 170.00
Striping, per stall
RI - 22
$ 7.00
Each
$
47.00
$ 329.00
Striping, thermoplastic, ( for crosswalk )
RI - 23
$ 3.00
SF
$
,$� 360.00
$ 1,080.00
Striping, 4" reflectorized line
RI - 24
$ 0.50
LF
200
$ 100.00
$ -
Page 4 of 9
611n ic•>tr_11111
$ 7,113.50 -4,67.6 d.
108,233.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
King County Bond Quantity worksheet Report Date: 11/30/2022
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
n�c+l io
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
1/26/2023
Unit Price
Unit
Quant. Cost
Quant, Cost
Quant, Cost
DEVELOPMENT
ROAD SURFACING
No.
4" Rock = 2.5 base & 1.5" top course 9 1/2" Rock= 8" base & 1.5" top course
Additional 2.5" Crushed Surfacing
RS - 1
$ 3.60
SY
$
$
HMA 1/2" Overlay, 1.5"
RS - 2
$ 14.00
SY
$ -
$
HMA 1/2" Overlay 2"
RS - 3
$ 18.00
SY
47
$ 846.00
$
HMA Road, 2", 4" rock, First 2500 SY
RS - 4
$ 28.00
SY
$ -
$
HMA Road, 2", 4" rock, Qty. over 2500 S
RS - 5
$ 21.00
SY
$
$
HMA Road, 3", 9 1/2" Rock, First 2500 S
RS - 6
$ 42.00
SY
$
$
HMA Road, 3", 9 1/2" Rock, Qty Over 25
RS - 7
$ 35.00
SY
$
$
Not Used
RS - 8
$
Not Used
RS - 9
$ -
$
HMA Road, 6" Depth, First 2500 SY
RS - 10
$ 33.10
SY
12
$397.20
HMA Road, 6" Depth, Qty. Over 2500 SY
RS - 11
$ 30.00
SY
$ -
$
HMA 3/4" or 1 ", 4" Depth
RS - 12
$ 20.00
SY
$
$
Gravel Road, 4" rock, First 2500 SY
RS - 13
$ 15.00
SY
$
$
Gravel Road, 4" rock, Qty. over 2500 SY
RS - 14
$ 10.00
SY
$
$
PCC Road (Add Under Write -Ins w/Desi
RS - 15
$
$
Thickened Edge
IRS - 17
$ 8.60
LF
$
$
Page 5 of 9
SUBTOTAL
$ 1243.20—84t-819—
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
King County Bond Quantity worksheet Report Date: 11/30/2022
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
M�C%l 10
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
1/26/2023 I
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
CITY OF EDMONDS
DEVELUPMENI
DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.
Access Road, R/D
D - 1
1 $ 21.001
SY
I
1
1
$
Bollards - fixed
D - 2
1 $ 240.74
1 Each
$
$
Bollards - removable
D - 3
$ 452.34
Each
$
$
* (CBs include frame and lid)
CB Type I
D - 4
$ 1,500.00
Each
14.00
$21,000.00
CB Type IL
D - 5
$ 1,750.00
Each
$
$
CB Type Il, 48" diameter
D - 6
$ 2,300.00
Each
1
$ 2,300.00
$
for additional depth over 4'
D - 7
$ 480.00
FT
$
CB Type Il, 54" diameter
D - 8
$ 2,500.00
Each
$ -
$
for additional depth over 4'
D - 9
$ 495.00
FT
$
$
CB Type Il, 60" diameter
D - 10
$ 2,800.00
Each
$
$
for additional depth over 4'
D - 11
$ 600.00
FT
$
$ -
CB Type Il, 72" diameter
D - 12
$ 3,600.00
Each
$
1.00
$ 3,600.00
for additional depth over 4'
D - 13
$ 850.00
FT
$
$ -
Through -curb Inlet Framework (Add)
D - 14
$ 400.00
Each
$
$ -
Cleanout, PVC, 4"
D - 15
$ 150.00
Each
$
16.00
$ 2,400.00
Cleanout, PVC, 6"
D - 16
$ 170.00
Each
$
1.00
