Loading...
REVIEWED Engineer_OK_Redline_Drainage_ReportShuster, Jerry From: David Harmsen <davidh@harmsenllc.com> Sent: Friday, May 12, 2023 12:34 PM To: Shuster, Jerry Cc: Lambert, Jennifer Subject: RE: BLD2022-1319 Housing Hope You have my permission to red line the report. I agree with the revisions. DAVID HARMSEN / Director of Engineering Harmsen, LLC. / www.HarmsenLLC.com 2822 Colby Avenue, Suite 300 Everett, WA 98201 (425) 252-1884 From: Shuster, Jerry <jerry.shuster@edmondswa.gov> Sent: Friday, May 12, 2023 11:48 AM To: DavidH@harmsenllc.com Cc: Lambert, Jennifer<Jennifer.Lambert@edmondswa.gov> Subject: FW: BLD2022-1319 Housing Hope Hi David, We are putting the finishing touches on approving this project. One of the reviewers noticed a few minor inconsistencies in the drainage report. These will not affect the design but we want some minor tweaks to the report. Page 6 — the table of impervious surface area does not include the sidewalk or the right-of-way. The modeling includes the bypass basin (0.03 acre sidewalk) but not the right of way. The difference is minor relative to the overall impervious, so it will not negatively affect the performance of the vault. Figure 3 show 0.5 acres of the bypass basin. Should be 0.05 acres? There are two ways to fix this: 1) You give permission for us to redline the report or 2) You make the changes to the report and resubmit. Let me know what works best for you. Thanks, -� of ED& /tic. 1890 Jerry Shuster, P.E. (he/him) Stormwater Engineer City of Edmonds Public Works 121 5th Ave N., Edmonds, WA 98020 Desk: 425.771.0220 x1323 Cell: 425.512.2597 Jerry.Shuster@edmondswa.eov From: David Harmsen <> Sent: Thursday, December 15, 2022 8:25 AM To: Lambert, Jennifer<Jennifer.Lambert@edmondswa.gov> Subject: BLD2022-1319 Housing Hope Jennifer, we are working through the review comments. Two questions. 1) The proposed curb line (11 foot lane) is landing right over the Olympic water main. Olympic then wants the project to reconstruct the water main away from the curb. The team is wondering if we can make the lane wider and move the curb back away from the water main? 2) There was discussion about the dumpster pad. The location is on the opposite side of the existing sewer making a connection inconvenient. Couple questions/options here. • Immediately downstream of the pad is a biopod treatment system. Could we place a floatables separator and connect to the enhanced treatment system? • Could we cover the pad and then place a dead end sump (Type 2 cb). Housing Hope would vactor it out when full? • Are there other options you have seen? Maybe a specific treatment system at the dumpster pad? Thanks 2822 Colby Avenue, Suite 300 Everett, WA 98201 (360) 794-7811 (425) 252-1884 P1