APPROVED RESUB1 BLD2022-1323+VAULT STRUCTRAL CALCS+1.26.2023_12.27.00_AM+3334572_DEA Reviewed1 /26/2023
CITY OFEDMONDS BLD2022-1323
DEVELOPMENT
SERVICES
Structural Calculations For:
Housing Hope ELC Field
Apartments
Detention Vault
8215 23611 Street SW
Edmonds, WA 98026
Submit Specific Item Rejected
Revise and Resubmit Furnish with Corrections Noted
Reviewed Not Required/Not Reviewed
This review is only for general conformance with the design concept of
the Project and general compliance with the information given in the
Contract Documents. Corrections or comments made on the shop
drawings during this review do not relieve contractor from compliance
with the requirements of the plans and specifications. Approval of the
specific item shall not include approval of an assembly of which the
item is a component. Contractor is responsible for dimensions to be
confirmed and correlated at the job site; information that pertains solely
to the fabrication processes or to the means, methods, techniques,
sequences, and procedures of construction; coordination of his or her
Work with that of other trades; and for performing all work in a safe and
satisfactory manner.
DAVID EVANS AND ASSOCIATES, INC.
Date: 3/15/23 Reviewed by: Mike Schumann
Prepared for: Designs Northwest Architects
Job #: 12034-2021-01
Date: September 29, 2022
/STRUCTURAL
NGINEERING
SEATTLE 2124 Third Avenue, Suite 100, Seattle, WA 98121
TACOMA 934 Broadway, Suite 100, Tacoma, WA 98402 206.443.6212
CENTRAL VJA 414 N Pearl Street, Suite 8, Ellensburg, WA 98926 +0 ssfenglneers.com
h
cf)
E .
rTl �
�
�
m�L7
fTl
r
t
03
Ga
70
0
4
�
`0
cft
4A
a
y
c
SWENSON SAY FAG& +: ssfenglneers.com SEATTLE 2124 Third Ave, Suite 100, Seattle, WA 98121 O 206.443,6212
TACOMA 934 Broadway, Suite 100, Tacoma, WA 98402 1 0 253.284.9470
�2,r, A k k,.s l � "-,A \,� � "
:-
N\ tj
�32— Celt A r V,�t,
VIA - Z'z%-- 4t
yn
/TRUCTURAL
NGINEERING
a
E
0
y
Lo
(D
Q)
0)
G+)
,W
z
0
V)
z
w
Q-
w4u- Cow%
cc-
0 NIA
C�-
Q
)ZIL
c
TO-T A.
I
Q�
VSTRUCTURAL
S ElINGINEERING
<7![ c
�)O
110 �7
DATE
�, c
IN 'T
CP M
'm "r
'r cc
zr �j
CC) m
0 Ln
li N
00
N
00
p,
V)
z
0
(A
z
LU
3:
In
�Aui-T L)za&Q
= �,2k-z)
pol
(rT
D'F A I %C V-1 CO n I-T-Y--,) %
\AL—
M�,- '119 11
�A O-J-% NAZTAlt ��r :All �t
Z": M
Ez '2 n c
vc
M-Vcsr�
QLs., ZVJ 4L k.Wq,,, L�-
fJ '7 A (p q
i(c
STRUCTURAL
ENGINEERING
DATE
SHEET
e:)
our ZtC)QTQ cv*lcg>
5-.,7� A7'i3O
Z@u4q-�
9UIIJC,(A IOU 4Z�4--LMZ
to, cl WITAKA) fliccJ4
Ll �(j ), -? L�9
7 7 L 0 C 2, 1 U, -7)
STRUCTURAL
E 04 G HIJ E E R I N G