$170.00
Cleanout, PVC, 8"
D - 17
$ 200.00
Each
$
Culvert, PVC, 4"
D - 18
$ 10.00
LF
$
$ -
Culvert, PVC, 6"
D - 19
$ 13.00
LF
$
Culvert, PVC, 8"
D - 20
$ 15.00
LF
$
Culvert, PVC, 12"
D - 21
$ 23.00
LF
$
$
Culvert, CMP, 8"
D - 22
$ 19.00
LF
$
$
Culvert, CMP, 12"
D - 23
$ 29.00
LF
$
$
Culvert, CMP, 15"
D - 24
$ 35.00
LF
$
$
Culvert, CMP, 18"
D - 25
$ 41.00
LF
$
$
Culvert, CMP, 24"
D - 26
$ 56.00
LF
$
$
Culvert, CMP, 30"
D - 27
$ 78.00
LF
$
$
Culvert, CMP, 36"
D - 28
$ 130.00
LF
$
$
Culvert, CMP, 48"
D - 29
$ 190.00
LF
$
$
Culvert, CMP, 60"
1 D - 30
$ 270.00
LF
$
$
Culvert, CMP, 72"
1 D - 31
1 $ 350.00
LF
$
$
Page 6 of 9
SUBTOTAL
$ 2,300.00
$ 27,170.00 -6,9984B9-
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
King County Bond Quantity worksheet Report Date: 11/30/2022
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
M�C%l 10
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
1/26/2023
No.
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
CITY OF EDMONDS
Culvert, Concrete, 8"
D - 32
$ 25.00
LF
Culvert, Concrete, 12"
D - 33
$ 36.00
LF
Culvert, Concrete, 15"
D - 34
$ 42.00
LF
Culvert, Concrete, 18"
D - 35
$ 48.00
LF
Culvert, Concrete, 24"
D - 36
$ 78.00
LF
Culvert, Concrete, 30"
D - 37
$ 125.00
LF
Culvert, Concrete, 36"
D - 38
$ 150.00
LF
Culvert, Concrete, 42"
D - 39
$ 175.00
LF
Culvert, Concrete, 48"
D - 40
$ 205.00
LF
Culvert, CPP, 6"
D - 41
$ 14.00
LF
Culvert, CPP, 8"
D - 42
$ 16.00
LF
Culvert, CPP, 12"
D - 43
$ 24.00
LF
49
$ 1,176.00
754
$ 18,096.00
Culvert, CPP, 15"
D - 44
$ 35.00
LF
Culvert, CPP, 18"
D - 45
$ 41.00
LF
Culvert, CPP, 24"
D - 46
$ 56.00
LF
Culvert, CPP, 30"
D - 47
$ 78.00
LF
Culvert, CPP, 36"
D - 48
$ 130.00
LF
Ditching
D - 49
$ 9.50
CY
Flow Dispersal Trench (1,436 base+)
D - 50
$ 28.00
LF
French Drain (3' depth)
D - 51
$ 26.00
LF
Geotextile, laid in trench, polypropylene
D - 52
$ 3.00
SY
Mid -tank Access Riser, 48" dia, 6' deep
D - 54
$ 2,000.00
Each
Pond Overflow Spillway
D - 55
$ 16.00
SY
Restrictor/Oil Separator, 12"
D - 56
$ 1,150.00
Each
Restrictor/Oil Separator, 15"
D - 57
$ 1,350.00
Each
Restrictor/Oil Separator, 18"
D - 58
$ 1,700.00
Each
Riprap, placed
D - 59
$ 42.00
CY
Tank End Reducer (36" diameter)
D - 60
$ 1,200.00
Each
Trash Rack, 12"
D - 61
$ 350.00
Each
Trash Rack, 15"
D - 62
$ 410.00
Each
Trash Rack, 18"
1 D - 63
$ 480.00
1 Each
Trash Rack, 21"
1 D - 64
$ 550.00
1 Each
Page 7 of 9
SUBTOTAL
$ 1,176.00
$ 18,096.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
King County Bond Quantity worksheet Report Date: 11/30/2022
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
r% r A . 1 r%
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
1/26/2023 I
Unit Price
Unit
Quant. Price
Quant, Cost
Quant. Cost
CITY OF EDMONDS
PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders
No.
