Loading...
RFI-1- BLD2022-1323+Civil_Plan+11.3.2023_12.33.25_PM+3880267UTILITY VAULT 444LA WITH 44-332P COVER H-20 RATED 0 E IP M I dV� M�M�� I e- 1.25"-6#6,2#8GN D CH1-19,21,23,25 4� 7 HOT B 120V CIRCJJX7;� Tc I CH1-41 I III o 0I� I I I 1 I I I ICI �I I I I I I I I� �I x 1.25" TO CH1 BUILDING C TEL/PHONE DEMARC & RESIDENTIAL IDF C PANEL CH1 BD M � — I � I w Q a OJ �w o M j T i F F BUILDING D 1.25"-6#6,2#8GND TO DH1 SITE PLAN - ELECTRICAL 1 /16" = 1'-0" 1.25" TO CH1 TEL/PHONE DEMARC & RESIDENTIAL IDF D� PANEL DH1 1.25"-6#6,2#8GND 1.25"-6#6,2#8GND TO DH1 TO DH1 /7'- �f S BH7-6 VIA EXTERIOR — LIGHTING CONTROLLER HOT BOX 1 "-3#11 120V CIRCUIT t 41 HOTBOX 120 CIRCUIT 1.25" TO AH 1 EXIST. ZIPLY UTILITY POLE TO BE RELOCATED. COORDINATE WITH ZIPLY. NEW ZIPLY UTILITY POLE LOCATION 1.25" TO AH 1 1.25" TO AH1 HOTBOX 120V CIRCUIT AH1-107 LOCATION TBD BUILDING A FIRE ALARM CONTROLPANEL (FACP) LD I N-QIAl INITIAL MD FA 1.25"-3#6,1 #8GN D TO BH1 ANEL BH1 J I 1.25"-3 ,1#8GND Q � BH1;27,I 9 -VA u) - 1.25' -6#6,2#8GND BH1-19,21,23,25 (E) EDMONDS LUTHERAN CHURCH APN: 00576700002508 23525 84TH AVE W +/- 3.05 ACRES (+/-132,879 SF) RS-8 ZONE PANEL AH1 TEL/PHONE DEMARC '& RESIDENTIAL IDF B Q U METER CENTER B EXTERIOR AND HOUSE PANEL CT CABINET SNOHOMISH PUD SECONDARY CABINET AND VAULT. 1.25'-6#6,2#8GN D TO BH1 J L_ J �I — SECONDARY, SEE ONE LINE L _ J � 236�fH ST SW 4" CONAM SNOHOMISH PUD TRANSFORMER, VAULT, AND PAD PER SNOPUD STANDARDS FIGURE 4-31. PROVIDE PROTECTIVE BOLLARDS PER SNOPUD STANDARDS. —TRANSFORMER 10'-0" ACCESS CLEARANCE EXIST. ZIPLY UTILITY POLE TO BE RELOCATED. COORDINATE WITH ZIPLY. FfF B ENGINEERS= Travis Fitzmaurice Wartelle Balangue Engineers Inc. 1200 Westlake Ave. N., #509 Seattle, WA 98109 p:206-285-7228 1 info@tf-wb.com (2) 4" PRIMARY COORDINATE STREET CROSSING WITH SNOHOMISH PUD PROPOSED SNOHOMISH PUD 3 PHASE SERVICE POLE COMCAST INTERFACE POINT FLAG NOTES: DINSTALL DOUBLE EV SHARED LOAD MANAGEMENT CHARGING STATION 2 INSTALL SINGLE EV CHARGING STATION DFUTURE DOUBLE EV CHARGING STATION. LOCATION SHALL BE EV READY WITH CONDUIT AND WIRE INSTALLED. DFUTURE DOUBLE EV CHARGING STATION. LOCATION SHALL BE EV CAPABLE WITH CONDUIT INSTALLED. SHEET NOTES: INSTALLED ELECTRICAL VEHICLE CHARGING FACILITY SHALL MEET ECDC 17.115.020.1. REQUIREMENTS OF LEVEL II ELECTRICAL VEHICLE CHARGING STATIONS. PROVIDE MINIMUM 3 HORIZONTAL AND V VERTICAL SEPARATION FROM WATER/SEWER/STORM UTILITIES ON PRIVATE PROPERTY AND 5 FEET SEPARATION FROM CITY UTILITIES IN RIGHT-OF-WAY. HOUSING HOPE we keep hope alive `DESIGNS northwest ARCHITECTS 360. Box 1270 P.O. Box 1270 10031 SR 532, Suite B Stanwood, WA 98292 w ww.designsnw.com r c architecture resource collaborative 119 MAIN ST, STE #200 SEATTLE, WA 98104-2579 (206) 322-3322 O N O 00 LUd� am Cn O FMz0 Z z0 0 Q � W C� J U) z WI— W ` W cf) LL a= co O J M N L LO 00 PERMIT SET ISSUE DATE: SEPTEMBER 2022 REVISION SCHEDULE Rev # Date Description 1 2 3 5 11 10-19-2022 01-25-2023 03-30-2023 08-14-2023 10-30-2023 Bid Set REV 2 Conformed Set ASI01/RFI24 ELEC REV CONTENTS: SITE PLAN - ELECTRICAL SCALE: As indicated DRAWN: ELIAS CHECKED: MF PROJECT NO: 2021031.00 SHEET: N El 1,