Loading...
REV1 REVIEWED RESUB1 BLD2022-1323+OVWSD APPROVAL+11.17.2023_9.42.22_AM+3907065Kim Williams From: Chris Scott <chriss@ovwater.com> Sent: Thursday, November 16, 2023 11:S4 AM To: John Safstrom; Matthew Jones Cc: Marty Henninger; Billy Ward; Kim Williams; Ryan Boone; David Harmsen (davidh@harmsenllc.com); Tim Ferguson Subject: RE: Housing Hope Edmonds - FDC Locations, OVSD Hi John, We are fine with the location then. I don't think it warrants a new plan to be signed, just the changes reflected on the as- builts at the end of the project. Thanks, Chris S. From: John Safstrom <JSafstrom@Kirtley-Cole.com> Sent: Thursday, November 16, 2023 9:32 AM To: Chris Scott <chriss@ovwater.com> Cc: Marty Henninger <Marty@ovwater.com>; Billy Ward <billyw@ovwater.com>; Kim Williams <kim@designsnw.com>; Ryan Boone <boone@arcarchitects.com>; David Harmsen (davidh@harmsenllc.com) <davidh@harmsenllc.com>; Tim Ferguson <TFerguson@Kirtley-Cole.com> Subject: RE: Housing Hope Edmonds - FDC Locations Hi Chris, Yes, FDC's are after the backflow protection. Thanks, John Safstrom Superintendent CELL 425 231 6719 C�(I RTLEY C O L E ,973 - 2023 cGENERAL CONTRACTOR From: Chris Scott <chriss@ovwater.com> Sent: Thursday, November 16, 2023 7:52 AM To: John Safstrom <JSafstrom@Kirtley-Cole.com> Cc: Marty Henninger <Marty@ovwater.com>; Billy Ward <billyw@ovwater.com>; Kim Williams <kim@designsnw.com>; Ryan Boone <boone@arcarchitects.com>; David Harmsen (davidh@harmsenllc.com) <davidh@harmsenllc.com>; Tim Ferguson <TFerguson@Kirtley-Cole.com> Subject: RE: Housing Hope Edmonds - FDC Locations Hi John, It looks like the FDC's on the prints are put before the backflow protection. FDC's need to be after backflow protection. Can you confirm what side of protection they are proposed on? Location for us doesn't matter for us. Our only concern is where protection needs to be. Thanks, Chris S. From: John Safstrom <JSafstrom@Kirtley-Cole.com> Sent: Friday, October 27, 2023 7:01 AM To: Chris Scott <chriss@ovwater.com> Cc: Marty Henninger <Marty@ovwater.com>; Billy Ward <billyw@ovwater.com>; Kim Williams <kim@designsnw.com>; Ryan Boone <boone@arcarchitects.com>; David Harmsen (davidh@harmsenllc.com) <davidh@harmsenllc.com>; Tim Ferguson <TFerguson@Kirtley-Cole.com> Subject: Housing Hope Edmonds - FDC Locations Hi Chris, On the Housing Hope Edmonds project, I wanted to confirm a topic of conservation we had at the pre -construction meeting in regard to the FDC locations. We are going through the revision to the FDC locations and have revised the plan to have two on the East half (for the two East Buildings) and two on the West half (for the West two buildings. See attached plan C2.0 from Harmsen. The City of Edmonds and South County Fire District are approving these locations as a revision through our permit, but they wanted to make sure you had given approval of this revision prior to their decision. Can you confirm that it is acceptable to OVWSD to have the FDC's as shown on the attached C2.0? Thanks, John Safstrom Superintendent CELL 425 231 6719 KI RTLEY C O L E 973-2023 C40 GENERAL CONTRACTOR