2" AC, 2" top course rock & 4" borrow
PL - 1
$ 21.00
SY
NA
NA
2" AC, 1.5" top course & 2.5" base cour
PL - 2
$ 28.00
SY
NA
NA
879
$ 24,612.00
4" select borrow
PL - 3
$ 5.00
SY
NA
NA
1.5" top course rock & 2.5" base course
PL - 4
$ 14.00
SY
NA
NA
UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied b Franchise Utility's Cost EstimatE
Utility Pole(s) Relocation
UP-1
I=Hffip Saar
2
$20,000.00
Street Light Poles w/Luminaires
UP-2
$ 7,500.00 Each
WRITE -IN -ITEMS
(Such as detention/water quality vaults.)
No.
Stormwater Vault
WI - 1
$ 218,000.00
Each
1
$ 218,000.00
Block Wall
WI - 2
$ 16.00
SY
560
$ 8,960.00
Yard Drain
WI - 3
$ 225.00
CY
10
$ 2,250.00
Biopod
WI - 4
$ 20,000.00
Each
2
$ 40,000.00
WI-5
FT
$ -
WI-6
$
WI-7
$
WI-8
$
WI-9
$
WI-10
$
SUBTOTAL
SUBTOTAL (SUM ALL PAGES)
30% CONTINGENCY & MOBILIZATION:
GRANDTOTAL:
COLUMN:
Page 8 of 9
B
$20,000.00 -
$ $29,332. 0
$ $8,799.81�
$ $38,132.5
L
$293,822.00
$483,809.00
$ 454785t'OlT
$ $145,142.70tyaA6&-30_
$ $628,951.7
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
King County Bond Quantity worksheet Report Date: 11/30/2022
Site Improvement Bond Quantity Worksheet
Original bond computations prepared by:
Name:
PE Registration Number:
Firm Name:
Address:
Stabilization/Erosion Sediment Control (ESC)
Existing Right -of -Way Improvements
Future Public Right of Way
Private Improvements
Calculated Quantity Completed
Total Right -of Way and/or Site Restoration Bond*/**
(First $7,500 of bond* shall be cash.
Performance Bond* Amount (A+B+C+D) = TOTAL
Maintenance/Defect Bond* Total
NAME OF PERSON PREPARING BOND* REDUCTION:
Web date: 04/03/2015
RESUB
1 /26/2023
Date:
Tel. #: CITY OF EDMONDS
ENT
SERVICES
Project No:
FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND*
AMOUNT
(A) $ 70,915.0
(B) $ -
(C)
(D)
$ $38,132.51 _aJ4-
$ $628,951.70 594-306-3
(A+B) $ 70,915.0
(T) $ 693,158.7
Minimum is $2000.
MINIMUM BOND* AMOUNT
REQUIRED FOR RECORDING OR
TEMPORARY OCCUPANCY AT
SUBSTANTIAL COMPLETION ***
T x 0.30 $ 207,947.6
Minimum is $2000.
Date:
PUBLIC ROAD & DRAINAGE
MAINTENANCE/DEFECT BOND*
(B+C) x
0.25 = $ 7,734.4
Minimum is $2000.
* NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County.
** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
*** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY
Page 9 of 9 Unit prices updated: 03/02/2015
Check out the DDES Web site at www.kin_pcounty._goy/permits Version: 03/02/2015
King County Bond Quantity worksheet Report Date: 11/30/2022